Isaac Howland Architecture & Design Portfolio 2023

Page 1

20 23

ABOUT ME

Emerging AEC professional with residential, commmercial and mixed-use project experience across all project phases. Currently pursuing architectural licensure and aspiring to innovative models of practicing architecture, placemaking and socially responsible real estate development.

EDUCATION

Syracuse University Master of Architecture

School of Architecture Syracuse, NY

2021

Temple University Bachelor of Science in Architecture

School of Architecture Philadelphia, PA

2017

GEM University Fellow Syracuse University

2020-2021

Honorable Mention Britton Memorial Awards Thesis Prize Competition

2021 Syracuse University

DIGSAU Designer I

2021 - 2023 Architectural design from concept to CD & CA phases of notable building projects in Philadelphia metro area.

sekou cooke STUDIO Architectural Designer

2019 - 2020 Design development on 12,000sf adaptive reuse project. Digital & physical modeling. 3D rendering for presentation & fundraising.

AMP Architecture Jr. Architectural Designer

2017 - 2019

Drafting & preparation of drawing sets for NYC DOB submission. Construction Administration and measurement site visits.

HIP HOP HEADQUARTERS ……………………………………………………………………………………………………………………………………………………………4

sekou cooke STUDIO | 2019-21 | Design Development / Visualization

GFS CONNECTOR ……………………………………………………………………………………………………………………………………………………………………………8

DIGSAU | 2021 | Design Development / Construction Documentats

CHALLENGE PROGRAM FURNITURE STUDIO …………………………………………………………………………………………………………………………14

DIGSAU | 2022 | Concept Design / Construction Administration

YARDS BREWERY IMPROVEMENTS …………………………………………………………………………………………………………………………………………18

DIGSAU | 2021 | Concept Design / Bidding Documents

IRA DAVIS TOWER RENOVATION ………………………………………………………………………………………………………………………………………………26

DIGSAU | 2022 | Concept Design / Feasibility Study

BUNGEE BENCH ……………………………………………………………………………………………………………………………………………………………………………30

TEMPLE UNIVERSITY | 2016 | Professor: Clifton Fordham

MEMORIAL PARK RENOVATION …………………………………………………………………………………………………………………………………………………32

DIGSAU | 2022 | Landscape Design

HIP HOP URBANIST RECONSTRUCTIONS ……………………………………………………………………………………………………………………………34

SYRACUSE University | 2021 | Thesis Advisor: Brian Lonsway

PAGE
isaachowl.com @isaachowl 267-997-3169
ACADEMIC ACHIEVEMENTS PROFESSIONAL PRACTICE Isaac Howland Emerging Designer SELECTED WORKS iya9241@gmail.com

HIP HOP HEADQUARTERS

The Hip Hop HQ converts an abandoned dairy warehouse and training ground for graffiti artists into a multi-use, culturally rich hub facilitating youth entrepreneurship, career development and social growth for youth centered around the pillars of Hip Hop culture. The 12,000SF program includes residential, offices, classrooms, a business incubator, a print studio, a recording studio, and indoor and outdoor event spaces.

ProjectExperience: DDlevelExisting/Demofloorplans,Elevations,Sections,3DRhinoModeling,&Renderings.

GROUND FLOOR PLAN

WYOMING STREET TULLYSTREET 147'-413/16" 193'-4 WEST STREET FABIUSSTREET sekou cooke STUDIO CONCORD PLACE, SYRACUSE, 13210 347.385.6805 www.sekoucooke.com FEB 2020 These drawings exclusive intellectual property sekou cooke STUDIO. designs and ideas contained herein shall used any purpose other construction this project, described writing sekou cooke STUDIO. THE GOOD LIFE HQ SYRACUSE , NY 13204 DATESCALE 1/32" 1'-0" SITE PLAN OUTDOOR EVENT SPACE ELEVATED GARDEN 3'-2.5" ABOVE EXT. GRADE +1'-0" FROM EXT. GRADE UP RAMP UP 3'-2.5" ABOVE EXT. GRADE 0'-0" EXT. GRADE UP REVISIONS sekou cooke STUDIO 102 CONCORD PLACE, SYRACUSE, NY 13210 347.385.6805 www.sekoucooke.com These drawings are the exclusive intellectual property sekou cooke STUDIO. All designs and ideas contained herein shall not be used for any purpose other than the construction of this project, or as described writing sekou cooke STUDIO. THE GOOD LIFE HQ 215 TULLY STREET SYRACUSE , NY 13204 DATESCALE DRAWING TITLE GROUND FLOOR PLAN PARTIAL DRAWING KEY A2.02 A2.02 A2.02 A3.02 A3.01 A3.02 LEGEND 2-HOUR FIRE-RATED PARTITION 1-HOUR FIRE-RATED PARTITION OBJECTS OVERHEAD DOOR SCHEDULE DESIGNATION WINDOW SCHEDULE DESIGNATION CAFE LOBBY PRINT STUDIO ART GALLERY WAITING ROOM CYPHER BOOTH RECORDING STUDIO PRINT RETAIL KITCHENBUSINESS INCUBATOR 1'-7.5" ABOVE EXT. GRADE 1'-0.5" ABOVE EXT. GRADE (1'-10") BELOW EXT. GRADE +1'-0" FROM EXT. GRADE 0"0" FROM EXT. GRADE +1"-0" FROM EXT. GRADE +1'-0" FROM EXT. GRADE 3'-2.5" ABOVE EXT. GRADE 0'-0" EXT. GRADE 0'-0" EXT. GRADE 0'-0" EXT. GRADE PITCH GRADE +1'-0" FROM EXT. GRADE UP UP DN BUSINESS INCUBATOR MECH./ STORAGE PRINT STUDIO BOOTH REVISIONS sekou cooke STUDIO 102 CONCORD PLACE, SYRACUSE, NY 13210 SHEET NUMBER 347.385.6805 www.sekoucooke.com 24 FEB 2020 These drawings are the exclusive intellectual property of sekou cooke STUDIO. All designs and ideas contained herein shall not be used for any purpose other than the construction of this project, or as described writing by sekou cooke STUDIO. THE GOOD LIFE HQ 215 TULLY STREET SYRACUSE , NY 13204 ORIENTATION DATESCALE DRAWING TITLE A1.01 1/8" 1'-0" GROUND FLOOR PLAN GROUND FLOOR PLAN SCALE: 1/8"=1'-0" 1 A1.11 PARTIAL DRAWING KEY LEGEND 2-HOUR FIRE-RATED PARTITION 1-HOUR FIRE-RATED PARTITION OBJECTS OVERHEAD DOOR SCHEDULE DESIGNATION WINDOW SCHEDULE DESIGNATION A2.02 A2.02 A2.02 A3.01 A3.02 A3.01 A2.01 A2.01 A2.01 5 4 EntryPerspective SitePlan FloorPlan
HIP HOP HQ
sekou cooke STUDIO / 2019-21 / Syracuse, NY

PERSPECTIVES

BUILDING ELEVATIONS

PRINT STUDIO 3280 SF ART GALLERY (1,500 SF) CYPHER (3838 SF) A A B C C E D D B A B E ENTRANCE CANOPY CAFE (822 SF) sekou cook 102 CONCORD PLACE, S 347.385.6 www.sekouco 24 FEB 2020 These drawings are the property of sekou cooke ST ideas contained herein sha purpose other than the const as described in writing by THE GOOD LIFE HQ 215 TULLY STREET PROJECT ORIENTATION DATE DRAWING SECTIO NORTH SECTION A-A SCALE: 1/8"=1'-0" 1 NORTH SECTION A-B SCALE: 1/8"=1'-0" 2 SECTION KEY SCALE: NTS SOUTH SECTION B-B SCALE: 1/8"=1'-0" 3 PRINT STUDIO 3280 SF ART GALLERY (1,500 SF) CYPHER (3838 SF) A A B C E D B A B ENTRANCE CANOPY CAFE (822 SF) sekou cook 102 CONCORD PLACE, S 347.385.6 www.sekouco 24 FEB 2020 These drawings are the property of sekou cooke ST ideas contained herein sha purpose other than the const as described in writing by THE GOOD LIFE HQ 215 TULLY STREET PROJECT ORIENTATION DATE DRAWING SECTIO NORTH SECTION A-A SCALE: 1/8"=1'-0" 1 NORTH SECTION A-B SCALE: 1/8"=1'-0" 2 SECTION KEY SCALE: NTS SOUTH SECTION B-B SCALE: 1/8"=1'-0" 3 sekou cooke STUDIO 102 CONCORD PLACE, SYRACUSE, NY 13210 347.385.6805 www.sekoucooke.com 24 FEB 2020 These drawings are the exclusive intellectual property sekou cooke STUDIO. All designs and ideas contained herein shall not be used any purpose other than the construction this project, or as described writing sekou cooke STUDIO. THE GOOD LIFE HQ SYRACUSE , NY 13204 DATE SCALE DRAWING TITLE AS NOTED NORTH WEST ELEVATIONS EXTERIOR ELEVATION NORTH SCALE: 1/8"=1'-0" 1 SCALE: 1/8"=1'-0" 2 EXTERIOR ELEVATION WEST 12 REVISIONS E GOOD LIFE HQ 215 TULLY STREET YRACUSE , NY 13204 EXTERIOR ELEVATION NORTH SCALE: 1/8"=1'-0" A2.02 A2.02 12 REVISIONS sekou cooke S 102 CONCORD PLACE, SYRACU 347.385.6805 www.sekoucooke.com FEB 2020 These drawings are the exclusiv property sekou cooke STUDIO. ideas contained herein shall purpose other than the construction as described writing by sekou THE GOOD LIFE HQ 215 TULLY STREET SYRACUSE , NY 13204 DATE DRAWING TITLE SOUTH EAST ELEVATIONS EXTERIOR ELEVATION SOUTH SCALE: 1/8"=1'-0" 1 SCALE: 1/8"=1'-0" 2 EXTERIOR ELEVATION EAST A2.01 A2.01 REVISIONS E GOOD LIFE HQ 215 TULLY STREET RACUSE , NY 13204 EXTERIOR ELEVATION SOUTH SCALE: 1/8"=1'-0" 1 12 PRINT STUDIO 3280 SF ART GALLERY (1,500 SF) CYPHER (3838 SF) A A B C C E D D B A B E ENTRANCE CANOPY CAFE (822 SF) REVISIO sekou cook 102 CONCORD PLACE, S 347.385.6 www.sekouco 24 FEB 2020 These drawings are the property of sekou cooke ST ideas contained herein sha purpose other than the const as described in writing by THE GOOD LIFE HQ 215 TULLY STREET PROJECT ORIENTATION DATE DRAWING SECTIO NORTH SECTION A-A SCALE: 1/8"=1'-0" 1 NORTH SECTION A-B SCALE: 1/8"=1'-0" 2 SECTION KEY SCALE: NTS SOUTH SECTION B-B SCALE: 1/8"=1'-0" 3 7 6 North Facade Outdoor Event Space NW Corner Section B-B Section A-B
West Elevation South Elevation East Elevation Section A-A North Elevation HIP HOP HQ
AERIAL AXONOMETRIC
BUILDING SECTIONS

GFS CONNECTOR

DIGSAU / 2021-2022 / Philadelphia, PA

The GFS connector is a 37,000 square foot new construction project consolidating campus wide visual arts education and dining facilities, and providing accessible paths between two existing 20th century structures.

FINISH FLOOR PLANS

ProjectExperience: DD-CDFinishPlans,InteriorElevations&Details,Sections,RevitModeling,&LumionRenderings.

