2021 - Academic Portfolio

Page 1

2021


WORK EXPERIENCE: 2015 - Architectural Intern, ArchLink Kenya 2016 - 2018 - Architectural Intern, City County of Nairobi 2019 - 2021 - Architectural Intern, Planning Systems Services Ltd.

EDUCATION: 2012 - High School Certificate, Strathmore School MACHARIA ISAAC MUTHONDU

2021 - Bachelor of Architectural Studies

B02/35595/2013

ABOUT ME: An architecture student from Kenya. I am a creative and intense worker passionate about design and the real world applications of Architecture. In addition to creativity I bring a positive perspective in problem solving as well as teamwork. I am also proficient in visualization and 3d modelling.

CONTACT: muthondumacharia@gmail.com

SKILLS & SOFTWARES: Hand sketching 3d Modelling Graphic Design

ArchiCAD: Revit: Adobe Photoshop: Adobe Illustrator: Adobe Lightroom: Adobe InDesign: SketchUp: AutoCAD:

Team Coordination Photography Design Ideation


CONTENTS:

2021 PORTFOLIO

01

02

03

INTERIOR DESIGN

HOUSING

CONFERENCE CENTRE

04

05

06

CONSERVATION

PHOTOGRAPHY

OTHER

MACHARIA ISAAC MUTHONDU


01

INTERIOR DESIGN CHALLENGES: • • • •

SITE SLOPE LOCATING STAFF AND KITCHEN ACCESS POINTS ISOLATING NOISE KEEPING SECURITY WHILE ATTRACTING USERS

SOLUTIONS: •

2021 PORTFOLIO

PROVIDING ACCESS THROUGH UPPER LEVEL PARKING AT THE SITE PROVIDES ADEQUATE LEVELS FOR LOADING YARD AND KITCHEN ACCESS BY STAFF USING ACOUSTIC PANELS ON THE CEILING TO ABSORB NOISE FROM USERS PROVIDES ACOUSTIC COMFORT FOR THE REST OF THE CAMPUS HAVING ONE SINGULAR ACCESS POINT FOR USERS AS WELL AS A SECURITY SCREEN AT THE CAMPUS MAIN ENTRANCE

MACHARIA ISAAC MUTHONDU


Main access points

UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

PROJECT 02: INTERIOR DESIGN

2021 PORTFOLIO

Services & Staff access

Pedestrian access

SITE PLAN

SITE PLAN

Loading zone

Outdoor seating

MACHARIA ISAAC MUTHONDU B02/35595/2013

MACHARIA ISAAC MUTHONDU


ZONE 01: AIR ZONE

SOLUTIONS:

ENTRY

This zone is characterized by light coloured finishes and loose seating. This is done to encourage a high turnover of customers for the restaurant.

N MANAGEMENT:

ation into and out of the restaurant while interference with the rest of the operations ing was the hardest challenge here. The es this by isolating staff related functions to e of the site and public users to the northen

preparation area

HEAD CHEF’S OFFICE

Bar style stools are located closest to the entrance to enable quick access into and out of the cafeteria after a quick meal in between classes.

ENTRY

cooking island drainage at 1:4 gradient

RECEPTION

hexagonal grey ceramic tiles floor finish

SERVERY

cooking island preparation area

ea also doubles as the examination hall during the school cirriculum. Keeping noise from g areas away from this area is paramount period as the hall is used as a study area ongoing. This is mitigated by the use of panels as well as having the larger groups of southern side of the restaurant, far enough e to dissipate. Alternatively the outdoor ed from the elements and can provide an ssion area.

02

03

non slip ceramic tiles ff

01

ZONE 02: VINE ZONE EXHIBITION HALL

Here the customers can dine in groups of 8. This number is ideal for group discussions and can be utilized for study sessions as well as a group of friends.

01

01 wash area CUTLERY STORE

UTILITIES CLOSET COLD STORE

It is characterized by the hanging light fixtures that mimic vines in the forest. The zone is located here to attract larger groups of customers and can spend more than one hour here.

