UPPER BALEPHI HYDROPOWER PROJECT
SALIENT FEATURES SN
FEATURES
CHARACTERISTICS
GENERAL 1 2 3 4
Name of Project Type Install Capacity Progress
Upper Balephi Hydropower Project Run of River 46 MW Infrastructure Development (Access Road, Labor camp) construction work on progress
PROJECT LOCATION 1 2 3
Latitude of Project Area Longitude of Project Area Project Area
27° 58’ 59’’ N and 28° 01’ 23’’ N 85° 46’ 46’’E and 85° 48’ 03’’ E Jugal Rural Municipality, Sindhupalchowk, Province 3
TECHNICAL INFORMATION 1 2 3
Hydrology Catchment Area Design Discharge (Q 40 %) Weir and Intake No. of Intake Type of Weir Length Desanding Basin Type
270.38 km2 12.72 m3/s
Diversion weir with side intake 42 m Hopper Type, Single bay with Bypass channel
SN
FEATURES
CHARACTERISTICS
4 5 6 7
Head Race Tunnel Tunnel on Right Bank Adit Tunnel Steel Penstock No of Penstock Pipe Length of the single Penstock Pipe Power House Type Number of Generating Units Turbine Type Power and Energy Gross Head
4100 m 150 m
650 m
Underground 3 , 12, 500 kVA each Pelton 438 m
CURRENT STATUS OF THE PROJECT 1 2 3 4
Feasibility Study Detailed Project Report EIA PPA and PPA Rate
5
Land Acquisition
Completed In the Process, Scoping and ToR Approved Final report submitted to Ministry of Environment Applied for PPA on January 30, 2019 Rs. 4.8/unit for Wet Season Rs. 8.40/unit for Dry Season Completed
SN
FEATURES
CHARACTERISTICS
DEVELOPMENT MODALITY 1 2 3
Development modality Role of the Foreign Partner Role of the Developer
4
Development Period
Option open for Equity Investment Up to 70% equity investment Project management, award construction contract, monitoring and supervision of project, local issues liasioning and settlement, liasioning with Government entities as and when required, evacuate electricity to the national grid. n Financial Closure: January 2019-2020 n Construction Planning: n Infrastructure development work 2019 n Tunnel excavation to start by 2020 n Other civil structures to start by end of 2020 n Completion Date: March 2022
INDICATIVE FINANCIALS 1 2 3 4
Total Project Cost (including Interest During Construction) Interest Rate (including hedging cost) Project IRR Equity IRR
$ 72.5 Million 12% 15.61% 18.88%