Integral Build National Grid case study

Page 1

Client: National Grid Project: Control Room Kitchen This project was carried out by Integral Build over a three week programme. It was logistically challenging due to a location within the live 24hr environment of National Grids main UK control room. The control room itself had to remain operational for the duration of the project with temporary welfare facilities provided. Our focus was to provide a functional yet comfortable space for the control room staff whilst ensuring a Zero tolerance Health and safety policy was adhered to. The space gives five separate teams their own storage spaces as they cook in shifts and share responsibilities for making refreshments. The nature of their work dictates that most of the time is spent at their work stations within a secure environment.


Client: National Grid National Grid – Control Room Kitchen Project: Control Room Kitchen Powder coated stainless steel units throughout, Low Iron glass splash backs, magnetic & dry wipe back printed glass notice boards, as well as acrylic solid worktops for durability. New technology was used with LED modular panel lighting technology, energy efficient LED strip and integrated appliances and convenience functions such as a Zip Tap and roll out recycling systems. From the outset, we worked very closely with the National Grid team based on site to deliver a solution tailored and fine tuned to meet their requirements and wish List! The knowledge of the facility from our Integral UK site based engineers and managers ensured any service or access requirements were organised with minimal disruption to the client.

“I would like to thank the Integral Build ‘Interiors’ team “I would like to thank the Integral Build ‘Interiors’ for the fantastic work carried out in completing the team for the fantastic work carried out in completing Control Room kitchen. We are extremely pleased with the Control Room kitchen. We are extremely pleased the outcome of the project. The work is of a high quality with the outcome of the project. The work is of a high and has brought to fruition a very attractive and quality and has brought to fruition a very attractive functional space for the Control Staff. Everyone involved and functional space for the Control Staff. Everyone was driven by the desire to complete the project on involved was driven by the desire to complete the time but most of all to the best standard possible” project on time but most of all to the best standard possible” Lisa Hughes, National Grid Operational Projects Specialist Lisa Hughes, National Grid Operational Projects Specialist


Client: National Grid National Grid – Control Room Kitchen Project: Control Room Kitchen We introduced subtle colour to the kitchen through wall art featuring their winning design for a new pylon (below) and taking the main ‘Picasso’ grid and using back printed vinyl, displaying it on their functional glass splash back.

“I would like to thank the Integral Build ‘Interiors’ team for the fantastic work carried out in completing the Control Room kitchen. We are extremely pleased with the outcome of the project. The work is of a high quality and has brought to fruition a very attractive and functional space for the Control Staff. Everyone involved was driven by the desire to complete the project on time but most of all to the best standard possible” Lisa Hughes, National Grid Operational Projects Specialist


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.