KITCHEN

SHWR LADIES CHANGING ROOM W.C.

non slip ceramic tiles ff VEGETABLE STORE

blue ceramic tiles ff non slip ceramic tiles ff

ATING NUMBERS

SHWR

l setting it is important to provide seating for people or more. This is provided for in the ment: having small groups (1-4 people) closer nd the larger spaces allocated towards large outdoor benches allowing for up to 10 people

INDOOR DINING

Located near the glazed edge of the ADD building allows for adequate lighting for study sessions during the day.

04 W.C.

GENTS CHANGING ROOM blue ceramic tiles ff

AIR LOCK

dark ceramic floor tiles defining circulation

03

non slip ceramic tiles ff

non slip ceramic tiles ff

brown mosaic ceramic tiles floor finish

02

faux wood ceramic floor tiles

04

DRY GOODS STORE

ZONE 03: EARTH ZONE LOADING YARD

OUTDOOR DINING

It is characterized by booth seating, more comfortable than the other zones. This is to encourage longer stays and can accommodate up to 8 people per seat.

bove issues under one common theme, the re utilizes nature as its driving principle: three y nature to show the different groups that are within. They are as follows, The Air Zone, The he Earth Zone.

The colour scheme and material choice increases comfort and apetite to enable customers to order multiple meals.

ironment encompasses all three of the above nified theme.

03

This zone is located at the furthest area in the interior from the entrance.

hollow concrete floor tiles with grass

OUTDOOR DINING

LOADING YARD

ZONE 04: OUTDOOR DINING

LAYOUT PLAN

02

OUTDOOR BOOTH SEATS

OUTDOOR BOOTH SEATS

OUTDOOR BOOTH SEATS

OUTDOOR BOOTH SEATS

OUTDOOR BOOTH SEATS

This forms a combination of the other three zones with concrete booth seats for 6 people as well as large benches for 8 people at a time. MACHARIA

T 02: INTERIOR DESIGN

PLAN

1:100

ISAAC This will bring the outdoor experience to diners and can be MUTHONDU B02/35595/2013 the heart of the restaurant during the day.

UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

PROJECT 02: INTERIOR DESIGN

2021 PORTFOLIO

PLAN

1:50

PLAN

MACHARIA ISAAC MUTHONDU B02/35595/2013

MACHARIA ISAAC MUTHONDU


EARTH ZONE

VINE ZONE

50 x 125 mm timber ceiling panels

50 x 125 mm timber ceiling panels

custom light fixture bolted to ceiling

20x20 mm mild steel light fixture bolted to ceiling

circulation vestibule

DETAIL D-03

kitchen

planter box to architect’s detail

white plastered rough and tough wall finish

300x300mm brown mosaic ceramic floor tiles

150x150mm blue ceramic floor tiles

SECTION 01

AIR ZONE

OUTDOOR DINING

DETAIL D-01

50 x 125 mm timber ceiling panels

DETAIL D-02

brown fired clay brick wall finish

35x120mm timber slats bolted to mild steel frame 75x120 mm timber louvres bolted to mild steel frame

1100mm high counter top

white painted cast in place concrete seat and table

hexagona light grey ceramic floor tiles

150x300 mm hollow concrete pavers

SECTION 02

SECTIONS UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

PROJECT 02: INTERIOR DESIGN

SECTIONS

MACHARIA ISAAC MUTHONDU

1:50

B02/35595/2013

concrete planter box to architect’s detail 6 - seater booth

6 - seater booth

300x300mm hexagonal pattern ceramic floor tiles

300x300 mm grey shaded ceramic tiles floor finish 300x300 mm mosaic ceramic tiles floor finish

