Jackson Plumlee Portfolio Appendix

Page 1

PORTFOLIO APPENDIX

Technical Experience & Built Projects at Reed Hilderbrand

JACKSON PLUMLEE

Tanglewood Linde Center for Music and Learning

Building Project - Lenox, MA

Client: Boston Symphony Orchestra

Collaborators: William Rawn Associates

Architects, Foresight Land Services (Civil)

RH Team: Doug Reed, Adrian Nial, Geoff Fritz

My Role: Project Designer 2016 - 2019

The Linde Center opened in June 2019 as home to Tanglewood’s year-round programs for education and performance. The landscape knits new buildings for rehearsal, performance, and gathering into the campus experience. Visitors arrive through a densely-planted woodland edge onto the campus’ iconic canopied lawns.

I was involved from the project’s outset as the main design staff responsible for studying, drafting, and refining landscape concepts in collaboration with the RH team and other consultants. I translated sketches and concepts into drawings and construction documentation. The RH project manager left the firm at 50% CD’s and I inherited many of the dayto-day responsibilities of project management and coordination through construction and project completion. Throughout construction, I participated in 12 site visits to observe progress on grading, planting, walkways, lighting, and fencing. I also participated in coordination calls with the owner, owner’s rep., contractors, and design team. I was the primary staff responsible for managing and processing landscape construction submittals and requests for information in consultation with the RH team.

1
TANGLEWOOD LINDE CENTER / PROFESSIONAL

Topography Concept (top left)

Set in the rolling Berkshire hills, Tanglewood’s 527-acre campus occupies a broad ridgeline overlooking a large lake, the Stockbridge Bowl. The campus originated as two separate estates punctuating the high point of the ridge. The subsequent campus buildings and performance venues defer to the ridge, utilizing the gentle slopes for lawn seating and acoustics. The new complex of buildings straddles the ridgeline, creating a dramatic arrival experience onto the ridge.

Entry Grading (top right)

The major grading challenges included fitting the substantial building footprints to the ridge and its sideslopes and discretely accommodating the necessary parking. Grading and planting along the southern and eastern edges embed the arrival and parking within a dense wooded edge. The parking is set lower than the campus lawns to conceal vehicles and a series of embankments terrace the lot down the hillside.

Sustaining the Heritage Oak (bottom right)

A heritage Red Oak tree serves as a major focal point around which the building volumes were delicately sited. Several other mature canopy trees also dot through the complex. Grading around the trees required careful calibration of the building FFE’s and coordination with an arborist and soil scientist to ensure construction activity did not impact their root zones. Drainage and grades around the Oak were fine-tuned extensively during construction.

A
Enlargement A
TANGLEWOOD LINDE CENTER / PROFESSIONAL 2
Enlargement B

CONCRETE PAVING DETAIL AT STUDIO THRESHOLDS

Concrete Details and Finish

The project required utmost finesse with grading and planting, but fewer technical details. The most critical hardscape features were a canopied exposed aggregate concrete walkway, which connected the three main studio buildings and an exposed aggregate concrete cafe terrace for dining spillout. Connections at the studio thresholds received a unique dye treatment, which we refined through custom samples and the mockup process. The areas that required extensive coordination with the architects and structural engineer were at the covered walkway post footings and building edges to eliminate differential settlement.

TANGLEWOOD LINDE CENTER / PROFESSIONAL

CONCRETE PAVING DETAIL AT COLUMN

COVERED WALKWAY CONCRETE FORMWORK IN PROGRESS

FINISHED COVERED WALKWAY

REVISIONS: © 2016 WILLIAM RAWN ASSOCIATES ARCHITECTS INC STOCKBRIDGE MA BOSTON SYMPHONY ORCHESTRA INC TANGLEWOOD MUSIC CENTER TANGLEWOOD LEARNING INSTITUTE BUILDING PROJECT NO 21505 STRUCTURAL ENGINEER LeMESSURIER CONSULTANTS 1380 SOLDIERS FIELD ROAD BOSTON MA 02135 T: 617.868.1200 MEP/FP/IT/SEC ENGINEER R.G VANDERWEIL ENGINEERS LLP 274 SUMMER STREET BOSTON MA 02210 T: 617.423.7423 CIVIL ENGINEER FORESIGHT LAND SERVICES 1496 WEST HOUSATONIC STREET PITTSFIELD MA 01201 T: 413.499.1560 WILLIAM RAWN ASSOCIATES ARCHITECTS INC 10 POST OFFICE SQUARE SUITE 1010N BOSTON MASSACHUSETTS 02109 T: 617.423.3470 F:617.451.9205 ARCHITECT ACOUSTICS AV CONSULTANT KIRKEGAARD ASSOCIATES 801 WEST ADAMS STREET CHICAGO IL 60607 T: 312.441.1980 LANDSCAPE ARCHITECT REED HILDERBRAND LLC 130 BISHOP ALLEN DRIVE CAMBRIDGE MA 02139 T: 617.923.2422 THEATER DESIGN CONSULTANT NEXTSTAGE DESIGN 760 CHAPEL STREET NEW HAVEN CT 06510 T: 203.936.6565 SUSTAINABILITY CONSULTANT THE GREEN ENGINEER 54 JUNCTION SQUARE DRIVE CONCORD MA 01742 T: 978.369.8978 SPECIFICATIONS CONSULTANT KALIN ASSOCIATES 1121 WASHINGTON STREET NEWTON MA 02465 T: 617.964.5477 CODE CONSULTANT R.W SULLIVAN 529 MAIN STREET SUITE 203 BOSTON MA 02129 T: 617.523.8277 FOOD SERVICE CONSULTANT LISA C MAY FCSI FOODSERVICE DESIGN 512 CUSHING ROAD NEWMARKET NH 03857 T: 603.969.0009 LIGHTING DESIGN CONSULTANT LAM PARTNERS 84 SHERMAN STREET CAMBRIDGE MA 02140 T: 617.354.4502 CONSTRUCTION DOCUMENTS REV NO REVISION DATE 1 2017-09-01 CONFORMANCE SET BLUESTONE PAVERS ON AGGREGATE Scale: 1-1/2" = 1'-0" 2 CONCRETE PAVING EXPOSED AGGREGATE Scale: 1-1/2" = 1'-0" 5 ASPHALT WEARING COURSE COMPACTED AGGREGATE ASPHALT BINDER COURSE FABRIC GEOTEXTILE COMPACTED OR UNDISTURBED SUBGRADE ADJACENT CONDITION VARIES WRAP FABRIC CONTROL JOINT EXPOSED AGGREGATE CONCRETE FINISH WITH HAUNCH AT ALL EDGES 3/16" VERIFY VIA MOCK UP SAWN CONTROL JOINT 1/4 DEPTH OF SLAB 1" MINIMUM DECORATIVE SCORE JOINT 1/4" EXPRESSED EXPANSION JOINT EXPANSION JOINT (30'-0" MAX) SEE PLAN FOR LOCATION SEALANT BACKER ROD 1/2"O.D X 12" S.S DOWEL ONE SIDE GREASED OTHER SIDE SET IN CONCRETE 12"O.C COMPRESSIBLE FILLER THROUGH FULL DEPTH OF SLAB BLUESTONE PAVER SAWN ALL FACES THERMAL TOP SECTION 2" 1'-0" 1/4" COMPACTED FILL OR UNDISTURBED SUBGRADE COMPACTED AGGREGATE BASE STONEDUST SETTING BED MIN POLYMERIC SAND SWEPT JOINT NEXTGEL SAND BY TECHNISEAL 2" GEOTEXTILE FABRIC 1 BLUESTONE PAVERS ON CONCRETE SUB BASE Scale: 1-1/2" = 1'-0" 3 SECTION 4" 1'-0" COMPACTED SUBGRADE COMPACTED AGGREGATE MORTAR SETTING BED BLUESTONE PAVER CONCRETE BASE 1" 1/4" JOINT 2" x x x W6 X W6 GEOTEXTILE FABRIC 1 SAWN CONTROL JOINT 1/4 DEPTH OF SLAB 1" MINIMUM DECORATIVE SCORE JOINT 3/16" VERIFY VIA MOCK UP DECORATIVE SCORE JOINT 1/2” DEEP JOINT STEEL COLUMN SEE ARCH AND STRUCTURAL REINFORCING SEE STRUCTURAL EXPOSED AGGREGATE CONCRETE SLAB FINISH 1 SEE STRUCTURAL CONCRETE PIER SEE STRUCTURAL CONCRETE FOOTING SEE STRUCTURAL 1 CONTROL JOINT DECORATIVE SCORE JOINT DECORATIVE SCORE JOINT 3/16" VERIFY VIA MOCK UP DECORATIVE SCORE JOINT 1/2” DEEP BASE BE ARCHITECT UNDISTURBED REVISIONS: © 2016 WILLIAM RAWN ASSOCIATES ARCHITECTS INC STOCKBRIDGE, MA BOSTON SYMPHONY ORCHESTRA, INC TANGLEWOOD MUSIC CENTER / TANGLEWOOD LEARNING INSTITUTE BUILDING PROJECT NO 21505 STRUCTURAL ENGINEER LeMESSURIER CONSULTANTS 1380 SOLDIERS FIELD ROAD BOSTON MA 02135 T: 617.868.1200 MEP/FP/IT/SEC ENGINEER R.G VANDERWEIL ENGINEERS LLP 274 SUMMER STREET BOSTON MA 02210 T: 617.423.7423 CIVIL ENGINEER FORESIGHT LAND SERVICES 1496 WEST HOUSATONIC STREET PITTSFIELD MA 01201 T: 413.499.1560 WILLIAM RAWN ASSOCIATES ARCHITECTS INC 10 POST OFFICE SQUARE SUITE 1010N BOSTON MASSACHUSETTS 02109 T: 617.423.3470 F:617.451.9205 ARCHITECT ACOUSTICS AV CONSULTANT KIRKEGAARD ASSOCIATES 801 WEST ADAMS STREET CHICAGO IL 60607 T: 312.441.1980 LANDSCAPE ARCHITECT REED HILDERBRAND LLC 130 BISHOP ALLEN DRIVE CAMBRIDGE MA 02139 T: 617.923.2422 THEATER DESIGN CONSULTANT NEXTSTAGE DESIGN 760 CHAPEL STREET NEW HAVEN CT 06510 T: 203.936.6565 SUSTAINABILITY CONSULTANT THE GREEN ENGINEER 54 JUNCTION SQUARE DRIVE CONCORD MA 01742 T: 978.369.8978 SPECIFICATIONS CONSULTANT KALIN ASSOCIATES 1121 WASHINGTON STREET NEWTON MA 02465 T: 617.964.5477 CODE CONSULTANT R.W SULLIVAN 529 MAIN STREET SUITE 203 BOSTON MA 02129 T: 617.523.8277 FOOD SERVICE CONSULTANT LISA C MAY FCSI FOODSERVICE DESIGN 512 CUSHING ROAD NEWMARKET NH 03857 T: 603.969.0009 LIGHTING DESIGN CONSULTANT LAM PARTNERS 84 SHERMAN STREET CAMBRIDGE MA 02140 T: 617.354.4502 CONSTRUCTION DOCUMENTS REV NO REVISION DATE 1 2017-09-01 CONFORMANCE SET BLUESTONE PAVERS ON AGGREGATE Scale: 1-1/2" = 1'-0" 2 CONCRETE PAVING - EXPOSED AGGREGATE Scale: 1-1/2" = 1'-0" 5 ASPHALT WEARING COURSE COMPACTED AGGREGATE ASPHALT BINDER COURSE GEOTEXTILE COMPACTED OR UNDISTURBED SUBGRADE ADJACENT CONDITION VARIES FABRIC CONTROL JOINT EXPOSED AGGREGATE CONCRETE FINISH 1 WITH HAUNCH AT ALL EDGES 3/16" VERIFY VIA MOCK UP SAWN CONTROL JOINT 1/4 DEPTH OF SLAB 1" MINIMUM DECORATIVE SCORE JOINT 1/4" EXPRESSED EXPANSION JOINT EXPANSION JOINT (30'-0" MAX) SEE PLAN FOR LOCATION SEALANT BACKER ROD 1/2"O.D X 12" S.S DOWEL ONE SIDE GREASED OTHER SIDE SET IN CONCRETE 12"O.C COMPRESSIBLE FILLER THROUGH FULL DEPTH OF SLAB BLUESTONE PAVER SAWN ALL FACES THERMAL TOP SECTION 2" 1'-0" 1/4" COMPACTED FILL OR UNDISTURBED SUBGRADE COMPACTED AGGREGATE BASE STONEDUST SETTING BED MIN POLYMERIC SAND SWEPT JOINT NEXTGEL SAND BY TECHNISEAL 2" GEOTEXTILE FABRIC 1 BLUESTONE PAVERS ON CONCRETE SUB BASE Scale: 1-1/2" = 1'-0" 3 SECTION 4" 1'-0" COMPACTED SUBGRADE COMPACTED AGGREGATE MORTAR SETTING BED BLUESTONE PAVER CONCRETE BASE 1" 1/4" JOINT 2" x x x W6 X W6 GEOTEXTILE FABRIC 1 SAWN CONTROL JOINT 1/4 DEPTH OF SLAB 1" MINIMUM DECORATIVE SCORE JOINT 3/16" VERIFY VIA MOCK UP DECORATIVE SCORE JOINT 1/2” DEEP CONCRETE WITH HAUNCH STEEL COLUMN SEE ARCH AND STRUCTURAL REINFORCING SEE STRUCTURAL EXPOSED AGGREGATE CONCRETE SLAB FINISH SEE STRUCTURAL CONCRETE PIER SEE STRUCTURAL CONCRETE FOOTING SEE STRUCTURAL CONTROL JOINT EXPOSED AGGREGATE CONCRETE FINISH 1 WITH HAUNCH AT ALL EDGES DECORATIVE SCORE JOINT DECORATIVE SCORE JOINT 3/16" VERIFY VIA MOCK UP DECORATIVE SCORE JOINT 1/2” DEEP ARCHITECT REVISIONS: © 2016 WILLIAM RAWN ASSOCIATES ARCHITECTS INC STOCKBRIDGE MA BOSTON SYMPHONY ORCHESTRA, INC. TANGLEWOOD MUSIC CENTER / TANGLEWOOD LEARNING INSTITUTE BUILDING PROJECT NO 21505 STRUCTURAL ENGINEER LeMESSURIER CONSULTANTS 1380 SOLDIERS FIELD ROAD BOSTON MA 02135 T: 617.868.1200 MEP/FP/IT/SEC ENGINEER R.G VANDERWEIL ENGINEERS LLP 274 SUMMER STREET BOSTON MA 02210 T: 617.423.7423 CIVIL ENGINEER FORESIGHT LAND SERVICES 1496 WEST HOUSATONIC STREET PITTSFIELD MA 01201 T: 413.499.1560 WILLIAM RAWN ASSOCIATES ARCHITECTS INC 10 POST OFFICE SQUARE SUITE 1010N BOSTON MASSACHUSETTS 02109 T: 617.423.3470 F:617.451.9205 ARCHITECT ACOUSTICS AV CONSULTANT KIRKEGAARD ASSOCIATES 801 WEST ADAMS STREET CHICAGO IL 60607 T: 312.441.1980 LANDSCAPE ARCHITECT REED HILDERBRAND LLC 130 BISHOP ALLEN DRIVE CAMBRIDGE MA 02139 T: 617.923.2422 THEATER DESIGN CONSULTANT NEXTSTAGE DESIGN 760 CHAPEL STREET NEW HAVEN CT 06510 T: 203.936.6565 SUSTAINABILITY CONSULTANT THE GREEN ENGINEER 54 JUNCTION SQUARE DRIVE CONCORD MA 01742 T: 978.369.8978 SPECIFICATIONS CONSULTANT KALIN ASSOCIATES 1121 WASHINGTON STREET NEWTON MA 02465 T: 617.964.5477 CODE CONSULTANT R.W SULLIVAN 529 MAIN STREET SUITE 203 BOSTON MA 02129 T: 617.523.8277 FOOD SERVICE CONSULTANT LISA C MAY FCSI FOODSERVICE DESIGN 512 CUSHING ROAD NEWMARKET NH 03857 T: 603.969.0009 LIGHTING DESIGN CONSULTANT LAM PARTNERS 84 SHERMAN STREET CAMBRIDGE MA 02140 T: 617.354.4502 REV NO REVISION DATE 1 2017-09-01 CONFORMANCE SET x x x x EXPANSION JOINTS EXPOSED AGGREGATE CONCRETE FINISH 1 - COVERED WALKWAY SEE STRUCTURAL 1/2” X 12” STAINLESS STEEL DOWEL 12” O.C ALONG LENGTH OF EXPANSION JOINT COMPACTED OR EXISTING SUBGRADE COMPACTED AGGREGATE EXPOSED AGGREGATE CONCRETE FINISH 2 COVERED WALKWAY HAUNCH SEE STRUCTURAL STONE PAVING @ STUDIOS A & C THRESHOLD Scale: 1" = 1'-0" 2 1
CONCRETE
control joints, and column joints.
EXPOSED AGGREGATE
MOCK-UP The mock-up demonstrated contrasting dye treatments, expansion joints, sawn
3

