Ismail Rahim
Profile & Selected Work
Physical model for Gamuda Garden Rawang Community Hub.
Installation : Petak 1 Meranti Wood
Ground Floor Plan Not to Scale
First Floor Plan Not to Scale
Roof Plan
Not to Scale
Perspective view toward main entrace Ayana Clubhouse
Perspective view toward main entrace Guardhouse Ayana Development
Perspective view toward Surau Ayana Development
Ground Floor Plan Not to Scale
Lower Ground Floor Plan Not to Scale
First Floor Plan Not to Scale
Perspective view from lake opposite of Emerald clubhouse
Perspective view from swimming pool toward Gym
Perspective view from swimming pool toward Gym and Multipurpose Hall
Ground Floor Plan Not to Scale
First Floor Plan Not to Scale
Second Floor Plan Not to Scale
Perspective view toward main entrance
Perspective view from main entrance of NECF building
Perspective view toward open staircase with pocket garden.
.
Perspective view toward main lobby with semi open courtyard.
Ground Floor Plan Not to Scale
Perspective view toward main entrance Sales Gallery
Perspective view toward open plaza between retail area and sales gallery
Ariel view show overall Sales Gallery
Perspective view toward open terrace at retail area
Site Plan
Not to Scale
Ground Floor Plan Not to Scale
Type A1
First Floor Plan
Not to Scale
Front Perspective of Type A Unit
Side View Perspective of Type B Unit
Ground Floor Plan Not to Scale
Type B1
First Floor Plan
Not to Scale
Front Perspective of Type B Unit
Side View Perspective of Type B Unit
MBSA/BGN/BB/600-
U12/
16
(
)/SEK:
/
- 20
U12/17A
60M
DAERAH GOMBAK
(23)
SELASIH
TAPAK CADANGAN
Ke Rawang / Utara
SELASIH
JALAN
Kompleks Penjara Sg. Buloh
RRI
6 7
3
U6
4
Kg. Rasak
20
19
JALAN U12/16D (23B)
SELASIH 16C
JALAN
U12/ SELASIH JALAN
15.58% S
PKN AN 7) GUN N BAN SYE PEM (SEK
100.00%
MAJLIS PERBANDARAN SUBANG JAYA
27
33 Kg. Bukit Kemuning
28
Kg. Bukit Naga
32
Kg. Bukit Lancong
31
Ke Pulau Indah Kg. Jalan Kebun
Kawasan Selatan Seksyen 25 - 36
40.82%
LOT 8093
Lebuhraya Shah Alam
26
25
34
Kawasan Tengah Seksyen 1 - 24
43.60% Ke K.L
Kg. Melayu Kebun Bunga
21 22
23
24
35
Lebuhraya Persekutuan
Susur Ke Lapangan Terbang Subang
11 12
20'
36
14
Lebuhraya Baru Lembah Klang
U1
10
18
17
U2
13
9
5
15
16
Kg. Sg. Kandis Kg. Bukit Badak
(22)
U3
U8
8
2
1
Ke Klang
Kawasan Utara Seksyen U1 - U20
15 U12/
55'
Kg. Baru Subang
U7
TAPAK CADANGAN
SELASIH
MAJLIS PERBANDARAN PETALING JAYA
Kg. Melayu Subang
U9
U11
Bukit Cerakah
U12
JALAN U12/ SELASIH
JALAN
SELASIH
U12/
16B
(20B)
U4 U15
U10
U13
16
JALAN
U15
U14
Meru
Ke Klang
U12/ SELASIH JALAN
U5
Kg. haji Md. Sharif (Kg. Budiman)
MAJLIS PERBANDARAN KLANG
SELASIH
U12/17
JALAN
Stesen KTM U20 Kg. Sungai Plong Kg. Paya Jaras Kg. Paya Kg. Paya Jaras Hulu Kg. Paya Jaras Tangah Jaras Hilir U15 Kg. Baru Sg. Buloh U18 Kg. Paya Jaras Dalam
(23A)
U17
Kg. Kubu Gajah Dalam
16A
Kg. Merbau Sempak Kg. Kubu Gajah
DAERAH KUALA SELANGOR
Kg. Lombong
30
29
Ke KLIA Hubungan Tengah - Utara - Selatan
DAERAH KUALA LANGAT
LALUAN JALAN MASUK KE TAPAK CADANGAN DARI SEKSYEN 7
KEY PLAN
LOCATION PLAN SCALE 1 :6,000
N.T.S
CONTOH ALAMAT NO. 54 JALAN SELASIH U12/30A, CAHAYA ALAM, SEKSYEN U12, 40170 SHAH ALAM, SELANGOR DARUL EHSAN
JALAN SELASIH U12/30
JALAN SELASIH U12/13
E LIN K AC
>
>
>
SE IN
E LIN
ILD
AC
K
BU
TB
MM
SE
24
ILD
IN
G
15
>
>
>
>
>
>
>
G
FFL +9.85m
>
TB
>
>
>
>
>
>
>
> >
>
BU MM 24 15
6100 BUILDING SETBACK
RUMAH TERES 2 TINGKAT (MIN. 22' x 75')
FFL +9.85m
> >
A1b
6100MM BUILDING SETBACK LINE
>
A1a
BLOCK - C
>
>
>
NO.46G, JALAN PJU 5/22, ENCORP STRAND, PUSAT PERDAGANGAN KOTA DAMANSARA, KOTA DAMANSARA PJU 5, 47810 PETALING JAYA, SELANGOR DARUL EHSAN. Tel : 03-6286 7777 Fax : 03-6286 7699
TANDATANGAN ARKITEK "Saya memperakui bahawa perinci-perinci dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-Undang Kecil Bangunan Seragam Selangor 1986 dan saya setuju terima tanggungjawab penuh dengan sewajarnya"
>
>
A2 >
> >
A1b
>
> >
>
A1a
> >
A1b
>
>
BLOCK - B
A1a
JALAN SELASIH U12/13
10'
RUMAH TERES 2 TINGKAT (MIN. 22' x 75')
6100MM BUILDING SETBACK LINE
MR. TEO LEONG PENG (NO. KP : 581029-01-6013 ) (Head of Group Property)
MUST EHSAN DEVELOPMENT SDN. BHD.
