Advanced Jet Training (AJT) Facility, RAF Valley Client: VT Aerospace Ltd Architect: Parsons Brinckerhoff Project Description The new AJT Facility includeds the construction of the new Advanced Jet Trainer (AJT) buildings to be utilised as part of the UK Military Flying Training System (MFTS) at RAF Valley. The new buildings included an operational squadron building, incorporating two aircraft simulators, and a maintenance hangar together with associated car parking. The hangar will house the new 28 Hawk TMk 2 aircraft that will provide airborne fast jet training as part of MFTS.
Hawk Mk 128 – Full Mission Simulators, RAF Valley.
3D image of proposed state-of-the-art airport ticketing kiosk with interactive ticket screens and dispensers, all under a modern, ‘floating’ stainless-steel aerofoil roof.
Edinburgh Tram Network Airport Kiosk Canopy Edinburgh Airport tram stop is a new tram stop currently under construction by Edinburgh Trams. It will serve Edinburgh Airport, both the stop and the entire tram line are expected to open in 2014. Project Description The project involved the construction of a new tram line running from Edinburgh Airport through to Edinburgh city centre whilst linking with Edinburgh Park, Haymarket, Waverley rail stations, as well as Murrayfield Stadium, Princess Street and Ocean Terminal.
New Oncology Unit – Furness General Hospital This is a £2m scheme for a new Oncology (Cancer) Unit at Furness General Hospital – Morcambe Bay Hospitals NHS Trust.
The development provided a large amount of accommodation at reasonable cost due to the structural framing & cladding made from localised timber. The project was completed in June/July 2005.
A
B
C
4300
D
6800
E
4250
F
2830
G
5670
BALCONY
CL
H
5670
2830
J
K
4250
L
2830
M
5670
BALCONY
BALCONY
N
5670
BALCONY
Q
P
2830
4250
R
6800
LUXURY HIGH-END RESIDENTIAL FLATS Location: Glasgow City Centre, Scotland, UK.
4300
BALCONY
BALCONY
sliding doors
sliding doors
1
sliding doors
sliding doors
KITCHEN Wardrobe
LIVING
BEDROOM 1
sliding doors
KITCHEN
LIVING
KITCHEN
1
sliding doors
LIVING
KITCHEN
LIVING
Wardrobe
BEDROOM 1
Wardrobe
Wardrobe Canopy
Canopy
4300
Lift
Canopy
BEDROOM 2
Lift
Lift
4300
Canopy
BEDROOM 2
Wardrobe
Wardrobe
DINING
DINING
Dry Riser
Duct
Meter/St. Cloak
Services / Cloak
Duct
DINING
Wardrobe Dry Riser
Cloak Meter/St.
DINING
Services / Cloak
glass-block wall
glass-block wall
glass-block wall sliding doors
sliding doors
glass-block wall
sliding doors
2
sliding doors
CLOAK/STORE (VENTED)
CLOAK/STORE (VENTED)
CLOAK/STORE (VENTED)
CLOAK/STORE (VENTED) HALL
shelf
HALL
BATHROOM
BATHROOM
En-Suite
HALL
shelf
BATHROOM
Duct
Canopy
glass-block wall
Meter
Meter En-suite
En-suite
Up Vented Store
En-suite
En-suite
Up
Up
BATHROOM
KITCHEN Cloak
Wardrobe
Wardrobe
Description: The Metropole is a ten storey building with a pleasant courtyard serving 94 apartments. This dramatic riverside setting in the heart of the city will also house a number of commercial & retail units on the ground floor.
HALL
BATHROOM Duct
Canopy
Cupboards
En-Suite
sliding doors
HALL Cupboards
sliding doors
HALL
Vented Store
BATHROOM
Wardrobe
Wardrobe
Wardrobe
Wardrobe
Wardrobe
6800
DINING
Wardrobe
DINING
2
6800
LIVING
glass-block wall
LIVING
KITCHEN Cloak
Wardrobe
over-head storage
over-head storage
BEDROOM 1
BEDROOM 2
BEDROOM 1
BEDROOM 1
BEDROOM 1
BEDROOM 2 overhead cupboards
over-head store
Cloak/Store (vented) glass-block wall
3
Wardrobe
ENTRANCE
BEDROOM 2
Wardrobe
BEDROOM 2
Wardrobe
Wardrobe
ENTRANCE
Wardrobe
KITCHEN
3
Cloak/Store (vented)
Cloak
Cloak Canopy
glass block wall
KITCHEN
Canopy
Wardrobe
BEDROOM 2
Wardrobe
DINING
Wardrobe
BALCONY
LIVING En-suite
En-suite MASTER BEDROOM
BATHROOM
BEDROOM 1
BATHROOM
LIVING
BEDROOM 1
BATHROOM
LIVING
4
4
En-suite
sliding doors
En-suite
6400
LIVING
Wardrobe sliding doors
Wardrobe
Wardrobe
BALCONY
Wardrobe sliding doors
HALL
BEDROOM 2 HALL
Up
Wardrobe
Cloak
Canopy
(vented)
Cloak
2326
glass-block wall
LIFT
ENTRANCE
(vented)
LIFT
glass block wall
Cloak/Store
KITCHEN
DINING
BEDROOM 2
Up
Wardrobe
Canopy
5
5 KITCHEN
ENTRANCE
Cloak/Store over-head store overhead cupboards
over-head storage
over-head storage
ENTRANCE
ENTRANCE
ENTRANCE
BATHROOM
ENTRANCE
overhead cupboards
Cloak Meter
overhead cupboards
Cloak Meter
Canopy
Cloak
W.C.
W.C.
KITCHEN
Cupboards
Cupboards
KITCHEN
KITCHEN
En-Suite
En-Suite
HALL
STORE
STORE
STORE
STORE
KITCHEN
Meter
W.C.
KITCHEN
overhead cupboards
Cloak Meter
W.C.
KITCHEN
overhead cupboards
Cloak Meter
W.C.
KITCHEN
overhead cupboards
Cloak Meter
W.C.
KITCHEN
overhead cupboards
Cloak Meter
W.C.
sliding doors
Vented Store
Meter overhead cupboards
1250
ENTRANCE
Meter
Canopy
5.2
ENTRANCE
ENTRANCE
6800
glass-block wall
3224
Cloak BATHROOM
Vented Store
glass-block wall
Cloak KITCHEN
STORE
STORE
HALL
STORE
sliding doors
5.1
6
6 Canopy
DINING
Canopy glass-block wall
Up
Canopy glass-block wall
Up
Canopy glass-block wall
Up
Canopy glass-block wall
Up
Canopy glass-block wall
Up
Canopy glass-block wall
Up
glass-block wall
Up
DINING
Wardrobe
Wardrobe
DINING
DINING LIVING
DINING LIVING
DINING LIVING
DINING LIVING
DINING LIVING
Wardrobe
DINING LIVING
4300
Wardrobe
LIVING
BEDROOM 2
BEDROOM 2 Wardrobe Wardrobe
Wardrobe
BEDROOM 1
VOID
LIVING
VOID
VOID
VOID
VOID
VOID
BEDROOM 1
VOID
Wardrobe
LIVING
7
7 sliding doors
sliding doors
4300
A
sliding doors
BALCONY
BALCONY
6800
B
C
sliding doors
BALCONY
6680
D1
sliding doors
BALCONY
6680
F1
sliding doors
BALCONY
6680
G1
sliding doors
BALCONY
6670
J1
BALCONY
6680
K1
sliding doors
sliding doors
BALCONY
6680
BALCONY
6680
N1
6800
P
CL
sliding doors
BALCONY
MASTER BEDROOM
6400
BATHROOM
4300
CL
sliding doors
sliding doors
6400
Wardrobe
6400
sliding doors
sliding doors
HALL BEDROOM 2
HALL
Wardrobe
BALCONY
4300
Q
R
Start date: 2005 Completion date: 2006 Cost: £20m
MADELEY ACADEMY ~ PROPOSED VISUALS FOR COMPETITION ENTRY ~ URBAN VISION PARTNERSHIP LTD.
Beath High School in Fife was one of three new schools rebuilt as part of a £40m Capital Investment by Fife Council in a 25-year PFI deal with Pinnicle.
Flakefleet Primary School ~ Lancashire County Council ÂŁ4.5m refurbishment of existing Fleetwood school with the creation of a new entrance frontage, and additional courtyard extensions comprising 3no. classroom pods.
Studio Level
Observation Level
Chairman/ Meeting Room 2
Male WC
Chairma n Storag e Wall
8 30
Coffee Bar
et in ab C y la p is D
tor ec ll Dir Wa e s. Op orag St
Managing Director
M.
D.
's
St
Boardroom/ Present at ion Area
tor ec ll Dir Wa e n. Ma orag St
P.
or
A.
e ag
ll Wa
Man. Dir. P.A.
ion rat ll ist Wa min e Ad orag St
Operat ions Director
Fire Lobby ion trat l inis e Wal Adm rag Sto
St at ionary St ore
Meet ing tion nistra Admi age Wall Stor
'ZOO' Area
Admin 1 Admin 2
Traffic Storage Wall
Traffic Storage Wall
Audio-Visual Storage
Traffic
Traffic 2
Traffic 1
Crea t Stor ive age Wall
Chair Store
PRINTER
Servic
t e Duc
Disabled WC
Pr
SHOWER Sal Sto es rag e Wal l
Shower Room
Sales Stor age
Sa St les ora ge Wa ll
Female WC
Sales Team 1 Team Leader 1/1
Cre Sto at ive rag e Wal l
Cleaner/ St ore
s on ll oti e Wa om ag or St
Wall
Sales ge Wall Stora
Sales Team 1 1/5
Sales Director Sales Team 1 1/4 Sales Team 1 1/6
Sales Team 2 2/6
Sales Team 2 2/7
Sales Team 2 2/5
FAX
PRINTER
Sales Team 1 1/7
Sales Team 2 2/8 Sales Team 2 2/3
Sales Team 1 Sales Support 1/2
Sales Team 1 1/3
Sales Team 1 1/8 Sales Team 2 Team Leader 2/1
Sales Team 2 2/4
Sales Dir. P.A.
FAX
s tion l mo e Wal Pro rag Sto
PRINTER
Sales Team 2 Sales Support 2/2
FAX
PRINTER
FAX
West Cumberland Hospital Whitehaven, UK Project Description The new West Cumberland Hospital will be a benchmark for the new generation of facilities that must replace the old district hospitals. It will be the hub of a much wider network providing acute care whilst many of the traditional hospital based services will be provided in the community.
Exiting Site
The budget for this project was set at £100 million (later reduced to £90 million) before any detailed brief was formulated. The winning strategy was to devise a development plan which balanced new building and refurbishment, reconstruction and demolition to get as much out of this budget as possible.
Working collaboratively within Revit Architecture to produce detail design, tender drawings, room loaded c-sheets, specifications & schedules for a £25m Hospital project in line with current HTM & HBN Healthcare Regulations. Produce 3D models based off 2D construction drawings and specifications using Revit. Co-ordinate 3D BIM models with external consultants and review for inconsistencies and clashes.
Example of a Room-Loaded C-sheet. Typical hospital ward layout showing positions of all clinical equipment. All layouts are signed off by hospital prior to installation of equipment.
Completion