723 GEN. USE CLASSROOM 716 GEN. USE CLASSROOM ART -CERAMIC 214 STOR. 298 RESTROOM 1729 CORRIDOR/FLEX WORK EXG STAIR S-3 MEZZ. RECEIVE NEW FLOORING MEETING ROOM 217 STAIR STOR. STOR. FLOOR SLAB BENEATHA810 A810 A810 CORRIDOR/FLEX CONFERENCE 218 A810 A810 FLOOR FINISH LEGEND - CERAMIC - EXISTING CERAMIC TILE REPAIRED REPLACED -KIND -CARPET GLUE/FLOATIN WOM -METAL WALK-OFF MAT RUB RUBBER FLOORING -NEW WOOD FLOORING SLNT LEVEL - FINISH PLANSTORAGE RESTROOM ELEC OUTSIDE SCOPE WORK STOR. STOR. TEACHER WORKROOM MEETING ROOM TEACHER WORKROOM A810 A810 A810 A810 A810 A810 CONC -CONCRETE -EXG FLOORING REFINISHED -SEAMLESS RESIN EPOXY- EXISTING CERAMIC TILE-CARPET GLUE/FLOATING) EXPANSION JOINT FLOOR -NEW WOOD FLOORING EPOXY SEALANT EXG FLOORING STONE TILE TO MATCH COURTYARD MAR MARMOLEUM FLOORING LEVEL FINISH PLAN SHEET NAME: SHEET NUMBER: PROJECT PHASE: CHECKED: DRAWN: DATE: PROJECT DATE: DESCRIPTION: GERMANTOWN FRIENDS SCHOOL Philadelphia, PA 19144 ARCHITECT 340 North 12th Street, Suite 421 Philadelphia, PA 19107 215.627.0808 www.digsau.com LESLIE GILL ARCHITECT 277 Broadway, Suite 100 New York, 10007 212.334.8011 www.lesliegill.com DAVID MASON ASSOCIATES 123 Broad Suite 1130 Philadelphia, PA 19109 DAVID MASON ASSOCIATES 123 Broad Suite 1130 Philadelphia, PA 19109 STUDIO ZEWDE 163 Lenox Avenue New York, 10026 212.518.1548 MEP/FP ENGINEER DB|HMS 1500 Walnut Suite 1910 Philadelphia, PA 19102 267.217.1612 FOOD SERVICE CONSULTANT 515 Washington Norwell, 02061 303.621.6327 ACOUSTIC CONSULTANT METROPOLITAN ACOUSTICS 1628 Kennedy Blvd #1902, Philadelphia, PA 19103 215.248.4352A903 LEVEL FINISH PLANS Author Checker Germantown Friends School GFS PHASE Coulter Philadelphia, PA 19144 NOVEMBER 2022 CONSTRUCTION DOCUMENTS 2009 STAIR B02 166 DARK ROOM B14 B07 PLUMBING B11 PHOTO LAB EXG STAIR S-3 OUTSIDE SCOPE 547 PHOTO/DIGITAL EDITING 222 CORRIDOR ELEC CORRIDOR 700 MULTIPURPOSE DIGITAL SEMINAR STORAGE B13 UTILITY B09.2 WATER B09.1 FLOOR FINISH LEGEND CONC -CONCRETE -EXG FLOORING -SEAMLESS RESIN EPOXY - CERAMICREPAIRED REPLACED -KIND -CARPET GLUE/FLOATIN WOM -METAL WALK-OFF MAT EXPANSION JOINT FLOOR RUB RUBBER FLOORING SLNT EPOXY SEALANT EXG STONE TILE TO MATCH COU MAR MARMOLEUM FLOORINGLEVEL - FINISH PLAN LOBBY/EVENT 313 STAIR S2-1 CORRIDOR RECEIVING OFFICE CHANG. RESTROOM 398 COLD PREP REF. STORAGE 2186 257 PREP OUTSIDE SCOPE VESTIBULE VESTIBULE 228 STAIR ELEC. FROM DEPRESSED BENEATH FLOOR SLABTYP FLOOR SLAB WALKOFF MAT, A810 A810 A810 A810 A810 A810 8.1 A810 EXG A810 A810 A810 FLOOR FINISH LEGEND CONC -CONCRETE -EXG FLOORING REFINISHED -SEAMLESS RESIN EPOXY- EXISTING CERAMIC TILE REPAIRED REPLACED-CARPET GLUE/FLOATING) WOM -METAL WALK-OFF MAT EXPANSION JOINT FLOOR RUB RUBBER FLOORING -NEW WOOD FLOORING SLNT EPOXY SEALANT EXG FLOORING STONE TILE TO MATCH COURTYARD MAR MARMOLEUM FLOORING LEVEL - FINISH PLAN SHEET NAME: SHEET NUMBER: PROJECT PHASE: CHECKED: DRAWN: FORMAT: PROJECT OWNER GERMANTOWN FRIENDS SCHOOL Coulter Philadelphia, PA 19144 ARCHITECT 340 North 12th Street, Suite 421 Philadelphia, PA 19107 215.627.0808 www.digsau.com 277 Broadway, Suite 100 New York, 10007 212.334.8011 www.lesliegill.com STRUCTURAL ENGINEER DAVID MASON ASSOCIATES 123 Broad Suite 1130 Philadelphia, PA 19109 DAVID MASON ASSOCIATES 123 Broad Suite 1130 Philadelphia, PA 19109 STUDIO ZEWDE New York, 10026 DB|HMS 1500 Walnut Suite 1910 Philadelphia, PA 19102 267.217.1612 FOOD SERVICE CONSULTANT 515 Washington Norwell, 02061 303.621.6327 ACOUSTIC CONSULTANT 1628 Kennedy Blvd #1902, Philadelphia, PA 19103 215.248.4352A901 LEVEL FINISH PLANS Author Checker Germantown Friends School GFS PHASE Coulter Philadelphia, PA 19144 NOVEMBER 2022 CONSTRUCTION DOCUMENTS 2009 OUTSIDE SCOPE OF WORK TEACHER WORKROOM 317 334 SF TEACHER WORKROOM 318 21 FLOOR FINISH LEGEND CONC -CONCRETE EXG WD -EXG WD FLOORING TO BE REFINISHED SRF -SEAMLESS RESIN EPOXY CT- - CERAMIC TILE EXG CT - EXISTING CERAMIC TILE TO BE REPAIRED REPLACED IN-KIND CPT -CARPET (NO GLUE/FLOATING) WOM -METAL WALK-OFF MAT EXPANSION JOINT AT FLOOR RUB RUBBER FLOORING WD -NEW WOOD FLOORING SLNT EPOXY SEALANT ON EXG FLOORING STN STONE TILE TO MATCH COURTYARD MAR MARMOLEUM FLOORING OWNER GERMANTOWN FRIENDS SCHOOL 31 W Coulter St Philadelphia, PA 19144 215.951.2300 ARCHITECT DIGSAU 340 North 12th Street, Suite 421 Philadelphia, PA 19107 215.627.0808 www.digsau.com LESLIE GILL ARCHITECT 277 Broadway, Suite 100 New York, NY 10007 212.334.8011 www.lesliegill.com STRUCTURAL ENGINEER DAVID MASON & ASSOCIATES 123 Broad St, Suite 1130 Philadelphia, PA 19109 215.372.3400 CIVIL ENGINEER DAVID MASON & ASSOCIATES 123 Broad St, Suite 1130 Philadelphia, PA 19109 215.372.3400 LANDSCAPE ARCHITECT STUDIO ZEWDE 163 Lenox Avenue New York, NY 10026 212.518.1548 MEP/FP ENGINEER DB|HMS 1500 Walnut St, Suite 1910 Philadelphia, PA 19102 267.217.1612 FOOD SERVICE CONSULTANT RICCA DESIGN STUDIOS 515 Washington Norwell, MA 02061 303.621.6327 ACOUSTIC CONSULTANT METROPOLITAN ACOUSTICS 1628 John Kennedy Blvd #1902, Philadelphia, PA 19103 215.248.4352 9 8 GroundFloorFinishPlan 3rdFloorFinishPlan BasementFloorFinishPlan 2ndFloorFinishPlan EntryPerspective SitePlan
GFS CONNECTOR

ENLARGED RESTROOM PLANS, RCP & ELEVATIONS

ENLARGED CLASSROOM PLANS, RCP & ELEVATIONS

2.7 A711 C.5 2.4 118.10 118.5 118.4 118.3 118.2 300 SF RESTROOM 118 TROUGH SINK CT WALL HUNG TOILET, TYP A3C A3A 10" 10" 10" C.6 C.8 A710 A710 A710 A710 13 118.1 A3A A3C A6A A3C C3C A3A C3B A6A 10" 118.9 118.8 118.7 118.6 AMBULATORY COMPARTMENT 10" A3C C3B C6A 10" A3C A3C A3C A3C F0A A6C C3C TA-12 1/2" A711 15 2.7 C.5 2.4 GWB-2 -0" GWB-2 -4" C.6 C.8 A710 14 A710 A710 EQ EQ EQ EQ EQ EQ EQ PNT GWB-1 -4" R7A R7AR7AR7A R7A EQ EQ PNT GWB-1 -4" EQ EQ EQ EQ EQ EQ EQ EQ EQ R7AR7AR7AR7AR7A EQEQ R7 R7 EQ EQ EQ EQ OS GWB PNT 118.5 118.4 118.3 118.2 CT BASE 118.1 CT-2 MIRROR, TYP CT-2 GWB PNT GWB PNT CT-2 OPEN TO BYND OPEN TO BYND WD PNL-2 CT-2 GWB PNT GWB PNT TA-1 TA-3 TA-4 TA-9 1/2"EQ TA-9 TA-4 GWB PNT 118.10 BASE 118.9 118.8 118.7 118.6 RCP LEGEND LIGHTING LEGEND EXIT FIXTURE -CLNG MT DIRECTION AS INDICATED EXIT FIXTURE -WALL MT DIRECTION AS INDICATED RECESSED LIGHT FIXTURES Rx, ERx PENDANT LIGHT FIXTURE PxPx CORD REEL DIFFUSER CEILING SENSOR ACCESS PANEL RADIANT HEATER PANEL SMOKE DETECTOR SPRINKLER HEAD (CONCEALED) OS INTERIOR SYMBOL LEGEND SPEAKER CLOCK SPEAKER VISUAL ALARM POWER OUTLET DATA OUTLET SWITCH SOLAR TUBES SYS ACP-1 PNT GWB-1 ACPEXPOSED STRUCT ACPACPACPMCPEXG WD Rx SURFACE MOUNTED LIGHT FIXTURE TRACK LIGHT FIXTURE Sx, ESx INTERIOR ELEVATION GENERAL NOTES REFER TO A001 FOR TYPICAL MOUNTING HEIGHTS AND ACCESSIBILITY DETAILS REFER TO A710 FOR TOILET ACCESSORIES SCHEDULE PNT GWB-2 FRP-1 WD PNLCTINTERIOR FILL LEGEND SPEAKER VISUAL ALARM FRP-1 EXISTING WALL 5.2 5 A711 11 12 C.5 3.7 C.6 3.5 C.8 10 A710 A710 13 A710 298 SF RESTROOM 205 205.1 205.2 205.3 205.6 DRINKING FOUNTAIN AND WATER DISPENSER, SEE MEP DWGS A3B C3C C3B C3B A3B C3B C3B C6B C3A C3C A3B A3B C3B 3/4" A3C 1/2" 3/4" 205.5 205.4 12' 7/8" 19 A710 Sim 20 A710 3/8" 10 A831 A711 13 5.2 C.5 3.7 C.6 C.8 P3 PNT GWB-1 -4" EQ EQ PNT GWB-1 -4" R7AR7AR7A R7AR7AR7A EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ 1/4" GWB-2 -4" PNT GWB-1 -4" CT BASE GWB PNT 205.1 205.2 205.3 CT-2 MIRROR, TYP CT-2 GWB PNT GWB PNT TA-1 TA-3 CT-2 WD CT-2 GWB PNT GWB PNT OPEN TO BYND OPEN TO BYND EQ EQ TA-9 TA-9 TA-4 TA-3 TA-1 TA-1 TA-3 TA-4 GWB PNT CT BASE 205.6 205.5 205.4 206 RB CORRIDOR RESTROOM 1/2" EQ EQ 3/4" 3/4" GWB CURVED SOLID SURFACE PNL WITH WATERFALL EDGE SOLID SURFACE PNL SOLID SURFACE VALANCE WITH WATERFALL EDGE TILE BASE CNTR SUPPORT BRACKET AUTOMATIC FAUCETS AND SOAPS (2) SERVICE ACCESS PANELS 19 A710 A711 14 RCONT. DRAIN SLOPING SOLID SURFACE TROUGH SINK 4:12 1/2" SOLID SURFACE CNTR TA-5 20 A710 1/2" 1/2" 4" 19 A710 Sim SLOPING SOLID SURFACE TROUGH SINK CONT. DRAIN SOLID SURFACE TOP SHEET NAME: SHEET NUMBER: PROJECT PHASE: CHECKED: DRAWN: FORMAT: SCALE: DATE: 30" 42" PROJECT DATE: DESCRIPTION: OWNER GERMANTOWN FRIENDS SCHOOL Coulter Philadelphia, PA 19144 215.951.2300 ARCHITECT DIGSAU 340 North 12th Street, Suite 421 Philadelphia, PA 19107 215.627.0808 www.digsau.com LESLIE GILL ARCHITECT 277 Broadway, Suite 100 New York, NY 10007 212.334.8011 www.lesliegill.com STRUCTURAL ENGINEER DAVID MASON ASSOCIATES 123 Broad St, Suite 1130 Philadelphia, PA 19109 215.372.3400 CIVIL ENGINEER DAVID MASON ASSOCIATES 123 Broad St, Suite 1130 Philadelphia, PA 19109 215.372.3400 LANDSCAPE ARCHITECT STUDIO ZEWDE 163 Lenox Avenue New York, NY 10026 212.518.1548 MEP/FP ENGINEER DB|HMS 1500 Walnut Suite 1910 Philadelphia, PA 19102 267.217.1612 FOOD SERVICE CONSULTANT RICCA DESIGN STUDIOS 515 Washington Norwell, MA 02061 303.621.6327 ACOUSTIC CONSULTANT METROPOLITAN ACOUSTICS 1628 John Kennedy Blvd #1902, Philadelphia, PA 19103 215.248.4352 GERMANTOWN FRIENDS SCHOOLALL SCHOOL COMMONS Printed: As indicated 11/4/2022 1:14:19 AM A711 ENLARGED PLANS & ELEVATIONSRESTROOMS Author Checker Germantown Friends School GFS PHASE I 31 W Coulter St Philadelphia, PA 19144 04 NOVEMBER 2022 CONSTRUCTION DOCUMENTS 2009 A711 1/4" 1'-0" ENLARGED FLOOR PLAN - LEVEL RESTROOMS A711 1/4" 1'-0" ENLARGED RCP - LEVEL RESTROOMS A711 1/4" 1'-0" INT ELEV - RESTROOM 118 - N A711 1/4" 1'-0" INT ELEV - RESTROOM 118 - E A711 1/4" 1'-0" INT ELEV - RESTROOM 118 - W A711 1/4" 1'-0" INT ELEV - RESTROOM 118 - S A711 1/4" 1'-0" ENLARGED FLOOR PLAN - LEVEL RESTROOM A711 1/4" 1'-0" ENLARGED RCP - LEVEL RESTROOM A711 1/4" 1'-0" INT ELEVATION - LEVEL RESTROOM NORTH A711 1/4" 1'-0" 11 INT ELEVATION - LEVEL RESTROOM EAST A711 1/4" 1'-0" 12 INT ELEVATION - LEVEL RESTROOM WEST A711 1/4" 1'-0" 10A711 1/2" 1'-0" 14 ENLARGED ELEVATION - LEVEL RESTROOM SINKS A711 1/2" 1'-0" 15 ENLARGED FLOOR PLAN - LEVEL RESTROOM TROUGH SINK A711 1/2" 1'-0" 13 ENLARGED FLOOR PLAN - LEVEL TROUGH SINK REFER A001 FOR ALL DEVICE MOUNTING HEIGHTS U.O.N REFER A710 FOR TYP BATHROOM DETAILS AND SCHEDULE ALL DEVICES AND LIGHTING FIXTURES CENTERED IN GYP (ACP) CEILING PANELS U.O.N. CONTRACTOR TO PROVIDE BEHIND-WALL REINFORMENT AND/OR BLOCKING FOR ATTACHMENT OF MILLWORK, CASEWORK, HANDRAILS, GRABBARS, AV EQUIPMENT, ETC. RESTROOMS DIMENSIONED TO FINISH FACE OF WALL U.O.N ALL REQUIRED CLEAR WIDTH, CLEAR FLOOR SPACES, MANEUVERING CLEARANCE AND THE LIKE SHALL BASED ON DIMENSIONS AFTER THE INSTALLATION OF FINISHES AND RIM INCLUDING, THOUGH NOT LIMITED TO, WALL BASE, CHAIR RAIL, AND HANDRAILS; MODIFY PLANS MAY BE REQUIRED TO PROVIDE DIMENSIONS. PAINT, TILE AND BASE ACCENT COLORS BE SELECTED ARCHITECT V SV 1.1 1.7 745 SF ART -CERAMIC 214 A735 11 A735 13 15 14 12 A735 16 17 18 19 A735 151 STOR. 213 C.5 MOVABLE WORK TABLES, FFE, TYP STOOL SEATING, FFE, TYP WALL-MOUNTED PROJECTOR 90 SF KILN 216 BUILT-IN CASEWORK WITH EPOXY RESIN COUNTERTOP AND OPEN SHELVING ABOVE BUILT-IN CUBBY HOOK STORAGE POTTERY WHEELS 1.3 C3A A3A A3A A3A A6F A3A A6F 216 215 214 213 109 SF STOR. 215 13' 1/2" PIN-UP WALL KILNS, FFE OPEN SHELVING, FFE CONCRETE FLOORING C.6 TEACHING WALL OPEN SHELVING, FFE LOCKABLE STORAGE CABINET, FFE A735 SLAB ROLLER, FFE PUG MILL, FFE RETRACTABLE DROP CORD C.8 E.1 A6F C3E A6A F1A F1A 1.1 D 1.7 C.5 1.3 S2 S2 S2 S2 S2R7 PNT GWB-1 -4" PNT GWB-1 -4" EXPOSED ACOUSTIC METAL DECKING C.6 90 SF KILN 216 109 STOR. 215 745 ART -CERAMIC 214 151 SF STOR. 213 PNT GWB-1 -4" PNT GWB-1 -4" C.8 E.1 S2 S2 S2 S2AP-2A A831 P9 RCP LEGEND LIGHTING LEGEND EXIT FIXTURE -CLNG MT DIRECTION AS INDICATED EXIT FIXTURE -WALL MT DIRECTION AS INDICATED RECESSED LIGHT FIXTURES Rx, ERx PENDANT LIGHT FIXTURE PxPx CORD REEL DIFFUSER CEILING SENSOR ACCESS PANEL RADIANT HEATER PANEL SMOKE DETECTOR SPRINKLER HEAD (CONCEALED) OS INTERIOR SYMBOL LEGEND SPEAKER CLOCK SPEAKER VISUAL ALARM POWER OUTLET DATA OUTLET SWITCH SOLAR TUBES SYS ACP-1 PNT GWB-1 ACPEXPOSED STRUCT ACPACPACPMCPEXG WD Rx SURFACE MOUNTED LIGHT FIXTURE Sx TRACK LIGHT FIXTURE Sx, ESx Px INTERIOR ELEVATION GENERAL NOTES REFER TO A001 FOR TYPICAL MOUNTING HEIGHTS AND ACCESSIBILITY DETAILS REFER TO A710 FOR TOILET ACCESSORIES SCHEDULE PNT GWB-2 FRP-1 WD PNLCTINTERIOR FILL LEGEND SPEAKER VISUAL ALARM FRP-1 EXISTING WALL GWB AWP MB-1 WALL MOUNTED PROJECTOR RCPTS FOR PROJECTOR POWER, HDMI, LOW VOLTAGE, SEE DWGS RB OPN BYD SPEAKER VISUAL ALARM SPEAKER CLOCK 7' 2" EQ EQ 215 GWB AWP RB OPN BYD TC88 W36 W36 W36 W36 SB36 B36 B36 SB36 TA-10 TA-6 TA-6 TA-10 PIN-UP WALL PANELS AWP OPN BYD 213 GWB GWB RB GWB RB OPEN SHELVING, FFE OPN BYD GWB 213 RB OPEN SHELVING, FFE SPEAKER VISUAL ALARM RB OPEN SHELVING, FFE GWB GWB OPEN SHELVING, FFE RB 216 RB OPEN SHELVING, FFE LOCKABLE STORAGE CABINET, FFE OPEN SHELVING, FFE RB GWB 215 RB OPN BYD VISUAL ALARM 214 RB 11" GWB RB GWB RB 216 GWB VISUAL ALARM RB GWB SHEET NAME: SHEET NUMBER: PROJECT PHASE: CHECKED: DRAWN: FORMAT: SCALE: DATE: 30" 42" PROJECT DATE: DESCRIPTION: OWNER GERMANTOWN FRIENDS SCHOOL 31 Coulter Philadelphia, PA 19144 215.951.2300 ARCHITECT DIGSAU 340 North 12th Street, Suite 421 Philadelphia, PA 19107 215.627.0808 www.digsau.com LESLIE GILL ARCHITECT 277 Broadway, Suite 100 New York, NY 10007 212.334.8011 www.lesliegill.com STRUCTURAL ENGINEER DAVID MASON & ASSOCIATES 123 Broad St, Suite 1130 Philadelphia, PA 19109 215.372.3400 CIVIL ENGINEER DAVID MASON & ASSOCIATES 123 Broad St, Suite 1130 Philadelphia, PA 19109 215.372.3400 LANDSCAPE ARCHITECT STUDIO ZEWDE 163 Lenox Avenue New York, NY 10026 212.518.1548 MEP/FP ENGINEER DB|HMS 1500 Walnut St, Suite 1910 Philadelphia, PA 19102 267.217.1612 FOOD SERVICE CONSULTANT RICCA DESIGN STUDIOS 515 Washington Norwell, MA 02061 303.621.6327 ACOUSTIC CONSULTANT METROPOLITAN ACOUSTICS 1628 John Kennedy Blvd #1902, Philadelphia, PA 19103 215.248.4352As indicated A735 ENLARGED PLANS & ELEVATIONS - ART CERAMICS 214 Author Checker Germantown Friends School GFS PHASE 31 W Coulter St Philadelphia, PA 19144 04 NOVEMBER 2022 CONSTRUCTION DOCUMENTS 2009 A735 1/4" 1'-0" ENLARGED PLAN - ART CERAMIC 214 A735 1/4" 1'-0" ENLARGED RCP - ART CERAMIC 214 A735 1/4" 1'-0" INT ELEV - ART CERAMIC 214A735 1/4" 1'-0" INT ELEV - ART CERAMIC 214A735 1/4" 1'-0" INT ELEV - ART CERAMIC 214A735 1/4" 1'-0" 11 INT ELEV - ART CERAMIC 214A735 1/4" 1'-0" INT ELEV - ART 206 STORAGEA735 1/4" 1'-0" INT ELEV - ART 206 STORAGEA735 1/4" 1'-0" INT ELEV - ART 206 STORAGEA735 1/4" 1'-0" 10 INT ELEV - ART 206 STORAGE - W A735 1/4" 1'-0" 12 INT ELEV - STORAGE 216 - N A735 1/4" 1'-0" 13 INT ELEV - STORAGE 216A735 1/4" 1'-0" 14 INT ELEV - STORAGE 216A735 1/4" 1'-0" 15 INT ELEV - STORAGE 216 - W A735 1/4" 1'-0" INT ELEV - ART CERAMIC 214 - ENTRY - N A735 1/4" 1'-0" 16 INT ELEV - KILN 215 - N A735 1/4" 1'-0" INT ELEV - KILN 215A735 1/4" 1'-0" 18 INT ELEV - KILN 215A735 1/4" 1'-0" 19 INT ELEV - STORAGE 215 - N 11 10 GFS CONNECTOR