150x300mm timber pattern ceramic floor tiles 6 - seater booth

6 - seater booth concrete planter box to architect’s detail

UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

PROJECT 02: INTERIOR DESIGN 2021 PORTFOLIO

PART PLAN PART PLAN 1:20

MACHARIA ISAAC MUTHONDU B02/35595/2013

MACHARIA ISAAC MUTHONDU


UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

MACHARIA ISAAC MUTHONDU

PROJECT 02: INTERIOR DESIGN

B02/35595/2013

INTERIOR PERSPECTIVE 2021 PORTFOLIO

MACHARIA ISAAC MUTHONDU


UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

MACHARIA ISAAC MUTHONDU

PROJECT 02: INTERIOR DESIGN

B02/35595/2013

EXTERIOR PERSPECTIVE 2021 PORTFOLIO

MACHARIA ISAAC MUTHONDU


02

HOUSING CHALLENGES: • • •

SITE SLOPE PROVIDING SAFE SPACES FOR CHILDREN PLAY AVOIDING EXCESS ATTENTION TOWARDS VEHICLES

SOLUTIONS: •

2021 PORTFOLIO

CLUSTERING THE BUILDINGS GROUPS OF 4 - 6 FOLLOWING THE SITE CONTOURS HAS THE LEAST IMPACT ON SITE SLOPE AS WELL AS PROVIDING SAFE ZONES FOR CHILDREN TO PLAY INSTEAD OF BRINGING THE VEHICLES CLOSE TO AN INDIVIDUAL BUILDING, THE PROPOSAL IS TO HAVE EACH CLUSTER WITH IT’S OWN PARKING ZONE, MAXIMIZING GREEN SPACE.

MACHARIA ISAAC MUTHONDU


SITE PLAN UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

PROJECT 03: MAMLAKA STAFF HOUSING 2021 PORTFOLIO

LOCATION PLAN & SITE PLAN

MACHARIA ISAAC MUTHONDU B02/35595/2013

MACHARIA ISAAC MUTHONDU


4BR UNIT

3BR UNIT

CLUBHOUSE

3BR UNIT

4BR UNIT

CLUBHOUSE

4BR UNITS

UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

PROJECT 03: MAMLAKA STAFF HOUSING 2021 PORTFOLIO

SITE ELEVATIONS

CLUBHOUSE

SITE SECTIONS & ELEVATIONS

MACHARIA ISAAC MUTHONDU B02/35595/2013

MACHARIA ISAAC MUTHONDU


02

02

02 02

W.C.

600x600mm ceramic floor tiles f.f.

PORCH

MASTER BEDROOM

STUDY

600x600mm concrete paving slabs

t&g mvule floor boards on screed

T&G mvule floor boards on screed

BATH 600x600mm ceramic floor tiles f.f.

3 BEDROOM UNIT

01

03 01

DINING

T&G mvule floor boards on screed

BEDROOM 02 FAMILY ROOM

LIVING ROOM

T&Gmvule floor boards on screed

01

03

linen closet

T&G mvule floor boards on screed

t&g mvule floor boards on screed

T&G mvule floor boards on screed

01

KITCHEN

01

01

SHWR/ W.C

150x150mm ceramic floor tiles f.f.

600x600mm ceramic floor tiles f.f.

PANTRY

BEDROOM 01

T&G mvule floor boards on screed

DHOBIE 600x600mm ceramic floor tiles f.f.

02

02

04

04 04

GROUND FLOOR

FIRST FLOOR

UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

3 BEDROOM UNIT PLANS 1:50

02

PROJECT 03: MAMLAKA STAFF HOUSING 02

MACHARIA ISAAC MUTHONDU

02 02

B02/35595/2013

DHOBIE

600x600mm ceramic floor tiles f.f.

BEDROOM 02 T&G mvule floor boards on screed

BEDROOM 01 T&G mvule floor boards on screed

PANTRY

SHWR/ W.C

KITCHEN

150x150mm ceramic floor tiles f.f.

01

01

4 BEDROOM UNIT

T&G mvule floor boards on screed

linen closet

600x600mm ceramic floor tiles f.f.

LIVING ROOM

01

03

01

01

01

BEDROOM 03

t&g mvule floor boards on screed

T&G mvule floor boards on screed

DINING

03

FAMILY ROOM

T&G mvule floor boards on screed

linen closet t&g mvule floor boards on screed

BATH

600x600mm ceramic floor tiles f.f.

STUDY

T&Gmvule floor boards on screed

PORCH

MASTER BEDROOM

600x600mm concrete paving slabs

T&G mvule floor boards on screed

Walk-in Closet

W.C. 600x600mm ceramic floor tiles f.f.

