Demodag Middelgrote Windturbines
Programma 11.00: Ontvangst 11.30: Verwelkoming door Peter Vyncke, CEO Vyncke nv 11.45: Vergunningenbeleid door 3E 12.20: Lunch 13.00: Mogelijkheden in de landbouw door het Innovatiesteunpunt 13.30: Middelgrote windturbines door Xant 14.00: Rondleiding en bezoek aan windturbine 15.00: Einde
2
Vergunningenbeleid Demodag middelgrote windturbines
1999
100
20
40
7
3
Founded
Experts
Nationalities
Countries
Offices
Spin-offs
4 | 3E Document confidentiality classification: general public
They trust us: Technology providers
5 | 3E Document confidentiality classification: general public
Owners, developers & operators
Lenders & investors
Public & non-profit
Scope
Consulting
Innovation
Solar
Grids & markets
Software
6 | 3E Document confidentiality classification: general public
Wind
Buildings & sites
iLAB
Solar & wind power Technical advisory
Applied research
Feasibility studies & resource assessment s
Due diligence at all project phases
Monitoring, reporting & performance improvement with SynaptiQ 8 | 3E Document confidentiality classification: general public
Strategy & policy
Verschillende fases •
•
Fase1: Haalbaarheid: •
Technische haalbaarheid: Windaanbod
•
Vergunningstechnische haalbaarheid: Beperkingen
Haalbaarheidstudie
Fase 2: Opmaak vergunning
Opmaak Vergunning
•
Fase 3: vergunningstraject
Vergunningstraject
9 | 3E Document confidentiality classification: general public
Fase 1: Haalbaarheid •
Windaanbod •
Welke windsnelheid wordt verwacht op de site
•
Bepalend voor financiële haalbaarheid
•
Maar ook selectie turbinetype
•
Verschillende mogelijkheden •
Windkaarten
•
Windmeting
•
Winddata
10 | 3E Document confidentiality classification: general public
Technische haalbaarheid: Windkaarten
11 | 3E Document confidentiality classification: general public
Technische haalbaarheid: Windkaarten
12 | 3E Document confidentiality classification: general public
Technische haalbaarheid: Windmeetcampagne •
Windsnelheid
•
Windrichting
•
Meting van minimaal 1 jaar
•
Extrapolatie naar lange termijn adhv winddata
•
Twee mogelijkheden •
windmeetmast
•
Lidar
13 | 3E Document confidentiality classification: general public
Technische haalbaarheid: Windmeetcampagne •
Windmeetmast
14 | 3E Document confidentiality classification: general public
Technische haalbaarheid: Windmeetcampagne •
Lidar
15 | 3E Document confidentiality classification: general public
Technische haalbaarheid: Winddata •
regionale windstatistieken
•
MERRA reanalysis data
•
Periode 2001-2010
•
Gevalideerd in kader van Endorse
16 | 3E Document confidentiality classification: general public
Vergunningstechnische haalbaarheid: Beperkingen •
Opmaak kaart met beperkingen vergunbaarheid cfr voorwaarden omzendbrief •
Afstand tot lijninfrastructuur (HS lijnen, spoorwegen, autowegen)
•
Gewestplan
•
Natuur (vogels- vleermuizen- natura2000)
•
Landschap
•
Luchtvaart (Belgocontrol-Defensie)
•
Watertoets
•
Afstand tot woningen (geluid- slagschaduw)
Visueel overzicht potentieel windproject op site Input bepaling locatie turbine in combinatie met operationele beperkingen 17 | 3E Document confidentiality classification: general public