>
A2
FFL +9.85m
3050MM CAR PARK SETBACK LINE
JALAN SELASIH U12/30A 50'
RUMAH TERES 2 TINGKAT (MIN. 22' x 75') 6100MM BUILDING SETBACK LINE
3050MM CAR PARK SETBACK LINE
BLOCK - A
FFL +9.85m
1524MM BUILDING SETBACK LINE
12192 [40'-0"]
3050MM CAR PARK SETBACK LINE
6100 BUILDING SETBACK 6100MM BUILDING SETBACK LINE
10'
3050MM CAR PARK SETBACK LINE
6100 BUILDING SETBACK
3048
3048
BLOCK - H
>
>
>
>
>
>
>
>
>
>
>
6100MM BUILDING SETBACK LINE
>
7315
FFL +9.85m
1524MM BUILDING SETBACK LINE
6100 BUILDING SETBACK
20'
1524MM BUILDING SETBACK LINE
FFL +9.85m
1524MM BUILDING SETBACK LINE
1524MM BUILDING SETBACK LINE
6100 BUILDING SETBACK
FFL +9.85m
RUMAH TERES 2 TINGKAT (MIN. 22' x 75')
6100MM BUILDING SETBACK LINE
3050MM CAR PARK SETBACK LINE
JALAN SELASIH U12/30A
15240 [50'-0"]
6100 BUILDING SETBACK
6100 BUILDING SETBACK 3050MM CAR PARK SETBACK LINE
FFL +9.85m
RUMAH TERES 2 TINGKAT (MIN. 22' x 75')
6100MM BUILDING SETBACK LINE
> >
> > >
> >
>
1524MM BUILDING SETBACK LINE 1524MM BUILDING SETBACK LINE >
> >
> >
> > > >
FFL +9.85m
RUMAH TERES 2 TINGKAT (MIN. 22' x 75')
50'
6100 BUILDING SETBACK
>
BLOCK - J
6100 BUILDING SETBACK
>
> >
>
>
>
> >
> >
>
>
>
>
>
> >
>
>
>
>
>
>
>
>
>
>
> >
>
15
24
>
6100MM BUILDING SETBACK LINE
MM
FFL +9.85m
>
>
>
>
>
> >
>
E LIN K AC TB SE G
E
IN
LIN
ILD
K
BU
AC TB SE G IN ILD BU MM 24 15
1524MM BUILDING SETBACK LINE
6100MM BUILDING SETBACK LINE
>> >
3050MM CAR PARK SETBACK LINE
> > > >
3050MM CAR PARK SETBACK LINE
C2
>
6100 BUILDING SETBACK 6100MM BUILDING SETBACK LINE
>> > > >>
>
> >>
6100 BUILDING SETBACK
>> > >
> >>
C2
C1a
>
>
>
6100 BUILDING SETBACK
>> > > >>
>> >
>> >
> > > >
C1b
>
>> > >
> > >>
> >>
>
C1b
C1a
>
>
> >>
>
C1b
A1a A1b
79-2, BLOCK G, ZENITH CORPORATE PARK, JALAN SS7/26, 47301 PETALING JAYA, SELANGOR DARUL EHSAN TEL : 603-7887 8193 FAX : 603-7887 6193 EMAIL : cloa@cloa.com.my (1038658-P)
TAJUK
CADANGAN PEMBANGUNAN 92 UNIT RUMAH TERES 2 TINGKAT ( MIN. 22' x 75') YANG MENGANDUNGI :
>
>
A1a A1b
> >
A2
JENIS A1a (2 TINGKAT) - 21 UNIT
JENIS C1a (2 TINGKAT) - 15 UNIT
- NO. 6, 10, 14, 22, 26, 34, 38, 42, 46, 50, 58,62, NO. 66, 70, 74, 78, 86, 90, 98, 102 & 106 JALAN SELASIH U12/30A
- NO. 3, 7, 11, 15, 25, 27, 31, 41, 45, 49, 53, 61, NO. 65, 69 & 73 JALAN SELASIH U12/30A
JENIS A1b (2 TINGKAT) - 21 UNIT
JENIS C1b (2 TINGKAT) - 13 UNIT
- NO. 4, 8, 12, 20, 24, 32, 36, 40, 44, 48, 56, 60, NO. 64, 68, 72, 76, 84, 88, 96, 100 & 104 JALAN SELASIH U12/30A
- NO. 5, 9, 13, 17, 29, 33, 43, 47, 51, 63, NO. 67, 71 & 75 JALAN SELASIH U12/30A
JENIS A2 (2 TINGKAT) - 8 UNIT
JENIS C2 (2 TINGKAT) - 4 UNIT
- NO. 2, 16, 18, 52, 54, 92, 94 & 108 JALAN SELASIH U12/30A
- NO. 1, 35, 39 & 77 JALAN SELASIH U12/30A
JENIS A3 (2 TINGKAT) - 4 UNIT
JENIS C3 (2 TINGKAT) - 2 UNIT
- NO. 28, 30, 80 & 82 JALAN SELASIH U12/30A
- NO. 23 & 55 JALAN SELASIH U12/30A
JENIS B1 (2 TINGKAT) - 2 UNIT
>
>
>
- NO. 19 & 59 JALAN SELASIH U12/30A
<
>> >
C1a
> >>
>> >
>
>
>> >>
>> >
>> > >
>
C1b
> >>
C1a
C1a
>
>
>
>> >
C1b
3963
>
<
6100
>> >
7315 15240 [50'-0"]
TANDATANGAN DAN ALAMAT PEMAJU >
<
>> >
> >>
> >>
>
> >>
>
C1b
C1a > >>
>
>
>
>
C1a
C1b >> >
>> >
> >>
>
BLOCK - D
>
> >>
>> > >
3963
> >
>
>
<
>
>
B1
IR. HAJI MOHAMAD SHARIF BIN MOK SOM (NO. KP : 601214-10-5443 ) (Ketua Pegawai Teknikal)
A3
<
>> >
>> >
>> >
> > >>
> >>
>> >
> >>
BLOCK - F
>
C1b
TANDATANGAN DAN ALAMAT PEMILIK TANAH
<
B3 >
C3 > > > >
>> >
>
>
>
C1a
6100MM BUILDING SETBACK LINE
>
>
>
>
>> >
>
C1b C1a > >>
C1b C1a
>
>
C2 > > > >
C1a > >>
>
A3
6100MM BUILDING SETBACK LINE
6100 BUILDING SETBACK
6100MM BUILDING SETBACK LINE
>
>
A1a A1b
50'
>
>
12192 [40'-0"]
A1a A1b
3050MM CAR PARK SETBACK LINE
3050MM CAR PARK SETBACK LINE
>> >
>> >
>> >
> >>
10'
A1a A1b
RUMAH TERES 2 TKT (MIN. 22' x 75')
RUMAH TERES 2 TKT (MIN. 22' x 75')
> >>
> > > >
>> >
> >>
>> >
> >>
> >
>
BLOCK - K
A1a A1b
6100MM BUILDING SETBACK LINE
>
C2
>
> >>
>
>
>> >
> >>
C1b C1a
A1a A1b
3050MM CAR PARK SETBACK LINE
3050MM CAR PARK SETBACK LINE
>
>
>
>
>
>
>
C1b C1a >> >
> >>
C1b C1a
>
> > >
> >
>
A2
>
< <
<
> >>
A1a
> >>
A1b
C1a
>> >
A1a
C3
>
A1b
> >
A2
6100MM BUILDING SETBACK LINE sump
JALAN SELASIH U12/30A
RUMAH TERES 2 TKT (MIN. 22' x 75')
>
A1a
B1
>
A1b
B3
> > >
<