FINISH FLOOR TRANSITION DETAILS

SCHED PRTN RUBBER COVE BASE FINISH PER INTERIOR ELEVATIONS FINISH FLOOR WHERE OCCURS, REF FINISH PLAN SCHED PRTN THINSET MORTAR BED CT-1 MMB CT-2 CEMENT BACKER BOARD ALUM. SADDLE RECESSED WALK-OFF MAT DOOR, SEE SCHEDULE CONC ANGLE PER STRUCTURAL SUBBASE (REF TO CIVIL) WRAP WATERPROOFING OVER CURB 1" POLYSTYRENE INSULATION PAVING (SEE LANDSCAPE) CT-1 POLISHED CONC WALL EDGE BEYOND METAL TRANSITION THINSET MORTAR BED ALUM. SADDLE RECESSED WALK-OFF MAT DOOR, SEE SCHEDULE CONC METAL TRANSITION ALUM. STOREFRONT ENTRANCE SUBBASE (REF TO CIVIL) WRAP WATERPROOFING OVER CURB POLYSTYRENE INSULATION RECESSED WALK OFF MAT METAL TRANSITION PAVING (SEE LANDSCAPE) STONE TRANSITION METAL T-TRANSITION POLISHED CONC SRF PRIMER AS PER MANU SPECS FIN PER INTERIOR ELEVATIONS FLRING PER FINISH PLAN SOLID WD BASE CPT DOOR, SEE SCHEDULE RESILIENT TRANSITION EXG CT EXG DOOR, SEE SCHEDULE DOOR JAMB BEYOND SCHED PRTN METAL TRANSITION EXG CONC TO BE REFINISHED SCHED PRTN SRF CT-2 6" METAL SCHLUTER STRIP HARD BOARD 3/4" RADIUS COVE CPT DOOR, SEE SCHEDULE SRF METAL TRANSITION EXG CT DOOR, SEE SCHEDULE RESILIENT TRANSITION RUB POLISHED CONC DOOR, SEE SCHEDULE DOOR JAMB BEYOND SCHED PRTN METAL TRANSITION EXG CONC TO BE REFINISHED CONTROL JOINT BACKER ROD SLNT POLISHED CONC DOOR JAMB BEYOND BRASS TRANSITION EXG WD TO BE REFINISHED SMITH DINING CONNECTOR BACKER ROD NEW CONC SLAB CONNECTOR EXG SUB CLEAN UP POLISHED CONC DOOR JAMB BEYOND BRASS TRANSITION WD SMITH DINING CONNECTOR CONTROL JOINT BACKER ROD NEW CONC SLAB @ CONNECTOR EXG SUB CLEAN UP SRF DOOR JAMB BEYOND SMITH DINING CONNECTOR CONTROL JOINT BACKER ROD SLNT BACKER ROD NEW CONC SLAB @ CONNECTOR EXG SUB CLEAN UP BRASS TRANSITION EXG WD TO BE REFINISHED SCHED PRTN SRF FIN PER INTERIOR ELEVATIONS FRP EDGE TRIM FRP LOCATIONS -PER INTERIOR ELEVATIONS 3/4" RADIUS COVE DOOR, SEE SCHEDULE RESILIENT TRANSITION MAR SCHED PRTN THINSET MORTAR BED CT-1 MMB CTB FINISH PER INTERIOR ELEVATIONS DOOR, SEE SCHEDULE POLISHED CONC CPT RESILIENT TRANSITION ALUM. STOREFRONT ENTRANCE SUBBASE (REF TO CIVIL) WRAP WATERPROOFING OVER CURB 1" POLYSTYRENE INSULATION RECESSED WALK OFF MAT METAL TRANSITION PAVING (SEE LANDSCAPE) STONE TRANSITION EXG STONE TRANSITION LOEB CONNECTOR DOOR JAMB BEYOND DOOR, SEE SCHEDULE POLISHED CONC CONTROL JOINT SUB CLEAN UP ALIGN ALIGN ADA SLOPE AS REQUIRED TO ALIGN BETWEEN LOEB CONNECTOR VARIES SEE PLAN CT-1 ALUMINUM TRIM MAGNETIC CONNECTION ALIGN SHEET NAME: SHEET NUMBER: PROJECT PHASE: CHECKED: DRAWN: FORMAT: SCALE: DATE: 30" 42" PROJECT #: DATE: DESCRIPTION: OWNER GERMANTOWN FRIENDS SCHOOL 31 Coulter St Philadelphia, PA 19144 215.951.2300 ARCHITECT DIGSAU 340 North 12th Street, Suite 421 Philadelphia, PA 19107 215.627.0808 www.digsau.com LESLIE GILL ARCHITECT 277 Broadway, Suite 100 New York, NY 10007 212.334.8011 www.lesliegill.com STRUCTURAL ENGINEER DAVID MASON ASSOCIATES 123 Broad St, Suite 1130 Philadelphia, PA 19109 215.372.3400 CIVIL ENGINEER DAVID MASON ASSOCIATES 123 Broad St, Suite 1130 Philadelphia, PA 19109 215.372.3400 LANDSCAPE ARCHITECT STUDIO ZEWDE 163 Lenox Avenue New York, NY 10026 212.518.1548 MEP/FP ENGINEER DB|HMS 1500 Walnut St, Suite 1910 Philadelphia, PA 19102 267.217.1612 FOOD SERVICE CONSULTANT RICCA DESIGN STUDIOS 515 Washington St Norwell, MA 02061 303.621.6327 ACOUSTIC CONSULTANT METROPOLITAN ACOUSTICS 1628 John Kennedy Blvd #1902, Philadelphia, PA 19103 215.248.4352As indicated BIM 360://Germantown Friends School/2009_GFS P1_202 A810 INTERIOR DETAILS FLOOR Author Checker Germantown Friends School GFS PHASE 31 W Coulter St Philadelphia, PA 19144 NOVEMBER 2022 CONSTRUCTION DOCUMENTS 2009 A810 3" 1'-0" FLR DTL - RUBBER COVE BASE A810 3" 1'-0" BASE A810 3" 1'-0" 11 FLR DTL - THRESHOLD PAVING TO WALKOFF MATT A810 1'-0" FLR DTL - TRANSITION @ CONC TO CT - RECESSED A810 1'-0" FLR DTL - THRESHOLD @ CONC TO WALKOFF GRILLE A810 1'-0" FLR DTL - THRESHOLD @ WALKOFF MATT TO EXT COURTYARD PAVER A810 1'-0" 8.1 FLR DTL - TRANSITION @ SRF TO CONC A810 1'-0" FLR DTL - WD BASE WD FLR A810 1'-0" 3.1 FLR DTL - THRESHOLD @ EXG CT TO CPT A810 1'-0" 2.1 FLR DTL - THRESHOLD @ EXG CT TO EXG CONC A810 1'-0" 10 FLR DTL - BASE SELF COVE AT CT A810 3" 1'-0" 9.1 FLR DTL - THRESHOLD SRF TO CPT A810 1'-0" 4.1 FLR DTL - THRESHOLD @ EXG CT TO RUB A810 1'-0" 1.1 FLR DTL - THRESHOLD @ CONC TO EXG CT A810 1'-0" 6.1 FLR DTL - THRESHOLD @ EXG WD TO CONC A810 1'-0" 5.1 FLR DTL - THRESHOLD @ WD TO CONC A810 1'-0" 7.1 FLR DTL - THRESHOLD @ EXG WD TO SRF A810 1'-0" 19 FLR DTL - BASE SELF COVE AT FRP A810 1'-0" 17 FLR DTL - THRESHOLD @ CONC TO MAR A810 1'-0" 20 FLR DTL - BASE CT A810 1'-0" 21 FLR DTL - THRESHOLD @ CONC TO CPT A810 1'-0" 22 FLR DTL - THRESHOLD @ WALKOFF MATT TO EXT PAVER A810 1/2" 1'-0" 23 FLR DTL - THRESHOLD @ LOEB EXG CONC TO CONC A810 1'-0" DTL SECTION TRENCH DRAIN SCHED PRTN RUBBER COVE BASE FINISH PER INTERIOR ELEVATIONS FINISH FLOOR WHERE OCCURS, REF FINISH PLAN SCHED PRTN THINSET MORTAR BED CT-1 MMB CT-2 CEMENT BACKER BOARD ALUM. SADDLE RECESSED WALK-OFF MAT DOOR, SEE SCHEDULE CONC ANGLE PER STRUCTURAL SUBBASE (REF TO CIVIL) WRAP WATERPROOFING OVER POLYSTYRENE INSULATION PAVING (SEE LANDSCAPE) CT-1 POLISHED CONC WALL EDGE BEYOND METAL TRANSITION THINSET MORTAR BED ALUM. SADDLE RECESSED WALK-OFF MAT DOOR, SEE SCHEDULE CONC METAL TRANSITION ALUM. STOREFRONT ENTRANCE SUBBASE (REF TO CIVIL) WRAP WATERPROOFING OVER CURB POLYSTYRENE INSULATION RECESSED WALK OFF MAT METAL TRANSITION PAVING (SEE LANDSCAPE) STONE TRANSITION METAL T-TRANSITION POLISHED CONC SRF PRIMER PER MANU SPECS FIN PER INTERIOR ELEVATIONS FLRING PER FINISH PLAN SOLID BASE CPT DOOR, SEE SCHEDULE RESILIENT TRANSITION EXG CT EXG CT DOOR, SEE SCHEDULE DOOR JAMB BEYOND SCHED PRTN METAL TRANSITION EXG CONC TO BE REFINISHED SCHED PRTN SRF CT-2 METAL SCHLUTER STRIP HARD BOARD 3/4" RADIUS COVE CPT DOOR, SEE SCHEDULE SRF METAL TRANSITION EXG CT DOOR, SEE SCHEDULE RESILIENT TRANSITION RUB POLISHED CONC DOOR, SEE SCHEDULE DOOR JAMB BEYOND SCHED PRTN METAL TRANSITION EXG CONC TO BE REFINISHED CONTROL JOINT BACKER ROD SLNT POLISHED CONC DOOR JAMB BEYOND BRASS TRANSITION EXG WD REFINISHED SMITH DINING CONNECTOR BACKER ROD NEW CONC SLAB CONNECTOR EXG SUB CLEAN POLISHED CONC DOOR JAMB BEYOND BRASS TRANSITION WD SMITH DINING CONNECTOR CONTROL JOINT BACKER ROD NEW CONC SLAB CONNECTOR EXG SUB CLEAN UP SRF DOOR JAMB BEYOND SMITH DINING CONNECTOR CONTROL JOINT BACKER ROD SLNT BACKER ROD NEW CONC SLAB CONNECTOR EXG SUB CLEAN UP BRASS TRANSITION EXG WD TO BE REFINISHED SCHED PRTN SRF FIN PER INTERIOR ELEVATIONS FRP EDGE FRP LOCATIONS -PER INTERIOR ELEVATIONS 3/4" RADIUS COVE DOOR, SEE SCHEDULE RESILIENT TRANSITION MAR SCHED PRTN THINSET MORTAR BED CT-1 MMB CTB FINISH PER INTERIOR ELEVATIONS DOOR, SEE SCHEDULE POLISHED CONC CPT RESILIENT TRANSITION ALUM. STOREFRONT ENTRANCE SUBBASE (REF TO CIVIL) WRAP WATERPROOFING OVER CURB POLYSTYRENE INSULATION RECESSED WALK MAT METAL TRANSITION PAVING (SEE LANDSCAPE) STONE TRANSITION EXG STONE TRANSITION LOEB CONNECTOR DOOR JAMB BEYOND DOOR, SEE SCHEDULE POLISHED CONC CONTROL JOINT SUB CLEAN UP ALIGN ALIGN ADA SLOPE AS REQUIRED TO ALIGN BETWEEN LOEB CONNECTOR VARIES SEE CT-1 ALUMINUM TRIM MAGNETIC CONNECTION ALIGN SHEET NAME: SHEET NUMBER: PROJECT PHASE: CHECKED: DRAWN: FORMAT: SCALE: DATE: 30" 42" PROJECT DATE: DESCRIPTION: OWNER GERMANTOWN FRIENDS SCHOOL 31 Coulter Philadelphia, PA 