John Cunningham Student Centre

Page 1

John Cunningham Student Centre Plans and Concepts






PROPOSED RIDGE

EXG + PROP 5TH FLOOR

EXG + PROP 4TH FLOOR

EXG + PROP 3RD FLOOR

EXG + PROP SECOND FLOOR

EXG + PROP FIRST FLOOR

EXG + PROP GROUND FLOOR OVAL

1

Proposed Eastern Elevation: External Materials + Finishes Scale: 1:200

NOTE: GROUND FLOOR Walls: Smooth render Arches & plinth: dressed sandstone Stone string course: dressed sandstone Windows: painted timber with sandstone sill, rybat & lintel Pedestal to bay window: dressed sandstone FIRST FLOOR Walls generally: smooth render Stone string course: dressed sandstone Windows: painted timber frame with dressed sandstone surrounds incl sill, rybat & lintel, sandstone mullions & transoms Tourelle: dressed sandstone Balustrade: smooth render Handrail [balustrade cap]: dressed sandstone Pedestal to bay window: dressed sandstone SECOND FLOOR Walls generally: smooth render, painted Stone string course: dressed sandstone Windows: painted timber with sandstone sill, rybat & lintel Bay windows: painted timber frame with dressed sandstone surrounds incl sill, rybat & lintel, sandstone mullions & transoms Tourelle: dressed sandstone

THIRD FLOOR Walls generally: smooth render, painted Stone string course: dressed sandstone Windows: painted timber with sandstone sill, rybat & lintel Bay windows: painted timber frame with dressed sandstone surrounds incl sill, rybat & lintel, sands & transoms Tourelle: dressed sandstone

FOURTH FLOOR Walls generally: Smooth render Stone string course: dressed sandstone Windows: painted timber with sandstone sill, rybat & lintel Bay windows: painted timber frame with dressed sandstone surrounds incl sill, rybat & lintel, sands & transoms Tourelle: dressed sandstone ROOF/FIFTH FLOOR Roof generally Welsh slate Dormers generally: lead standing seam to roofing Lead: to bay windows capping, roof ridge capping, tourelle caps & flashings Parapet Cappings & Dormer Gables: Sandstone [sawn/dressed] Parapet & Dormer Gable sculptures: Sandstone [sawn/dressed] Dormer side walls: smooth render Tower & Tourelle gutters: lead Balustrade: smooth render Handrail [balustrade cap]: dressed sandstone RW Goods: cast iron

*Paint colours: to match Business Studies Centre Neutral palette. Tonally darker than Aspinall House & Middle School Building. All Sandstone: Capricorn ‘Heritage Rose’ Link: http://capricornsandstone.com.au/our-sandstone.html


stone mullions

RR L 75.95

RL 71.05

RL 67.95 GENERAL NOTES

RL 65.275

RL 61.57

RL 58.38

- Consult with ALL relevant authorities prior to commencing works - DO NOT scale. All dimensions are nominal + should be confirmed on site prior to commencement - Obtain setting out information from architect PRIOR to commencment - Bring discrepencies to the immediate attention of the Architect - If unsure of any aspect of the works seek instruction from the Architect before proceeding - All drawings must be read in conjunction with the council consent, specification, schedules, site notes + instructions issued by the Architect - This material / work is protected by Copyright CONSULTANTS TPQS Quantity Surveyors BBC Planning Consultant

RL 54.99 RL 54.65

ACV Mechanical Engineer Code Performance Accessibility Consultant PBE Structural Engineer BCG BCA Consultant JCL Hydraulic Engineer Riley Mac Fire Consultant MCD Fire Engineer UMEA Electrical Engineer BCG BCA Consultant Beveridge Williams Surveyors

Smooth Render

Smooth Render

Smooth Render

*Proposed colours to match image

CLIENT STEVEN ADAMS THE SCOTS COLLEGE PROJECT

MAJOR ALTERATIONS + ADDITIONS TO THE STEVENSON LIBRARY [SSD 8922]