02

02

04

04

GROUND FLOOR

FIRST FLOOR

UNIT TYPOLOGIES 2021 PORTFOLIO

UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

PROJECT 03: MAMLAKA STAFF HOUSING

4 BEDROOM UNIT PLANS 1:50

MACHARIA ISAAC MUTHONDU B02/35595/2013

MACHARIA ISAAC MUTHONDU


19 degrees pitched roof

19 degrees pitched roof

Brown roof shingles nailed on battens on purlins on rafters

Brown roof shingles nailed on battens on purlins on rafters

white painted wood fascia board

white painted wood fascia board

brown fired brick cladding on exterior wall

brown fired brick cladding on exterior wall

1800x1500mm steel casement window with 50mm thick white plastered and painted lightweight concrete reveal

300x2400mm steel casement window with 50mm thick white plastered and painted lightweight concrete reveal

900x2100mm steel door leading to kitchen for security

200x200mm structural steel columns as stilts supporting upper floor and defining porch

ELEVATION 01

ELEVATION 02

ELEVATION 01

19 degrees pitched roof

19 degrees pitched roof

Brown roof shingles nailed on battens on purlins on rafters

Brown roof shingles nailed on battens on purlins on rafters

white painted wood fascia board

white painted wood fascia board

brown fired brick cladding on exterior wall

brown fired brick cladding on exterior wall

750x1400 mm steel casement window with 50mm thick white plastered and painted lightweight concrete reveal

ELEVATION 03

UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

PROJECT 03: MAMLAKA STAFF HOUSING

ELEVATION 02

750x1400 mm steel casement window with 50mm thick white plastered and painted lightweight concrete reveal

ELEVATION 04

3 BEDROOM UNIT 3 BEDROOM UNIT ELEVATIONS 1:50

ELEVATION 03

4 BEDROOM UNIT

MACHARIA ISAAC MUTHONDU B02/35595/2013

ELEVATION 04

UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

PROJECT 03: MAMLAKA STAFF HOUSING

4 BEDROOM UNIT ELEVATIONS 1:50

MACHARIA ISAAC MUTHONDU B02/35595/2013

ELEVATIONS

2021 PORTFOLIO

MACHARIA ISAAC MUTHONDU


19 degrees pitched roof Brown roof shingles nailed on battens on purlins on rafters timber rafters to S.E details

19 degrees pitched roof Brown roof shingles nailed on battens on purlins on rafters timber rafters to S.E details 50mm thick gypsum ceiling soffit

50mm thick gypsum ceiling soffit 200x600mm R.C beam

SHWR/ W.C.

FAMILY ROOM

FAMILY ROOM

FAMILY ROOM

MASTER BEDROOM

SHWR/ W.C.

2100 mm high mahogany door 150x150mm ceramic tiles wall finish in shower cubicle

LIVING ROOM

LIVING ROOM LIVING ROOM

600x600mm concrete paving blocks bedded in mortar on screed

KITCHEN

FAMILY ROOM

1200mm high top hung steel casement window

150x150mm ceramic tiles wall finish in shower cubicle

2400mm high mahogany double door for main entrance

1200mm high top hung steel casement window

LIVING ROOM

PORCH

Brown fired clay brick cladding bedded in mortar on masonry block wall

300mm thick hand compacted hardcore 300x600mm Reinforced Concrete footing

SECTION 2-2

SECTION 2-2

3 BEDROOM UNIT

PROJECT 03: MAMLAKA STAFF HOUSING

BEDROOM 01

600x600mm concrete paving blocks bedded in mortar on screed

SECTION 1-1

UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

2100 mm high mahogany door

PORCH

300mm thick hand compacted hardcore 300x600mm Reinforced Concrete footing

SECTION 1-1

white painted brick cladding on interior wall

145x75mm t&g mvule floor boards on screed 200mm thick Reinforced Concrete floor slab

145x75mm t&g mvule floor boards on screed 200mm thick Reinforced Concrete floor slab