19144 215.951.2300 ARCHITECT DIGSAU 340 North 12th Street, Suite 421 Philadelphia, PA 19107 215.627.0808 www.digsau.com LESLIE GILL ARCHITECT 277 Broadway, Suite 100 New NY 10007 212.334.8011 www.lesliegill.com STRUCTURAL ENGINEER DAVID MASON ASSOCIATES 123 Broad St, Suite Philadelphia, PA 19109 215.372.3400 CIVIL ENGINEER DAVID MASON ASSOCIATES 123 Broad St, Suite Philadelphia, PA 19109 215.372.3400 LANDSCAPE ARCHITECT STUDIO ZEWDE 163 Lenox Avenue New NY 10026 212.518.1548 MEP/FP ENGINEER DB|HMS 1500 Walnut St, Suite 1910 Philadelphia, PA 19102 267.217.1612 FOOD SERVICE CONSULTANT RICCA DESIGN STUDIOS 515 Washington Norwell, MA 02061 303.621.6327 ACOUSTIC CONSULTANT METROPOLITAN ACOUSTICS 1628 John Kennedy Blvd #1902, Philadelphia, PA 19103 215.248.4352As indicated A810 INTERIOR DETAILSFLOOR Author Checker Germantown Friends School GFS PHASE I 31 W Coulter St Philadelphia, PA 19144 04 NOVEMBER 2022 CONSTRUCTION DOCUMENTS 2009 A810 1'-0" FLR DTL - RUBBER COVE BASE A810 1'-0" BASE A810 11 FLR DTL - THRESHOLD @ PAVING TO WALKOFF MATT A810 3" 1'-0" FLR DTL - TRANSITION @ CONC TO CT -RECESSED A810 1'-0" FLR DTL - THRESHOLD @ CONC TO WALKOFF GRILLE A810 1'-0" FLR DTL -THRESHOLD @ WALKOFF MATT TO EXT COURTYARD PAVER A810 3" 1'-0" 8.1 FLR DTL - TRANSITION @ SRF TO CONC A810 1'-0" FLR DTL - WD BASE @ WD FLR A810 3" 1'-0" 3.1 FLR DTL - THRESHOLD EXG CT TO CPT A810 1'-0" 2.1 FLR DTL - THRESHOLD @ EXG CT TO EXG CONC A810 1'-0" 10 FLR DTL - BASE SELF COVE AT CT A810 1'-0" 9.1 FLR DTL - THRESHOLD @ SRF TO A810 3" 1'-0" 4.1 FLR DTL - THRESHOLD @ EXG CT TO RUB A810 1'-0" 1.1 FLR DTL -THRESHOLD @ CONC TO EXG CT A810 1'-0" 6.1 FLR DTL - THRESHOLD @ EXG WD TO CONC A810 1'-0" 5.1 FLR DTL -THRESHOLD @ WD CONC A810 3" 1'-0" 7.1 FLR DTL - THRESHOLD EXG WD TO A810 1'-0" 19 FLR DTL - BASE SELF COVE AT A810 1'-0" 17 FLR DTL - THRESHOLD @ CONC TO MAR A810 1'-0" 20 FLR DTL - BASE CT A810 1'-0" 21 FLR DTL - THRESHOLD @ CONC TO CPT A810 3" 1'-0" 22 FLR DTL - THRESHOLD WALKOFF MATT TO PAVER A810 1/2" 1'-0" 23 FLR DTL - THRESHOLD @ LOEB EXG CONC TO CONC A810 1'-0" DTL SECTION TRENCH DRAIN EXT WALL SYS-2 (BRICK MTL STUD) -LONG FORMAT CLAY FACE BRICK -2" MIN AIR GAP (VARIABLE) -SMARTCi Z-GIRT BRACKET 16" O.C. MAX VERTICAL SPACING -4" MINERAL WOOL INSULATION (R-17 MIN) -AIR/VAPOR BARRIER -5/8" EXT GYP SHEATHING -6" CFMF -5 1/2" BATT INSULATION (R-20) -(1) LAYER 5/8" GWB PLAN DETAIL SECTION DETAIL EXTERIOR INTERIOR 5/8" 2" SOFFIT SYS-1A (STUCCO) -STRUCTURE ABOVE OR CFMF 1/2" BATT INSULATION (R-20) -EXT GYP SHEATHING -AIR/VAPOR BARRIER -SUB-FRAMING THERMAL SPACER -4" MIN. INSULATION -EXT SHEATHING -METAL LATH -STUCCO FINISH 6" CFMF 16" O.C. ROOF SYSTEM -1B -LIGHTWEIGHT BALLAST STONE OR PAVER (SEE ROOF PLAN FOR FINISH) -STONE FILTER FABRIC OR SPACER TAB (SEE ROOF PLAN FOR FINISH) -MIN 6" INSULATION LAYER (R-30) -HYDROFLEX -MONOLITHIC MEMBRANE 6125-FR -SURFACE CONDITIONER 1/2" CONCRETE TOPPING SLAB -COMPOSITE ROOF DECK (SEE STRUC. FOR EXTENT OF ACOUSTIC DECK) -STRUCTURE BELOW (SEE ROOF PLAN FOR SLOPE) 1B ARCHITECTURAL PAVER ON SPACER TABS STONE BALLAST ON FILTER FABRIC DAMP PROOFING SYSTEM -2" XPS RIGID INSULATION TO TOP OF FOOTING -DRAINAGE BOARD -DAMP PROOFING -CAST IN PLACE CONCRETE WALL (SEE STRUC) SECTION DETAIL EXTERIOR EXT WALL SYS-3A (STONE MTL STUD) -STONE VENEER; SPLIT FACE, SMOOTH -2" MIN AIR GAP (VARIES) -SMARTCi Z-GIRT BRACKET 16" O.C. MAX VERTICAL SPACING -4" MINERAL WOOL INSULATION (R-17 MIN) -AIR/VAPOR BARRIER -5/8" EXT GYP SHEATHING -6" CFMF -5 1/2" BATT INSULATION (R-20 MIN) -(1) LAYER 5/8" GWB PLAN DETAIL SECTION DETAIL EXTERIOR INTERIOR 3A S EXT WALL SYS-1A (METAL PANEL MTL STUD) -ALUM COMPOSITE PANEL -SUB-FRAMING THERMAL SPACER -4" MINERAL WOOL INSULATION (R-17 MIN) -AIR/VAPOR BARRIER -5/8" EXT GYP SHEATHING -6" CFMF 1/2" BATT INSULATION (R-20 MIN) -(1) LAYER 5/8" GWB PLAN DETAIL SECTION DETAIL EXTERIOR INTERIOR 1A EXT WALL SYS-1B (METAL PANEL MTL STUD) -ALUM COMPOSITE PANEL W/ FIELD APPLIED SPLINE -SUB-FRAMING THERMAL SPACER -4" MINERAL WOOL INSULATION (R-17 MIN) -AIR/VAPOR BARRIER -5/8" EXT GYP SHEATHING -6" CFMF -5 1/2" BATT INSULATION (R-20 MIN) -(1) LAYER 5/8" GWB PLAN DETAIL SECTION DETAIL EXTERIOR INTERIOR EXTERIOR 1/2" 1/2" ROOF SYSTEM -2 (EXTENSIVE GREEN ROOF) -PLANTING MATERIALS -GARDENEDGE METAL EDGE RESTRAINT -EXTENSIVE GROWING MEDIA -GARDEN DRAIN WITH FILTER FABRIC / LIGHTWEIGHT BALLAST STONE OR PAVERS -6" MIN. INSULATION LAYER (R-30) -HYDROFLEX 30 AND ROOT STOP -MONOLITHIC MEMBRANE 6125-FR -SURFACE CONDITIONER -MECHANICALLY ATTACHED SECUROCK ROOF BOARD -NON-COMPOSITE ROOF DECK (SEE STRUC. FOR EXTENT OF ACOUSTIC DECK) -STRUCTURE BELOW 1' 1/2" MECHANICAL FASTENERS MUST LIMITED TO METAL DECK RIBS 3/4" 6" MIN. OVERLAP 10 1/8" ROOF SYSTEM -1A -LIGHTWEIGHT BALLAST STONE -STONE FILTER FABRIC OR SPACER TAB (SEE ROOF PLAN FOR FINISH) -MIN INSULATION LAYER (R-30) (SEE ROOF PLAN FOR SLOPE) -HYDROFLEX / ROOT STOP -MONOLITHIC MEMBRANE 6125-FR -MECHANICALLY ATTACHED SECUROCK ROOF BOARD -NON-COMPOSITE METAL ROOF DECK (SEE STRUC. FOR EXTE OF ACOUSTIC DECK) -STRUCTURE BELOW (SEE ROOF PLAN FOR SLOPE) 1A MECHANICAL FASTENERS MUST BE LIMITED METAL DECK RIBS STONE BALLAST ON FILTER FABRIC WATERPROOFING SYSTEM -2" XPS RIGID INSULATION TO TOP OF FOOTING -DRAINAGE BOARD -SHEET APPLIED WATERPROOFING -CAST IN PLACE CONCRETE WALL (SEE STRUC) SECTION DETAIL EXT WALL SYS-3B (STONE MTL STUD) -STONE VENEER; SPLIT FACE, NATURAL/ROUGH TEXTURE -2" MIN AIR GAP (VARIES) -SMARTCi Z-GIRT BRACKET 16" O.C. MAX VERTICAL SPACING -4" MINERAL WOOL INSULATION (R-17 MIN) -AIR/VAPOR BARRIER -5/8" EXT GYP SHEATHING -6" CFMF -5 1/2" BATT INSULATION (R-20 MIN) -(1) LAYER 5/8" GWB PLAN DETAIL SECTION DETAIL EXTERIOR INTERIOR 3B 1' 5 1/4" SOFFIT SYS-1B CANOPIES (STUCCO) -FLAT SEAM OR LOCK METAL PANEL -1/2" EXT SHEATHING -METAL DECKING -CFMF OR TUBE STEEL - EXT SHEATHING -METAL LATH -STUCCO FINISH VARIES; SEE CANOPY DRAWINGS TYPICAL SLAB ON GRADE -STRUCTURAL CONC FLOOR SLAB -VAPOR RETARDER -2" XPS INSULATION -GRAVEL FILL; SEE STRUCTURAL DRAWINGS SECTION DETAIL INTERIOR SPACE TYPICAL SLAB BELOW GRADE -STRUCTURAL CONC FLOOR SLAB -WATERPROOFING -2" XPS INSULATION -GRAVEL FILL; SEE STRUCTURAL DRAWINGS SECTION DETAIL INTERIOR SPACE SHEET NAME: SHEET NUMBER: PROJECT PHASE: CHECKED: DRAWN: FORMAT: SCALE: DATE: 30" 42" PROJECT DATE: DESCRIPTION: OWNER GERMANTOWN FRIENDS SCHOOL 31 Coulter St Philadelphia, PA 19144 215.951.2300 ARCHITECT DIGSAU 340 North 12th Street, Suite 421 Philadelphia, PA 19107 215.627.0808 www.digsau.com LESLIE GILL ARCHITECT 277 Broadway, Suite 100 New York, NY 10007 212.334.8011 www.lesliegill.com STRUCTURAL ENGINEER DAVID MASON ASSOCIATES 123 Broad St, Suite 1130 Philadelphia, PA 19109 215.372.3400 CIVIL ENGINEER DAVID MASON ASSOCIATES 123 Broad St, Suite 1130 Philadelphia, PA 19109 215.372.3400 LANDSCAPE ARCHITECT STUDIO ZEWDE 163 Lenox Avenue New York, NY 10026 212.518.1548 MEP/FP ENGINEER DB|HMS 1500 Walnut St, Suite 1910 Philadelphia, PA 19102 267.217.1612 FOOD SERVICE CONSULTANT RICCA DESIGN STUDIOS 515 Washington St Norwell, MA 02061 303.621.6327 ACOUSTIC CONSULTANT METROPOLITAN ACOUSTICS 1628 John Kennedy Blvd #1902, Philadelphia, PA 19103 215.248.4352A600 EXTERIOR SYSTEMS ASSEMBLIES GF JG/ DF Germantown Friends School GFS PHASE 31 W Coulter St Philadelphia, PA 19144 NOVEMBER 2022 CONSTRUCTION DOCUMENTS 2009 13 12 GFS CONNECTOR
EXTERIOR ASSEMBLY DETAILS