Voorbeelden constraint mapping
18 | 3E Document confidentiality classification: general public
Fase 2: Opmaak vergunningsaanvraag •
Oud: bouwvergunning
•
Nieuw: omgevingsvergunning
•
Reeds in voege voor provincie en gewest sinds feb 2017
•
Vanaf 2018 ook voor gemeentes
•
Nu al voor Beersel, Diest, Dilsen-Stokkem, Herstape, Langemark-Poelkapelle en Staden
19 | 3E Document confidentiality classification: general public
Waar indienen
20 | 3E Document confidentiality classification: general public
•
Windturbines met vermogen <1.5MW => indienen bij gemeente
â&#x20AC;˘
Windturbine met vermogen < 300kW => niet ingedeeld indelingslijst => enkel stedenbouwkundig deel invullen
Veranderingen •
•
Wat verandert niet: •
Technische plannen
•
Beschrijvende nota (lokalisatienota)
Wat verandert wel: •
Aanvraagformulier
•
Project-MER-screening (integratie in aanvraagformulier)
•
Wijze van aanvragen
21 | 3E Document confidentiality classification: general public
Lokalisatienota •
Bij iedere aanvraag beschrijvende nota in de vorm van lokalisatienota
•
Beschrijving van het project, en zijn impact op de omgeving
•
Toetsing aan de omzendbrief
•
Middelgrote WT=> aantonen dat geen grote WT mogelijk
•
Zelfde voorwaarden als grote WT van kracht (VLAREM) •
Geluid
•
Slagschaduw
•
Veiligheid
22 | 3E Document confidentiality classification: general public
Technische plannen •
Liggingsplan;
•
Omgevingsplannen;
•
Inplantingsplan;
•
Terreindoorsnede;
•
Overzichtsplan met fotopunten;
•
Bovenaanzicht, vooraanzicht en zijaanzicht windturbine;
•
Bovenaanzicht werkplatform.
23 | 3E Document confidentiality classification: general public
24 | 3E Document confidentiality classification: general public
25 | 3E Document confidentiality classification: general public
Vergunningsaanvraagformulier •
Stedenbouwkundige handelingen:
•
verhardingen, infrastructuurwerken of technische werken
•
Nieuwe constructie => hemelwaterverordening
•
Technische plannen
•
MER plicht=> project MER-screening => Impact op omgeving •
Geluid
•
Slagschaduw
•
Veiligheid
•
Natuur
26 | 3E Document confidentiality classification: general public
Fase 3: Vergunningsprocedure
27 | 3E Document confidentiality classification: general public
Projectvergadering •
Vroeger voorafgaand aan indiening enkel informeel vooroverleg
•
Nu ook mogelijkheid tot projectvergadering
•
Aanvrager vraagt aan per beveiligde zending
•
Bevoegde overheid •
Organiseert vergadering < 60d na ontvangst
•
Nodigt adviesinstanties, en afdelingen bevoegd voor MER/OVR uit
•
Maakt verslag maken en stelt ter beschikking aan betrokken partijen
•
Geen garanties of beloftes – wel stroomlijnen
28 | 3E Document confidentiality classification: general public
Indienen aanvraag – volledig en ontvankelijk •
Demo Omgevingsloket
•
Ontvankelijkheid en volledigheid
•
•
onderzoeken binnen 30d
•
Bijkomende stukken vragen binnen 30d
gaat na
•
Vergunning/meldingsplichtig?
•
SH + exploitatie onlosmakelijk? Niet apart!
•
Bevoegde overheid? Fout: doorsturen + nieuwe termijn
•
Gegevens en stukken cfr het aanvraagformulieren de bijhorende addenda uit de addendabib?
•
Vereenvoudigde of gewone procedure
•
Mer-plichtig?