Field Work

I drafted all field notes for coordination with the design team, owner, and contractors to ensure that the work was carried out in accordance with the design intent and construction documents. I documented any issues that arose during construction administration through regular field reports, which were discussed on weekly OAC calls and provided the contractors supplemental information to guide their work. Grading and site drainage adjustments, such as the above selection, were major recurring items in the reports.

4
TANGLEWOOD LINDE CENTER / PROFESSIONAL CAMPUS PATH, VIEW EAST A winding path leads from the Linde Center parking to the canopied lawns of the main campus. CAFE TERRACE AND THE HERITAGE OAK The building volumes and covered walkway array around a heritage Red Oak, which provides the backdrop to performances in the main studio. WOODLAND THRESHOLD A woodland pallete of Hayscented Fern, Viburnum, Rhododendron, and Whitespire Birch occupy slopes graded to nestle the entry drive and parking into the larger landscape. COURTYARD GARDEN Whitespire Birch, Hakanachloa, Christmas Fern, Snakeroot, and European Ginger occupy a viewing garden between building volumes.
5
TANGLEWOOD LINDE CENTER / PROFESSIONAL

Tanglewood Koussevitzky

Sculpture Terrace

Main Entrance Plaza - Lenox, MA

Client: Boston Symphony Orchestra

Collaborators: Foresight Land Services (Civil), Barry Engineers (Structural and Geotech.), Penelope Jencks (Sculptor)

RH Team: Doug Reed, Adrian Nial, Geoff Fritz

My Role: Project Manager 2018 - 2019

This main entry plaza was identified and funded as one of the first early intiative projects to be implemented as part of a larger Landscape Framework Plan we completed for the 527-acre campus. Though modest in scope, the project was meant to demonstrate a new era of reinvestment in the campus landscape and provide a welcoming new entry experience where previously there was only a sea of asphalt.

The plaza’s focal point is a bust of Serge Koussevitzky,Tanglewood’s founding composer. Our design incorporated new paving, planting, walls, furnishings, and feature lighting for the bust. The project and bust were commissioned by composer John Williams.

As the project manager, my responsibilities included coordination with the client, design team, and construction team as well as the primary point of contact for construction administration.

KOUSSEVITZKY SCULPTURE TERRACE / PROFESSIONAL 6

GRANITE SEATWALL AND SCULPTURE BASE DETAILS

GRANITE SEATWALL PIECE WITH INSCRIPTION

CONSTRUCTION PROGRESS ON PLANTER ISLAND

Though our detail initially called for the foundations for the flush granite curbing and granite seatwall to be poured separately and pinned together, the contractor preferred to build them in a single pour. We approved the change in consultation with the structural engineer, which ultimately saved time and budget.