TRENCHDRAIN CONTROLPANEL

TIMBERSCULPTURE

ENDWALL FENESTRATION

SignagePerspective

CHALLENGE PROGRAM FURNITURE STUDIO

DIGSAU / 2022 / WILMINGTON, DE

This project yields 14,000 square feet of wood working and metal fabrication shops, a furniture show room and expanded office spaces. The project triples the footprint of their existing facility by arranging the program into a 3 bar parti, 2 of which utilize heavy timber framing. My tasks on the project came during CA phase with the issuance of several sketches for options of finishing and fenestration methods, as well as replacement of long-lead time products, as specified in the basis of design. Simultaneously, I drove the initial design iteration of the building’s sculptural signage component.

ProjectExperience:

SignageDesignIteration,ConstructionAdminSketchesViaBluebeam,Rhino,&Enscape.

Rectangular - Vertical

Aligned Seams - Concealed Beam

Triangular - Timber Offset

Aligned Seams - Revealed Beam

Rectangular - Rafter Aligned

Staggered Seams - Concealed Beam

Light Wall

Staggered Seams - Revealed Beam

10% LP SLOPE GATE CONTROL ACCESS PANEL TRENCH DRAIN, SEE CIVIL SIDEWALK 14 '10 " SIGNAGE CP SCULPTURE FENCE 9 -51/4" 5'-6" LEVEL - 0" T.O. RIDGE- BAR B/C 30' - 0" F T.O.WALL - BAR 18' - 3" WALL SYS-2B (COLOR CONC STEM WALL PLANTED RFG ASSEMBLY 1/8" 1'-0" SK-5 SK -BAR C1 -EAST ELEVATION LEVELT.O. RIDGE- BAR B/C 30'F E T.O.WALL - BAR 18'WALL SYS-2B (COLOR CONC STEM WALL PLANTED RFG ASSEMBLY DIGSAU 1/8" -0" 06/27/22 BAR C - EAST GABLE END WINDOWS SK-5 1/8" 1'-0" SK-5 1 SK -BAR C1 -EAST ELEVATION T.O. RIDGE- BAR B/C 30'F E T.O.WALL - BAR 18'WALL SYS-2B (COLOR CONC STEM WALL PLANTED RFG ASSEMBLY 1/8" 1'-0" SK-6 1 SK -BAR C1 -EAST ELEVATION LEVEL - 0" D T.O. RIDGE- BAR B/C 30' - 0" T.O.WALL - BAR B 18' - 3" WALL SYS-2B (COLOR A) CONC STEM WALL PLANTED RFG ASSEMBLY DIGSAU 1/8" - 06/27/22 BAR C - EAST GABLE END WINDOWS SK-5 1/8" = 1'-0" SK-5 SK -BAR C1 -EAST ELEVATION 1/2" 1/2" 1/2" 1/2" 1/2" 1/2" DIGSAU 06/24/22 SHEAR WALL SK 1/4" 1'-0" SK-4 STORAGE (#06A) -S -Shear Wall SK 1/2" 1/2" 1/2" 1/2" 1/2" 1/2" DIGSAU 06/24/22 SHEAR WALL SK 1/4" 1'-0" SK-4 STORAGE (#06A) -S -Shear Wall SK 1/2" 1/2" 1/2" 1/2" 1/2" 1/2" DIGSAU 06/24/22 SHEAR WALL SK 1/4" 1'-0" SK-4 STORAGE (#06A) -S -Shear Wall SK 1/2" 1/2" 1/2" 1/2" 1/2" 1/2" DIGSAU 06/24/22 SHEAR WALL SK 1/4" 1'-0" SK-4 STORAGE (#06A) -S -Shear Wall SK 15 14
SitePlan
SIGNAGE SIDEWALK FENCE CHALLENGE PROGRAM SHEAR WALL FINISH STUDY

SIGNAGE DESIGN ITERATION

FINALIZED SIGNAGE DESIGN

**design intent collaboratively documented by colleagues** Initial Revision Path Revisited Design Intent

10 3/4" 4' - 10 1/4" 8'0" 2'6" TYP 10 3/4" 2'2 3/4" 3'3" 1'7 1/4" 3' - 8 3/4" 1'5 1/2" 4' - 9 1/2" 3 1/2" TYP 9' - 5 1/4" ALIGN 3' - 7 1/4" 10 3/4" 4' 10 1/4" 8'0" 2'6" TYP 10 3/4" 2'2 3/4" 3'3" 1'7 1/4" 3' - 8 3/4" 1'5 1/2" 4' - 9 1/2" 3 1/2" TYP 9' - 5 1/4" ALIGN 3' 7 1/4" 10 3/4" 4' 10 1/4" 2'6" 10 3/4" 2'2 3/4" 3'3" 1'7 1/4" 3' - 8 3/4" 1'5 1/2" 4' - 9 1/2" 3 1/2" TYP 9' - 5 1/4" ALIGN 3' - 7 1/4" 10 3/4" 4' - 10 1/4" 8'0" 2'6" TYP 10 3/4" 2'2 3/4" 3'3" 1'7 1/4" 3' - 8 3/4" 1'5 1/2" 4' - 9 1/2" 3 1/2" TYP 9' - 5 1/4" ALIGN 3' - 7 1/4"
17 16 Initial Preference Rotate Logo Proud Logo 45 CCW Rotate Logo Revisited for Final Final Preference
Logo Orientation Signage Proportion/Typology
Initial Design Iteration Preferences Revised Design Iterations Material Tests - Sign Backing, Logo & Lettering SECTION / ELEVATION CHALLENGE PROGRAM

Yards Brewery’s Spring Garden tasting room and brewing facility opened in 2o16 to much success. However, as the pandemic threw a wrench in dining operations across 2020-2021, their demand for all-season outdoor dining spaces became evident. In addition - they wanted to provide new openings along the fifth street facade from their private banquet hall as well as an ADA restroom.

BIDDING SET FLOORPLANS

YARDS 456 N. 5TH STREET, PHILADELPHIA, PA 19123 NOVEMBER 11, 2021 | DESIGN MEETING 2 SpRInG GARDEn St - LooKInG SoutH 500 SPRING GARDEN ST, PHILADELPHIA, PA 19123 SPRING GARDEN ST N 5TH ST N 6TH ST YARDS AREA OF WORK PROPERTY LINE NOT IN PROJECT SCOPE DRAWING KEY NEW GWB PARTITION EXISTING TO BE DEMOLISHED DEMOLISH EXG EXTERIOR WALL AT NEW OPENING LOCATIONS. RETAIN BRICK. DEMO KEYED NOTES DEMOLISH EXG SIDEWALK. ABBREVIATIONS COLColumn CONCConcrete DSDown Spout DWGDrawing EAEach ELECElectrical EXGExisting EQEqual FFEFinish Floor Elevation GWBGypsum Wall Board MTLMetal OVHDOverhead PNTPaint, painted RCPReflected Ceiling Plan REQRequired STLSteel STRUCStructure, Structural VIFVerify in field WDWWindow ARCHITECT DIGSAU 340 North 12th Street, Suite 421 Philadelphia, PA 19107 C8 C8 C7 C7 CJ CI CH CG CF CE CD CC C6 C5 C4 C3 C2 C1 CA CB NOT SCOPE 11' 10" 2' 2" 10' 0" 2' 2" 2'8" NEW ROOF ABOVE (5) COLS AT EXG FENCE POST LOCATIONS EXG FENCE DRINK RAIL TO REMAIN DS 1/4" 1'-0" NEW FENCE COLS NEW CONC RAISED PATIO NEW ROOF ABOVE 28.85' 28.85' 28.85' 4' 3" 11' 0" 27.8' NEW DRINK RAIL NEW CONC STAIR, LANDING AND MTL RAILING NEW COL PROPERTY LINE 8" VIF 10" VIF 6' 10" VIF 10" VIF 6' 8' 47' 6" 3"FFE DS (3) NEW OPENINGS 1' 6" 16' 6" 15' 7" 14' 8" 10' 5' 8" 13' NEW PLANTED AREA NEW CONC CURB DS DS DS 9' 0" 6'9 1/2" NEW BAR (OPTIONAL) GATE GATE3NOT SCOPE A2.0 2' 2" NEW ROOF NEW ROOF (4) NEW OPENINGS NEW ADA BATHROOM OPEN TRELLIS 1/4" 1'-0" 1/2" 1'-0" 11/16" 1'-0" 1/4" 1'-0" GUTTER GUTTER GUTTER GUTTER GUTTER NOT IN SCOPE (12) NEW HANGING PATIO HEATERS (12) NEW HANGING PATIO HEATERS (6) NEW HANGING PATIO HEATERS (1) NEW HANGING FAN @ CANOPY RIDGE (2) NEW HANGING FANS @ CANOPY RIDGES NEW HANGING SIGNAGE DEMOLISH EXG EXTERIOR WALL AT NEW OPENING LOCATIONS. RETAIN BRICK. DEMOLISH EXG SIDEWALK. DEMOLISH EXG CONCRETE STAIR METAL RAILINGS. REROUTE EXG CONDUIT RELOCATE EXG LIGHT FIXTURES AS REQ. SHEET NAME: SHEET NUMBE PROJECT PHAS FILENAME: CHECKED: DRAWN: FORMAT: SCALE: DATE: 30" PHASE: PROJECT #: YARD 2118 CONC CONC AS NO 10 DE DIGSA DIGSA YA BRE 500 SPRING GARDE PHILADELPHIA, PA DATE: DES A1.0 PLANS 83/21/2017IFC 1/8" 1'-0" A1.0 LEVEL PATIO PLAN 1/8" 1'-0" A1.0 MEZZANINE LEVEL & CANOPY ROOF PLAN 1" 100'-0" A1.0 7 SITE PLAN 1/8" 1'-0" A1.0 LEVEL DEMO PLAN 1/8" 1'-0" A1.0 MEZZANINE DEMO PLAN 1/8" = 1'-0" A1.0 MEZZANINE & CANOPIES RCP 0' NEW BAR 19 18 1FL Demo Plan 1FL Proposed Plan 2FL Demo Plan 2FL / Canopy Roof Proposed Plan 2FL / Canopy Roof Proposed Plan Entry Perspective New Patio Openings Site Plan 5th St Canopy
Commercial Renovation, Design Iterating, Bid Drawing Set, Revit Modeling, & Lumion.
BREWERY
Project Experience:
YARDS
IMPROVEMENTS
2021-2022 /
Crossing Street Perspective YARDS SPRING GARDEN
DIGSAU /
Philadelphia, PA

