Engineering for Public Works - Issue 24, December 2021

Page 105

IPWEAQ UPDATES

SEQ BRANCH PRESIDENT’S REPORT Jo O’Brien SEQ Branch President

Thank you all very much for the warm welcome as the new SEQ Branch President. I was sworn in at the AGM in Cairns in October together with fellow SEQ Branch member, Sarah Hausler elected as an ‘at large’ Board member. My first role as SEQ Branch President was to welcome branch members to the SEQ Branch Christmas function at our facilities in Eagle Farm. It was a wet night with heavy rains yet 50 members joined 24 delegates attending the Public Works Professionals Orientation Intensive and enjoyed a selfguided tour of the IPWEAQ collection of Aboriginal Art followed by drinks and canapes. Our congratulations to SEQ Branch committee member, Ross Ullman who was declared Engineer of the Year at the awards night in Cairns in October! A wonderful welldeserved achievement for Ross’ contributions to the Sunshine Coast Council. Rhys McQueen, Transport Asset Management Engineer at City of Gold Coast, took home the award for Professional of the Year while the Department of Transport and Main Roads won the inaugural Employer of the Year (public sector). And once again, SEQ councils secured a fair share of project awards on the night including Project of the Year for Brisbane City Council for the Kingsford Smith Drive Upgrade project. Congratulations to the team at Brisbane City which also won awards for:

Tropical night

Innovation - Kingsford Smith Drive Upgrade (award sponsored by C.R Kennedy) Road Safety Infrastructure – SAMs for Schools (award sponsored by Delnorth Group) Community Road Safety - School Traffic Management Plans and Improvements (award sponsored by Delnorth Group) Projects over $20 million -Highly Commended for the Indooroopilly Riverwalk (award sponsored by Danley) Other SEQ councils and organisations on the winners list on the night included: 1. Moreton Bay Regional Council - Projects $5 - $10 million for the The Mill at Moreton Bay water park and play space 2. Sunshine Coast Council & Interflow - Projects under $1 million for the Renewal of the Amarina Culvert, Mooloolaba 3. City of Gold Coast - Coastal Engineering for the Surfers Paradise Sand Backpass 4. Pipeline Project 5. S unshine Coast Council – Highly Commended for the Maroochy Groyne Project (award sponsored by RCPA) The City of Gold Coast’s Surfers Paradise Sand Backpass Pipeline Project and the Sunshine Coast Council’s Maroochy Groyne

Project were two of five finalists for Project of the Year. It was an exceptional night celebrating our sector and we look forward to seeing more SEQ projects highlighted at the 2022 awards program which will be launched at the President’s Breakfast, Friday 4 February in Brisbane. I was delighted to participate in the 2021 Great Debate successfully arguing, not that there could be any dispute, that technology will not make engineering redundant. My thanks to fellow Negative Team debaters, Justin Fischer and Jordan Maultboy. If you have a topic for a future debate, please contact our CEO Leigh Cunningham. The Call for Papers is currently open for our joint branch conference with our colleagues in the south-west, 16-17 March in Toowoomba. Please submit an abstract before 10 December to share our SEQ innovations and learnings with our peers. On behalf of the SEQ Branch committee, please have a happy and safe Christmas. I hope to see you at the President’s Breakfast in Brisbane, 4 February, the first event in what is a very busy program for 2022. See you then!

ENGINEERING FOR PUBLIC WORKS | DEC 2021

105


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Qldwater Report

3min
page 113

Professional Development Update

2min
page 108

ADAC Update

2min
page 112

Native Title Update

2min
page 111

Industry News – Around the State

5min
pages 106-107

SEQ Branch President’s Report

2min
page 105

Video Recording Services for Partners

3min
pages 109-110

NQ Branch President’s Report

2min
page 102

CQ Branch President’s Report

2min
page 101

Microsurfacing and Cape Seals in the Darling Downs

18min
pages 90-95

A Reseal Contract Like No Other

13min
pages 86-89

Brisbane City Council, Kingsford Smith Drive Upgrade

16min
pages 56-61

Tully Grandstand, a Difference Way to Deliver

11min
pages 72-75

The Reinvention of the Ayr Drinking Water Supply

9min
pages 82-85

Wooden it be Nice, Building our Bridge to the Future

3min
pages 70-71

Bundaberg Regional Council, Stormwater Management Strategy

19min
pages 62-69

Annual Conference Features

29min
pages 38-55

Member Profile, Monica Accornero

5min
pages 34-37

Member Profile, Darcy Stevenson

4min
pages 32-33

Member Profile, Bernie-Anne Freeman

4min
pages 30-31

New Qualification Infrastructure Asset Management

2min
page 24

Honorary Members

1min
page 29

President’s Report

5min
pages 10-13

New Survey Standards

1min
page 26

CEO’s Report

5min
pages 14-15

Community News

10min
pages 16-23

Infrastructure Report

3min
page 25

Temporary Traffic Management Toolkit

3min
page 5
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.