KOUSSEVITZKY SCULPTURE TERRACE / PROFESSIONAL

FINISHED GRANITE SEATWALL AND BUST

SCULPTURE BUST BY OTHERS ALIGN TO WALL EQ EQ EQ ALIGN ALIGN GRANITE PAVER SOLID GRANITE WALL IN (3) EQUAL PIECES 1/4” MORTAR JOINT TYP DOWEL (3) PER STONE 90° TYP 47.62° 47.62° 47.62° R 9’-6” Revisions Drawn by Checked by Scale Date Number Date Description Sheet Title Sheet Number 21 NOV 2018 GENERAL NOTES GN/JP AN Stamp TANGLEWOOD KOUSSEVITZKY SCULPTURE TERRACE BOSTON SYMPHONY ORCHESTRA INC STOCKBRIDGE MA Landscape Architecture 130 Bishop Allen Drive Cambridge MA 02139 P617 923 2422 F617 923 3740 www.reedhilderbrand.com BID SETFOR CONSTRUCTION Civil Engineering 1496 W Housatonic St Pittsfield MA 01201 P 413-499-1560 F 413-499-3307 www.foresightland.com Foresight Land Services Lighting Design 434 Massachusetts Ave Suite 506 Boston MA 02118 P 617-267-9500 F 617-267-9590 www.sladenfeinstein.com Sladen Feinstein Job # 103620 Existing conditions and topography data from survey prepared by Foresight Land Services 1496 West Housatonic Street Pittsfield MA 01201 March 2016 and updated January 2018 Contractor shall verify location any existing utilities and services and provide protection during construction Utilities damaged during construction shall be repaired contractors expense Contractor shall obtain permits for the work as required and comply with all laws ordinances rules and regulations the local jurisdiction the state and all other authorities having jurisdiction Contractor shall leave site clean and orderly during construction process Remove from site all excess materials soil debris and equipment Store materials only in an approved location All erosion control measures are to be constructed to meet field conditions at the time construction and prior to any grading or disturbance existing material on balance of site Silt fence hay bales or coire logs shall be installed per plans and all downhill edge Erosion control measures shall be checked and maintained daily Structural Engineering 176 Churchill Street Pittsfield MA 01201 P 413 464 2522 Barry Engineers and Constructors Inc 1 12/05/18 Addendum AS NOTED L-802 SCULPTURE BASE AND WALL DETAILS GRANITE SEAT WALL 1/2" 1'-0" 1 A PLAN SEE PLANS 3" 1'-0" 1'-0" 1" 1/4" JOINT w/ SEALANT GRANITE PAVERS; SIZE VARIES SEE MATERIALS LAYOUT PLAN UNDISTURBED SUBGRADE MORTAR SETTING BED GRANITE WALL INDIA BLACK GRANITE POLISHED FINISH ON FRONT FACE THERMAL TOP BACK AND EXPOSED ENDS; ENGRAVED LETTERING TEXT TO BE CONFIRMED BY OWNER/ARTIST TURN DOWN CONCRETE EDGE SEE STRUCTURAL DWGS 1/2” O.D.x10” S.S SMOOTH OR SHEATHED DOWEL PIN TO CONCRETE SLAB; SET IN NON-SHRINK GROUT 1’-10” .C TYP 1/4”R NOSING @ EDGE FRONT BACK 2'-3" REINFORCED CONCRETE BASE SET LEVEL; #4 @ 12” .C EACH WAY TOP AND BOTTOM 1/2" O.D.x12" S.S DOWEL 12" O.C 1'-6" SECTION (SCALE: 1-1/2" = 1'-0") SCULPTURE BASE 1" 1'-0" 2 ADJACENT GRANITE PAVING; SIZE VARIES SEE MATERIALS/ LAYOUT PLAN REINFORCED CONCRETE SLAB WITH DEEPENED BASE AT SCULPTURE; #4 @ 12” O.C EACH WAY TOP & BOTTOM UNDISTURBED SUBGRADE (3) 1/2” O.D.x18” S.S SMOOTH OR SHEATHED DOWEL; EPOXY TOP TO GRANITE OTHER SIDE SET IN CONCRETE BASE @ 6” O.C GRANITE SCULPTURE BASE PROVIDED BY OWNER KOUSSEVITZKY SCULPTURE BY OTHERS MORTAR SETTING BED 2'-6" 1'-0" VIF 6" +/5'-0" 3" 6" 1/2" MIN 1'-0" 1'-0" B DOWEL EMBEDMENT LAYOUT A SECTION SEE PLANS KOUSSEVITZKY TANGLEWOOD MUSIC CENTER GRANITE PAVERS; SIZE VARIES SEE MATERIALS LAYOUT PLAN 1/4”R NOSING @ EDGE FRONT & BACK 1/4” MORTAR JOINT TYP ENGRAVED TEXT FINISH GRADE REINFORCED CONCRETE BASE SET LEVEL SOLID GRANITE WALL INSTALLED ON TURN DOWN CONCRETE EDGE POLISHED FINISH ON FRONT FACE THERMAL TOP BACK AND SIDES; ENGRAVED LETTERING TEXT TO BE CONFIRMED BY OWNER/ARTIST SERGE FOUNDER NOTE: PROVIDE SAMPLES OF GRANITE MOCK-UP NOT REQUIRED B SECTION ELEVATION GRANITE SEAT WALL 1/2" = 1'-0" 1 A PLAN SEE PLANS 1'-0" 1" 2'-3" B SECTION SCULPTURE 1" = 1'-0" 2 A SEE PLANS GRANITE PAVERS; SIZE VARIES SEE MATERIALS LAYOUT PLAN 1/4”R NOSING @ EDGE FRONT & BACK 1/4” MORTAR JOINT TYP ENGRAVED TEXT FINISH GRADE REINFORCED CONCRETE BASE SET LEVEL SOLID GRANITE WALL INSTALLED ON TURN DOWN CONCRETE EDGE POLISHED FINISH ON FRONT FACE TOP AND SIDES THERMAL BACK; ENGRAVED LETTERING TEXT TO BE CONFIRMED BY OWNER/ARTIST NOTE: PROVIDE SAMPLES OF GRANITE MOCK-UP NOT REQUIRED S E R G E K O U S S E V T Z K Y O U N D O F T A N G W O O D 2 A SECTION ELEVATION S E R G E K O U S S E V I T Z K Y F O U N D E R O F T A N G L E W O O D 3 1/2" 4 1/2" 10 1/4" ENGRAVED TEXT; THESANS PLAIN FONT; CENTER JUSTIFY LINES NOTE: SEE ATTACHED 1:1 SKETCH FOR FONT SIZE TRACKING AND LINE SPACING MORTAR JOINT RENDERING SHOWN FOR CHARACTER REFERENCE ONLY: B TEXT INSCRIPTION ENLARGEMENT (SCALE: 1" = 1'-0") 4 4
7

Paving Details and Layout

The piano shape of the planted island was said to have been originally designed by Koussevitzky himself, which the project donor and client wanted to honor. We improved the shape of the island, incorporated flush granite curbing with a flamed finish to define the edges, and used the paving and wall to frame a special alcove that would highlight the bust.

Concrete unit pavers define a larger terrace around the island for gathering and seating at the main entry gate. Though we originally carried a concrete paving slab to minimize subgrade settlement, we switched to a bituminous base and sand setting bed during value engineering.

R15'-0" 55'-6" EQ EQ EQ EQ EQ EQ 22.50° 22.50° 22.50° 22.50° 22.50° 22.50° 22.50° 22.50° 12 .00° 26.00° 26.00° 26.00° 12'-6" 15'-0" 0" R12'-6" 14'-0" +/- R 9'-6" R9'-6" +/R 9'-6" 15.00° 13.71° 13.71° 16.29° 16 .29° 15.00° EQ EQ EQ EQ EQ EQ EQ EQ 9'-0" +/-2'-6" +/-9'-0" EQ EQ 3'-6" 26.43° 2'-0" 26.43° Revisions Drawn by Checked by Scale Date Number Date Description Sheet Title Sheet Number GN/JP AN Stamp TANGLEWOOD KOUSSEVITZKY SCULPTURE TERRACE BOSTON SYMPHONY ORCHESTRA INC STOCKBRIDGE MA BID SETFOR CONSTRUCTION 0' 16' Job 103620 21 NOV 2018 GENERAL NOTES Landscape Architecture 130 Bishop Allen Drive Cambridge MA 02139 P617 923 2422 F617 923 3740 .reedhilderbrand Civil Engineering 1496 W Housatonic St Pittsfield MA 01201 413-499-1560 413-499-3307 www.foresightland.com Foresight Land Services Lighting Design 434 Massachusetts Ave Suite 506 Boston MA 02118 617-267-9500 617-267-9590 www.sladenfeinstein.com Sladen Feinstein 1 Existing conditions and topography data are from survey prepared by Foresight Land Services 1496 West Housatonic Street Pittsfield MA 01201 in March 2016 and updated in January 2018 2 Contractor shall verify location any existing utilities and services and provide protection during construction Utilities damaged during construction shall be repaired contractors expense 3 Contractor shall obtain permits for the work required and comply with all laws ordinances rules and regulations the local jurisdiction the state and all other authorities having jurisdiction 4 Contractor shall leave site clean and orderly during construction process Remove from site all materials soil debris and equipment Store materials only in an approved location 5 All erosion control measures are to be constructed to meet field conditions the time construction and prior to any grading disturbance of existing material on balance site Silt fence hay bales or coire logs shall be installed per plans and at downhill edge Erosion control measures shall be checked and maintained daily Structural Engineering 176 Churchill Street Pittsfield MA 01201 413 443 6591 Barry Engineers and Constructors Inc 12/05/18 Addendum 1/07/19 Addendum LAYOUT PLAN PIANO ISLAND L-302 4' 8' prior commencing Stake or otherwise flag all design elements and features the field Obtain Landscape Architect's approval prior to commencing construction All dimensions from structure are from face of finish of exterior wall unless otherwise stated All angles are assumed to be 90 degrees unless otherwise stated See planting plans for location of trees and shrubs planting beds and extent sodding and seeding Any changes proposed to dimensions shown on this drawing shall be approved by the Landscape Architect prior to construction TANGLEWOOD KOUSSEVITZKY SCULPTURE BOSTON ORCHESTRA STOCKBRIDGE Landscape 130 Bishop Cambridge P617 923 www.reedhilderbrand Civil Engineering 1496 W Pittsfield P 413-499-1560 www.foresightland Foresight Lighting 434 Massachusetts Boston MA Sladen 1/16" w/ SAND JOINT FILLER TYP 4" 3" 1'-4" SAND SETTING BED (2) 8” LAYERS OF CURSHED STONE PER ASTM T57 FROST FREE MATERIAL OVER MARIFI STRUCTURAL FABRIC BITUMINOUS BINDER BASE CONCRETE UNIT PAVER UNDISTURBED SUBGRADE HAND TIGHT JOINT NOTE: MOCK-UP CAN BE IN PLACED 2 ASPHALT PAVER 1-1/2" = 1'-0" 1 GRANITE PAVER 1-1/2" = 1'-0" 2 3" GRANITE PAVERS; SIZE VARIES SEE MATERIALS LAYOUT PLAN REINFORCED CONCRETE SLAB NO 4 BAR TOP (2) NO 4 BAR BOTTOM (12” O.C.) MORTAR SETTING BED ADJACENT CONCRETE UNIT PAVING ADJACENT PLANTING BED COMPACTED FILL OR UNDISTURBED SUBGRADE (2) 8” LAYERS OF CURSHED STONE PER ASTM T57 FROST FREE MATERIAL OVER MARIFI STRUCTURAL FABRIC 1'-4" 8" 1'-4" 3" NOTE: MOCK-UP CAN BE IN PLACED 2 A ON-GRADE UNIT PAVER ADJACENT ASPHALT PAVEMENT BY OTHERS; PROTECT AND CLEAN PAVERS NOTE: MOCK-UP CAN BE IN PLACED 2 B CONDITION AT EDGE 3/16" PAVING LAYOUT PLAN CONCRETE UNIT PAVERS IN PROGRESS GRANITE PAVING DETAIL KOUSSEVITZKY SCULPTURE TERRACE / PROFESSIONAL 8

Tanglewood Whispering Bench Restoration

Garden Restoration - Lenox, MA

Client: Boston Symphony Orchestra

Collaborators: Simpson, Gumpertz & Heger (Structural)

RH Team: Doug Reed, Adrian Nial, Geoff Fritz

My Role: Project Designer 2018 - 2019

This project was also one of the early initiative projects implemented out of the larger Tanglewood Landscape Framework Plan. This cast-concrete bench sits as the terminus in a series of formal terraced garden rooms. The hemlock hedges that define the formal gardens and frame the southern edge of the campus were not maintained properly for decades. Some had grown up to 30 feet tall, obscuring long views to the surrounding Berkshire hills and Stockbridge Bowl, which initially defined the Tanglewood experience. The restoration of the bench and surrounding hedges was a demonstration project intended to recover a window into those views, reconnect visitors with the campus context, and generate momentum and donor interest toward a full restoration of the formal garden.