Verklaring V&O = start van de beslissingstermijn
29 | 3E Document confidentiality classification: general public
Behandeling aanvraag •
•
2 procedures •
Vereenvoudigde procedure
•
Gewone procedure
Gewone procedure •
Steeds openbaar onderzoek
•
Adviesvraag aan adviesinstanties (geen advies = gunstig)
•
Soms advies OVC
•
Beslissing 105d/120d (zonder/met OVC)
30 | 3E Document confidentiality classification: general public
indien
•
Exploitaties klasse 1 en klasse 2A
•
Dossiers met MER of ontheffing, MOBER
•
Dossiers met 5 verplichte externe adviezen
•
Beroepen
Behandeling aanvraag •
•
Tijdens procedure •
Wijziging van de aanvraag tijdens procedure
•
Administratieve lus
Administratieve lus •
Herstel onregelmatigheid procedure
•
Vermijden overdone volledige procedure
•
Bv fout bij aanplakking, vergeten adviesinstantie
•
•
Wijzigingsverzoek •
Wijzigen voorwerp en plannen
•
Elke wijziging toegestaan bij gewone procedure
•
Geen bijkomend OO als •
Geen afbreuk aan milieu of RO
•
Geen schending rechten derden
•
Komt tegemoet aan adviezen/bezwaren OO
•
Andere gevallen=> 2e OO
•
Indien 2e OO: termijn+60d
Termijn +60d
31 | 3E Document confidentiality classification: general public
Belissing •
Vereenvoudigde procedure: 60d
•
Gewone procedure 105d •
•
Gewone procedure met OVC 120d •
•
termijnverlenging +60d mogelijk
termijnverlenging +60d mogelijk
Geen beslissing binnen termijn => stilzwijgende weigering
32 | 3E Document confidentiality classification: general public
Beroep •
Binnen de 30d
•
Beroep is schorsend
•
Beroepsschrift aan verschillende partijen bezorgen
•
Voorwaarde: bezwaar ingediend, tenzij beroep ingegeven door •
Wijziging aanvraag na OO
•
Bijzondere milieuvoorwaarde of voorwaarde
•
Beslissingtermijn 120d vanaf dag na Ontvankelijk en volledigheidsverklaring vh beroep
•
Geen beslissing beroep afgewezen
33 | 3E Document confidentiality classification: general public
Thank you! Brussels Paris London Delhi Toulouse Istanbul Cape Town
WWW.3E.EU
34 | 3E Document confidentiality classification: general public
Quality informations Project number 001.A
Author: 3E Authors Verified by: 3E Checked by 3E Checked by date Approved by: 3E Approved by 3E Approved by date
Document confidentiality classification
Classification details
Client named individuals only
For disclosure only to the named individuals within the client’s organization.
Client organisation only
For disclosure only within the client’s organisation.
Client & named organizations only
For disclosure only within client’s organization & within named other organizations.
Client & relevant organizations only
For disclosure only within client’s organization &, if applicable, to the extent as needed for the purpose of client’s project development, within relevant other organisations (subject to the notice & disclaimer on 3E’s document).
General public
For disclosure to the general public (subject to the notice & disclaimer on 3E’s document).
3E internal only
For 3E colleagues only.
35 | 3E Document confidentiality classification: general public
Demodag middelgrote windturbines 17 oktober 2017
Project gefinancierd door het Vlaams Klimaatfonds van de Vlaamse overheid in het kader van de uitvoering van het Vlaams Klimaatplan 2013-2020
Inhoud • Voorstelling Innovatiesteunpunt • Aanpak energieproject • Een windmolen op je bedrijf?
Onze Missie Land- en tuinbouwers
Plattelandsactoren
Inspireren en adviseren rond nieuwe kansen en uitdagingen
innovatie
Ontwikkelen en uitvoeren van concrete projecten
initiĂŤren
&
realiseren 40
Innovatief Ondernemerschap en Samenwerking • Toekomstgericht ondernemerschap • Meerwaardecreatie in de keten • Multifunctionele landbouw 2.0
Technische Innovatie • • • •
Duurzame energie Emissie- en geurreductie Klimaat Reductie voedselverliezen
Duurzame Plattelandsontwikkeling â&#x20AC;˘ Burger participatieve processen voor leefbare dorpen â&#x20AC;˘ Mobiliteit op het platteland â&#x20AC;˘ Stad-platteland
Aanpak energieproject 1. Meten is weten
5,6 kWh/100 liter melk 260-520 kWhth/zeugplaats
Aanpak energieproject 2. Minimaliseer verbruik
(uit Energiekalender 2009 â&#x20AC;&#x201C; www.energiesparen.be)
Aanpak energieproject 3. Eigen energieproductie
(uit Energiekalender 2009 â&#x20AC;&#x201C; www.energiesparen.be)
Aanpak energieproject 4. Slim aansturen van elektriciteit â&#x20AC;&#x201C; eigen verbruiksprofiel en eigen energieproductie op elkaar afstemmen
(uit Energiekalender 2009 â&#x20AC;&#x201C; www.energiesparen.be)
47
Aanpak energieproject 5. Samenwerken in energie – nieuwe financieringsmodellen – coöperaties –…
Project â&#x20AC;&#x153;windmolen op het bedrijfâ&#x20AC;? technische voorwaarden: verbruik, windsnelheid
vergunningen (begint bij draagvlak!)