KITCHEN

MASTER BEDROOM

200x600mm R.C beam

white painted brick cladding on interior wall

3 BEDROOM UNIT SECTIONS 1:50

4 BEDROOM UNIT

UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

MACHARIA ISAAC MUTHONDU

PROJECT 03: MAMLAKA STAFF HOUSING B02/35595/2013

MACHARIA ISAAC MUTHONDU

4 BEDROOM UNIT SECTIONS 1:50

B02/35595/2013

SECTIONS

2021 PORTFOLIO

MACHARIA ISAAC MUTHONDU


03

CONFERENCE CENTRE CHALLENGES: • • •

SITE SLOPE PROVIDING ACCESS TO V.I.PS FOR THE CONFERENCE CENTRE HALL COMBINING THE LIBRARY, CAFETERIA & AUDITORIUM HALL INTO ONE COHERENT BUILDING THAT BLENDS INTO THE SITE

SOLUTIONS: •

• •

NFERENCE CENTRE 2021 PORTFOLIO

AXONOMETRIC VIEW

LOCATING THE LOWEST LEVEL OF THE AUDITORIUM HALL AT THE LOWEST LEVEL OF THE SITE TAKES MAXIMUM ADVANTAGE OF THE SITE DUE TO THE HEIGHT REQUIREMENTS OF THE AUDITORIUM ACCESS TO BOTH NORMAL USERS AND V.I.P ARE DIFFERENTIATED HAVING THE LIBRARY’S LEVELS MATCH WITH THE HEIGHT OF THE AUDITORIUM HALL FORMS A UNIFORM DESIGN LANGUAGE.

MACHARIA ISAAC MUTHONDU B02/35595/2013

MACHARIA ISAAC MUTHONDU


MATERIAL TESTING YARD

PARKING LOT

to student halls

LOADING YARD

PEDESTRIAN ACCESS VIP ACCESS

to add building

SITE PLAN UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

PROJECT 04 & 05: CONFERENCE CENTRE 2021 PORTFOLIO

SITE PLAN

MACHARIA ISAAC MUTHONDU B02/35595/2013

MACHARIA ISAAC MUTHONDU


to student halls MEETING ROOM

UP

MANAGEMENT OFFICE UP

to H.R.D.U BREAKOUT ROOM

STORE

V.I.P W.C.

LADIES W.C.

LADIES W.C.

V.I.P ROOM TICKETS

MAIN STAGE

MEDIA BOX

BACKSTAGE

GENTS W.C.

GENTS W.C.

THOROUGHFARE

BREAKOUT ROOM

UP

to cafeteria

UP

V.I.P ACCESS

LOWER GROUND FLOOR

NFERENCE CENTRE

LOWER GROUND FLOOR

1:100

UPPER GROUND FLOOR UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

MACHARIA ISAAC MUTHONDU

PROJECT 04 & 05: CONFERENCE CENTRE B02/35595/2013

UPPER GROUND FLOOR

1:100

MACHARIA ISAAC MUTHONDU B02/35595/2013

PLANS

2021 PORTFOLIO

MACHARIA ISAAC MUTHONDU


MATERIAL TESTING YARD

thermal testing lab

acoustic testing lab

H.R.D.U. deputy’s office

H.R.D.U. reception

waiting area/ easy reading

H.R.D.U. head office

H.R.D.U meeting room

archives room Secretary’s Office

cutlery wash and store

STUDY ZONE cashier’s office chef ’s office

COMPUTER RESEARCH AREA LADIES W.C.

LOADING YARD

KITCHEN

LADIES W.C.

CURATOR’S OFFICE

SERVERY LIBRARY READING AREA

GENTS W.C.

LADIES W.C.

EQUIPMENT CONTROL ROOM INDOOR DINING dry goods store

cold store

SECRETARY’S OFFICE

WAITING AREA/ EASY READING

vegetable store

VOID GENTS W.C.

BOOKSHELVES

OUTDOOR DINING

GENTS W.C.