My responsibilities included project design and construction documentation. I also participated in construction coordination calls and made several site visits to observe construction progress.

WHISPERING BENCH / PROFESSIONAL 9
THE WHISPERING BENCH AND FORMAL GARDENS HEDGES CA. 1931

DELAMINATED CONCRETE AREA (SHALLOW OR DEEP TOPSIDE/WALL REPAIRS. SEE 2/CR-03).

LOCATION (>0.040 IN; 4/CR-03).

LARGE DELAMINATED CONCRETE. CONTRACTOR

Structural Assessment

* Drawings by

We worked closely with a local structural engineer and concrete restoration contractor to come up with a strategy and best practices for restoring the bench. The team determined that an in situ restoration would be more cost effective and authentic than a complete replacement and could produce a high quality result based on the contractor’s previous restoration experience. The structural engineer conducted an assessment of the bench and produced the above diagrams to guide the contractors’ work. Corresponding details for each type of damage/condition along with detailed specifications were also provided.

CR-03 A A SEE DETAIL SEE DETAIL SEE DETAIL SEE DETAIL SEE DETAIL LEGEND: LOCALIZED DELAMINATED CONCRET AREA (SHALLOW OR DEEP TOPSIDE/WALL REPAIRS. SEE CRACK LOCATION (>0.040 IN; CR-03). LARGE DELAMINATED CONCRETE. ONTRACTOR TO REMOVE AND REPLACE. (SEE 3/CR-03) HAIRLINE CRACK LOCATION (<0.040 IN; 4/CR-03 SIM.) REMOVE EMBEDED ANCHOR NOTES: 1. THIS DRAWING IS BEST VIEWED IN COLOR (THOUGH NOT REQUIRED) TO REVIEW INFORMATION. A REAR LEFT RIGHT I:\BOS\Projects\2017\171824.00-COND\Drawings\Workin g_Set\_Revit\LOCAL USERS\JSUN\171824.00_Tanglewood Bench_R17_JSUN.rvt 3/4" = 1'-0" BENCH FRONT ELEVATION (UNFOLDED VIEW) 1 3/4" = 1'-0" BENCH LEFT ELEVATION 2 3/4" = 1'-0" BENCH REAR ELEVATION 4 3/4" = 1'-0" BENCH RIGHT ELEVATION 3 3D KEY PLAN 3/4" 1'-0" BENCH FRONT SIDE LEFT 3/4" = 1'-0" BENCH FRONT SIDE RIGHT BENCH PLAN SEE DETAIL 7 SEE DETAIL 2 SEE DETAIL 3 SEE DETAIL 7 SEE DETAIL 4 SEE DETAIL 5 SEE DETAIL 6
LEGEND: LOCALIZED
CRACK
TO REMOVE AND REPLACE. (SEE 3/CR-03) HAIRLINE CRACK LOCATION (<0.040 IN; 4/CR-03 SIM.) REMOVE EMBEDED ANCHOR NOTES: 1. THIS DRAWING IS BEST VIEWED IN COLOR (THOUGH NOT REQUIRED) TO REVIEW INFORMATION. A GENERAL NOTES Landscape Architecture 130 Bishop Allen Drive Cambridge MA 02139 P617 923 2422 F617 923 3740 www.reedhilderbrand.com Structural Engineer Simpson Gumpertz & Heger 41 Seyon Street, Bldg. 1, Ste. 500 Waltham MA 02453 P 781.907.9000 F 781.907.9009 www.sgh.com
WHISPERING BENCH
SYMPHONY ORCHESTRA, INC STOCKBRIDGE, MA 3D KEY PLAN
TANGLEWOOD
BOSTON
WHISPERING BENCH AND HEMLOCK HEDGES BEFORE RESTORATION (2018)
BENCH / PROFESSIONAL 10
Structural
WHISPERING

TOP PORTION

SEAT-BACK

RECONSTRUCTION OF TOP PORTION OF SEAT-BACK OF THE BENCH

RECONSTRUCTION OF TOP PORTION OF SEAT-BACK OF THE

BENCH REPAIR DETAILS

* Drawings by Structural

Bench Repair and Garden Room Restoration

HORIZONTAL SHALLOW-DEPTH REPAIR REPAIR LESS THAN OR EQUAL TO 1.5")

REPAIR EQUAL TO 1.5")

VERTICAL OR HORIZONTAL SHALLOW-DEPTH REPAIR (FOR DEPTH OF REPAIR LESS THAN OR EQUAL TO 1.5")

The project also served as a field test for replacing a larger ~1/2 mile segment of overgrown Hemlock hedge along the campus’ southern edge. Techny Arborvitae was found to perform well as a hedge replacement species that is easily grown and sheared into a single mass, while also avoiding immenent problems with the Hemlock Wooly Adelgid. The restoration also replaced overgrown boxwood hedges that defined the edges of the garden room and provided new bluestone paving with lawn joints at the base of the bench. All details were researched and executed in accordance with historic documentation of the original garden, but also adapted to contemporary construction standards and best practices.

VERTICAL OR HORIZONTAL DEEP-DEPTH REPAIR (FOR DEPTH OF REPAIR GREATER THAN 1.5")

VERTICAL OR HORIZONTAL DEEP-DEPTH REPAIR (FOR DEPTH OF REPAIR GREATER THAN 1.5") 3 CRACK REPAIR AT AREAS WITH DETERIORATED