ADDRESS 29-53 Victoria Rd Bellevue Hill, NSW

stone mullions

DRAWING TITLE External Materials + Finishes DRAWN BY JC, CF, JW, ZW

Dressed Sandstone

Dressed Sandstone Mullions Lead Roofing

Welsh Slate

SCALE 1:200 @ A3 ISSUE SEARS

LEGEND Smooth render Dressed sandstone

REVISION

Slate roof tiles Lead

Uncoursed sandstone blocks

S1

DATE JUNE 2018 DRAWING NUMBER

SSD1.02/17-212.1 SSD1.02/17-202


GENIUS BAR

BOOTHS

6

7

8

9

5 4 3 2

COUNTER 2

1

SERVICE POINT

ENTRY

1

Proposed Ground Floor Plan Scale: 1:200. Black Watch INDICATIVE PLAN SHOWN

BOOTHS

COLONAD


GENERAL NOTES - Consult with ALL relevant authorities prior to commencing works - DO NOT scale. All dimensions are nominal + should be confirmed on site prior to commencement - Obtain setting out information from architect PRIOR to commencment - Bring discrepencies to the immediate attention of the Architect - If unsure of any aspect of the works seek instruction from the Architect before proceeding - All drawings must be read in conjunction with the council consent, specification, schedules, site notes + instructions issued by the Architect - This material / work is protected by Copyright

FRIDGE

10 11 12 13 14

COUNTER 1

15 16 17 18

DE

BOOTHS

DRINKS ZONE

TPQS Quantity Surveyors BBC Planning Consultant ACV Mechanical Engineer Code Performance Accessibility Consultant

COUNTER 3

SENIOR DINING AREA

CONSULTANTS

PBE Structural Engineer BCG BCA Consultant JCL Hydraulic Engineer Riley Mac Fire Consultant MCD Fire Engineer UMEA Electrical Engineer

STUDENT INFORMATION POINT / TOUCH SCREEN

ENTRY

BCG BCA Consultant Beveridge Williams Surveyors

CLIENT STEVEN ADAMS THE SCOTS COLLEGE PROJECT

MAJOR ALTERATIONS + ADDITIONS TO THE STEVENSON LIBRARY [SSD 8922]

ADDRESS 29-53 Victoria Rd Bellevue Hill, NSW DRAWING TITLE PROPOSED GROUND FLOOR PLAN DRAWN BY JC, CF, JW, ZW SCALE

GFA: 635m2

1:200 @ A3

ISSUE SEARS REVISION

S1

DATE JUNE 2018 DRAWING NUMBER

SSD1.02/17-201.1


SPORTS

24

25

8 9

23 22 21 20 19

10 11 12 13 14 15 16 17 18

SERVICE POINT / TOUCH SCREEN

RESEARCH CENTRE

INFORMAL M POINT

STUDENT CENTRE

CONSULTI

GROUP WORK ROOM

TERRACE

1

Proposed First Floor Plan Scale: 1:200. Reception


GENERAL NOTES - Consult with ALL relevant authorities prior to commencing works - DO NOT scale. All dimensions are nominal + should be confirmed on site prior to commencement - Obtain setting out information from architect PRIOR to commencment - Bring discrepencies to the immediate attention of the Architect - If unsure of any aspect of the works seek instruction from the Architect before proceeding - All drawings must be read in conjunction with the council consent, specification, schedules, site notes + instructions issued by the Architect - This material / work is protected by Copyright

CAREERS

CONSULTANTS

MEETING T

TPQS Quantity Surveyors BBC Planning Consultant ACV Mechanical Engineer Code Performance Accessibility Consultant PBE Structural Engineer

COUNSELLING SUITE

BCG BCA Consultant

CAREERS

JCL Hydraulic Engineer

ING ROOM

Riley Mac Fire Consultant MCD Fire Engineer UMEA Electrical Engineer

COUNSELLING ROOM

BCG BCA Consultant Beveridge Williams Surveyors

CLIENT STEVEN ADAMS THE SCOTS COLLEGE PROJECT

MAJOR ALTERATIONS + ADDITIONS TO THE STEVENSON LIBRARY [SSD 8922]