3963
>
<
7315 15240 [50'-0"]
> >>
A2
<
3963
>
< <
A2
>
A1a
<
3964
<
>
>
A1b
50'
3050MM CAR PARK SETBACK LINE
6100MM BUILDING SETBACK LINE
6100MM BUILDING SETBACK LINE
7315
15243 [50'-0"]
<
>
>
>
>
A1a
3964
sump
A1b
3050MM CAR PARK SETBACK LINE
<
<
A3
6100MM BUILDING SETBACK LINE
<
6100 BUILDING SETBACK
A2
sump
A1a A1b
sump
A1a A1b
sump
A1a A1b
sump
A1b
<
A1a
RUMAH TERES 2 TKT (MIN. 22' x 75')
3050MM CAR PARK SETBACK LINE
<
A1a A1b
<
A1a A1b
<
A3
6100MM BUILDING SETBACK LINE
BLOCK - E 6100 BUILDING SETBACK
BLOCK - G
JENIS B3 (2 TINGKAT) - 2 UNIT - NO. 21 & 57 JALAN SELASIH U12/30A
1524MM BUILDING SETBACK LINE
1524MM BUILDING SETBACK LINE 6100 BUILDING SETBACK
DI ATAS SEBAHAGIAN LOT PT 8093, SEKSYEN U12, 40170 SHAH ALAM, SELANGOR DARUL EHSAN UNTUK TETUAN MUST EHSAN DEVELOPMENT SDN BHD DAN PERBADANAN KEMAJUAN NEGERI SELANGOR TAJUK LUKISAN
PELAN TAPAK, PELAN LOKASI & PELAN KUNCI
UKURAN
SITE PLAN
DILUKIS DISEMAK
SCALE 1:400
TARIKH
BUILDING SUBMISSION
Site Plan
Not to Scale
BIL PROJEK
2019 / P134
1 : 400 Npy MARTIN / SIM AUGUST 2019 BIL SALINAN
BS/S.1.101
RUJUKAN
Render imgae of Type C Unit (Image From 3D Artist)
Site inspection Photo of Type C Unit
Site inspection Photo of Type A Unit
Site inspection Photo of Type A Unit
U12/
DAERAH GOMBAK
(23)
HARGA JUALAN KEPADA BUMIPUTERA (DISKAUN 7%)
TERES 2 TINGKAT (intermediated)
RM850,000.00
RM790,000.00
TERES 2 TINGKAT (corner)
RM1,200,000.00
RM1,160,000.00
RM960,000.00
RM790,000.00
SELASIH JALAN
U12/16D (23B)
SELASIH 16C
JALAN
U12/ SELASIH JALAN
(22)
15 U12/
SELASIH JALAN
(23A)
SELASIH JALAN 16B U12/ SELASIH
KEGUNAAN TANAH KAWASAN REKREASI & LANDSKAP YANG DIPERLUKAN
5,544.19m² (10% DARIPADA LUAS KESELURUHAN)
10,533.97m² (19% DARIPADA LUAS KESELURUHAN)
AN SEL
ASIH
/14A
2
3
2279.51
2
3
206.99
2227.21
2
3
209.13
2250.24
2
3
TERES 2 TINGKAT - JENIS B2b (end lot)
4
206.82
2225.38
2
3
TERES 2 TINGKAT - JENIS B3b (corner )
4
211.95
2280.58
2
3
TERES 2 TINGKAT - JENIS C1 (intermediated)
53
207.51
2232.81
2
3
TERES 2 TINGKAT - JENIS C2 (end lot)
12
205.23
2208.27
2
3
TERES 2 TINGKAT - JENIS C3 (corner)
2
209.17
2250.67
2
3
NOTA :
TERES 2 TINGKAT - JENIS D1 (intermediated)
2
213.88
2301.35
2
3
1.ARAH ALIRAN LALULINTAS AKAN DITUNJUK DI ATAS TAPAK.
TERES 2 TINGKAT - JENIS D3 (corner)
2
216.97
2334.60
2
KAWASAN LAPANG PENCAWANG ELEKTRIK TNB KOLAM TAKUNGAN BANJIR
)
. SEL
U12
JLN
H ASI SEL AN JAL
Tadika 1
3° 31 '38 "
PELAN KUNCI
(0.248 ek)
LALUAN JALAN MASUK KE TAPAK CADANGAN DARI SEKSYEN 7
.10
11
N.T.S
50° 30' 00"
72
5.1
6.4
66
5° 30
'00
"
66 6.4 5°
66
30 '00 "
6.4
18
10.726
27
01
5.1
230°30'00"
"
65
'00
30
5°
44.496
3'5
°4 0"
KL 411È (0.102 ek)
13300 11100
CONTOH ALAMAT
44 '57 "
0" 77'4'40" °2°2 95 95
3050 Bldg Setback
8
.35
14
230°30'00"113.311
50°30'00"
50'
230°30'00"
JALAN SELASIH U12/13 (SEDIA ADA)NO. 12 JALAN SELASIH U12/14C,
sump
sump 1 no. rwdp #1 #2
sump
nearest drain discharge to
nearest drain discharge to
sump
sump
sump
sump
6100MM BUILDING SETBACK LINE
sump
3050MM CAR PARK SETBACK LINE
BLOCK - B JALAN SELASIH U12/13 (SEDIA ADA)
SD1
MH ft t
s
t
100dp
50dp
sump
sump
nearest drain discharge to
3050MM CAR PARK SETBACK LINE
6100MM BUILDING SETBACK LINE
BLOCK - A
3050MM CAR PARK SETBACK LINE
6100MM BUILDING SETBACK LINE
BLOCK - D U12/14A
3048
"
2.1 55
30 '00
5° 18
sump
6100MM BUILDING SETBACK LINE
3050MM CAR PARK SETBACK LINE
JALAN SELASIH
sump sump
sump
1081
sump
sump
sump
sump
sump
6100MM BUILDING SETBACK LINE
3050MM CAR PARK SETBACK LINE
rwdp #1 #2 rwdp #1 #2 rwdp #1 #2 rwdp #1 #2 rwdp #1 #2 rwdp #1 #2 rwdp #1 #2 rwdp #1 #2 rwdp #1 #2 rwdp #1 #2 rwdp #1 #2
W11
MH t
s
ft t
100dp
50dp
sump
sump
sump
sump
rwdp #1 #2
U12/14B
BLOCK - F
6100MM BUILDING SETBACK LINE
sump
sump
sump
3050MM CAR PARK SETBACK LINE
6100MM BUILDING SETBACK LINE
sump
sump
3050MM CAR PARK SETBACK LINE
6100 7000
sump
6100MM BUILDING SETBACK LINE
3050MM CAR PARK SETBACK LINE
JALAN SELASIH
sump
sump
sump
sump
sump
BLOCK - H
rwdp #1 #2
6100MM BUILDING SETBACK LINE
3050MM CAR PARK SETBACK LINE
3600
7425
6100MM BUILDING SETBACK
sump
6100MM BUILDING SETBACK LINE
1524MM BUILDING SETBACK LINE
1524MM BUILDING SETBACK LINE
sump sump
LINE
SETBACK LINE sump
3050MM CAR PARK
BLOCK - E