CAFETERIA & H.R.D.U

NFERENCE CENTRE

1 FLOOR - CAFETERIA & H.R.D.U ST

1:100

UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

PROJECT 04 & 05: CONFERENCE CENTRE MACHARIA ISAAC MUTHONDU

LIBRARY UPPER FLOOR

3RD FLOOR - LIBRARY

1:100

MACHARIA ISAAC MUTHONDU B02/35595/2013

B02/35595/2013

PLANS

2021 PORTFOLIO

MACHARIA ISAAC MUTHONDU


ELEVATION 01

ELEVATION 02

ELEVATIONS UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

2021 PORTFOLIO

PROJECT 04 & 05: CONFERENCE CENTRE

ELEVATIONS

1:100

MACHARIA ISAAC MACHARIA ISAAC MUTHONDU MUTHONDU B02/35595/2013


Green roof shingles placed on 50x50mm battens on rafters to structural engineer detail 200mm thick masonry block with wire brushed exterior finish

Acoustic sound absorbent panels to architect’s detail

SECTION A-A

Louvred clerestory openings to vent warm air through stack effect

50mm thick timber in between 15mm thick aluminium frame machine cut to architect’s detail acting as sunshade

library reading and study area

Green roof shingles placed on 50x50mm battens on rafters to structural engineer detail

library reception

library reading area PARKING

LOADING YARD

kitchen

cafeteria

library reception

equipment control room

outdoor seating

Ticketing

Media Box

AUDITORIUM HALL

SECTION B-B

UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

PROJECT 04 & 05: CONFERENCE CENTRE 2021 PORTFOLIO

200mm thick masonry block with wire brushed exterior finish

SECTIONS

1:100

SECTIONS

STAGE

200mm thick R.C floor slab on 300mm thick hardcore

MACHARIA ISAAC MUTHONDU B02/35595/2013

MACHARIA ISAAC MUTHONDU


04

CONSERVATION

FISH

MARK

ET

G

F

D

K

G

RAK

H

South Elevation

WY RO AD

MBA

D

N D I A K U U STREET

T H I K A S LT R E E T

GOVE S Q U AR N M E N RE T

PROPOSED SITE

N

NA HI AK AR MB

N A

ent square UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

BACHELOR OF ARCHITECTURAL STUDIES 4TH YEAR CLASS OF 2019 MARCH 2019

PROJECT 06b: SWAHILI ARCHITECTURE 2021 PORTFOLIO

RESIDENTIAL UNITS HOT & HUMID ORIGINAL• USERS: 1910 afluentCLIMATE Residential

Gujerati houses PRESENT USERS: Curio stores - left derelict for years as the current owner waits until the building is uninhabitable before putting up his own structure. 3rd floor was added in 1890 and renewal of the balcony has spoilt the entrance facade to Old Town. MATERIALS: Cement lime plaster and natural stone

SOLUTIONS: MOMBASA

CLUB

B M C L OU BM B A S A

MB ARA K H INA WY RO AD

N D I A K U U STREET

land

CHALLENGES:

1887-1990 radically altered with then present structural• conditions LOCATING THE SUPERMARKET & CURIO SHOPS Currently rendered vacant, transformed AT THE BOTTOM LEVEL into MAKES BEST USE OF THE storage for alcoholic drinks EXISTING BUILDING FOOTPRINT WITH MINIMAL Before alteration, Building exhibited strong DEMOLITION influence •from the &Gujeratti HOT HUMIDstyle CLIMATE IS COUNTERED THROUGH CONSTANTS CREATING SIGHTED: Gujerati doors, natuCROSS-VENTILATION AS WELL AS ral stone structure (coral rag), ornamentation, TAKING ADVANTAGE OF THE STACK EFFECT VIA AN narrow external staircase, altered geometries, ATRIUM carved brackets under balconies and a verandah that encircles the building witj sculpted woodwork.

C

d site ed was

Plot No. 65/2 EST - 1896 NAME: Ali’s Curio Market HISTORICAL SIGNIFICANCE: Listed as Antwerp East African Trading Company, listed as a GRADE I Building. Unfortunately plans were • MAINTAINING THE ORIGINAL BUILDING FOOTPRINT altered and misplaced after gazettement of • ACCOMMODATING NEW COMMERCIAL USES WITH Old Town Mombasa