ADDRESS 29-53 Victoria Rd Bellevue Hill, NSW DRAWING TITLE PROPOSED FIRST FLOOR PLAN DRAWN BY JC, CF, JW, ZW SCALE

GFA: 668m2

1:200 @ A3

ISSUE SEARS REVISION

S1

DATE JUNE 2018 DRAWING NUMBER

SSD1.02/17-202.1


7 8 9

6

5

4 3 2

10

1

11 12 13

INFORMAL MEETING POINT

1

14 15

45

46 26 27

44 28

43

29

42

30

41

31

40

32

39

33

38

34

37

35

THEATRETTE [COLLEGE CHAPEL STYLE]

36

RECEPTION ROOM

1

Proposed Second Floor Plan Scale: 1:200. Student Health

GRAND HALL

DISPLAY

DISPLAY


GENERAL NOTES - Consult with ALL relevant authorities prior to commencing works - DO NOT scale. All dimensions are nominal + should be confirmed on site prior to commencement - Obtain setting out information from architect PRIOR to commencment - Bring discrepencies to the immediate attention of the Architect - If unsure of any aspect of the works seek instruction from the Architect before proceeding - All drawings must be read in conjunction with the council consent, specification, schedules, site notes + instructions issued by the Architect - This material / work is protected by Copyright

11 12 13 14 15 16 17 18 19 20 21

10

9

8

7

6

5

4

3

2

1

CONSULTANTS TPQS Quantity Surveyors BBC Planning Consultant ACV Mechanical Engineer Code Performance Accessibility Consultant

DISPLAY

PBE Structural Engineer BCG BCA Consultant JCL Hydraulic Engineer Riley Mac Fire Consultant MCD Fire Engineer UMEA Electrical Engineer

Y

BCG BCA Consultant Beveridge Williams Surveyors

PRESENTATION SPACE

CLIENT STEVEN ADAMS THE SCOTS COLLEGE PROJECT

MAJOR ALTERATIONS + ADDITIONS TO THE STEVENSON LIBRARY [SSD 8922]

ADDRESS 29-53 Victoria Rd Bellevue Hill, NSW DRAWING TITLE PROPOSED SECOND FLOOR PLAN DRAWN BY JC, CF, JW, ZW SCALE

Floor Area: 575m2

1:200 @ A3

ISSUE SEARS REVISION

S1

DATE JUNE 2018 DRAWING NUMBER

SSD1.02/17-203.1


1

Reading Room Concept Sketch


GENERAL NOTES - Consult with ALL relevant authorities prior to commencing works - DO NOT scale. All dimensions are nominal + should be confirmed on site prior to commencement - Obtain setting out information from architect PRIOR to commencment - Bring discrepencies to the immediate attention of the Architect - If unsure of any aspect of the works seek instruction from the Architect before proceeding - All drawings must be read in conjunction with the council consent, specification, schedules, site notes + instructions issued by the Architect - This material / work is protected by Copyright CONSULTANTS TPQS Quantity Surveyors BBC Planning Consultant ACV Mechanical Engineer Code Performance Accessibility Consultant PBE Structural Engineer BCG BCA Consultant JCL Hydraulic Engineer Riley Mac Fire Consultant MCD Fire Engineer UMEA Electrical Engineer BCG BCA Consultant

CLIENT STEVEN ADAMS THE SCOTS COLLEGE PROJECT

MAJOR ALTERATIONS + ADDITIONS TO THE STEVENSON LIBRARY [SSD 8922]

ADDRESS 29-53 Victoria Rd Bellevue Hill, NSW DRAWING TITLE PROPOSED READING ROOM CONCEPT DRAWN BY JC, CF , JW, ZW SCALE

