TRISULI GALCHHI HYDROPOWER PROJECT
SALIENT FEATURES SN
FEATURES
CHARACTERISTICS
GENERAL
1 2 3 4 5 6
Name of Project Type of the Scheme Catchment Area Net head Design Discharge Install Capacity
Trisuli Galchhi Hydropower Project Run of River 5731 Km2 (approx..) 19.1 m 176.00 m3/s 30 MW
PROJECT LOCATION 1 2 3
Latitude Longitude Project Area
27051’48” 85005’47” Ratmate & Buddhasingh VDC of Nuwakot District, Province No. 3
TECHNICAL INFORMATION 1 2
Diversion Type Height of Barrage (from deepest foundation level) Length of Overflow Section Length of Non overflow Section Desander basin Type Number Size Depth
Barrage Type Structure with 6 radial gates of 12 m x 5 m 25.5 m 103 m 168.5 m
RCC type, Rectangular with hopper 2 nos. 116 m (L) x 23 m (W) 14 m
SN
FEATURES
3 4 5 6 7 8 9 10
Silt Flushing Arrangement Type Nos Length Power Intake Service Gate Nos. Size Type Hoist Stop Log Gate Nos. Size Type Hoist Penstock Type Size of Penstock Pipe Length Power House Type Number of units Size Draft Tube Gates Nos. Size Type Hoist Tailrace Pool Length Bed Width Transmission line & grid connection Transmission Line Access Road Connection
CHARACTERISTICS Vertical lift side gate 2 2mx2m 4 3.3 m x 4 m Vertical Lift roller gate Rope drum hoist 4 3.3 m x 4 m Vertical Lift roller gate Rope drum hoist Circular steel lined 4 m dia 45 m Semi Surface type 4 67.2 m x 18.5 m 8 3.6 m x 4 m Vertical lift gate Gantry Crane 20.6 m 60.3 m
132 kVA substation All season motorable road is available
SN
FEATURES
CHARACTERISTICS
CURRENT STATUS OF THE PROJECT 1 2 3 4 5
Feasibility Study Detailed Project Report EIA/IEE PPA and PPA Rate Land Acquisition
Completed Completed Completed Completed Completed
DEVELOPMENT MODALITY 1 Development modality 2 Role of Foreign Partner 3 Role of Local Developer 4 Development Period a. Pre-Construction Period b. Financial Closure c. Construction Period d. Concession Period
Public Private Partnership/looking foreign partner Arrange Debt/Equity for the project Facilitation and investment in agreed capital structure Ready to go for construction 1 Year 30 months 30 years
INDICATIVE FINANCIALS 1 2 3 4
Total Project Cost (including Interest During Construction) Project IRR Equity IRR Project Benefit-Cost Ratio
~USD 51 Mn. 20.33% 32.19% 1.53
CONTACT DETAILS MR. GURU P. NEUPANE CHAIRMAN, SIDDHAKALI POWER LIMITED 2nd Floor, Trade Tower Building Thapathali, Kathmandu Mobile: 9851033646 Email: guruneupane2000@gmail.com