ROA

OLD

E

I

M NYERI STREET

PORT

J

AWY

H

North Elevation

HIN

West Elevation

cifically

BRIEF HISTORY

East Elevation

egion. he ocean

N D I A K U U STR EET

Swahiliarchitecture STUDY OF OLD TOWN MOMBA

LOCATION PLAN

MACHARIA ISAAC MUTHONDU B02/35595/2013

MACHARIA ISAAC MUTHONDU


RD. NAWY AK HI

U

MBAR

A KU

NDI SITE PLAN

b: SWAHILI ARCHITECTURE 2021 PORTFOLIO

SITE PLAN

1:500

MACHARIA ISAAC MUTHONDU B02/35595/2013

MACHARIA ISAAC MUTHONDU


RD. NAWY AK HI MBAR UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

PROJECT 06b: SWAHILI ARCHITECTURE

BASEMENT BASEMENT PLAN PARKING 1:100

MACHARIA ISAAC MUTHONDU

UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

PROJECT 06b: SWAHILI ARCHITECTURE B02/35595/2013

GROUND FLOOR

GROUND FLOOR PLAN 1:100

MACHARIA ISAAC MUTHONDU B02/35595/2013

PLANS

2021 PORTFOLIO

MACHARIA ISAAC MUTHONDU


VERSITY OF NAIROBI ULTY OF ARCHITECTURE YEAR STUDIO

ROJECT 06b: SWAHILI ARCHITECTURE

FIRST FLOOR - OFFICES ST

1 FLOOR PLAN

1:100

UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

MACHARIA

ISAAC PROJECT 06b: SWAHILI ARCHITECTURE MUTHONDU

SECOND FLOOR - RESIDENTIAL 2ND FLOOR PLAN 1:100

MACHARIA ISAAC MUTHONDU B02/35595/2013

B02/35595/2013

PLANS

2021 PORTFOLIO

MACHARIA ISAAC MUTHONDU


ELEVATION ALONG NDIA KUU RD.

UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

PROJECT 06b: SWAHILI ARCHITECTURE

ELEVATION

MACHARIA ISAAC MUTHONDU

1:100

B02/35595/2013

ELEVATION ALONG MBARAK HINAWY RD.

ELEVATIONS 2021 PORTFOLIO

MACHARIA ISAAC MUTHONDU


Swahili Roof Atrium to detail and specifications as per working drawings

Clay tiles on 50mm x 25 mm timber battens on sarking felt on timber truss members 200mm high Decorative Balcony fascia

1200mm x 1800mm arched timber casement window stained and varnished to detail

BEDROOM

1200mm x 1800mm arched timber casement window stained and varnished to detail

OFFICE

1000mm high mangroove wood balustrade finished dark brown varnish to detail

100mm x 100mm thick Indian Teak balcony post varnished to detail

1000mm x 75mm thick mvule timber bracket treated with linseed oil bolted onto the wall to architects approval

RESTAUARANT Sidewalk Pavement finished with Cora stone

BASEMENT PARKNING

SECTION A-A

Clay tiles on 50mm x 25 mm timber battens on sarking felt on timber truss members UNIVERSITY OF NAIROBI FACULTY OF ARCHITECTURE 4TH YEAR STUDIO

500 mm thick coral masonry wall with lime plaster finish mixed with brown emulsion Paint

PROJECT 06b: SWAHILI ARCHITECTURE

SECTION

1:100

Balcony flooring of timber deck hardwood supported by timber bracket at 1000mm centers anchored to masonry wall

MACHARIA ISAAC MUTHONDU B02/35595/2013

Sidewalk Pavement finished with Cora stone BASEMENT PARKNING

SECTION B-B

SECTIONS 2021 PORTFOLIO

MACHARIA ISAAC MUTHONDU


05

2021 PORTFOLIO

PHOTOGRAPHY

MACHARIA ISAAC MUTHONDU


2021 PORTFOLIO

MACHARIA ISAAC MUTHONDU


06

OTHER

GRAPHIC DESIGN 2021 PORTFOLIO

MACHARIA ISAAC MUTHONDU


proposal

LOGOS &BRANDING 2021 PORTFOLIO

MACHARIA ISAAC MUTHONDU


PHOTOMANIPULATION 2021 PORTFOLIO

MACHARIA ISAAC MUTHONDU


2021 PORTFOLIO

MACHARIA ISAAC MUTHONDU


THANK YOU. 2021 PORTFOLIO

MACHARIA ISAAC MUTHONDU


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.