3050MM CAR PARK SETBACK LINE
6100MM BUILDING SETBACK LINE
3084
1524
sump sump
sump
sump
sump
1524MM BUILDING SETBACK LINE
1524MM BUILDING SETBACK LINE
LINE
3960
3009
18 5°
66 6.4
30 '00
"
JALAN SELASIH
BLOCK - G
3050MM CAR PARK
sump
sump
sump
LINE
SETBACK LINE
sump
LINE
3050MM CAR PARK SETBACK
sump
5° 18
LINE 6100MM BUILDING SETBACK
SD1
MH
100dp
sump
t s
BLOCK - L
X
6100MM BUILDING SETBACK
LINE
LINE
3050MM CAR PARK SETBACK
6100MM BUILDING SETBACK
100dp
sump
t s
sump
50dp
sump
U12/14D
X X X X X X
X
sump
sump
sump
8080
8080 3600
X X X X X
" '19 58 3° 18 8 .11 17
X X X
X X X
X X X X
X X X X X X
X X X X X X
BLOCK - N
X X
X X X
X X X
SD1
MH
X X
t ft
X
discharge to nearest drain
X X
X X
X
X X X X X
X X X X X X
X
X
X X X X
BLOCK - M
sump
t ft
sump
sump sump
6100MM BUILDING SETBACK
6.4 66 30 '00 "
X
7320
PELAN TAPAK, PELAN LOKASI & PELAN KUNCI
X X X
6.706
33
66'
X
3960
TAJUK LUKISAN
X
230°30'00"22.86
UKURAN
X
230°30'00"22.86
6.706
230°30'00"22.86
DISEMAK
X
6.706
DILUKIS
X
31
2
35
9.249
X
4
X
6.706
X
6
6.706
6.706
DI ATAS SEBAHAGIAN LOT PT 8093, SEKSYEN U12, 40170 SHAH ALAM, SELANGOR DARUL EHSAN UNTUK TETUAN MUST EHSAN DEVELOPMENT SDN BHD DAN PERBADANAN KEMAJUAN NEGERI SELANGOR
X
8
37
6.706
- NO. 2, JALAN SELASIH U12/13B
X
10
DAN 1 UNIT PENCAWANG ELEKTRIK (DOUBLE CHAMBER)
X
6.706
X
12
6.706
6.706
39
14
X
6.706
- NO. 2 & 36, JALAN SELASIH U12/14A - NO. 2 & 36, JALAN SELASIH U12/14B
X
16
X
6.706
41
18
9.754
6.706
X X 140°30'00"
20
X
6.706
6.706
22
X
6.706
6.706
24
6.706
8.23
6.706
3.048
26
26
6.706
8.23
140°30'00"
28
6.706
6.706
6.706
30
6.706
6.706
6.706
32
28
6.706
320°30'00"
34
6.706
6.706
48
36
JENIS D3 (2 TINGKAT) - 2 UNIT - NO. 2, JALAN SELASIH U12/14C - NO. 41, JALAN SELASIH U12/14E
JENIS B3b (2 TINGKAT) - 4 UNIT
230°30'00"22.86
230°30'00"22.86
6.706
6.706
6.706
38
6.706
6.706
320°30'00"
40
46
6.706
66 6.4
42
6.706
6.706
230°30'00"22.86
230°30'00"22.86
230°30'00"22.86
6.706
50'
44
U12/14E
6.706
JALAN SELASIH
50'
230°30'00"22.86
0" 0'0 °3 95
JALAN SELASIH U12/14D
1:400
230°30'00"19.812
3960
49
44
PELAN TAPAK
9.551
7320
10280
317°37'40"24.403
47
SEDIA ADA
230°30'00" 3.053
6.706
46
N
6.706
6.706
6.706
30
6.706
230°30'00"
6.706
6.706
32
6.706
6.706
6.706
230°30'00"22.86
- NO. 46, JALAN SELASIH U12/14C - NO. 1, JALAN SELASIH U12/14E
JENIS D1 (2 TINGKAT) - 2 UNIT - NO. 4, JALAN SELASIH U12/14C - NO. 39, JALAN SELASIH U12/14E
JENIS B2b (2 TINGKAT) - 4 UNIT - NO. 10 & 12, JALAN SELASIH U12/14A - NO. 26 & 28, JALAN SELASIH U12/14B
230°30'00"22.86
34
6.706
- NO. 6, 16, 20, 24, 28 & 32 JALAN SELASIH U12/14A - NO. 6, 10, 14, 18, 22 & 32 JALAN SELASIH U12/14B
22.86
230°30'00"22.86
6.706
8.23
15.24
230°30'00"22.86
6.706
3.048
230°30'00"22.86
1
22.86
6.706
8.23
230°30'00"
50°30'00" 15.531
Q
230°30'00"22.86
6.706
6.706
17
42
6.706
RUMAH TERES 2 TINGKAT (MIN. 22' x 75') 15 13 11 9 7 5 3
3050MM CAR PARK SETBACK LINE
6.706
6.706
19
0" 3.04
3.048
- NO. 1, 13, 17 & 25 JALAN SELASIH U12/14B - NO. 26 & 28 JALAN SELASIH U12/14C - NO. 2, 14, 16 & 30 JALAN SELASIH U12/14D - NO. 17 & 19 JALAN SELASIH U12/14E
JENIS C3 (2 TINGKAT) - 2 UNIT
JENIS B1b (2 TINGKAT) - 12 UNIT
0'0
22.86
40
6.706
21
55
°3
3960
6100MM BUILDING SETBACK LINE
23
6.4
95 50°30'00"86.868
12760 7320
6.706
6.706
1480
11.278
6.706
sump
50dp
sump
KL
9.551
C3
320°30'00"22.86
6.706
320°30'00"22.86
6.706
320°30'00"22.86
6.706
10'
320°30'00"22.86
RUMAH TERES 2 TINGKAT (MIN. 22' x 75') 35 33 31 29 27 25
320°30'00"22.86
37
sump
X
sump
sump
BLOCK - P
sump
" '00 27 5°
42
5.1
X X
'50 X
7 .50
X
11
X
10'
0.436 X
6.706
C1
X
C1
- NO. 4, 8, 14, 18, 22, 26, 30 & 34 JALAN SELASIH U12/14A - NO. 4, 8, 12, 16, 20, 24, 30 & 34 JALAN SELASIH U12/14B
X
6.706
C1
320°30'00"22.86
6.706
JENIS C2 (2 TINGKAT) - 12 UNIT
JENIS A3b (2 TINGKAT) - 2 UNIT - NO. 1 & 35 JALAN SELASIH U12/14A
9.754
50°30'00" 6.706
(0.273 ek)
320°30'00"22.86
39
JENIS C1 (2 TINGKAT) - 53 UNIT - NO. 3, 5, 7, 9, 11, 19, 21 & 23 JALAN SELASIH U12/14B - NO. 6, 8, 10, 12, 14, 16, 18, 20, 22, 24, 30, 32, 34, 36, 38, 40, 42 & 44 JALAN SELASIH U12/14C - NO. 4, 6, 8, 10, 12, 18, 20, 22, 24, 26 & 28 JALAN SELASIH U12/14D - NO. 3, 5, 7, 9, 11, 13, 15, 21, 23, 25, 27, 29, 31, 33, 35 & 37 JALAN SELASIH U12/14E