FLOORPLANS

ENLARGED PLANS & INTERIOR ELEVATIONS

LEVEL 1 0' - 0" NEW CONC CURB AT NEW PATIO 18'2" 10'11" 4" 9'11" 13'0" 10'7" VARIES 2'2" NEW ROOF NEW FENCE NEW CONC STAIR AND METAL RAILING NEW HANGING SIGNAGE EXG FENCE RELOCATE (3) EXG LIGHT FIXTURES. REROUTE CONDUIT. REMOVE & RETAIN (2) EXG FIXTURES. (3) NEW DOOR & WINDOW OPENINGS EXG DOOR TO REMAIN EXG DUCT TO REMAIN PNT MTL SURROUND AT WDW, TYP YARDS BREWERY 500 SPRING GARDEN ST DATE: 12/2/2017GMP ADDENDUM #1 42/24/2017100% CONSTRUCTION DOCS 206/14/2017ASI-010 1/8" = 1'-0" A2.0 2 EAST ELEVATION -5TH ST 1/4" = 1'-0" A2.0 4 MEZZANINE -EAST ELEVATION LEVEL 1 0' - 0" 10'9" 11'9" EXG FENCE LEVEL 1 0' - 0" NEW WINDOW & DOOR OPENINGS @ EXG MASONRY WALL NEW ROOF 18'2" 10'11" 4" 9'11" 13'0" 10'7" VARIES 2'2" NEW ROOF NEW FENCE NEW HANGING SIGNAGE EXG FENCE (OPTIONAL) 1/8" = 1'-0" A2.0 1 NORTH ELEVATION -SPRING GARDEN ST 1/8" = 1'-0" A2.0 2 EAST ELEVATION -5TH ST 1/4" = 1'-0" A2.0 3 GAME ROOM -EAST ELEVATION 1/4" = 1'-0" A2.0 6 MEZZANINE BATHROOM -NORTH 1/4" = 1'-0" A2.0 7 MEZZANINE BATHROOM -EAST 1/4" = 1'-0" A2.0 5 MEZZANINE BATHROOM PLAN AXONOMETRIC SCOPE DIAGRAM LEVEL 1 NEW ROOF 10'9" EXG FENCE LEVEL 0' - 0" NEW CONC CURB AT NEW PATIO NEW WINDOW DOOR OPENINGS @ EXG MASONRY WALL NEW ROOF 18'2" 10' 11" 13'0" VARIES NEW FENCE NEW CONC STAIR AND METAL RAILING EXG FENCE 103E EXIT RELOCATE RECEPTACLES REROUTE CONDUIT RELOCATE (3) EXG LIGHT FIXTURES. REROUTE CONDUIT. REMOVE RETAIN (2) EXG FIXTURES. EQ EQ (3) NEW DOOR WINDOW OPENINGS EQ EQ EQ EQ EXG DOOR TO REMAIN EXG DUCT TO REMAIN 7' 8" NEW BAR (OPTIONAL) PNT MTL SURROUND AT WDW, TYP EXG LIGHT FIXTURES TO REMAIN EXG ELEC CONDUIT & RECEPTACLES TO REMAIN (4) NEW WINDOW OPENINGS EXG STRUCT TO REMAIN RELOCATE (2) EXG LIGHT FIXTURES. REMOVE RETAIN (1) EXG FIXTURE. EXG DUCTWORK TO REMAIN EQ EQ EQ EQ EQ EQ REROUTE CONDUIT TO LIGHT FIXTURES NEW DOOR NEW COVE BASE AT NEW GWB PARTITIONS 5'6" 3' 6" PNT GWB COVE BASE EXG DUCT PNT EXG CMU A2.0 0'11" 7' 8" 9' 1/2" 1/2" 1/2" 1/2" VIF 80 6' 0" LINE OF SOFFIT OVHD GWB 9' -0" GWB 9' -0" SHEET NAME: SHEET NUMBER FILENAME: CHECKED: DRAWN: FORMAT: SCALE: DATE: 30" 42 PHASE: PROJECT #: ARCHITECT DIGSAU 340 North 12th Street, Philadelphia, PA 19107 215.627.0808 www.digsau.com OWNER Yards Brewing Compa 500 Spring Garden Stre Philadelphia, PA 19123 (215) 634-2600 STRUCTURAL ENGIN ConnShaffer 52 Pennsylvania Ave Malvern, PA 19355 (610) 450-6588 MEP ENGINEER Chesnut Engineering Lancaster Ave - 2n Ardmore, PA 19003 610-642-1750 YARDS2118 CONCE AS NOT DEC DIGSAU DIGSAU YAR BREW 500 SPRING GARDEN PHILADELPHIA, PA 19 DATE: DESC ELEVAT ENLARG 12/2/2017GMP 42/24/2017100% 206/14/2017ASI-0 1/8" 1'-0" A2.0 EAST ELEVATION -5TH ST 1/4" 1'-0" A2.0 GAME ROOM -EAST ELEVATION 1/4" 1'-0" A2.0 MEZZANINE -EAST ELEVATION 1/4" = 1'-0" A2.0 6 MEZZANINE BATHROOM -NORTH 1/4" 1'-0" A2.0 MEZZANINE BATHROOM -EAST 1/4" 1'-0" A2.0 MEZZANINE BATHROOM PLAN 1/4" 1'-0" A2.0 MEZZANINE BATHROOM WEST 1/4" = 1'-0" A2.0 9 MEZZANINE BATHROOM SOUTH 1/4" 1'-0" A2.0 10 MEZZANINE BATHROOM RCP AXONOMETRIC SCOPE DIAGRAM 06 NEW BAR LEVEL 1 0' - 0" NEW ROOF 10'9" EXG FENCE LEVEL 0' - 0" NEW CONC CURB AT NEW PATIO NEW WINDOW DOOR OPENINGS @ EXG MASONRY WALL NEW ROOF 18' 2" 10'11" 13' 0" VARIES NEW FENCE NEW CONC STAIR AND METAL RAILING EXG FENCE 103E EXIT RELOCATE RECEPTACLES REROUTE CONDUIT RELOCATE (3) EXG LIGHT FIXTURES. REROUTE CONDUIT. REMOVE RETAIN (2) EXG FIXTURES. EQ EQ (3) NEW DOOR WINDOW OPENINGS EQ EQ EQ EQ EXG DOOR TO REMAIN EXG DUCT TO REMAIN 7' 8" NEW BAR (OPTIONAL) PNT MTL SURROUND AT WDW, TYP EXG LIGHT FIXTURES TO REMAIN EXG ELEC CONDUIT & RECEPTACLES TO REMAIN (4) NEW WINDOW OPENINGS EXG STRUCT TO REMAIN RELOCATE (2) EXG LIGHT FIXTURES. REMOVE RETAIN (1) EXG FIXTURE. EXG DUCTWORK TO REMAIN EQ EQ EQ EQ EQ EQ REROUTE CONDUIT TO LIGHT FIXTURES NEW DOOR NEW COVE BASE AT NEW GWB PARTITIONS 5' 6" 3' 6" PNT GWB COVE BASE EXG DUCT PNT EXG CMU A2.0 0'11" 7' 8" 9' 1/2" 1/2" 1/2" 1/2" VIF 80 6' 0" LINE OF SOFFIT OVHD GWB 9' -0" GWB 9' -0" NAME: SHEET NUMBER PROJECT PHASE FILENAME: CHECKED: DRAWN: FORMAT: SCALE: DATE: 30" 42 PHASE: PROJECT #: ARCHITECT DIGSAU 340 North 12th Street, Philadelphia, PA 19107 215.627.0808 www.digsau.com OWNER Yards Brewing Compa 500 Spring Garden Stre Philadelphia, PA 19123 (215) 634-2600 STRUCTURAL ENGIN ConnShaffer 52 Pennsylvania Ave Malvern, PA 19355 (610) 450-6588 MEP ENGINEER Chesnut Engineering Lancaster Ave - 2n Ardmore, PA 19003 610-642-1750 YARDS2118 CONCE AS NOT DEC DIGSAU DIGSAU YAR BREW 500 SPRING GARDEN PHILADELPHIA, PA 19 DATE: DESC A2.0 ELEVAT ENLARG 12/2/2017GMP 42/24/2017100% 206/14/2017ASI-0 1/8" 1'-0" A2.0 NORTH ELEVATION -SPRING GARDEN ST 1/8" 1'-0" A2.0 EAST ELEVATION -5TH ST 1/4" 1'-0" A2.0 GAME ROOM -EAST ELEVATION 1/4" 1'-0" A2.0 MEZZANINE -EAST ELEVATION 1/4" = 1'-0" A2.0 6 MEZZANINE BATHROOM -NORTH 1/4" 1'-0" A2.0 MEZZANINE BATHROOM -EAST 1/4" 1'-0" A2.0 MEZZANINE BATHROOM PLAN 1/4" 1'-0" A2.0 MEZZANINE BATHROOM WEST 1/4" = 1'-0" A2.0 9 MEZZANINE BATHROOM SOUTH 1/4" 1'-0" A2.0 10 MEZZANINE BATHROOM RCP AXONOMETRIC SCOPE DIAGRAM 06 NEW BAR LEVEL 0' - 0" NEW ROOF EXG FENCE LEVEL 0' - 0" NEW CONC CURB AT NEW PATIO NEW WINDOW DOOR OPENINGS @ EXG MASONRY WALL NEW ROOF 4" NEW ROOF NEW FENCE NEW CONC STAIR AND METAL RAILING NEW HANGING SIGNAGE EXG FENCE 103E EXIT RELOCATE RECEPTACLES REROUTE CONDUIT RELOCATE (3) EXG LIGHT FIXTURES. REROUTE CONDUIT. REMOVE RETAIN (2) EXG FIXTURES. EQ EQ (3) NEW DOOR WINDOW OPENINGS EQ EQ EQ EQ EXG DOOR TO REMAIN EXG DUCT TO REMAIN NEW BAR (OPTIONAL) PNT MTL SURROUND AT WDW, TYP EXG LIGHT FIXTURES TO REMAIN EXG ELEC CONDUIT RECEPTACLES TO REMAIN (4) NEW WINDOW OPENINGS EXG STRUCT TO REMAIN RELOCATE (2) EXG LIGHT FIXTURES. REMOVE & RETAIN (1) EXG FIXTURE. EXG DUCTWORK TO REMAIN EQ EQ EQ EQ EQ EQ REROUTE CONDUIT TO LIGHT FIXTURES NEW DOOR NEW COVE BASE AT NEW GWB PARTITIONS 9'0" PNT GWB COVE BASE EXG DUCT PNT EXG CMU A2.0 8" 1/2" 1' 1/2" 1/2" 1/2" VIF1 ALIGN LINE OF SOFFIT OVHD GWB -0" GWB -0" 1/8" 1'-0" A2.0 NORTH ELEVATION -SPRING GARDEN ST 1/8" 1'-0" A2.0 EAST ELEVATION -5TH ST 1/4" 1'-0" A2.0 GAME ROOM -EAST ELEVATION 1/4" 1'-0" A2.0 MEZZANINE -EAST ELEVATION 1/4" 1'-0" A2.0 MEZZANINE BATHROOM -NORTH 1/4" = 1'-0" A2.0 7 MEZZANINE BATHROOM -EAST 1/4" 1'-0" A2.0 MEZZANINE BATHROOM PLAN 1/4" = 1'-0" A2.0 8 MEZZANINE BATHROOM WEST 1/4" 1'-0" A2.0 MEZZANINE BATHROOM SOUTH 1/4" 1'-0" A2.0 10 MEZZANINE BATHROOM RCP NEW BAR LEVEL 0' - 0" NEW ROOF EXG FENCE LEVEL 0' - 0" NEW CONC CURB AT NEW PATIO NEW WINDOW DOOR OPENINGS @ EXG MASONRY WALL NEW ROOF 4" NEW ROOF NEW FENCE NEW CONC STAIR AND METAL RAILING NEW HANGING SIGNAGE EXG FENCE 103E EXIT RELOCATE RECEPTACLES REROUTE CONDUIT RELOCATE (3) EXG LIGHT FIXTURES. REROUTE CONDUIT. REMOVE RETAIN (2) EXG FIXTURES. EQ EQ (3) NEW DOOR WINDOW OPENINGS EQ EQ EQ EQ EXG DOOR TO REMAIN EXG DUCT TO REMAIN NEW BAR (OPTIONAL) PNT MTL SURROUND AT WDW, TYP EXG LIGHT FIXTURES TO REMAIN EXG ELEC CONDUIT RECEPTACLES TO REMAIN (4) NEW WINDOW OPENINGS EXG STRUCT TO REMAIN RELOCATE (2) EXG LIGHT FIXTURES. REMOVE & RETAIN (1) EXG FIXTURE. EXG DUCTWORK TO REMAIN EQ EQ EQ EQ EQ EQ REROUTE CONDUIT TO LIGHT FIXTURES NEW DOOR NEW COVE BASE AT NEW GWB PARTITIONS 9'0" PNT GWB COVE BASE EXG DUCT PNT EXG CMU A2.0 8" 1/2" 1' 1/2" 1/2" 1/2" VIF1 ALIGN LINE OF SOFFIT OVHD GWB -0" GWB -0" 1/8" 1'-0" A2.0 NORTH ELEVATION -SPRING GARDEN ST 1/8" 1'-0" A2.0 EAST ELEVATION -5TH ST 1/4" 1'-0" A2.0 GAME ROOM -EAST ELEVATION 1/4" 1'-0" A2.0 MEZZANINE -EAST ELEVATION 1/4" 1'-0" A2.0 MEZZANINE BATHROOM -NORTH 1/4" = 1'-0" A2.0 7 MEZZANINE BATHROOM -EAST 1/4" 1'-0" A2.0 MEZZANINE BATHROOM PLAN 1/4" = 1'-0" A2.0 8 MEZZANINE BATHROOM WEST 1/4" 1'-0" A2.0 MEZZANINE BATHROOM SOUTH 1/4" 1'-0" A2.0 10 MEZZANINE BATHROOM RCP AXONOMETRIC SCOPE DIAGRAM NEW BAR 21 20 East Patio Plan - Seating Plan Interior Elevation - 1FL Openings Interior Elevation - 2FL Openings Bathroom RCP Bathroom Enlarged Plan Bathroom Interior Elevations Mezzanine Floor Plan East Canopy Elevation North Canopy Elevation YARDS SPRING GARDEN
CANOPY ELEVATIONS

YARDS BREWERY - INTERIOR FIT OUT DIGSAU / 2022 / Malvern, PA

After evaluating the cost-benefit of the outdoor patio and event space improvements to at their existing Philadelphia location, our project team’s focus shifted to conceptualize and evaluate an interior fit out at a suburban sattelite location. The 12,000 square foot conceptual planning included a small scale brew-house, distillery, speakeasy, tasting room, game room in addition to back of house and exterior patio spaces.

ProjectExperience: CommercialFitOut,SpacePlanning,RevitModeling,Lumion&EnscapeRendering.

Primary Entry Egress Points

Production Restrooms Retail

Back of House

Front of House Outdoor Seating

PROGRAM LEGEND Front of House Production Retail Back of House Circulation Restrooms Outdoor Seating Not In Scope 486 SF EXG ELECTRICAL 399 SF EXG TRASH 132 SF PUMP RM ? 1123 SF PATIO SEATING 1693 SF OUTDOOR ACTIVITIES LOUNGE 2847 SF GAME ROOM 10' 20' 5' 28' - 10" 31' 3" 22' - 0" 6' 7" 8' 9" 62' - 2" 97'2" 65' 0" 18' 7" 75' 11" 1426 SF KITCHEN N 145 SF CORRIDOR 287 SF MERCH 156 SF ENTRY 189 SF MERCH STORAGE 358 SF CORRIDOR 407 SF BREW HOUSE 14'7" 82'10" 4031 SF TASTING ROOM 396 SF EXG ENTRY 159' 6" COVERHEAD ANOPY POS 420 SF HIDDEN PUB 327 SF DISTILLERY 890 SF WAREHOUSE 719 SF LOUNGE 56 SF OFFICE Primary Entry Egress Doors 64 SF ADA WC 293 SF MENS RESTROOM 293 SF WMNS RESTROOM 64 SF WC 151 SF COLD BOX HOST SERVICE DRINK RAILS DRINK RAILS AIR HOCKEY ARCADE GAMES HIDDEN BOOKCASE & EXIT DOORS FOOSBALL SHUFFLEBOARD BOOTHS BOOTHS PLANTERS, TYP GRAVEL FIRE PIT FAMILY TABLE HALL TABLES CORNHOLE BOCCE BALL GARAGE DOOR GARAGE DOOR DRINK RAIL BANKQUETTE BANKQUETTE GARAGE DOOR GARAGE DOOR GARAGE DOOR GARAGE DOOR GAME ROOM BAR 27'-4" 16'-0" 32 SEATS TASTING ROOM BAR 31'-0" x 16'-5" 32 SEATS PUB BAR 15'-0" 10'-5" 18 SEATS WALK-IN FREEZER/REF. STORAGE RACKS SKYLIGHT, TYP SKYLIGHT, TYP 23'10" 72' - 5 1/2" 32' - 0" 52' - 5 1/2" 23 22 FloorPlan EntryPerspective FrontElevation
YARDS WORTHINGTON

INTERIOR PERSPECTIVES ENLARGED FLOORPLANS

CANOPY MATERAL STUDIES

EnlargedPlan-GameRoom

2847 SF GAME ROOM 113 1686 SF OUTDOOR ACTIVITIES LOUNGE 137 25 24
ExteriorCanopy-MetalSoffitOption ExteriorCanopy-WoodSoffitOption ExteriorCanopy-MetalScreenOption
YARDS WORTHINGTON
ExteriorCanopy-WoodSlatOption GameRoomInterior HiddenSpeakeasy EnlargedPlan-Speakeasy GamesPatio FACADE MURAL DESIGN

ExteriorPerspective

SitePlan

IRA DAVIS TOWER FEASIBILITY STUDY

DIGSAU / 2022 / Philadelphia, PA

The Ira Davis Storage Building is situated along an important gap in Nicetown’s commercial corridor atop an under-utilized assemblage of lots in comprising a roughly 1.5 acre site. The scope of this project was to determine the most feasible scenarios of building bulk, height, floor area, phasing, & zoning/building code compliance for +/- 50,000SF of adaptive re-use and new construction artisan and creative office spaces. vv

ProjectExperience: BuildingMassingIteration,ConceptPlanProduction,Programming,RevitModeling.