Windturbines in eigen gemeente? 30
65% 36
27
5 2
Heel erg tegen
Eerder tegen
Neutraal
Eerder voor
Heel erg voor
Betrekken buurtbewoners? 49
49
47
45
47
46
6
4
6
2014 n=1000
2015 n=1000
2016 n=1001
Ik wil zowel geïnformeerd worden als op voorhand actief betrokken worden bij de zoektocht naar een geschikte locatie voor de windturbine Ik wil enkel geïnformeerd worden Ik wil helemaal niet betrokken worden
│51
Financieel participeren? 3
4
14
16
62% 44
21
23
16
14
Neen, zeker niet
18
45
43
2014 n=1000
5
2015 n=1000
Neen, waarschijnlijk niet
Ja, waarschijnlijk wel
19
14 2016 n=1001
Ja, zeker wel
Weet niet
â&#x201D;&#x201A;52
Indeling windturbines • Kleine windturbines: - tot 15 m ashoogte
• Middelgrote windturbines: - vanaf 15 m ashoogte - tot 300 kW vermogen
• Grote windturbines - boven 300 kW vermogen
Windsnelheid cruciaal
– opbrengst ~ (snelheid)³ – minimum gemiddelde windsnelheid 5 m/s
Productie bij gem. windsnelheid 5 m/s
Productie bij gem. windsnelheid 7 m/s
Zelfconsumptie vs. injectie Injectie: 20 €/MWh A A N S L U I T I N G O P H E T N E T
GSC: 97 € GROENE STROOM TELLER
EAN-TELLER
VERDEELKAST
V E R B R U I K
Besparing: 210 €/MWh (LS)
Ken je verbruiksprofiel
Ken je verbruiksprofiel
Fruitbedrijf (met batterij)
Fruitbedrijf (met batterij)
Fruitbedrijf (met batterij)
Fruitbedrijf (met batterij)
Steunmaatregelen windturbines • Groenestroomcertificaten: – 97 euro/GSC – bandingfactor: 0,663 voor project met startdatum in 2017 (1.508 kWh elektriciteit voor 1 GSC)
• Ondersteuningsmaatregelen: – 30% VLIF-steun (voor eigen gebruik!) – verhoogde investeringsaftrek
Opbrengst windmolen • Jaarlijkse inkomsten: + besparing aankoop elektriciteit + verkoop geïnjecteerde elektriciteit + GSC
• Jaarlijkse uitgaven: – (beperkte) injectievergoeding – onderhoud
Opbrengst windmolen - LS
Opbrengst windmolen - MS
Inspiratieavond
Lean in land- en tuinbouw • • • •
Kan iemand makkelijk bepaalde taken op je bedrijf opnemen? Heeft al het materiaal op je bedrijf een duidelijke plek? Staat al het materiaal op punt en klaar om te gebruiken? Weet je wat de klant verwacht?