- NO. 9 & 11, JALAN SELASIH U12/14A - NO. 3, 19, 21 & 37, JALAN SELASIH U12/14D
RUMAH TERES 2 TINGKAT SEDIA ADA
6.706
C1
36
6.706
C1
11.278
C1
11.278
6.706
C1
11.278
6.706
320°30'00"22.86
9.589
41
JENIS A1a (2 TINGKAT) - 16 UNIT - NO. 3, 7, 13, 17, 21, 25, 29 & 33 JALAN SELASIH U12/14A - NO. 5, 9, 13, 17, 23, 27, 31 & 35 JALAN SELASIH U12/14D
JENIS A1b (2 TINGKAT) - 12 UNIT - NO. 5, 15, 19, 23, 27 & 31 JALAN SELASIH U12/14A - NO. 7, 11, 15, 25, 29 & 33 JALAN SELASIH U12/14D
JENIS A2b (2 TINGKAT) - 6 UNIT
38
8.23
C2
320°30'00"22.86
3050MM CAR PARK SETBACK LINE sump
320°30'00"22.86
26
"
3048
sump
sump
16.764
X
3.048 sump
X
discharge to nearest drain
X
sump
X
50dp sump discharge to nearest drain
discharge to nearest drain
X
100dp sump
X
100dp
50dp
sump
X
sump
X
sump
X
sump
sump
6100MM BUILDING SETBACK LINE
discharge to nearest drain
X
12.281
X
A3b
discharge to nearest drain
X
79-2, BLOCK G, ZENITH CORPORATE PARK, JALAN SS7/26, 47301 PETALING JAYA, SELANGOR DARUL EHSAN TEL : 603-7887 8193 FAX : 603-7887 6193 EMAIL : cloa@cloa.com.my (1038658-P)
CADANGAN PEMBANGUNAN 143 UNIT RUMAH TERES 2 TINGKAT ( MIN. 22' x 75') YANG MENGANDUNGI :
sump
"
X
CL&O ARCHITECTS SDN BHD
TAJUK
230°30'00"22.86
1 no. rwdp #1 #2
'00 30
X
TANDATANGAN ARKITEK
6.706
5°
27
sump
NO.46G, JALAN PJU 5/22, ENCORP STRAND, PUSAT PERDAGANGAN KOTA DAMANSARA, KOTA DAMANSARA PJU 5, 47810 PETALING JAYA, SELANGOR DARUL EHSAN. Tel : 03-6286 7777 Fax : 03-6286 7699
"Saya memperakui bahawa perinci-perinci dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-Undang Kecil Bangunan Seragam Selangor 1986 dan saya setuju terima tanggungjawab penuh dengan sewajarnya"
66
X
MUST EHSAN DEVELOPMENT SDN. BHD.
6.4
discharge to nearest drain
230°30'00"22.86
A1a
sump
sump
X
230°30'00"22.86
A1b
6.706
1
9.233
X
6.706
3
6.706
X
SD1
5
6.706
X
MH
8.23
7
6.706
A1a
JALAN INDAH, SEKSYEN 14, 40000 SHAH ALAM, SELANGOR Tel : 03-55201234 Fax : 03-55103204
JALAN SELASIH U12/14
RUMAH TERES 2 TINGKAT SEDIA ADA
X
t s
t ft
100dp
230°30'00"22.86
230°30'00"
50'
RUMAH TERES 2 TINGKAT SEDIA ADA
X
50dp
sump
sump
1524MM BUILDING SETBACK LINE
A2b
discharge to nearest drain
9
8.23
3580
50°30'00"
1.524
X
3.048
10'
RUMAH TERES 2 TKT (MIN. 22' x 75')
8.23
C2
140°30'00"22.86
X
8.23
230°30'00"22.86 230°30'00"22.86 sump
6.706
C1
320°30'00"22.86
100dp
6100MM BUILDING SETBACK LINE 6.6
'50
C1
320°30'00"22.86
X
230°30'00"22.86
A2b 1524MM BUILDING SETBACK LINE
sump
6.706
320°30'00"22.86
X
A1a
6.706
8.23
11
230°30'00"131.061
6.706
C1
320°30'00"22.86
50dp
sump
sump
03
C1
320°30'00"22.86
X
140°30'00" 6.706
6.706
13
50°30'00" 6.706
6.706
C1
320°30'00"22.86
sump
4°
320°30'00"22.86
X
6.706
15
6.706 320°30'00"
3579
PERBADANAN KEMAJUAN NEGERI SELANGOR
TANDATANGAN DAN ALAMAT PEMAJU
50°30'00"80.772 0.428
6.706
C1
320°30'00"22.86
X
6.706
6.706
17
sump
"
6.706
C1
320°30'00"22.86
1480
320°30'00"22.86
X
6.706
6.706
19
230°30'00"22.86
A1a
TANDATANGAN DAN ALAMAT PEMILIK TANAH
66'
230°30'00"22.86
A1b
230°30'00"22.86
sump
sump
'00 30
6.706
C1
sump
D1
41.184
6.706
C1
140°30'00"
BLOCK - R
22.896
discharge to nearest drain
50dp
D3
sump
320°30'00"22.86
18.317
317°37'40"
X
230°30'00"22.86
A1a
JENIS B1a (2 TINGKAT) - 16 UNIT
BLOCK - Q
4.883
4.883
X
6.706
6.706
2
9.233
50'
6.706
21
8080
6.706
6.706
23
3580
6.706
6.706
25
230°30'00"22.86
A1b
1.526
1.526
X
6.706
230°30'00"22.86
A1a
A1b
4
sump
sump
sump
sump
nearest drain discharge to
discharge to nearest drain
13.805
13.805
5°
27
27
320°30'00"
10.977
9.83
6.706
discharge to nearest drain
sump
27
X
6.706
6.706
6.706
sump
sump
rwdp #1 #2
rwdp #1 #2
66 6.4
sump
18.288
27
6
rwdp #1 #2
rwdp #1 #2
nearest drain nearest drain discharge to discharge to
discharge to discharge to nearest drain nearest drain
sump
sump
sump
sump
sump
sump
sump
3.048
RUMAH TERES 2 TINGKAT (MIN. 22' x 75')
6.706
6.706
6.706
9.233
36
B3b 6100MM BUILDING SETBACK LINE
10'
8
rwdp #1 #2
rwdp #1 #2
nearest drain discharge to
discharge to nearest drain
sump
sump
230°30'00"22.86
6.706
6.706
6.706
B1a
10
rwdp #1 #2
rwdp #1 #2
nearest drain discharge to
discharge to nearest drain
sump
sump
B1b 230°30'00"22.86
8049
8.23
6.706
6.706
B1a 230°30'00"22.86
RUMAH TERES 2 TKT (MIN. 22' x 75')
