1 minute read

Information about location?

People in Canterbury either have to travel all the Way to Gatwick airport, which takes 1hr 13min

Advertisement

Or they could travel to Southend-on-Sea airport, which should take 1hr 17min the Viridor Waste Management landfill and gas generation businesses has been recently purchased, bringing them into private ownership.

Valencia Waste Management Ltd – is now the name for the business which started as CW Harrison Ltd when it was incorporated in 1956.

There is a lot of land to be used. It doesn’t look or smell very pleasant there. A lot of waste which is not very sustainable

This map has helped me deicde where the best place would be to design an airport

This business is located exactly near my location so I have decided that it will have to be demolished in order to make more space for the building of the airport as well as not taking away from the beauty of the structure.

This article is from: