2 minute read
Modular feldsher-obsteric station. The largest variant
светильник (подвесной/встроенный) Встроенный (галогенный) светильник-подсветка Розетка на уровне столешницы (850
Advertisement
Quadrum modular hotel & village
Task: Design & construction of modular sailing & yoga resort
Authors: Ivan Moiseenko, Ilya Kirushin
Design: 2019 - 2020
Location: Peryaslavl-Zalessky
Status: Partially completed
Link: http://quadrumtecture.com/
33 modules in total in two blocks
3 storeys height each block
6 months in total
4 months off-site construction
4 days assembly
GFA 1600 m2 two blocks
Upper block semi-modular
- 15 standard rooms (1 module)
- 3 family rooms (2 modules)
6 men on-site assembly team modular block construction timeline
- open terraces
I founded my own modular company with my partner at the end of 2019, after I left big Moscow development company I worked for. My partner got a land in PeryaslavlZalessky and we decided to build modular hotel overthere to test the technology, technical solutions and the concept, in general. At this moment, first block is completed, and we are ready to build the second one, which is situated at the top of the slope.
Lower block modular
- lobby area
- restaurant & bar
- 1 standard room (1 module)
- 1 lux room (3 modules)
- storage facilities
- open terraces
- sauna
Exterior photos
Exterior photos
Detailed design of the modules
Mighty Buildings_3D printing housing USA startup
Task: Make prefab 3d printed housing kit quickly installed on site
Authors: Mighty Buildings, inc
Design: 2018 - ongoing
Location: California, USA
Status: Design, Under construction
Management job_ samples of completed projects and tasks
Task: Management activities
Authors: Ivan Moiseenko
Design: 2017 - 2020
Location: Moscow
Status: Completed
1. Process Maps.
Process maps is a powerful instrument not only for visualization of existing processes in the company, but also for their adaptation and development. Process maps take the beginning in automobile industry, especially in Japanese automotive culture. By using such structured, graphically simple and visually friendly schemes for representation of the process in any company it is possible, first of all, to fixate a status quo, and, then, to improve it during collaborative meetings and brainstorm sessions. These process maps are extremely important for new employees who might get stuck at the beginning. The example of tender process map shown above help legal and tender departments to follow the exact process and do not lose any piece of information in order to close contracts on time and within the budget. Moreover, instead of preparing long text documents and company standards which are, many times, hard to read, these maps are catchy, simple and provide an overview of any process. It is also very easy to adjust processes in the company by working with such graphic schemes.
Metrics is a powerful tool for collecting and visualization of data for any company. The architectural office I worked for uses such parameters as planned and actual working hours spent for the projects, number of people in working teams and other factros to manage the company. Although this data was used in the office long time ago, there was no effective and intuitive tool which represents all these charts in a user-friendly way. That is why I initiated the process of design such effective visual tool which should be visible on the internal web-portal of the company. Together with my colleague we prepared detailed technical brief which described all the instruments we would like to use. We drew diagrams, charts, tables and formulas to give a powerful tool to all management teams in the company. Now on, when this tool is in use, it is easy for everybody to check many parameters of the company and to be aware when planning the activities.
Actual vs Maximum Workload of the Design Departments (Architectural, Structural, MEP)
Standard view of the Design projects with tasks and calculations of the main metrics