rwdp #1 #2
rwdp #1 #2
nearest drain discharge to
discharge to nearest drain
sump
sump
230°30'00"22.86
3612
230°30'00"22.86
A1b
230°30'00"22.889
sump
317°37'30" 47.766
X
29%
230°30'00"22.86
sump
sump
B2b
W11
W11
34
6.706
6100MM BUILDING SETBACK LINE
12
100dp
ft t
MH
MH
8.23
8.23
32
6.706
B3b
1524MM BUILDING SETBACK LINE s t
t ft
t s
30
6.706
B1a 230°30'00"22.86
50dp
sump
sump
sump
sump
nearest drain discharge to
discharge to nearest drain
8.23
B1b 230°30'00"22.86
230°30'00"22.86
8.23
3.048
100dp
28
RUMAH TERES 2 TKT (MIN. 22' x 75')
B1a 230°30'00"22.86
230°30'00"22.86
3.048
50dp
sump
sump
230°30'00"22.86
14
B2b 1524MM BUILDING SETBACK LINE
6.706
8.23
8.23
3.048
230°30'00"22.86
1524MM BUILDING SETBACK LINE
3048
A1a
6.706
16
230°30'00"22.86
230°30'00"22.86
B2b
140°30'00" 6.706
6.706
B1a
6.706
B1a
18.288
18
230°30'00"22.86
6.706
B1b
6.706
140°30'00" 6.706
8.23
26
50'
20
230°30'00"22.86
1524MM BUILDING SETBACK LINE
B2b
6.706
6.706
140°30'00" 6.706
B1a
22
230°30'00"22.86
230°30'00"22.86
B1a
6.706
6.706
6.706
B1b
24
230°30'00"22.86
230°30'00"22.86
B1b
6.706
6.706
6.706
B1a
26
230°30'00"22.86
230°30'00"22.86
B1a
6.706
6.706
6.706
B1b
28
6.706
6.706
230°30'00"22.86
10'
1524MM BUILDING SETBACK LINE
100dp
45
X
23%
4.50
230°30'00"22.86
6.706
6.706
24
6.706
1.524
6.706
6.706
3033
6.706
22
6.706 320°30'00"
8.230
8.230
C2
B1a
230°30'00"22.86
B1b
230°30'00"22.86
6.706
230°30'00"22.86
10'
230°30'00"22.86
10'
C2
20
6.706
6.706
C1
6.706 140°30'00"
140°30'00"56.541
317°37'40" 6.706
6.706
C1
6.706
230°30'00"22.86
227°37'40"22.86
227°37'40"22.86
18
6.706
8080
8.305
C1
6.706
6.706
227°37'40"22.86
C1
6.706
6.706
6.706
C1
C1 230°30'00"22.86
230°30'00"22.86
230°30'00"22.86
B1a
230°30'00"22.86
sump
8.305
6.706
6.706 317°37'40" 58.296
17 19 21 23 25 RUMAH TERES 2 TKT (MIN. 22' x 75')
sump
sump
sump
C2 230°30'00"22.86
C1
16
6.706
20'
B1b
230°30'00"22.86
230°30'00"
6.706
6.706
C1
227°37'40"22.86
14
6.706
320°30'00"
317°37'40"120.349
137°37'30" 8.23
3623
230°30'00"22.86
230°30'00"22.86
B1b
B1b
230°30'00"
22.86 LINE 1524MM BUILDING SETBACK
227°37'40"22.86
12
11.563
13
1524MM BUILDING SETBACK LINE 22.86
6.706
6.706
11
11.563
3048
3048
10
6.706
9
6.706
230°30'00"22.86
C2
7
6.706
C1
140°30'00" 6.706
6.706
230°30'00"22.86
5
6.706
320°30'00"
C1
6.706
230°30'00"22.86
3
6.706
C1
6.706
RUMAH TERES 2 TINGKAT (MIN. 22' x 75')
6.706
C1
C1
1
230°30'00"22.86
11.564
11.564
C2
230°30'00"22.86
140°30'00"56.657
8.23
LINE
C1
10'
7320
sump
1524MM BUILDING SETBACK LINE
227°37'40"22.86
sump
10280
3960
50°30'00" 22.86
sump
sump
3.048
sump
14.628
10'
sump
BLOCK - J
50°30'00"137.092
6.706
6.706
29
6.706
(JPS) 3.98 ekar
50°30'00"22.889
43
X
29%
6.45
15.30
230°30'00"22.86
A1a A1b
6.706
6.706
A3b
31
6.706
6100 BUILDING SETBACK
6.706
6.706
LINE
C2
sump
41
X
4.50
27.48
TRANSFORMER ROOM (ROOM NO.2)
6100MM BUILDING SETBACK LINE
3548
33
6.706
RUMAH TERES 2 TINGKAT (MIN. 22' x 75')
6.706
30
6.706
B1a
6.706
6.706
32
6.706
230°30'00"22.869
39
317°37'40" X
EXT
15.30
SWITCHGEAR ROOM
230°30'00"22.86
6.706
8.23
34
sump
3.048 230°30'00"
230°30'00"22.86
230°30'00"22.86
6.706
8.23
B1b
6.706
6.706
B1a
sump
6100 BUILDING SETBACK
6.706
6.706
50'
6.706
6.706
B1a 230°30'00"22.86
6.706
6.706
B1b
RUMAH TERES 2 TINGKAT (MIN. 22' x 75')
6.706
230°30'00"22.86
230°30'00"22.86
6.706
6.706
6.706
1524
C2
6.706
sump
1.524
8080
D3
B3b
230°30'00"22.86
B1a
8
D1
B3b
6
C1
8047
6.706
C1
3623
sump
3.084
6.706
sump
18.288
C1
320°30'00"22.86
C1
320°30'00"22.86
C1
47°37'40" 22.860
15.308
RUMAH TERES 2 TINGKAT
3.048 X
INT
% OF LIGHTING & VENTILATION
15.297
2
50°30'00"21.336
6100 BUILDING SETBACK
10.056
4
KOLAM TAKUNGAN BANJIR
227°37'40" 22.860
1524MM BUILDING SETBACK
(MIN. 22' x 75') RUMAH TERES 2 TINGKAT 30 28 26 24 22 20 18
3628
4.877
1524
X
PELAN TINGKAT BAWAH
TRANSFORMER ROOM (ROOM NO.1)
WINDOW AREA / OPENING (sq.m)
55
6.706
6
320°30'00"22.86
C1
320°30'00"22.86
C1
320°30'00"22.86
C1
320°30'00"22.86
C1
320°30'00"22.86
C1
320°30'00"22.86
C2
320°30'00"22.86
sump
320°30'00"22.86
10'
320°30'00"22.86
sump
320°30'00"22.86
C2
320°30'00"22.86
C1
140°30'00"22.86
C1
140°30'00"22.86
C1
140°30'00"22.86
C1
6.706
47°37'40"22.86
1524MM BUILDING SETBACK
8.23
8.23
4.877 X
A.