NTS

ISSUE SEAR'S REVISION

S1

DATE MAY 2018 DRAWING NUMBER

SSD1.02/17-204.2


1

Senior Study Space Concept Sketch


GENERAL NOTES - Consult with ALL relevant authorities prior to commencing works - DO NOT scale. All dimensions are nominal + should be confirmed on site prior to commencement - Obtain setting out information from architect PRIOR to commencment - Bring discrepencies to the immediate attention of the Architect - If unsure of any aspect of the works seek instruction from the Architect before proceeding - All drawings must be read in conjunction with the council consent, specification, schedules, site notes + instructions issued by the Architect - This material / work is protected by Copyright CONSULTANTS TPQS Quantity Surveyors BBC Planning Consultant ACV Mechanical Engineer Code Performance Accessibility Consultant PBE Structural Engineer BCG BCA Consultant JCL Hydraulic Engineer Riley Mac Fire Consultant MCD Fire Engineer UMEA Electrical Engineer BCG BCA Consultant

CLIENT STEVEN ADAMS THE SCOTS COLLEGE PROJECT

MAJOR ALTERATIONS + ADDITIONS TO THE STEVENSON LIBRARY [SSD 8922]

ADDRESS 29-53 Victoria Rd Bellevue Hill, NSW DRAWING TITLE PROPOSED SENIOR STUDY SPACE CONCEPT DRAWN BY JC, CF , JW, ZW SCALE

NTS

ISSUE SEAR'S REVISION

S1

DATE MAY 2018 DRAWING NUMBER

SSD1.02/17-204.3


i

6

7

ii

ii

5 25

8

24

9

23

10

22

11

21

12 13

20

14 15 16 17 18

19 43

44

29 30

42 41

31

40

32 33 34 35 36 37 38 39

Library

Media storage

Reading room Senior study space

CC

BB AA

1

Proposed Third Floor Plan

Scale: 1:200. Library + Senior Study


i

ii

ii

iv

v GENERAL NOTES - Consult with ALL relevant authorities prior to commencing works - DO NOT scale. All dimensions are nominal + should be confirmed on site prior to commencement - Obtain setting out information from architect PRIOR to commencment - Bring discrepencies to the immediate attention of the Architect - If unsure of any aspect of the works seek instruction from the Architect before proceeding - All drawings must be read in conjunction with the council consent, specification, schedules, site notes + instructions issued by the Architect - This material / work is protected by Copyright

B 11 12 13 14 15 16 17 18 19 20 21

10

9

8

7

26

25 24 23 22

F Debating room

CONSULTANTS

Librarian

TPQS Quantity Surveyors BBC Planning Consultant

E

ACV Mechanical Engineer Code Performance Accessibility Consultant PBE Structural Engineer BCG BCA Consultant

Learning Commons

Media storage

JCL Hydraulic Engineer

D

Riley Mac Fire Consultant MCD Fire Engineer

Reading room

Reading room

A

UMEA Electrical Engineer BCG BCA Consultant Beveridge Williams Surveyors

C Chess room

B

A CLIENT STEVEN ADAMS THE SCOTS COLLEGE PROJECT

MAJOR ALTERATIONS + ADDITIONS TO THE STEVENSON LIBRARY [SSD 8922]

B

ADDRESS 29-53 Victoria Rd Bellevue Hill, NSW DRAWING TITLE PROPOSED THIRD FLOOR PLAN DRAWN BY JC, CF, JW, ZW SCALE

GFA: 654m2

1:200 @ A3

ISSUE SEARS REVISION

S1

DATE JUNE 2018 DRAWING NUMBER

SSD1.02/17-204.1


i

ii

iii

40 39 38 37 36 35

29 30 31 32 33

34

Individual

65

66

45 46

64 63 47

62

Pods

61

48

60

49

59

50

58

51 52

57

53

56

54

F

55

UT

U RE S P H

ER

Small

E

Individual / small group booth Group create Group reading

CC

BB

Board Room

AA

1

Proposed Fourth Floor Plan

Scale: 1:200. Centre for Active + Professional Learning


i

ii

v

iv B

GENERAL NOTES - Consult with ALL relevant authorities prior to commencing works - DO NOT scale. All dimensions are nominal + should be confirmed on site prior to commencement - Obtain setting out information from architect PRIOR to commencment - Bring discrepencies to the immediate attention of the Architect - If unsure of any aspect of the works seek instruction from the Architect before proceeding - All drawings must be read in conjunction with the council consent, specification, schedules, site notes + instructions issued by the Architect - This material / work is protected by Copyright

