Fire Station #9 I midtown I Inseon Lee

Page 1

FIRE STATION #9 midtown by inseon lee


contents


4-5 6-9 10-17 18-23 24-25 26-29 30-31 32-37 38-41

I I I I I I I I I

site programming floor plan building skin energy section structure research case study


opportunities + challenges

light-rail

indian school

central

site

40 e columbus ave phoenix, az midtown

given site

osborn 900ft

4


given site

247,600 sf t5:7 transit-oriented districts max hight 100’ setback 30’

fire station #9 32,000 sf

alley

underground power to be kept clear

unbuilt area adjacent high-rise developments

to be sold to offset construction cost

phx firefighters association to be kept separate from fire station #9

300ft

5


station sleeping

station living

public - private massing

6 station apparatus bay

station public

public

programming

private


positive pressure zone

living

bringing in public

sleeping

public

apparatus bay negative pressure zone

7


programming the process

8


how do we bring community in? like wood joints; more surfaces are glued, stronger the joint becomes. pushing & pulling

9


floor plan site plan ground floor

public entry

A. living quarters

fire fighter entry

A1. A2. A3. A4. A5. A6. A7. A8. A9.

vehicle access turning radius

outdoor patio offices library/study restroom squash court courtyard day room kitchen/dining storage

A10. A11. A12. A13. A14. A15. A16. A17.

B. community B1. B2. B3. B4.

public entry vestibule public lobby public restroom community/training

C. apparatus bay C1. C2. C3. C4. C5. C6. C7. C8.

10

decontamination sink apparatus bay IDC closet SCBA storage turnouts storage EMS storage electrical exterior storage

pantry fitness mechanical radio room watch room janitors closet laundry room on-site training


weldon ave.

A2

A2

A2

A2

A2

A2

A2 B1

C3 B2

A3

C4

UP

A4 A5

A6

A4

C2

B3

A1 A7

C8 C1

A9

A8

B4

A11

C1

C5

UP

A10

A12

A13

A14

A15

C6

A16

C7

A17

alley

25ft

11


floor plan colored ground floor

living public push/pull apparatus bay

12


25ft

13


floor plan second floor

property line

B. community B3. public restroom B5. community gallery B6. mechanical

C. apparatus bay C9. mezzanine storage

D. sleeping quarters D1. D2. D3. D4. D5. D6. D7. D8.

14

patio dormitory restroom break room storage mechanical laundry office


D2

D2

D2

D2

D2

D2

D2

D2

D2

D2 B5

B6 D2

D3

D3

D3

D3

D3

D3

D2

D4 D5

B3 D7

C9

B5

D6

D1 D2

D2

D2

D2

D8 D2

D2

25ft

15


floor plan colored second floor

sleeping public push/pull apparatus bay perspective location

16


public gallery

apparatus bay view 25ft

17


private

18

glass

metal

translucent concrete

materials

concrete

building skin

public


50ft

apparatus bay, semi-public

metal panel + glass

living + sleeping private

concrete

living + sleeping private

translucent concrete

public entry public

glass


building skin

80%

translucent concrete building envelope light transmitting plastic resin

concrete blocks direct sunlight

40%

brings natural light in

20

20%


interior fire resistant plasterboard steel stud insulation

sheathing air and moisture resistive barrier

operable precast translucent conc. panel

hanger rails

21


building skin day & night rendering translucent concrete behavior

22


23


energy

climate summary

design strategy phoenix, arizona

average high and low temperature

24


courtyard brings natural light in to the dark space in the middle

second floor

large glazing for public entry faces north to avoid heat gain

ground floor

foot-candle levels 0

19

37

56

74+

operable translucent concrete panels help to block direct sunlight and bring in natural light

25


section perspective section cut through courtyard

laundry

26


y

office

gallery

gallery

community/training

courtyard

lobby

10ft

27


section perspective section cut through apparatus bay

T.O.P. 25’- 0”

second level ceiling 21’- 0”

gallery

sleeping

second F.F.L. 13’- 0”

ground level ceiling 10’- 0”

day rm ground F.F.L. 0’- 0”

28

fitness

community / training


T.O.P. 25’- 0”

apparatus bay below structure 21’- 0”

mezzanine storage

apparatus bay EMS storage

exterior storage

20ft

29


roof decking

second floor structure

structure

app. bay structure

structure plan exploded axon

A

second floor slab

B

C

ground floor structure

D

E

ground floor slab

30


1

2

3

4

5

6

7

8

9

10

11

12

13

14

F

G

H

column primary structure secondary structure

31


research

dormitories group R-3, residential group <16 occupants

apparatus bay + storages group S-2, low-hazard storage

occupancy type construction type

station sleeping quarters

32

station apparatus bay


e living group B, business group

community / training rm group A-3, assembly group

station living quarters

33


concrete basics for sustainability I

research structure material study concrete I impact on bldg energy precast vs poured

disadvantage for sustainability I

green concrete options

I

peaking cooling load I external wall conduction gains

34


• durable • use recycled materials • can be recycled and reused • less energy required to produce • locally manufactured • reduce energy required for heating and cooling through thermal mass • low VOC emission

• concrete has a huge impact on green built because of its sheer volume and the massive resources used to make it • Co2 emission from using cement

precast

poured

excavate the land as needed

required excavation & on-site forms to be created and placed

uses a controlled environment, weather does not play a factor in forming

unexpected weather conditions will delay progress. cold weather can add cure time

strict strength requirements before leaving the plant. consistency across all precast materials

variables factor into your final product. temperature, wind, humidity, etc. can impact final strength

controlled environment prevents any outside variables. all concrete must pass strict testing. ideal conditions are maintained

concrete is subject to outside variables and changing conditions. all testing must be performed on site

prep work

weather

• cement free concrete • rice husk ash cement • rice husk cement strength

quality control

35


research structure material study steel I concrete I glass base sunken under a dune

36

Miami dade college


JA house

el musical cultural center

new leme gallery

RATP bus center in Thiais

37


case study ave fenix fire station mexico city

38


ROOF

THIRD LEVEL Dorms Gym Control

SECOND LEVEL Dorms Class Rooms

FIRST LEVEL Civic - Public Patio Bomberoteca Dinning

GROUND LEVEL Trucks - Equipment Training Area

39


case study italy pavillion I shanghai expo

40


41


thank you. and a special thank you to our firefighters. inseon lee


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.