Integral jockey club case study

Page 1

CASE STUDY

The Jockey Club / Cheltenham

www.integral.co.uk

fire maintenance services Providing fire maintenance services to

delivering engineering excellence


overview The Jockey Club is the largest commercial group in British horseracing, with assets including Cheltenham, Aintree, Epsom Downs and Newmarket racecourses. Governed by Royal Charter, all profits are invested back into the UK’s second biggest spectator sport

The Jockey Club (JCR) owns 15 leading racecourses, including Aintree, home of the Cabbie’s Grand National; Cheltenham, stage for the prestigious Cheltenham Festival; Epsom Downs, home to the Investec Derby; and Newmarket’s Rowley Mile and July Course, considered Flat racing’s global HQ. Integral Fire undertake the planned maintenance and reactive calls to all of the JCR properties with our dedicated BAFE accredited “in house “engineers who are available 24/7 365 days a year to ensure that all stakeholders can enjoy a day at the races in fire safe properties. Located at its current site since 1898, The Cheltenham Racecourse is a Gloucestershire institution. Throughout the year it welcomes more than 700,000

www.integral.co.uk


CASE STUDY

The Jockey Club / Cheltenham

visitors with numbers reaching their peak during Festival

ideal for this type of environment.

Week, culminating with the Betfred Cheltenham Gold Cup.

The race course’s next major redevelopment includes the

Since 2003 more than £20m has been invested in a new

Weighing Room and Media Centre, requiring the detection

enclosure and additional race day facilities with The Centaur,

system to be fully networked. As such, the panels installed

a new conference and events centre, at the heart of this

have been future proofed to allow for this integration as the

redevelopment. Part of this investment has seen Integral

development continues.

rejuvenate the site’s fire detection equipment. As with any large venue it is important to minimise disruption Tony Marsh, National Operations Manager at Integral UK,

from unwanted alarms on event days. Therefore, should any

explains: “With the Grandstand suffering from on-going faults

alarm be activated it goes to alert before ringing so the fire and

from its legacy detection equipment and Festival Week less

security team at the Races can quickly ascertain if a full scale

than four months away, we were asked to refit the main

evacuation is needed.

Grandstand, function rooms and boxes. The system we implemented used Advance four loop panels with Apollo XP95 equipment. We work with Apollo products on a regular basis and chose the XP95 range because it is a robust, cost effective and easy to install suite of fire detection products,

delivering engineering excellence


our services

compliance refrigeration

cle an ing

pre dict ive

ma bui n ldin g co agem ntr e ols nt

su fir pp e res sio n

pr oj ec ts

fabric

delivering engineering excellence

al itic cr

ty uri ec s & s tem fire sys

ir repa tive reac

energy services

mobile

ele se ctric rvi al ce s s ce rvi se n ing ig ild es bu & d

ed n an pl

mechanical services

m an ne d

n sigy e y d nc ert ulta p s procon

mp s u p tem s sy

(commercial & industrial)

Company Registration No. 5307588

www.integral.co.uk delivering engineering excellence


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.