CRACK REPAIR AT AREAS WITH DETERIORATED CONCRETE ALONG CRACK

CRACK REPAIR AT AREAS WITH DETERIORATED CONCRETE ALONG CRACK

VERTICAL

VERTICAL OR HORIZONTAL DEEP-DEPTH REPAIR (FOR

BENCH AFTER STRUCTURAL REPAIRS AND KEIM PALL COATING BLUESTONE PAVING PROGRESS

APPROVED HAND-APPLIED REPAIR MATERIAL TAPCON ANCHORS (1" MIN. EMBED) SPACED @ 8" OC MAX. PROVIDE NO FEWER THAN (4) ANCHORS W/IN EA. REPAIR AREA. SAW-CUT TO MIN. 3/4" DEPTH AROUND PERIMETER OF REPAIR AREA (E) CONCRETE NOTES: 1. THE GENERAL LOCATIONS OF DELAMINATED/SPALLED CONCRETE ARE INDICATED ON CR-02, AND TO BE CONFIRMED BY EOR AFTER CLEANING OF THE BENCH STRUCTURE. 2. TAPCON ANCHORS ARE ONLY REQUIRED FOR VERTICAL SHALLOW-DEPTH REPAIR (I.E. NOT REQUIRED FOR HORIZONTAL REPAIR AREAS). 3. THE GENERAL PROCEDURES SHALL FOLLOW NOTE 4 OF DETAIL 1/CR-03, WITH THE EXCEPTION THAT HAND APPLICATION IS ALLOWED FOR THIS REPAIR DETAIL. 4. THE SURFACE PROFILE OF FINISHED REPAIR SHALL MATCH THE ORIGINAL PROFILE. GROUND 0" 2" TYP 2" 2 TYP #4 STAINLESS STEEL DOWELS W/ 6" MIN. EMBED IN APPROVED ADHESIVE SPACED @ 12" OC SAW-CUT THE EDGE OF REPAIR #5 STAINLESS STEEL REINFORCEMENT, TYP. 2 " T Y P 6" ROUGHEN ALL (E) CONCRETE SURFACE TO BE RECEIVE REPAIR MATERIAL TO 1/4" AMPLITUDE NOTES: 1. THE GENERAL LOCATION OF REQUIRED RECONSTRUCTED LARGE PORTION OF BENCH STRUCTURE IS SHOWN IN DETAIL 1/CR-02. 2. THIS DETAIL SHOWS THE APPROXIMATE EXTENT OF REQUIRED RECONSTRUCTION. CONTRACTOR TO VIF. 3. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO SHOW EXTENT OF RECONSTRUCTION, CONSTRUCTION METHOD, AND REINFORCEMENT/DOWEL LAYOUT FOR APPROVAL PRIOR TO CONSTRUCTION. THESE DRAWINGS ASSUME A CAST-IN-PLACE METHOD; OTHER METHODS WILL BE CONSIDERED IF SUBMITTED. 4. THE GENERAL PROCEDURES ARE AS FOLLOWS: A. MEASURE ORIGINAL PROFILE AND CREATE ANY REQUIRED TEMPLATES. B. SAW-CUT TO A MINIMUM DEPTH OF 3/4" AROUND THE PERIMETER OF THE DETERIORATED CONCRETE. MODIFY AS REQUIRED TO AVOID CUTTING REINFORCEMENT (CONTRACTOR TO VIF). C. REMOVE CONCRETE WITHIN THE SAW-CUT TO EXPOSE SOUND CONCRETE. D. WHERE EXISTING REINFORCEMENT IS EXPOSED DURING DEMOLITION, REMOVE CONCRETE TO A MINIMUM DEPTH OF 3/4" BEYOND THE REINFORCEMENT. E. CONSULT EOR TO PROCEEDING IF EXISTING REINFORCEMENT IS SEVERELY CORRODED WITH A SECTION LOSS OF 15% OR MORE OR IS DAMAGED DURING DEMOLITION. F. ROUGHEN CONCRETE SURFACE TO A MINIMUM OF 1/4" AMPLITUDE. G. CLEAN EXPOSED REINFORCEMENT TO SSPC-6, COMMERCIAL BLAST FINISH, OR BETTER. H. COAT EXISTING REINFORCEMENT. I. INSTALL STAINLESS STEEL REINFORCEMENT AND ADHESIVE DOWELS AND ANCHORS SHOWN IN SECTION. J. IMMEDIATELY BEFORE PLACING NEW CONCRETE (OR INSTALLING NEW CONCRETE SECTION), PROVIDE APPROVED SCRUBCOAT ON THE SURFACE OF SUBSTRATE K. THE NEW REPAIR CONCRETE SHALL BE PLACED AND CONSOLIDATED USING FORM-AND-POUR METHOD. 5. THE PROFILE OF RECONSTRUCTED CONCRETE SHALL MATCH THE ORIGINAL PROFILE. CL STAINLESS STEEL SHEAR PINS @ 6" OC EA. WAY W/ 2" MIN. EMBED. SAW-CUT TO MIN. 3/4" DEPTH AROUND PERIMETER OF REPAIR AREA (E) CONCRETE APPROVED HAND-APPLIED REPAIR MATERIAL Sheet Number I:\BOS\Projects\2017\171824.00-COND\Drawings\Workin g_Set\_Revit\LOCAL USERS\JSUN\171824.00_Tanglewood Bench_R17_JSUN.rvt 5/9/2018 10:59:25 AM CR-03 REPAIR DETAILS 1 1/2" = 1'-0"
DEPTH OF
2 3/4" = 1'-0"
OR HORIZONTAL SHALLOW-DEPTH REPAIR (FOR
REPAIR LESS THAN OR EQUAL TO 1.5")
1
BENCH
APPROVED HAND-APPLIED REPAIR MATERIAL TAPCON ANCHORS (1" MIN. EMBED) SPACED @ 8" OC MAX. PROVIDE NO FEWER THAN (4) ANCHORS W/IN EA. REPAIR AREA. SAW-CUT TO MIN. 3/4" DEPTH AROUND PERIMETER OF REPAIR AREA (E) CONCRETE NOTES: 1. THE GENERAL LOCATIONS OF DELAMINATED/SPALLED CONCRETE ARE INDICATED ON CR-02, AND TO BE CONFIRMED BY EOR AFTER CLEANING OF THE BENCH STRUCTURE. 2. TAPCON ANCHORS ARE ONLY REQUIRED FOR VERTICAL SHALLOW-DEPTH REPAIR (I.E. NOT REQUIRED FOR HORIZONTAL REPAIR AREAS). 3. THE GENERAL PROCEDURES SHALL FOLLOW NOTE 4 OF DETAIL 1/CR-03, WITH THE EXCEPTION THAT HAND APPLICATION IS ALLOWED FOR THIS REPAIR DETAIL. 4. THE SURFACE PROFILE OF FINISHED REPAIR SHALL MATCH THE ORIGINAL PROFILE. GROUND 0" 2" TYP EDGE OF REPAIR P 6" NOTES: 1. THE GENERAL LOCATION OF REQUIRED RECONSTRUCTED LARGE PORTION OF BENCH STRUCTURE IS SHOWN IN DETAIL 1/CR-02. 2. THIS DETAIL SHOWS THE APPROXIMATE EXTENT OF REQUIRED RECONSTRUCTION. CONTRACTOR TO VIF. 3. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO SHOW EXTENT OF RECONSTRUCTION, CONSTRUCTION METHOD, AND REINFORCEMENT/DOWEL LAYOUT FOR APPROVAL PRIOR TO CONSTRUCTION. THESE DRAWINGS ASSUME A CAST-IN-PLACE METHOD; OTHER METHODS WILL BE CONSIDERED IF SUBMITTED. 4. THE GENERAL PROCEDURES ARE AS FOLLOWS: A. MEASURE ORIGINAL PROFILE AND CREATE ANY REQUIRED TEMPLATES. B. SAW-CUT TO A MINIMUM DEPTH OF 3/4" AROUND THE PERIMETER OF THE DETERIORATED CONCRETE. MODIFY AS REQUIRED TO AVOID CUTTING REINFORCEMENT (CONTRACTOR TO VIF). C. REMOVE CONCRETE WITHIN THE SAW-CUT TO EXPOSE SOUND CONCRETE. D. WHERE EXISTING REINFORCEMENT IS EXPOSED DURING DEMOLITION, REMOVE CONCRETE TO A MINIMUM DEPTH OF 3/4" BEYOND THE REINFORCEMENT. E. CONSULT EOR TO PROCEEDING IF EXISTING REINFORCEMENT IS SEVERELY CORRODED WITH A SECTION LOSS OF 15% OR MORE OR IS DAMAGED DURING DEMOLITION. F. ROUGHEN CONCRETE SURFACE TO A MINIMUM OF 1/4" AMPLITUDE. G. CLEAN EXPOSED REINFORCEMENT TO SSPC-6, COMMERCIAL BLAST FINISH, OR BETTER. H. COAT EXISTING REINFORCEMENT. I. INSTALL STAINLESS STEEL REINFORCEMENT AND ADHESIVE DOWELS AND ANCHORS SHOWN IN SECTION. J. IMMEDIATELY BEFORE PLACING NEW CONCRETE (OR INSTALLING NEW CONCRETE SECTION), PROVIDE APPROVED SCRUBCOAT ON THE SURFACE OF SUBSTRATE K. THE NEW REPAIR CONCRETE SHALL BE PLACED AND CONSOLIDATED USING FORM-AND-POUR METHOD. 5. THE PROFILE OF RECONSTRUCTED CONCRETE SHALL MATCH THE ORIGINAL PROFILE. APPROVED REPAIR MATERIAL STAINLESS STEEL SHEAR PINS @ 6" OC EA. WAY W/ 2" MIN. EMBED. SAW-CUT TO MIN. 3/4" DEPTH AROUND PERIMETER OF REPAIR AREA (E) CONCRETE NOTES: 1. THE GENERAL LOCATIONS OF DELAMINATED/SPALLED CONCRETE ARE INDICATED ON CR-02, AND TO BE CONFIRMED BY EOR AFTER CLEANING OF THE BENCH STRUCTURE. 2. THE GENERAL PROCEDURES SHALL FOLLOW NOTE 4 OF DETAIL 1/CR-03. 3. THE SURFACE PROFILE OF FINISHED REPAIR SHALL MATCH THE ORIGINAL PROFILE. NOTES: 1. THE GENERAL LOCATIONS OF CRACKS IN CONCRETE ARE INDICATED ON CR-02, AND TO BE CONFIRMED BY EOR AFTER CLEANING OF THE BENCH STRUCTURE. 2. IN ADDITION TO CRACKS SHOWN ON DRAWING CR-02, ALL CRACKS LARGER THAN 0.040 IN. SHALL BE REPAIRED IN ACCORDANCE WITH THIS DETAIL. REPORT TO EOR IF ADDITIONAL LARGE WIDTH CRACKS ARE FOUND. 3. REMOVE SEALANT INSIDE JOINTS/CRACKS IF PRESENT, CONTINUE INTO CONCRETE BEYOND INDICATED DEPTH. 4. THE GENERAL PROCEDURES SHALL FOLLOW NOTE 4 OF DE IS ALLOWED FOR THIS REPAIR DETAIL. 5. THE SURFACE PROFILE OF FINISHED REPAIR SHALL MAT 1 1/2" = 1'-0"
2 3/4" = 1'-0"
1 3 1 1/2" = 1'-0"
APPROVED HAND-APPLIED REPAIR MATERIAL TAPCON ANCHORS (1" MIN. EMBED) SPACED @ 8" OC MAX. PROVIDE NO FEWER THAN (4) ANCHORS W/IN EA. REPAIR AREA. SAW-CUT TO MIN. 3/4" DEPTH AROUND PERIMETER OF REPAIR AREA (E) CONCRETE DELAMINATED/SPALLED CONCRETE ARE BE CONFIRMED BY EOR AFTER CLEANING REQUIRED FOR VERTICAL SHALLOW-DEPTH HORIZONTAL REPAIR AREAS). SHALL FOLLOW NOTE 4 OF DETAIL 1/CR-03, HAND APPLICATION IS ALLOWED FOR THIS FINISHED REPAIR SHALL MATCH THE ORIGINAL GROUND 0" TYP P 6" REQUIRED RECONSTRUCTED LARGE PORTION OF BENCH STRUCTURE IS SHOWN IN DETAIL 1/CR-02. APPROXIMATE EXTENT OF REQUIRED RECONSTRUCTION. CONTRACTOR TO VIF. SHOP DRAWINGS TO SHOW EXTENT OF RECONSTRUCTION, CONSTRUCTION METHOD, AND REINFORCEMENT/DOWEL LAYOUT FOR APPROVAL PRIOR TO CONSTRUCTION. THESE ASSUME A CAST-IN-PLACE BE CONSIDERED IF SUBMITTED. AS FOLLOWS: AND CREATE ANY REQUIRED TEMPLATES. OF 3/4" AROUND THE PERIMETER OF THE DETERIORATED CONCRETE. MODIFY AS REQUIRED TO AVOID CUTTING REINFORCEMENT (CONTRACTOR TO VIF). THE SAW-CUT TO EXPOSE SOUND CONCRETE. REINFORCEMENT IS EXPOSED DURING DEMOLITION, REMOVE CONCRETE TO A MINIMUM DEPTH OF 3/4" BEYOND THE REINFORCEMENT. PROCEEDING IF EXISTING REINFORCEMENT IS SEVERELY CORRODED WITH A SECTION LOSS OF 15% OR MORE OR IS DAMAGED DURING DEMOLITION. SURFACE TO A MINIMUM OF 1/4" AMPLITUDE. REINFORCEMENT TO SSPC-6, COMMERCIAL BLAST FINISH, OR BETTER. REINFORCEMENT. REINFORCEMENT AND ADHESIVE DOWELS AND ANCHORS SHOWN IN SECTION. NEW CONCRETE (OR INSTALLING NEW CONCRETE SECTION), PROVIDE APPROVED SCRUBCOAT ON THE SURFACE OF SUBSTRATE SHALL BE PLACED AND CONSOLIDATED USING FORM-AND-POUR METHOD. CONCRETE SHALL MATCH THE ORIGINAL PROFILE. APPROVED REPAIR MATERIAL STAINLESS STEEL SHEAR PINS @ 6" OC EA. WAY W/ 2" MIN. EMBED. SAW-CUT TO MIN. 3/4" DEPTH AROUND PERIMETER OF REPAIR AREA (E) CONCRETE NOTES: 1. THE GENERAL LOCATIONS OF DELAMINATED/SPALLED CONCRETE ARE INDICATED ON CR-02, AND TO BE CONFIRMED BY EOR AFTER CLEANING OF THE BENCH STRUCTURE. 2. THE GENERAL PROCEDURES SHALL FOLLOW NOTE 4 OF DETAIL 1/CR-03. 3. THE SURFACE PROFILE OF FINISHED REPAIR SHALL MATCH THE ORIGINAL PROFILE. NOTES: 1. THE GENERAL LOCATIONS OF CRACKS IN CONCRETE ARE INDICATED ON CR-02, AND TO BE CONFIRMED BY EOR AFTER CLEANING OF THE BENCH STRUCTURE. 2. IN ADDITION TO CRACKS SHOWN ON DRAWING CR-02, ALL CRACKS LARGER THAN 0.040 IN. SHALL BE REPAIRED IN ACCORDANCE WITH THIS DETAIL. REPORT TO EOR IF ADDITIONAL LARGE WIDTH CRACKS ARE FOUND. 3. REMOVE SEALANT INSIDE JOINTS/CRACKS IF PRESENT, CONTINUE INTO CONCRETE BEYOND INDICATED DEPTH. 4. THE GENERAL PROCEDURES SHALL FOLLOW NOTE 4 OF DE 5. THE SURFACE PROFILE OF FINISHED REPAIR SHALL MAT CL 1" MIN. 1" MIN.
RECONSTRUCTION OF
OF
OF 1 1/2" = 1'-0"
3
GROUND 0" 6" STRUCTURE IS SHOWN IN DETAIL 1/CR-02. CONTRACTOR TO VIF. RECONSTRUCTION, CONSTRUCTION METHOD, AND REINFORCEMENT/DOWEL LAYOUT FOR APPROVAL PRIOR TO CONSTRUCTION. THESE DRAWINGS ASSUME A CAST-IN-PLACE DETERIORATED CONCRETE. MODIFY AS REQUIRED TO AVOID CUTTING REINFORCEMENT (CONTRACTOR TO VIF). CONCRETE TO A MINIMUM DEPTH OF 3/4" BEYOND THE REINFORCEMENT. CORRODED WITH A SECTION LOSS OF 15% OR MORE OR IS DAMAGED DURING DEMOLITION. BETTER. ANCHORS SHOWN IN SECTION. SECTION), PROVIDE APPROVED SCRUBCOAT ON THE SURFACE OF SUBSTRATE FORM-AND-POUR METHOD. APPROVED REPAIR MATERIAL STAINLESS STEEL SHEAR PINS @ 6" OC EA. WAY W/ 2" MIN. EMBED. SAW-CUT TO MIN. 3/4" DEPTH AROUND PERIMETER OF REPAIR AREA (E) CONCRETE NOTES: 1. THE GENERAL LOCATIONS OF DELAMINATED/SPALLED CONCRETE ARE INDICATED ON CR-02, AND TO BE CONFIRMED BY EOR AFTER CLEANING OF THE BENCH STRUCTURE. 2. THE GENERAL PROCEDURES SHALL FOLLOW NOTE 4 OF DETAIL 1/CR-03. 3. THE SURFACE PROFILE OF FINISHED REPAIR SHALL MATCH THE ORIGINAL PROFILE. APPROVED HAND-APPLIED REPAIR MATERIAL TAPCON ANCHORS (1" MIN. EMBED) SPACED @ 8" OC MAX. ALONG THE REPAIR LENGTH, ALTERNATE EA. SIDE OF CRACK. PROVIDE NO FEWER THAN (4) ANCHORS W/IN EA. REPAIR AREA. SAW-CUT TO MIN. 3/4" DEPTH AROUND PERIMETER OF REPAIR AREA (E) CONCRETE NOTES:
GENERAL LOCATIONS OF CRACKS IN CONCRETE ARE INDICATED ON CR-02, AND TO BE CONFIRMED BY EOR AFTE CLEANING OF THE BENCH STRUCTURE. 2. IN ADDITION TO CRACKS SHOWN ON DRAWING CR-02, ALL CRACKS LARGER THAN 0.040 IN. SHALL BE REPAIRED IN ACCORDANCE WITH THIS DETAIL. REPORT TO EOR IF ADDITIONAL LARGE WIDTH CRACKS ARE FOUND. 3. REMOVE SEALANT INSIDE JOINTS/CRACKS IF PRESENT, PRIOR TO CONDUCTING CRACK REPAIR. NOTIFY EOR IF JOINTS CONTINUE INTO CONCRETE BEYOND INDICATED DEPTH. TAIL 1/CR-03, WITH THE EXCEPTION THAT HAND APPLICAT CL 1" MIN. 1" MIN. (E) CRACK
1. THE
SHALLOW-DEPTH
1 1/2" = 1'-0"
SEAT-BACK OF
BENCH REPAIRS IN PROGRESS
BENCH / PROFESSIONAL 11
WHISPERING