33 34 35 36 37 32

41 40

39 38

F Group space Group work

Group space

E White boards

/

Work Pods

CONSULTANTS TPQS Quantity Surveyors

Individual Work Space

BBC Planning Consultant ACV Mechanical Engineer

group

Code Performance Accessibility Consultant PBE Structural Engineer

D

BCG BCA Consultant JCL Hydraulic Engineer

Informal Lecture

A

Riley Mac Fire Consultant MCD Fire Engineer UMEA Electrical Engineer

Briefing direction with A / V

C Booth

BCG BCA Consultant Beveridge Williams Surveyors

B

A

CLIENT STEVEN ADAMS THE SCOTS COLLEGE

B

PROJECT

MAJOR ALTERATIONS + ADDITIONS TO THE STEVENSON LIBRARY [SSD 8922]

ADDRESS 29-53 Victoria Rd Bellevue Hill, NSW DRAWING TITLE PROPOSED FOURTH FLOOR PLAN DRAWN BY JC, CF, JW, ZW SCALE

GFA: 655m2

1:200 @ A3

ISSUE SEARS REVISION

S1

DATE JUNE 2018 DRAWING NUMBER

SSD1.02/17-205.1


i

42

41

ii

iii

40 39 38 37 36

43 44 45 48

46 47

49 50 17

Meeting + Conference Space

Even

Founders / Board Room

Terrace 70.90

72.1

CC

BB AA

1

Proposed Fifth Floor Plan

Scale: 1:200. Founders Room + Event Space


i

ii

iv

v

B

46

47 48 49

GENERAL NOTES 50

- Consult with ALL relevant authorities prior to commencing works - DO NOT scale. All dimensions are nominal + should be confirmed on site prior to commencement - Obtain setting out information from architect PRIOR to commencment - Bring discrepencies to the immediate attention of the Architect - If unsure of any aspect of the works seek instruction from the Architect before proceeding - All drawings must be read in conjunction with the council consent, specification, schedules, site notes + instructions issued by the Architect - This material / work is protected by Copyright

F

51 52 53 54 55

nt Space

Foyer

E Event dining/ meeting space

F WC M

CONSULTANTS TPQS Quantity Surveyors BBC Planning Consultant ACV Mechanical Engineer

D

Event Space

Terrace

Code Performance Accessibility Consultant PBE Structural Engineer

A

BCG BCA Consultant JCL Hydraulic Engineer

C

15

Riley Mac Fire Consultant MCD Fire Engineer UMEA Electrical Engineer

B

BCG BCA Consultant Beveridge Williams Surveyors

A

B CLIENT STEVEN ADAMS THE SCOTS COLLEGE PROJECT

MAJOR ALTERATIONS + ADDITIONS TO THE STEVENSON LIBRARY [SSD 8922]

ADDRESS 29-53 Victoria Rd Bellevue Hill, NSW DRAWING TITLE PROPOSED FIFTH FLOOR PLAN DRAWN BY JC, CF, JW, ZW SCALE

GFA: 312m2

1:200 @ A3

ISSUE SEARS REVISION

S1

DATE JUNE 2018 DRAWING NUMBER

SSD1.02/17-206.1


Locked Bag 5001, Bellevue Hill NSW 2023 Phone: +61 2 9391 7600 marcom@tsc.nsw.edu.au tsc.nsw.edu.au CRICOS Provider Code: 02287G The Presbyterian Church (New South Wales) Property Trust ABN 86 438 712 994


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.