FLOOR AREA (sq.m)
0"
6.706
8
3033
C1
16
37
2312
X
LOCATION
2.1
6.706
8080
35
6.706
10
230°30'00"22.86
1524
35
6.706
8.23
Not to Scale
137°37'40" 6.706
C1
47°37'40"22.86
discharge to nearest drain
Site Plan
6.706
12
3048
6.706
C1
47°37'40"22.86
1.524
227°37'40"25.908
6.706
14
6.706
227°37'40"22.86
8.23
33
6.706
8080
50'
6.706
16
10'
C1
6.706
31
6.706
3542
22860
C1
BLOCK - K
227°37'40"22.86
6.706
(MIN. 22' x 75')
6.706
A2b
6.706
18
227°37'40"22.86
6.706
29
40"
227°37'40"22.86
137°37'40" 63.402 6.706
6.706
A1a
LINE 1524MM BUILDING SETBACK 227°37'40"22.86
3055
6.706
20
RUMAH TERES 2 TINGKAT (MIN. 22' x 75')
6100MM BUILDING SETBACK LINE
10'
C1
6.706
27
37'
227°37'40"22.86
10'
6.706
6.706
A1b
25
317°
227°37'40"22.86
6.706
6.706
A1a
23
6.706
227°37'40"22.86
6.706
RUMAH TERES 2 TINGKAT
6.706
A1b
6.706
22
3050MM CAR PARK SETBACK LINE
227°37'40"22.86
6.706
21
SD1
227°37'40"22.86
C1
3033
C2
10' 8.23
MH
8.23
A1a
6.706
24
26
sump
sump
9.689
6.706
t
227°37'40"22.86
C1
6.706
50°30'00"22.869
(MIN. 22' x 75') RUMAH TERES 2 TINGKAT 14 12 10 8 6 4
t
ft
A1b
C1
12.762
1524MM BUILDING SETBACK LINE
sump
s
227°37'40"22.86
8.23
3.048
sump
sump
10'
2
3.048
100dp
A1a
50°30'00"
sump
sump
sump
sump
sump
50dp
nearest drain discharge to
227°37'40"22.86
8.23
28
140°30'00"22.86
3.052
19
137°37'40" 8.23
3.048
A2b
6.706
30
140°30'00"22.86
C3
sump
14.748
6100 BUILDING SETBACK
227°37'40"22.86
LINE
6.706
32
140°30'00"22.86
3.123
17
6.706
8.23 317°37'40"
LINE
227°37'40"22.86
6.706
34
140°30'00"22.86
"
15
6.706
(MIN. 22' x 75')
A2b 10'
1524MM BUILDING SETBACK
6.706
36
140°30'00"22.86
'24 317°39'00" 52.595
13
6.706
6.706
227°37'40"22.86
1524MM BUILDING SETBACK
6.706
38
140°30'00"22.86
°38
11
A1a
4008
317°37'40" 64.624 6.706
6.706
227°37'40"22.86
7320
3893
9
A1b
50'
6.706
6.706
227°37'40"22.86
10.835 317°44'00"
7
6.706
227°37'40"22.86
A1a
6.706
RUMAH TERES 2 TINGKAT
6.706
A1b
3035
5
6.706
227°37'40"22.86
6.706
6.706
A1a
317°37'40"
SD1
227°37'40" 22.860
10'
3
MH
A1b
(0.051 ek) KL
140°30'00"22.86
140°30'00"22.86
170
t
137°37'40" 10.598
t
ft
227°37'40" 22.860
6.706
40
6.706
2"
s
A1a
9.452
100dp
47°37'40" 22.860
6.706
42
RUMAH TERES 2 TINGKAT (MIN. 22' x 75')
6.706
9'4
sump
sump
sump
50dp
nearest drain discharge to
A2b
44
6100MM BUILDING SETBACK LINE sump
4
1°2
6
69
sump
1524MM BUILDING SETBACK LINE
8.9
3.052
6.706
46
3050MM CAR PARK SETBACK LINE
48
6.706
X
66
X
0"
X
6.4
X
0'0
X
KL 6100 BUILDING SETBACK
6100 BUILDING SETBACK
X
11.506
°3
X
22.889
6100 BUILDING SETBACK
X
18
X
.85
X
15
14.429
317°37'40"
45°43'30" X
230°29'50"
50' 3612
16.821
12.762 sump
'00"
8X
95
508
11.
67°48
11.50 X
(0.063 ek)
15.24 6100 BUILDING SETBACK
36
39
22.86
6100MM BUILDING SETBACK LINE
16.821
39'2
23°
7.4
X
3
TNB SUBSTATION AREA CALCULATION
50°30'00"
3.048
10'
6100MM BUILDING SETBACK LINE
2
0"
18.288
6100 BUILDING SETBACK
1524 Bldg Setback
X
3048
X
3050MM CAR PARK SETBACK LINE
X
6100MM BUILDING SETBACK LINE
X
6.4 66 30 '00 "
X
18 5°
X
sump
X
sump
X
sump
X
100dp
X
50dp
X
sump
X
sump
X
sump
X
sump
X
discharge to nearest drain
X
nearest drain discharge to
X
sump
X
sump
X
rwdp #1 #2
X
rwdp #1 #2
X
discharge to discharge to nearest drain nearest drain
X
nearest drain nearest drain discharge to discharge to
X
sump
X
sump
X
rwdp #1 #2
X
50'
discharge to nearest drain
X
nearest drain discharge to
X
sump
X
sump
X
rwdp #1 #2
X
discharge to nearest drain
X
nearest drain discharge to
X
sump
X
sump
X
rwdp #1 #2
X
discharge to nearest drain
X
nearest drain discharge to
X
sump
X
sump
X
rwdp #1 #2
X
discharge to nearest drain
X
nearest drain discharge to
X
sump
X
sump
X
rwdp #1 #2
X
discharge to nearest drain
X
nearest drain discharge to
X
sump
X
sump
X
rwdp #1 #2
X
discharge to nearest drain
X
nearest drain discharge to
X
sump
X
U12/14C
sump
X
rwdp #1 #2
X
discharge to nearest drain
X
nearest drain discharge to
X
sump
X
sump
X
rwdp #1 #2
X
discharge to nearest drain
X
nearest drain discharge to
X
sump
X
sump
X
rwdp #1 #2
X
JALAN SELASIH
discharge to nearest drain
X
nearest drain discharge to
X
sump
X
sump
X
rwdp #1 #2
X
discharge to nearest drain
X
nearest drain discharge to
X
sump
X
sump
X
rwdp #1 #2
X
discharge to nearest drain
X
6100 BUILDING SETBACK
1°
X
nearest drain discharge to
X
50'
sump
X
sump
X
W11
X
sump
X
sump
X
MH
X
t
X
t ft
X
s
X
sump
X
discharge to nearest drain
X
nearest drain discharge to
X
16.821
"
X
16.821
34
X
sump
X
6100 BUILDING SETBACK
"