0ExistingConditions

1A-By Right TowerAddition

2Phases

1B-ParallelTowers DemolishExgWarehouse w/HeightVariance

2Phases

2A-L-ShapedTower AccomodateBoxTruckLoading w/HeightVariance

2Phases

2B-L-ShapedTower(No w/HeightVariance

2Phases

3-ParallelLong/ShortTowers AccomodateBoxTruckLoading w/HeightVariance

2Phases

4A-L-ShapedTower w/HeightVariance DemolishExgWarehouse

1Phase

4B-Donut-ShapedTower w/HeightVariance DemolishExgWarehouse

2Phases

PHASING / MASSING SCENARIOS 27 26
IRA DAVIS TOWER
ROOF - WAREHOUSE 28' - 0" MEZZ - WAREHOUSE 14' - 4" LEVEL 1.2 NEW TOWER 3' - 0" NEW TOWER LEVEL 2 18' - 0" NEW TOWER LEVEL 3 29' - 0" NEW TOWER LEVEL 4 40' - 0" NEW TOWER LEVEL 5 51' - 0" NEW TOWER ROOF LEVEL 60' - 0" D2 C2 A2 NEW TOWER ROOF LEVEL (VARIANCE) 84' - 0" BLDG ENVELOPE W/ HEIGHT VARIANCE 81'0" OPTIONAL EXTENSION OF STAIR TO ROOF DECK ***(HEIGHT VARIANCE REQUIRED)*** NEW LOADING DOCK DOOR EXISTING WAREHOUSE NEW GATED PARKING ENTRY (BEYOND) 1 2 3 5 6 ROOF - WAREHOUSE 28' - 0" MEZZ - WAREHOUSE 14' - 4" 7 9 10 11 12 NEW TOWER LEVEL 29' - 0" NEW TOWER LEVEL 40' - 0" NEW TOWER LEVEL 51' - 0" NEW TOWER ROOF LEVEL 60' - 0" NEW TOWER ROOF LEVEL (VARIANCE) 84' - 0" BLDG ENVELOPE W/ HEIGHT VARIANCE OPTIONAL COMBINED FREIGHT PASSENGER ELEVATOR LIEU OF OR IN ADDITION TO OTHER ELEVATOR AT EXISTING SHAFT NEW 3'-0"W -0"H WINDOW OPENINGS @ EXG BRICK FACADE (TYP.) NEW -0"W 7'-0"H WINDOWS @ ADDITION NEW ADDITION EXG BUILDING EXISTING WAREHOUSE UP UP DN D C B A 7 9 10 11 12 D2 C2 A2 PROGRAM LEGEND Rentable Support Circulation Level 1.2 INFILL EXG STAIR OPENING N 227 SF TENANT 520 SF LOBBY 928 SF TENANT 149 SF TENANT 203 SF TENANT 173 SF TENANT 740 SF TENANT 402 SF TENANT 404 SF TENANT 914 SF RECEIVING 604 SF CORRIDOR 114 SF FREIGHT 633 SF TENANT 3' 0" 3' 0" 1/4" 1'-0" 1" 1'-0" 1" 1'-0" 61 SF WC 85 SF WC 62 SF MECH LOADING 53'4" 106' 0" 102' 0" 51'7" 26'2" 20'0" 15'8" 15'3" 21'1" 54' 3" 10' 0" 13' 0" 11' 10" 13' 11" 25' 4" 19' 5" 37' 10" 18' 5" 24' 1" 38' 1" 9' 11" 31' 0" 25' 11" 19' 5" 29' 5" 8' 5" 19' 0" 527 SF TENANT 21'8" 6'0" 21'11" 397 SF TENANT 522 SF TENANT 773 SF CORRIDOR 1.2 OPTIONAL COMBINED FREIGHT PASSENGER ELEVATOR IN LIEU OF OR ADDITION TO OTHER ELEVATOR AT EXISTING SHAFT 597 SF TENANT 377 SF TENANT OPTIONAL CORRIDOR TO WAREHOUSE TENANT 0" 32'5" 19'6" 0'176 SF S-2 DRAWING No: SCALE: 1/16" 1'-0" IRA-A1 3939 GERMANTOWN 3939 GERMANTOWN AVENUE PHILADELPHIA, PA 19140 PROJECT NO: 2220 RETAINSEXG 3'-0"LEVELATREAR GRACIOUSLOBBYSPACEATGRADE FLOOR PLAN -LEVEL 1.2 SPLIT LEVEL GROUND FLOOR EXISTING NEW DN UP DN UP D C B A 7 9 10 11 12 1162 SF TENANT 212 SF TENANT 221 SF TENANT 234 SF TENANT 233 SF TENANT 264 SF TENANT 217 SF TENANT 245 SF TENANT 219 SF TENANT 1127 SF CORRIDOR 2FL 151 SF STAIR 521 SF TENANT 401 SF TENANT 791 SF TENANT 818 SF TENANT D2 C2 A2 PROGRAM LEGEND Rentable 114 SF FREIGHT 514 SF TENANT 510 SF TENANT 208' 0" 53'4" 106' 0" 102' 0" 51'7" 46'2" 101' 0" 44' 4" 13' 11" 11' 1" 11' 4" 11' 0" 11' 10" 26' 3" 38' - 11" 37' 1" 28'4" 21'4" 27' 0" 25' 3" 17' 1" 11' 4" 11' 0" 11' 10" 21'9" 29'1" 15'8" 15'3" 21'1" 67 SF WC 74 SF WC 402 SF TENANT 405 SF TENANT 14' 6" 597 SF TENANT OPTIONAL COMBINED FREIGHT PASSENGER ELEVATOR IN LIEU OF OR IN ADDITION TO OTHER ELEVATOR AT EXISTING SHAFT 6'0" 176 SF S-2 340 NORTH 12TH STREET SUITE 421 PHILADELPHIA, PA 19107 IRA DAVIS BLDG -FLOOR PLAN -LEVELS 2-4 (LEVELS 2-7 IF HEIGHT VARIANCE IS PURSUED) (18)UNITSRANGING~210-1160SF EXISTING NEW Level 1 0" LEVEL - IRA DAVIS BLDG 18' - 0" LEVEL - IRA DAVIS BLDG 29' - 0" LEVEL - IRA DAVIS BLDG 40' - 0" LEVEL - IRA DAVIS BLDG 51' - 0" LEVEL - IRA DAVIS BLDG 62' - 0" LEVEL - IRA DAVIS BLDG 73' - 0" ROOF - IRA DAVIS BLDG 84' - 0" D C B A T.O. PARAPET - IRA DAVIS BLDG 88' - 0" LEVEL 1.5 MEZZANINEIRA DAVIS BLDG 9' - 6" T.O. BULKHEAD - IRA DAVIS BLDG 99' - 0" EXG WINDOWS TO REMAIN (TYP.) EXG STOREFRONT TO REMAIN (TYP.) NEW GLAZING SYSTEM @ EXG ARCHWAY NEW GATED PARKING ENTRY (BEYOND) IRA -WEST ELEVATION -PROPOSED DN UP DN D C 7 9 114 SF FREIGHT 213 SF TENANT 221 SF TENANT 235 SF TENANT 233 SF TENANT 264 SF TENANT 515 SF TENANT 122 SF STAIR N 1149 SF TENANT 871 SF TENANT 74 SF WC 67 SF WC 625 SF CORRIDOR 7FL 106' 0" 43' 8" 14' 6" 10' 6" 11' 4" 11' 0" 12' 6" 31' 6" 20' 9" 51' 3" 53'4" 176 SF S-6-7 340 NORTH 12TH STREET PHILADELPHIA, PA 19107 3939 GERMANTOWN AVENUE IRA DAVIS BLDG -FLOOR PLAN -LEVEL 7 EGRESSTRANSFERSTAIRCONNECTINGEXGLEVELS6-7TONEWTOWERADDITIONEGRESS EXISTING NEW 7 8 10 11 12 T.O. BULKHEAD - IRA DAVIS BLDG 99' - 0" LEVEL 1.2 NEW TOWER 3' - 0" NEW TOWER LEVEL 2 18' - 0" NEW TOWER LEVEL 3 29' - 0" NEW TOWER LEVEL 4 40' - 0" NEW TOWER LEVEL 5 51' - 0" NEW TOWER ROOF LEVEL 60' - 0" NEW TOWER ROOF LEVEL (VARIANCE) 84' - 0" 9'0" 11'0" 11'0" 11'0" 15'0" BLDG ENVELOPE W/ HEIGHT VARIANCE 57'0" NEW 3'-0"W 7'-0"H WINDOW OPENINGS @ EXG BRICK FACADE (TYP.) NEW GATED PARKING ENTRY OPTIONAL EXTENSION OF STAIR TO ROOF DECK ***(HEIGHT VARIANCE REQUIRED)*** NEW ADDITION EXG BUILDING 29 28 ArchedEntryPortal EastElevation WestElevation HalfArched SetbackParkingGate NorthElevation SouthElevation AlignedOpenings StaggeredOpenings FullCurtainwallGlazing GroundFloorPlan ELEVATIONS
POCKET PARK STUDY TypicalFloorPlan Level6-7FloorPlan FENESTRATION STUDY IRA DAVIS TOWER
FLOORPLANS

BUNGEE BENCH

PHOTOS W/ ONE YEAR OF USAGE

ProjectExperience: FurnitureDesign,RhinoModeling,CNCMilling,

31 30
Top View Front View Bolt & Bungee Weave Details Side Profile
MDF Prototype Model Axonometric
Exploded A half semester long furniture making project where students were to create a chair with readily available materials and hardware. The design utilizes a tensile structural assembly with bungee cord, hence the name, being strung into two CNC-milled plywood profiles and secured with half-inch thick threaded rod, washers and end-nuts. The design was prototyped using medium density fiberboard before the profiles were refined and bungee cord spacing re-configured. The chair can seat an adult weighing up to 220 pounds.
TEMPLE UNIVERSITY | 2016 | Professor: Clifton Fordham

MEMORIAL PARK RENOVATION

DIGSAU / 2022 / Philadelphia, PA

ThePhiladelphiaStarsNegroLeagueBaseballteamwascommemoratedwithparkthatopened in the late 2000s, which relatively quickly fell into disrepair, and suffered a recent vehicular fatality on site. This project aims to re-energize the pocket park with new bleacher-esque seating zones which shield the site from the vehicular noise and exposure, while refocusing passerby’s attention on the existing monument as well as several new physical and multimedia public art pieces.

ProjectExperience:

DesignResearch,LandscapeDesign,SectionDiagramming,Rhino/RevitModeling,EnscapeRendering.

PublicGatheringPerspective

ApproachPerpsectives

7' 1 25'2 -2 24" 12" ASYMMETRICAL CONCRETE FOOTING; 6" THK CAST PLACE CONC. WALL LIGHTWEIGHT SLAT WALL WOOD METAL TBDEXG METAL FENCE GATE TRAFFIC CONTROL BOX ON CONC PAD. +/-2'-0" MIN. CLEARANCE SCULPTURAL INSTALLATION WITHIN SLAT WALL PARTITION EXG ELEC. TRANSFORMER ON CONC. PAD T SC ER AR RSCO 03'-1" EXG BUS SHELTER "GRANDSTAND" SEATING PLATFORM EXG UTILITY POLE RELOCATE ELEC. PANEL PUBLIC R.O.W. EXG UTILITY POLE EXG HYDRANT NEW PARK BENCHES DUMOR 105 NEW BOLLARDS DUMOR NEW LIGHTING SELUX DSCL4 EXG BUILDING NOT IN SCOPE CONCRETE FOOTING; 6" THK CAST IN PLACE CONC. WALL EXCAVATION IMPACT ZONE 2' 0" 1/8" 1'-0" L100 SITE PLAN -PROPOSED 1/8" 1'-0" L100 MURAL WALL PLAN -PROPOSED 1/2" = 1'-0" L100 3 *SECTION @ MURAL WALL 33 32
CONCEPT SITE PLAN ExistingSection ProposedSection STARS MEMORIAL PARK

HIP HOP URBANIST RECONSTRUCTIONS SYRACUSE UNIVERSITY / 2021 / Graduate Thesis (Honorable Mention)

This thesis posits Hip Hop as a liberatory spatial practice in critique of predetermined spatial, socioeconomic and political constructs of containment that have limited the agency of its actors and constituents to the realms of commoditized music and aesthetics, rather than envisioning new institutions of advocacy, spatial typologies, and reconsidered patterns of development that followed other cultural movements and contributed to their propagation in western architectural canon and solidification in society and the constructed environment.

The design prototyping outputs of this thesis are composed as ‘thought essays’ which ideate potential responses to the wicked problems and life works of reversing spatially rooted disinvestment and criminalization inflicted on communities of color. They seek to intervene in sites determined by Lyrical Exercise, using hip-hop sampling methodology from Don’t Sweat the Technique and responding to the calls of Manifesto Sampling. These design responses do not seek to provide a definitive solution but to provoke radical reconsiderations of the approach of these complex problems intertwined between the built environment, black identity and governance.