Restored Garden Room and Bench

The restoration was a strategic intervention in a small area, but with transformative results. Overgrown hemlock hedges once divided and obscured connections both within the campus and to the surrounding landscape. The restoration re-established these connections for visitors and created momentum toward other garden restorations that were funded and implemented in the following year.

WHISPERING BENCH / PROFESSIONAL 12

TOURISTS

Hotel and Event Space

Client: The Beyond Group LLC

RH Team: Doug Reed, Chris Moyles, Jeremy Martin

Collaborators: Hank Scollard (Architect), White Engineering (Civil)

My Role: Project Designer 2016 - 2019

The first projected implemented as part of The Blackinton Framework Plan is Tourists, a 48-room hotel located on the site of a former dilapidated 1950’s motel. Re-shaped topography and plantings set a main courtyard and event lawn at a lower level within the Hoosic River’s riparian domain. What had once been a plateau of junk fill overlooking a stagnant mire, is now a series of lawn glades, swales, and rehabilitated wetlands. At the upper level, a domestic frontage of hedges and apple trees sets the rooms away from the busy street and a network of garden beds shape a meandering circulation of woodland and lawn paths leading to a suspension bridge across the Hoosic and the rest of the 72-acre property.

I was involved in the project from the outset, working closely with the design and client team from concept to completion across two phases of work. I conducted ten site visits with the project manager throughout construction to review decks, boardwalks, grading, paving, pool installation, and direct the composition and installation of plant material. Landform, grading, and stormwater management were central to the project’s spatial and performative concepts.

PARKING SWALE

CATENARY LIGHTING

LODGE

THE AIRPORT ROOMS (1813 FARMHOUSE)

HOTEL ROOMS

LODGE DECK/COURTYARD OVERLOOK

WOODLAND GARDENS

SUNKEN EVENT LAWN

EXISTING RIVER BLUFF

RESTORED RIVER BLUFF

POOL

WETLAND SWALE

REHABILITATED WETLAND

WETLAND

BOARDWALK RIVER OVERLOOK PUBLIC ACCESS TRAIL SUSPENSION BRIDGE 1 1 1 2 3 4 5 5 6 7 8 9 9 10 11 13 14 15 16 17 12 5 5 2 1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
ROUTE 2 (MOHAWK TRAIL) BLACKINTON ISLAND
TOURISTS / PROFESSIONAL 13
HOOSIC RIVER

Topography Concept (top right)

When we began the project, the hotel foundations had already been built. Historic research revealed that junk fill including car parts, refridgerators, and construction debris were dumped beyond the edge of the river’s natural bluff landform when a shopping center across the street was built in the 1970s. The original bluff would have run through the main hotel courtyard. We proposed partially restoring the original landform to set the pool closer to the experience of the river and separate the courtyard from the street level. The elevation for the pool terrace was set safely above river flood elevations. Both steps and a 5% lawn path lead down to the lower level.

Sunken Event Lawn (Enlargement B)

In phase two of the project, a historic 19th century farmhouse adjacent to the hotel was rennovated as a restaurant and event space. An event lawn cut into the river bluff provides a mediumsized gathering space that is sheltered from road noise and oriented toward the river. As with much of the Phase 1 work, the earthwork design underwent an extensive approvals process with the local Conservation Commission to ensure there were no significant impacts to the riparian zone or the river’s flood storage capacity.

Enlargement B

Phase 1 Grading
A B
A
Historic
Phase 2 Grading
Enlargement
Existing River Bluff Edge HOOSIC RIVER STATE RT. 2 (MOHAWK TRAIL)
Bluff Edge 1970s Construction Spoils/Junk Fill
TOURISTS / PROFESSIONAL 14

In progress, October 2018.

MAIN

In progress, October 2017. The restored bluff was sculpted by cutting into the existing consistent slope across the courtyard.

MULTI-PURPOSE

On an average day, the sunken lawn is a secluded getaway for individuals or small groups, but spacious enough to accommodate special events such as weddings, concerts, or banquets.

COURTYARD ROUGH GRADING EVENT LAWN FINE GRADING GATHERING AND OVERLOOK A deck extends from the main lodge building, cantilevering over the bluff to look out on the pool terrace and central courtyard. SUCCESSIONAL BLUFF
TOURISTS / PROFESSIONAL 15
A deck extends from the main lodge building, cantilevering over the bluff to look out on the pool terrace and central courtyard.

Stormwater Management

In collaboration with the civil engineer, we developed a water management strategy to channel and infiltrate stormwater on site, while improving nearby riparian habitats through restoration of an existing wetland. Sheet flow across the front lawns, parking lots, and walkways is directed into a series of swales connected by underground pipes. Roof runoff falls into linear gravel infiltration strips at the edge of room walkways and underdrains beneath the back decks. Stormwater discharge into the existing wetland was restricted so all captured runoff is conveyed into a large wetland swale in the main courtyard, where it is retained and infiltrates into the ground.

PERFORMATIVE AND BIODIVERSE

The main wetland swale is key to the overall site stormwater management strategy while also providing a seasonally-fluctuating mix of diverse wetland forbs and grasses as a courtyard spectacle.

