ITER Organization 2019 Financial Report

Page 6

The Indian Domestic Agency and its contractors have finalized the cryostat base and lower cylinder. Around the skirt of the base (pictured), assembly teams are now installing interfacing components such as this protruding “toroidal lug� that will lock into the bioshield.

4

Certificate and Statement from the Director-General


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.