RESEARCH METHODOLOGIES

LYRICAL EXERCISE

Method 1 seeks to utilize hip hop music’s lyrics as a primary source of post-occupancy reporting on the urban conditions experienced in many minority communities and henceforth, originators and subsequent practitioners of hip hop culture. Citing lyrics which reference specific places or spatial typologies allows for extracting scales and sites within which to intervene. This method has generated 1 specific condition and 2 typologies that represent relevant sites of inquiry.

DON’T SWEAT THE TECHNIQUE

Method 2 aims to catalog and analyze the artifacts, tools and techniques of each the 4 pillars of hip hop culture. In order to generate an operational language for implementing architecture as the emergent fifth pillar, the tools and technologies adapted and reappropriated from the everyday and readymade objects begins to situate the importance of their relevance to spatial imagination and potentials in the built environment.

MANIFESTO SAMPLING

Method 3 seeks to generate an evaluative framework by looking at contemporary manifestos and literature regarding the subject matters of hip hop architecture and black identity in the built environment. This method aims to document the goals of these relevant organizers and organizations to connect with the audiences of this thesis and gauge their satisfaction on any outcomes of this project. These manifestos make clear an agenda to create a generative logic for architectural program in service to local organizations and communities.

35 34
HIP HOP URBANIST RECONSTRUCTIONS

HIPHOPURBANISTRECONSTRUCTIONS

ANTI-CARCERAL CORNER

SYRACUSE UNIVERSITY / 2021 / Any Hood, USA

This rapid design prototype resulting from the lyrical exercise design research method, re-envisions the corner as a site of justice for its wrongly-incarcerated occupants, encouraging the productive misuses of public space for loitering, marijuana growing and acts of pedestrian street performance. The text that follows evaluates the prototype in respect to points from the BlackSpace manifesto.

REFUSAL...

Of zoning

Of anti-loitering rules.

Of the disciplining gaze of governance.

Of pseudo-scientific criminomics

The public right of way is fully reclaimed and reappropriated for the purpose of furthering other manifestations. Prohibitive ordinances are recognized as a planning tool that have limited the socioeconomic potentialities of spaces in minority neighborhoods.

LIBERATION...

from the nexus of surveillance and over policing from collateral damage of gun violence from restrictions on “highest and best use” from the “carceral continuum”

AMPLIFY BLACK JOY with public performance with pedestrian speech acts by staying too long

By embracing a fugitive aesthetic

RECKON WITH THE PAST TO BUILD FUTURE

The stigma of illegal substances (drugs) in minority communities, as well as their sale and use as portrayed by hip hop artists has a distinct relationship to the accelerated dilapidation and designed over-policing of minority neighborhoods. The 1980s crack-cocaine era and coinciding “war on drugs” devastated these communities by rupturing and disintegrating countless households by way of the carceral continuum (see: prison-industrial-complex).

The corner represents a site of capture where arrests and sentencing practices for minor possession charges are brought about in disproportionate numbers by pervasive policing, and racial profiling. This process discretely creeps into the future through contemporary practices of surveillance and crime statistics.

CULTIVATE WEALTH

Whereby the possession and sale of drugs was previously grounds for arrest and incarceration, numerous startups and venture capitalists are flocking to industrialize and profit from the growth and sale of cannabis and it’s related products. Communities of color that bore the brunt of the sentencing for these former “crimes” fail to see this influx of investment nor a retroactive application of justice for being originators in the distribution and cultural relevance of this schedule 1 narcotic turned “medicine”. The anti-carceral corner simultaneously solidifies and re-envisions the growth and sale of marijuana as an act of collective economics, urban agriculture and wealth cultivation, as it always has been in spheres of urban minorities and hip hop artists.

37 36
AerialAxonometric-VerticalFarmingOrientation SidewalkView-VerticalFarmingOrientation AerialAxonometric-StreetPerformance SidewalkView-StreetPerformance HIP HOP URBANIST RECONSTRUCTIONS

HIPHOPURBANISTRECONSTRUCTIONS SANBORN SAMPLING PROCESS

Sanborn sampling is a form of historical research that can take place in a majority of urban sites in the United States. Sanborn Fire Insurance maps are detailed maps of twentieth century urban America that function as a fossil record of the historical built environment. These maps of the Brooklyn city blocks bounded by Myrtle, Marcy, Nostrand and Flushing avenues depict the pre-slum-clearance urban fabric on the site where Marcy Houses was constructed in 1949.

Many Hip Hop DJs and producers’ sonic recompositions are often preceded by what is known as “crate-digging.” or conducting a deep-dive through historical archives of vinyl records seeking complementary sonic snippets to be used as samples or elements of a remix. The prototyping process of Sanborn sampling seeks to emulate crate-digging in the built envrionment and to collage past and present condition to hypothesize a potential future spatial condition. In this way it resonates with Wilkins’ call for Hip Hop space tobepalimpsesticbyadaptingorbearingtraces of a previous form.

Design prototyping evolved from a reinterpretation of the site’s historical building footprints by using them as additive and subtractive inputs for the design and re-programming of open space in the Marcy Houses.

“Hip hop architecture is palimpsestic in the fact that it is engaged in reclaiming the subject from the object. Consistent with the foundations of hip hop’s flow, layering, and rupture, the palimpsestic nature of hip hop architecture reorganizes and rewrites the “[v]isible boundaries [of architecture], such as walls or enclosures in general,”1

1 Wilkins, Craig L. “(W)Rapped Space: The Architecture of Hip Hop.” Journal of Architectural Education 54, no. 1 (September 2000): 11.

39 38

HIPHOPURBANISTRECONSTRUCTIONS

SITE SELECTION | NYCHA IN BROOKLYN, NY - COMMUNITY DISTRICT 3

Brooklyn has 98 developments with 58,669 apartments making it the most populous borough of public housing residents in New York City. Many of these residents went on to become hip hop cultural figures whose rap lyrics can function as post-occupancy reporting and qualitative means of sourcing sites to intervene.

NYCHA IN BROOKLYN RAP LYRICS

1 NYC Housing Authority. “NYCHA Fact Sheet 2019,”

This is Bed-Stuy eighty-two Ninth floor, three tiny rooms, one view Bucktown, ROOSEVELT HOUSES Their green grass is green; our green grass is brown

-Yasiin Bey, LifeinMarvelousTimes, 2009

41 40
“I’m from MARCY HOUSES where the boys die by the thousands” -Jay-Z, Marcy Me LAFAYETTE GARDENS MARCY-GREENE A & B TOMPKINS HOUSES “I’m from MARCY HOUSES where the boys die by the thousands” -Jay-Z, MarcyMe.2017 SUMNER HOUSES ROOSEVELT & II STUYVESANT GARDENS BREVOORT HOUSES LAFAYETTE GARDENS TOMPKINS HOUSES BREVOORT HOUSES SUMNER HOUSES

Area

Marcy Plot 1 + 675,295 S.F. Unused Buildable Area

Marcy Plot 2 = 1,075,910SF OFOPPORTUNITY PARK AVENUE

WHAT MIGHT OCCUR IN 1,000,000SFOFBLACK SPACE?

The depiction of minority communities as “blighted” and fit for removal became the justification for the wholesale destruction of many neighborhoods’ distinct urban fabric as well as the physical symbol of the family unit and notion of home. The super-blocks that replaced these neighborhoods was a monolithic gesture which has come to collectively identify black and lower income people and render the contained condition known as an ‘island of poverty.’

Ifyoulookcloselyyou’llnotice

Thatthepatternonthissoft

broadclothshirt

Ismadeof

Workingman’sblood

Andprayingfolk’stears

AerialAxonometric-VerticalFarmingOrientation

“The windows on the Ave look like sad eyes They fix their sharp gaze on you when you pass by And if you dare to stand, you can see ’em cry You can watch ’em scowl, feel ’em prowl While they’re steady sizing every inch about you Fast math measuring what you amount to”

Jay-Z refers to Marcy Projects as a talent incubator “where they ball and breed rhyme stars” (Where I’m From, 1997). In the past, the only avenues of escaping that environment have been: “SPORTS, DRUGS, ENTERTAINMENT” (Camron, 2000) - with each of these so-called ‘hustles’ coming to represent stereotypes and reinforce a negative feedback loop of downward socioeconomic trajectory when intersecting with one another in such close proximity to the others and a robust police presence.

HIPHOPURBANISTRECONSTRUCTIONS

ADAPTIVE REMIXED USE

SYRACUSE UNIVERSITY / 2021 / BROOKLYN, NY

The mid to late 1920s saw the increased popularity of ‘garden city’ urban plans seeking to reduce overcrowding by implementing vast green spaces in suburban and urban developments. This tendency coupled with the Corbusian towers in the park scheme produced the presiding model for postwar UnitedStatespublichousing. In hindsight, these massive open spaces left the sites massively underbuilt by modern status quo of maximizing profitability of property through by-right or purchased zoning bulk.

This portion of quantitative research seeks to ground this project within the reality of twenty-first neoliberal urban development. While this status quo of building is acknowledged as typically reinforcing of existing socioeconomic inequities, this thesis aims to reappropriate the remainders of this so called ‘fast math’ towards culturally oriented and socioeconomically restorative means for the in-situ residents of the Marcy Houses.

The only public programs put on this site were basketball courts, fenced-off lawns, park benches and concrete paths. For the residents of NYCHA - a basketball court that was the only tool immediately at their disposal to develop skills to have a better career or life outlook.

Ifyoulookcloser,you’llnoticethat

Thispatternresembles

Tenementrowhouses,projecthighrises

Cellblocktiers

Discontinuedstretchesofelevatedtraintracks

Slaveshipgullies,acresoftombstones1

1 Mos Def / Yasiin Bey, A Soldier’s Dream (2006)

IfIwasn’tintherapgame I’dprobablyhaveakey,knee-deepinthecrackgame

Becausethestreetsisashortstop

Eitheryou’reslingin’crackrockoryougotawickedjumpshot2

2 Notorious BIG, Things Done Changed (1994)

Wherethedrugsczarsevolve,andthugsareatodds...

Butmosttimesfindthemselveslockedupbehindbars,... I’mfromwheretheyballandbreedrhymestars

I’mfromMarcy,son,justthoughtI’dremindy’all3

3 Jay-Z, Where I’m From (1997)

43 42
HIP HOP URBANIST RECONSTRUCTIONS
1 Stein,
“Toward New
America.”
Town Planning Review
616,250 SF LOT AREA X 2.43 R6 FAR = 1,497,487 S.F. Max BLDG Area822,192 S.F. Existing Bldg Area = 675,295 S.F. Development Rights 485,850 SF LOT AREA X 2.43 R6 FAR = 1,180,615 S.F. Max Zoned Floor Area780,000 S.F. Existing Built Space = 400,615 S.F. Development rights 400,615 S.F. Unused Buildable
Clarence S.
Towns for
The
20, no. 3 (1949): 24.
GARDEN
- Yasiin Bey, Life in Marvelous Times, 2009
EXISTING GROUNDSCAPE
APARTMENT STYLE TOWERS

She’syelling,“Selling’sasin,”well, soistellingyoungmen Thatsellingisasin

ifyoudon’toffernewwaystowin

Andre 3000, Sixteen by Rick Ross (2012).

BROWNSTONE STREET FURNITURE

Utilizing the Brooklyn brownstone facade and porch as a language of street furniture and pop-up venues allows for intermittent public vendors, communal gathering and eventual reconstruction of neighborhood social fabric that begins to erode the ‘island of poverty’ condition that currently presides.

MANIFESTATIONS:

Skill-Building-Kiosks

Pop-Up Commercial

Residential / Public Amenity

SKILL-SCAPE

If playing NBA basketball doesn’t pan out, the next closest team one can join is a gang. The only skill to develop is “hustling” (earning capital “by any means necessary”) to change one’s circumstances. Drugs - the next most profitable and socially networked activity behind sports - were only the medium by which to forge a path out of the environment where no other choice resides. If you didn’t like basketball, and couldn’t get a job “by any means necessary,” the alternative routes to try to change your circumstance were very limited if not non-existant.

Theinventionof hiphopculturestandsasanoutgrowthfrom or refusal of those routes out, frequently referring to them as forerunners in the flight from inherited circumstance. How can these spatial moments become conducive to building new informal economies and learning new skills? Maybe it’s a film editing kiosk or a public DJ booth where you just put on some headphones and can practice DJ-ing. A skill-building playscape in support of crafting skills to supplement the typical “rags to riches” escape routes have been in place in this site.

45 44 HIP HOP URBANIST RECONSTRUCTIONS
CENTER LIVED EXPERIENCE
KINSHIP
LAW
VALUE
MANIFESTATIONS:
NOSTALGIA
PERSONAL & COMMUNAL EVOLUTION CULTIVATE WEALTH RECON W/ THE PAST TO BUILD THE FUTURE
KNOWLEDGE
CARE

TECHNIQUE TOWERS

Using the formal techniques of the DJ to literally inform building upwards aims to culturally reappropriate and resuscitate the ‘towers in a park’ concept as an inevitability of the contemporary capitalist techniques of banking air and as-of-right development. They stand as an actualization of the black notion of “Movin’ on Up to a deluxe apartment in the sky” while simultaneously embodying Jay-Z’s “vision of the hood consistent with the utopianism of Marcus Garvey’s UNIA of 1920s Harlem.”

MANIFESTATIONS: CULTIVATE WEALTH COMMODITY CONTRADICTION ENVIRONMENT

1 DuBois, Ja’net. The Jeffersons Theme Song, 1975.

2 Lawrence Chua, “Life in Marvelous Times: Hip-hop, Housing, and Utopia,”

IDENTI-FACADE

The original structures of the Marcy Houses will be procedurally gutted as residents proceed to “move-on-up” and be converted to a mix of market-rate and affordable apartment units. The reconstructed facade panels will be representative of the residents who occupy the unit as a way to satisfy both the customization-inclined middle class and more importantly offer the long absent luxury of choice to NYCHA inbound residents while differentiating the family unit and individual from the monolithic identity of the super-block.

MANIFESTATIONS:

AMPLIFY BLACK JOY PROTECT & STRENGTHEN CULTURE PERSONAL /COMMUNAL EVOLUTION

47 46 HIP HOP URBANIST RECONSTRUCTIONS
AerialPerspectives High Frequency Scratch A Scratch B
49 48 StreetLevelPerspective ScanforVideo
HIP HOP URBANIST RECONSTRUCTIONS
AerialAxonometric-UrbanFabric
THANK YOU FOR YOUR CONSIDERATION

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.