ROOF AND WALKWAY INFILTRATION STRIPS
TOURISTS / PROFESSIONAL 16
PARKING LOT SWALES

no s a d aw g 2 Co a o h e y x s g on o n a d yo d m ns on he e d R po an d s ep c es o e a n c pe A c e d n p o omm c ng o s c o n 3 S k o he w e a a d s n e emen a d a u s n e e O a L nd ca e h e ap o a o o o mme c g on u n 4 A m n o n m u u a e om a e o s o x o w un es o he w e a d 5 A ng es a e s um d b 90 eg e un es o he w e a d 6 S e p a n ng p ns o oc n o ee a d h u s a b ds a n ex en o od n an s ed ng 7 S e a h e u a d aw ng o b u d ng m n o s 8 D me s n a u b o pa emen ed n a e en o m ou d a e cu o ou e u b n s o e w e a d 9 A y h ng s p po e o men o s ho w on h d w n g sh e ap o v d y e nd c pe A c e p o c n s uc o

Materials and Layout (Phase 1)

The project required detailed resolution of many different material conditions and adjacencies. The client had strong aesthetic preferences, which resulted in an incredible coherence between the material expression of the buildings and landscape. At times, their preferences were at odds with our own standards for long-term maintenance and durability, but that was a compromise the client was ultimately willing to make in favor of aesthetics. Specific examples were the widespread use of White Oak as the standard material for building cladding and decking and a curbless design for the gravel parking lot. We weighed these decisions in conversation with the client, who understood the maintenance they would require and decided they were essential to the project’s aesthetic expression.

G E N E R A L 1 E n c nd da a a om a Eng n e s - 0 D 01 26 - 06 6 0 2 C a o h e s ng u es a p o e p e o U d m ge s a be pa ed e pe e 3 C a o h wo k s qu ed aw o n n c s o he oc u d o a h o s 4 C a o h o d y du n g o Rem ve om s s eb s nd e m e s on y n

L.O.W L .O .W L.O.W L.O.W L.O.W BUILDING D BUILDING A BUILDING B BUILDING C BUILDING E HOUSE GARAGE GARAGE PV-CS2 PV-CN1 PV-CS1 PV-CN1 PV-CN2 PV-CN2 PV-WD1 PV-WD1 ST-CN1 PV-CN2 HR-3 ST-RS1 PV-ST1 PV-CN3 ST-CN1 (BY OTHERS) HR-1 LT-P1 LT-P2 PV-SD1 LT-P1 HR-2 GUARDRAIL SEE ARCH GR-1 ST-WD1 FE-WM1 BASELINE 1 E .O BLDG FOUNDATION 5'-8" 15'-7" 140'-10" 5'-0" 143'-0" LT-P1 5'-0" TYP 144'-1" VIF BASELINE 2 E .O HOUSE FOUNDATION 3'-0" 6'-2" 5'-0" TYP 6'-0" 3'-0" 2'-7" 6'-0" 1'-0" 5'-0" 6'-0" 4'-0" TYP PV-WS 8'-6" TYP 4'-4" 5'-0" 8'-6" TYP 13'-8" ALIGN 140'-0" FE-WP FE-WS 6'-2" PV-CS2 25'-0" PV-CN2 6'-2" PV-CS2 PV-CS2 PV-CN1 ST-CN1 PV-WS PV-WS PV-CN3 HVAC BY OTHERS PV-CS2 PV-CS2 PV-CS2 PV-CS2 GA-WM1 HR-1 BOTH SIDES HVAC BY OTHERS (BOTH SIDES) (BOTH SIDES) HR-2 (BOTH SIDES) HR-1 (BOTH SIDES) HR-3 ST-WD1 (BOTH SIDES) (BOTH SIDES) LT-C1 PV-WS PV-BT1 PV-BT1 PV-BT1 174'-7" VIF 9'-6" DECKING SEE ARCH PROVIDE 2" CRUSHED STONE SURFACE BELOW DECK ALIGN EDGE OF STONE WITH DECK ABOVE STAIR LAYOUT TO BE FIELD LOCATED BY LANDSCAPE ARCHITECT TO AVOID EXISTING TREES ALIGN ALIGN 3'-0" 1'-0" S W A E LAWN LAWN LAWN & MEADOW CMU RETAINING WALL BELOW DECK TRANSFORMER CONCRETE PAD AND BOLLARDS (BY OTHERS) LAWN & HEDGES LAWN & HEDGES LAWN & HEDGES WOODLAND PLANTING WOODLAND PLANTING S W L E S W A L E S W A E ALIGN ALIGN ALIGN ALIGN ALIGN PROVIDE DRIP STRIP PAVING SCORING ALONG THIS EDGE PROVIDE DRIP STRIP PAVING SCORING ALONG THIS EDGE PROVIDE DRIP STRIP PAVING SCORING ALONG THIS EDGE PROVIDE DRIP STRIP PAVING SCORING ALONG THIS EDGE PROVIDE DRIP STRIP PAVING SCORING ALONG THIS EDGE 80'-0" O.C TYP 20'-2" 22'-0" 40'-0" TYP 40'-1" 41'-0" 10'-10" 79'-0" O.C TYP 22'-0" 9'-6" 102'-0" TYP DECKING SEE ARCH PROVIDE 2" CRUSHED STONE SURFACE BELOW DECK ALIGN EDGE OF STONE WITH DECK ABOVE DECKING SEE ARCH PROVIDE 2" CRUSHED STONE SURFACE BELOW DECK ALIGN EDGE OF STONE WITH DECK ABOVE DECKING SEE ARCH PROVIDE 2" CRUSHED STONE SURFACE BELOW DECK ALIGN EDGE OF STONE WITH DECK ABOVE PROVIDE 2" CRUSHED STONE SURFACE BELOW DECK TO GRADE BREAK ALIGN EDGE OF STONE WITH DECK ABOVE POOL FIRE DEPARTMENT CONNECTION SEE FP DRAWINGS FIRE DEPARTMENT CONNECTION SEE FP DRAWINGS FIRE DEPARTMENT CONNECTION SEE FP DRAWINGS MATCHLINE: SEE SHEET L-201 PV-CS1 PV-WD1 POOL EQUIPMENT ENCLOSURE SEE L-754 WOOD TREAD PATH; CONTINUE STAIR TREADS SET IN GRADE OVER 6" CRUSHED STONE BASE BUTT ENDS OF TREADS FILL REMAINING GAPS WITH STONE DUST LODGE DECK ENLARGEMENT PLAN 1 L-730 ST-CN1 PV-CS2 FE-WS Revisions Job number Drawn by Scale Number Date Sheet Title Sheet Number JP TOURISTS Landscape Architecture 130 Bishop Allen Cambridge MA P617 923 2422 www.reedhilderbrand Stamp NORTH 0' 20' FOR BIDDING COORDINATION NOT CONSTRUCTION 1 06/15/17 LAYOUT MATERIALS L-200 LIMIT OF WORK SYMBOL KEY MATERIAL LEGEND DESCRIPTION DETAIL REF CRUSHED STONE PAVING VEHICULAR CRUSHED STONE PAVING PED SANDBLAST CONCRETE VEHICULAR SANDBLAST CONCRETE PEDESTRIAN X/L-X.XX PV-CS1 PV-CS2 PV-CN1 PV-CN2 PV-CN3 PV-ST1 PV-WD1 LAYOUT BASELINE LT-P2 LT-P1 FE-WM1 WIRE MESH POOL FENCE POST LIGHT PATH LIGHT X/L-X.XX X/L-X.XX X/L-X.XX BITUMINOUS ASPHALT X/L-X.XX PV-BT1 UTILITY PAD CONCRETE (BY OTHERS) PV-SD1 STABILIZED STONEDUST PAVING BLUESTONE COPING X/L-X.XX X/L-X.XX PV-WS WOOD DECKING PRECAST CONCRETE WHEEL STOP X/L-X.XX X/L-X.XX ST-CN1 CAST IN PLACE CONCRETE STEP X/L-X.XX ST-WD1 WOOD STAIR X/L-X.XX ST-RS1 RECYCLED STONE TREAD X/L-X.XX X/L-X.XX X/L-X.XX LT-C1 CATENARY LIGHTING X/L-X.XX X/L-X.XX FE-WP WOOD PROPERTY FENCE X/L-X.XX FE-WS WOOD SCREEN FENCE X/L-X.XX GA-WM1 WIRE MESH POOL GATE X/L-X.XX HR-1 GALV STEEL HANDRAIL AT STAIRS X/L-X.XX HR-2 GALV STEEL HANDRAIL AT RAMP X/L-X.XX HR-3 GALV STEEL AND WOOD HANDRAIL X/L-X.XX GR-1 GALV STEEL AND WOOD GUARDRAIL X/L-X.XX L A O U T N O T E S
1 Do
1 1 1 1
TOURISTS / PROFESSIONAL 17

Lodge Deck

Wood decks and boardwalks were a key design element used to create spaces for gathering, leisure, and relaxation. The main gathering space is a deck that extends from the main entry threshold and projects over the bluff landform into the space of the main courtyard. New mature sugar maples were planted within the footprint of the deck to provide ample shade and we incorporated poles and coordinated with the architect to provide connections on the building to string a canopy of cafe lighting overhead. I drafted every deck and boardwalk detail on the project in consultation with the project manager and our structural engineer. I also assisted with construction administration for those elements.

LODGE DECK PROJECTING INTO THE MAIN COURTYARD Photo Credit: James Ewing LODGE DECK FRAMING IN PROGRESS
TOURISTS / PROFESSIONAL 18
COMPLETED LODGE DECK

Lodge Deck Details

Detailing the lodge deck required close coordination with our structural engineer and the careful resolution with adjacent building and paving conditions. In particular, to acheive the cantilevered effect that would make the deck project into the main courtyard space, we had to devise a unique framing structure, which anchors the cantilevered portion to a frost-depth foundation wall.