X
100%
0'0
X
X X
12.249
'10
X
55,864.64
°3
X
sump
°52
X
0.55% 12.09%
- 20
95
X
sump
50°30'00" X
X
X
308.44 6,747.22
12.574
X X
X
69
31.96%
/
CAHAYA ALAM, SEKSYEN U12, 40170 SHAH ALAM, SELANGOR DARUL EHSAN
89
4.0
17,855.98
3. PENGGUNAAN BAHASA MALAYSIA UNTUK PAPANTANDA ARAH, ALAMAT DAN KENYATAAN.
3°
75
2
8.7 16
SWITCHGEAR ROOM
TRANSFORMER ROOM ( ROOM NO.2)
JALAN SELASIH U12/13B
PE
21.321
0" 7'4 °3 96
4
.96
12
11.26%
2. KABEL SALURAN TNB DENGAN KEDUDUKAN METER DI HADAPAN PAGAR (DEKAT DENGAN REFUSE CHAMBER), TELEKOM, PAIP GAS DAN AIR HENDAKLAH DIPASANG DI BAWAH TANAH.
MASUK
140°30'00"
13
TRANSFORMER ROOM ( ROOM NO.1 )
3050 Building Setback
14.957
KELUAR
16.749
Skala 1 :6,000
8
19.886
14.35
320°30'00"
14.357
"
'50
°43
6098 Building Setback
15.3
W3
PELAN LOKASI
0'00"
% 44.14%
6,290.00
)/SEK:
13300 11100
69°0
3050 Bldg Setback
"
rwdp
41°21'50
BLOCK - C
DAERAH KUALA LANGAT
Kawasan Selatan Seksyen 25 - 36
U12
ASIH SEL
2249.16
209.03 211.85
ADA
AN
3
2
/14E
JAL
3
2
TERES 2 TINGKAT - JENIS A2b (end lot)
LUAS sq.m 24,663.00
(
BIL. BILIK
2
2250.24
6
DIA
U12
30
Kawasan Tengah Seksyen 1 - 24
BIL. TINGKAT
2227.21
209.13
12
(SE
29
Kg. Jalan Kebun
Kawasan Utara Seksyen U1 - U20
Ke KLIA Hubungan Tengah - Utara - Selatan
Kg. Lombong
LUAS LANTAI (ft²)
206.99
12
16
/13
ASIH
U12
Ke Pulau Indah
LUAS LANTAI (m²)
16
TERES 2 TINGKAT - JENIS A1b (intermediated)
TERES 2 TINGKAT - JENIS B1b (intermediated)
JALAN & LONGKANG
/18A
U12
BIL. UNIT
JENIS UNIT TERES 2 TINGKAT - JENIS A1a (intermediated)
TERES 2 TINGKAT - JENIS B1a (intermediated)
UNIT KEDIAMAN
U12
ASIH
/14
ASIH
MBSA/BGN/BB/600-
RINGKASAN UNIT
: 13.7 ekar : 55,556.2 m² : 143 UNIT : 143 x 5 : 715 orang : 143 / 13.7 : 11 unit / ekar : 55 orang / ekar
TERES 2 TINGKAT - JENIS A3b (icorner)
KEGUNAAN TANAH
KAWASAN REKREASI DIPERLUKAN
S
SEL
/14D
KELUASAN TAPAK KESELURUHAN BILANGAN UNIT KEDIAMAN KEPADATAN PENDUDUK
PKN AN 7) GUN N BAN SYE PEM (SEK
AN
JAL
BRUSHED CONCRETE FINISH PEDESTRIAN PATH
LOT 8093
JAL
AN
/14B
Kg. Bukit Lancong
31
SEL
U12
32
(SE /13 U12 /14C U12 ASIH ASIH SEL
ASIH SEL
Kg. Bukit Naga
JAL
AN
AN
28
JAL
Kg. Bukit Kemuning
ADA
SEL
DIA
AN
)
MAJLIS PERBANDARAN SUBANG JAYA
27
33
JAL
26
25
34
TAPAK CADANGAN
JAL
22
23
24
35
36
Lebuhraya Shah Alam 20'
Kg. Sg. Kandis Kg. Bukit Badak
13.7 acres = 55,441.93m²
Kg. Melayu Kebun Bunga
21
20
19
18
17
Ke Klang
11 12
15
TERES 2 TINGKAT (end lot)
LUAS TAPAK
EXTEND OF METAL HOARDING TO BE ERECTED
Ke K.L
Susur Ke Lapangan Terbang Subang
: 7%
sump
14
2
16
Lebuhraya Persekutuan
U1
: 70% : 30%
JADUAL KETUMPATAN TANAH
Lebuhraya Baru Lembah Klang
U2
C
KAWASAN LAPANG SEMPADAN TAPAK
Kg. Rasak
13
10
KUOTA PEMILIKAN JUALAN KPD BUMIPUTERA JUALAN KPD BUKAN BUMIPUTERA POTONGAN HARGA DISKAUN HARGA JUALAN SEUNIT UTK BUMIPUTERA
sump
3 1
Ke Klang
PENCAWANG ELEKTRIK
U3
U7 U8 9
5
4
PE KL
55'
U6
8
6
TAPAK CADANGAN
MAJLIS PERBANDARAN PETALING JAYA
Kg. Baru Subang
U9
U11
Bukit Cerakah
7
SALURAN KUMBAHAN
JALAN
RRI Kg. Melayu Subang
U10
U12
(20B)
U4 U15
U14
Meru
U13
16
JALAN
U12/
U5
Kg. haji Md. Sharif (Kg. Budiman)
MAJLIS PERBANDARAN KLANG
U12/ SELASIH (0.767ek)
PENAMPAN ZON
16A
U17
Kg. Kubu Gajah Dalam
U15
JALAN SELASIH N U12/N
HARGA JUALAN KEPADA BUKAN BUMIPUTERA
A
U12/17
JALAN
Stesen KTM U20 Kg. Sungai Plong Kg. Paya Jaras Kg. Paya Kg. Paya Jaras Hulu Kg. Paya Jaras Tangah Jaras Hilir U15 Kg. Baru Sg. Buloh U18 Kg. Paya Jaras Dalam
Kg. Merbau Sempak Kg. Kubu Gajah
DAERAH KUALA SELANGOR
JADUAL KEPADATAN (DENSITY)
JENIS UNIT
B
PILI BOMBA JALAN
SELASIH
HARGA JUALAN
PETUNJUK :
U12/17A
16
SELASIH
Q
Ke Rawang / Utara
Kompleks Penjara Sg. Buloh
60M
N
N Q
TARIKH
BUILDING SUBMISSION
BIL PROJEK
2018 / P126
1 : 400 EZUWAN / Npy / yz MARTIN / SIM JUNE 2018 BIL SALINAN
BS/S.1.101
RUJUKAN
Render Image of Type C Unit (Image From 3D Artist)
Complete Photo of Type B Unit
Render Ima
age of Type B Unit (Image From 3D Artist)
Complete Photo of Type C Unit
-page is left intentionally blank-