Antwoord je op één van bovenstaande vragen “nee”, dan kan Lean-denken je helpen
29 november 2017 De Blekerij – Pittem 19u45 Inschrijven: www.innovatiesteunpunt.be
Inschrijven via www.slimaansturenvanelektriciteit.be
Meer info? www.enerpedia.be www.innovatiesteunpunt.be www.slimaansturenvanelektriciteit.be energie@innovatiesteunpunt.be 016/28 61 02
WWW.XANT.COM
76
WIND POWER MADE EASY
â&#x20AC;¢ Welkom
WIND POWER MADE EASY
• Creatie 2008 • Geboren 2011 • Aandeelhouders 3E VYNCKE PMV Jo VERSAVEL • Commercieel actief 2014
WIND POWER MADE EASY
• Creatie 2008 • Geboren 2011 • Aandeelhouders 3E VYNCKE PMV Jo VERSAVEL • Commercieel actief 2014
WIND POWER MADE EASY
• Creatie 2008 • Geboren 2011 • Aandeelhouders 3E VYNCKE PMV Jo VERSAVEL • Commercieel actief 2014
WIND POWER MADE EASY • Creatie 2008
• Geboren 2011 • Aandeelhouders 3E VYNCKE PMV Jo VERSAVEL • Commercieel actief 2014
WIND POWER MADE EASY • Creatie 2008
• Geboren 2011 • Aandeelhouders 3E VYNCKE PMV Jo VERSAVEL
• Commercieel actief 2014 • Referenties wereldwijd
TECHNISCHE EIGENSCHAPPEN • XANT M-24 95 kW Direct aangedreven Totale hoogte max 50 m Design DNV-GL gecertifieerd
Gecertifieerde geluidscurve 39 dB(A) @ 200 m
TECHNISCHE EIGENSCHAPPEN • XANT M-24 95 kW Gecertifieerde power curve 188.000 kWh @ 5,0m/s
BETROUWBAARHEID door EENVOUD
Typical Mid-Size Turbine
• XANT M-24 Gecertifieerd Hoe minder onderdelen hoe minder er kan XANT verkeerd gaan.
4 10
15
8
7
XANT portaal
â&#x20AC;¢ Controle vanop afstand (GSM)
XANT windkaart FL
XANT haalbaarheid
• 4,8 m/s : 162MWh /jaar (netto) • kWh tarief : 0,13€/kWh • Eigen verbruik : 70% • Injectie op het net : 30% • VLIF : 54.000€ • GSC : 61,7€/MWh
• CAPEX : 300.000 € • OPEX : 3.800 € • IRR : 10,34% (9 jaar)
XANT haalbaarheid
• 5 m/s : 179 MWh /jaar (netto) • kWh tarief : 0,12€/kWh • Eigen verbruik : 65% • Injectie op het net : 35% • VLIF : 54.000€ • GSC : 61,7€/MWh
• CAPEX : 300.000 € • OPEX : 3.800 € • IRR : 11,58% (8 jaar)
MINIMALE IMPACT OP OMGEVING
XANT M - Vyncke Energietechniek
MINIMALE IMPACT OP OMGEVING
XANT M - Vyncke Energietechniek
INSTALLATIE XANT M
92
92
INSTALLATIE XANT M
93
93
INSTALLATIE XANT M
94
94
INSTALLATIE XANT M
95
95
INSTALLATIE XANT M
96
96
INSTALLATIE XANT M
97
97
INSTALLATIE XANT M
98
98
INSTALLATIE XANT M
99
99
INSTALLATIE XANT M
100
100
INSTALLATIE XANT M
101
101
INSTALLATIE XANT M
102
102
INSTALLATIE XANT M
103
103
INSTALLATIE XANT M
104
104
INSTALLATIE XANT M
105
105
INSTALLATIE XANT M
106
106
INSTALLATIE XANT M
107
107
INSTALLATIE XANT M
108
108
INSTALLATIE XANT M
109
109
INSTALLATIE XANT M
110
110
INSTALLATIE XANT M
111
111
INSTALLATIE XANT M
112
112
INSTALLATIE XANT M
113
113
INSTALLATIE XANT M
114
114
INSTALLATIE XANT M
115
115
INSTALLATIE XANT M
116
116
INSTALLATIE XANT M
117
117
INSTALLATIE XANT M
118
118
HOE KUNNEN WE JULLIE VERDER HELPEN?
www.XANT.com info@XANT.com
VYNCKE Harelbeke - Flanders
DEME Antwerp - Flanders
PILOT POINT I Alaska - USA
HILLDINO POWER Horgabost - Scotland
STUART Melvich - Scotland
ENGIE Semakau Singapore
PORT OF OOSTENDE Oostende Flanders
UNELCO Vanuatu