SALIENT FEATURES SN
FEATURES
CHARACTERISTICS
GENERAL
1 2 3 4 5 6
Name of Project Type of the Scheme Catchment Area Gross head Design Discharge Install Capacity
Ingwa Hydropower Project Run of River 200 Km2 (approx..) 226 m 9.5 m3/s (@Q45% PoE) 18 MW
PROJECT LOCATION 1 2 3
Latitude Longitude Project Area
27016”46” 870’52” 22” Ankhop VDC of Taplegunj District, Province 1
TECHNICAL INFORMATION 1
Diversion Type Type Length of the Weir Crest Elevation Height of Weir Size of Intake Size of Under Sluice gate Sill Level of Intake
Free Flow Concrete Overflow Weir Free Flow Concrete Overflow Weir 54 m EL 1084.5 msl 6.75 m from River Bed (3.0 m x 1.5 m) x 3 Nos 4.0 m x 5.0 m (1 No.) 1083.0 m
SN
FEATURES
2 Desander basin Type Number Size Particle size to be settled 3 Approach Canal Type Length Size 4 Headrace Pipe Type Internal Diameter Length Thickness 5 Power House Type Number of units Size 6 Tubine Type Rated Output Capacity/unit Efficiency 7 Tailrace Type Tailrace Length Size 8 Generator Type Rated Output Capacity/unit Efficiency Power Factor 9 Governors Type Adjustment for Speed Droop 10 Transmission line Transmission Line 11 Access Road Connection
CHARACTERISTICS Dufour Type, Continuous Flushing 2 nos. 63 m x 7 m x 4.5 m >0.2 mm Rectangular Box Culvert 58.5 m 2.72 m x 1.86 m Steel Penstock Pipe 2.0 m to 2.2 m 4500 m 0.10mm to 0.14mm Surface 2 27.6 m x 1.7 m x 27.6 m Pelton ( Horizontal Shaft ) 9 MW 92 % RCC Rectangular Box Culvert 115.0 m 2.74 m x 2.0 m Synchronous, Three Phase 9,200 kW 97 % 0.85 Electronic with PID Controller Between 0 to 5% 16 km long to 33 kV to Kabeli substation Graveled road upto head works
SN
FEATURES
CHARACTERISTICS
CURRENT STATUS OF THE PROJECT 1 2 3 4
Feasibility Study Detailed Project Report EIA/IEE PPA and PPA Rate
5
Land Acquisition
Ready Ready Approved PPA Signed Price for 6 dry months = Rs. 8.40 Price for 6 wet months = Rs. 4.80 Not done
DEVELOPMENT MODALITY 1 2 3 4
Development modality Role of Foreign Partner Role of Local Developer Development Period a. Pre-Construction Period b. Financial Closure c. Construction Period d. Concession Period
Public Private Partnership/looking foreign partner Arrange Debt/Equity for the project Facilitation and investment in agreed capital structure 1 Year 1 Year 30 months 30 years
INDICATIVE FINANCIALS 1 2 3
Total Project Cost (including Interest During Construction) Interest Rate (including hedging cost) Project IRR
~ USD 30 Mn. 10 % 22.71%
CONTACT DETAILS MR. GURU P. NEUPANE CHAIRMAN, SIDDHAKALI POWER LIMITED 2nd Floor, Trade Tower Building Thapathali, Kathmandu Mobile: 9851033646 Email: guruneupane2000@gmail.com