72'-7" BUILDING D ALIGN END OF WALL WITH EDGE OF DECK 6'-0" 15 JUNE 2017 Revisions Job number Drawn by Checked by Scale Date Number Date Description Sheet Title Sheet Number JP JM Stamp 0' 20' 40' FOR BIDDING AND COORDINATION ONLY NOT FOR CONSTRUCTION 1 06/15/17 BID SET REVISED LODGE DECK DETAILS L-730 MAR 2018 DECK FOUNDATION WALL AND FOOTING LAYOUT 1" = 1'-0" 1 BUILDING D BUILDING A 8'-0" O.C TYP 8'-0" TYP 2X8 JOISTS DOUBLE 2X12 JOISTS CONTINUOUS OVER BEAM CAST IN PLACE CONCRETE FOOTING WITH 18” SONOTUBE PIER AND 6X6 PT WOOD POST DOUBLE 2X12 BEAM AROUND DECK EDGES LAP JOINTS TYP DOUBLE 2X12 BLOCKING TO ALLOW TREE PLANTING THROUGH DECK TYP.; REVIEW AND COORDINATE TREE LOCATION WITH LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION TREE CANOPY ABOVE TYP CONCRETE DECK FOUNDATION WALL DOUBLE 2X12 PT LEDGER BOARDS BOTH SIDES OF WALL; SEE DETAIL #3 6'-8" 2'-8" QUADRUPLE 2X10 #1 DENSE SOUTHERN YELLOW PINE WOOD BEAM GRADE BREAK BELOW DECK DOUBLE 2X10 BEAM LAP JOINTS TYP 12” SONOTUBE PIER TYP LODGE BUILDING 6'-0" BEAM CENTERLINE TO OUTSIDE EDGE 2'-1" 2X12 BLOCKING BETWEEN JOISTS AT MIDSPAN AND OVER BEAM TYP SOLID BLOCKING AT GUARDRAIL POST LOCATIONS SEE 3/L-731 INTERMEDIATE BLOCKING WHERE JOISTS ARE UNABLE TO SPAN BEAM TO BEAM DOUBLE 2X10 EDGE BEAM ADJACENT TO NEW LODGE STRUCTURE NOTE JOG IN DECK EDGE AT BUILDING A CORNER REVIEW WITH LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION 16" O .C TYP DECK FRAME EDGE ABUTS BUILDING FOUNDATIONS; SEE DETAILS 16" O.C TYP TREE TYP ALIGN BLOCKING WITH DECKING THIS SIDE OF FOUNDATION WALL 1 L-732 2 L-732 2 L731 L731 3 3 L731 4 L-732 5 L-732 EQ EQ 5 L-732 DECK FRAMING PLAN 1/8" = 1'-0" 2 3'-10" 1'-6" 1'-4" 1'-0" 4'-0 3/4" 10" 5/8” STAINLESS STEEL CONCRETE ANCHOR BOLT AT 24” O.C TYP.; STAGGER BOLTS ON EACH SIDE OF WALL 5/4” WOOD DECKING LUS210-2 ZMAX COATED JOIST HANGER; FASTEN WITH #10X2 1/2” SIMPSON SDS SCREWS DOUBLE PT 2X12 LEDGER BOARDS BOTH SIDES TYP 2x8 PT JOISTS AT 16” O.C THIS SIDE OF WALL (2) #4 CONTINUOUS PLANTING SOIL ON SLOPE CRUSHED STONE ON FLAT #4 AT 12” O.C EACH WAY EACH FACE (5) #4 CONTINUOUS #4 AT 12” O.C TOP #4 AT 12” O.C LUS28 ZMAX COATED JOIST HANGER 1'-0" DOUBLE 2X12 PT JOISTS AT 16” O.C THIS SIDE OF WALL HOLD DOWN TOP OF CONCRETE WALL BELOW BOTTOM OF DECK BOARDS 1/2" LODGE POOL FINISH GRADE COMPACTED OR UNDISTURBED SUBGRADE 10 3/4" CIP CONCRETE FOUNDATION WALL DECK FOUNDATION WALL 1 1/2" = 1'-0" 3 CIP CONCRETE FOUNDATION WALL ISOMETRIC DETAIL OF DECK FOUNDATION WALL SHELF NOT TO SCALE 72'-7" 54'-8" 17'-10 1/2" BUILDING D ALIGN END OF WALL WITH EDGE OF DECK 63'-11" 48'-4" 6'-0" 15 JUNE 2017 Revisions Job number Drawn by Checked by Scale Date Number Date Description Sheet Title Sheet Number JP JM Stamp 0' 20' 40' FOR BIDDING AND COORDINATION ONLY NOT FOR CONSTRUCTION 1 06/15/17 BID SET REVISED LODGE DECK DETAILS L-730 MAR 1 2018 DECK FOUNDATION WALL AND FOOTING LAYOUT 1" = 1'-0" 1 BUILDING D BUILDING A 8'-0" O.C TYP 8'-0" TYP 2X8 JOISTS DOUBLE 2X12 JOISTS CONTINUOUS OVER BEAM CAST IN PLACE CONCRETE FOOTING WITH 18” SONOTUBE PIER AND 6X6 PT WOOD POST DOUBLE 2X12 BEAM AROUND DECK EDGES LAP JOINTS TYP DOUBLE 2X12 BLOCKING TO ALLOW TREE PLANTING THROUGH DECK TYP.; REVIEW AND COORDINATE TREE LOCATION WITH LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION TREE CANOPY ABOVE TYP CONCRETE DECK FOUNDATION WALL DOUBLE 2X12 PT LEDGER BOARDS BOTH SIDES OF WALL; SEE DETAIL #3 6'-8" 2'-8" QUADRUPLE 2X10 #1 DENSE SOUTHERN YELLOW PINE WOOD BEAM GRADE BREAK BELOW DECK DOUBLE 2X10 BEAM LAP JOINTS TYP 12” SONOTUBE PIER TYP LODGE BUILDING 6'-0" BEAM CENTERLINE TO OUTSIDE EDGE 2'-1" 2X12 BLOCKING BETWEEN JOISTS AT MIDSPAN AND OVER BEAM TYP SOLID BLOCKING AT GUARDRAIL POST LOCATIONS SEE 3/L-731 INTERMEDIATE BLOCKING WHERE JOISTS ARE UNABLE TO SPAN BEAM TO BEAM DOUBLE 2X10 EDGE BEAM ADJACENT TO NEW LODGE STRUCTURE NOTE JOG IN DECK EDGE AT BUILDING A CORNER REVIEW WITH LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION 16" O .C TYP DECK FRAME EDGE ABUTS BUILDING FOUNDATIONS; SEE DETAILS 16" O.C TYP TREE TYP ALIGN BLOCKING WITH DECKING THIS SIDE OF FOUNDATION WALL 1 L-732 2 L-732 2 L731 1 L731 3 L731 4 L-732 5 L-732 EQ EQ L-732 DECK FRAMING PLAN 1/8" = 1'-0" 2 3'-10" 1'-6" 1'-4" 1'-0" 4'-0 3/4" 10" 5/8” STAINLESS STEEL CONCRETE ANCHOR BOLT AT 24” O.C TYP.; STAGGER BOLTS ON EACH SIDE OF WALL 5/4” WOOD DECKING LUS210-2 ZMAX COATED JOIST HANGER; FASTEN WITH #10X2 1/2” SIMPSON SDS SCREWS DOUBLE PT 2X12 LEDGER BOARDS BOTH SIDES TYP 2x8 PT JOISTS AT 16” O.C THIS SIDE OF WALL (2) #4 CONTINUOUS PLANTING SOIL ON SLOPE CRUSHED STONE ON FLAT #4 AT 12” O.C EACH WAY EACH FACE (5) #4 CONTINUOUS #4 AT 12” O.C TOP #4 AT 12” O.C LUS28 ZMAX COATED JOIST HANGER 1'-0" DOUBLE 2X12 PT JOISTS AT 16” O.C THIS SIDE OF WALL HOLD DOWN TOP OF CONCRETE WALL BELOW BOTTOM OF DECK BOARDS 1/2" LODGE POOL FINISH GRADE COMPACTED OR UNDISTURBED SUBGRADE 10 3/4" CIP CONCRETE FOUNDATION WALL DECK FOUNDATION WALL 1 1/2" = 1'-0" 3 2X8 JOISTS FINISH GRADE CIP CONCRETE FOUNDATION WALL ISOMETRIC DETAIL OF DECK FOUNDATION WALL SHELF - NOT TO SCALE STAINLESS STEEL AND WOOD GUARDRAIL SEE 5/L-732 4'-0" 5/4” WOOD DECKING; ALIGN WITH EDGE BEAM DOUBLE 2X12 PT JOIST QUADRUPLE 2X10 #1 DENSE SOUTHERN YELLOW PINE WOOD BEAM ZMAX COATED POST CAP 6X6 PT POST SIMPSON ABU66 ZMAX COATED POST BASE 1/2” GALVANIZED ANCHOR BOLT 1'-2" (3) #3 AT 4” O.C AT TOP OF PIER (4) #5 VERTICAL (5) #4 BOTTOM EACH WAY 18” SONOTUBE PIER COMPACTED OR UNDISTURBED SUBGRADE SHRUB PLANTING 4'-0" 1'-6" LUS210-2 ZMAX COATED JOIST HANGER DOUBLE 2X12 EDGE BEAM DOUBLE 2X12 BLOCKING AT GUARDRAIL ATTACHMENT POST DETAIL - SECTION THROUGH JOISTS 1" = 1'-0" 1 ZMAX COATED POST CAP 6X6 PT POST SIMPSON ABU66 ZMAX COATED POST BASE 1/2” GALVANIZED ANCHOR BOLT (3) #3 AT 4” O.C AT TOP OF PIER (4) #5 VERTICAL (5) #4 BOTTOM EACH WAY 4'-0" 1'-2" 18” SONOTUBE PIER COMPACTED OR UNDISTURBED SUBGRADE 4'-0" SIMPSON ABU66 ZMAX COATED POST BASE SHRUB PLANTING 1'-6" SOLID 2X12 BLOCKING OVER BEAM SIMPSON H8SS HURRICANE TIE AT EACH JOIST ON INSIDE OF BEAM 5/4” WOOD DECKING DOUBLE 2X12 JOIST STAINLESS STEEL AND WOOD GUARDRAIL WITH SLOPED TOP SEE 6/L-732 QUADRUPLE 2X10 #1 DENSE SOUTHERN YELLOW PINE BEAM POST DETAIL - SECTION THROUGH BEAM 1" = 1'-0" 2 TOP OF PIER 628.29 4'-0" TYP 1/2” GALVANIZED STEEL CROSS-BRACING WITH THREADED ENDS PASS THROUGH WOOD POST PROVIDE WASHER AND NUT ATTACHMENT FINISH GRADE NOTE: ALL ELEVATIONS TO BE REVIEWED IN FIELD WITH LANDSCAPE ARCHITECT 1'-9 1/2" TOP OF PIER 631.63 TOP OF PIER 631.63 MOUNT THREADED ROD TO PIER WITH GALVANIZED BRACKET AND CORE ANCHOR BOLTS TOP OF PIER 629.80 FULL DECK SECTION AT POSTS 1/2" = 1'-0" 3 STAINLESS STEEL AND WOOD GUARDRAIL SEE 5/L-732 4'-0" 5/4” WOOD DECKING; ALIGN WITH EDGE BEAM DOUBLE 2X12 PT JOIST QUADRUPLE 2X10 #1 DENSE SOUTHERN YELLOW PINE WOOD BEAM ZMAX COATED POST CAP 6X6 PT POST SIMPSON ABU66 ZMAX COATED POST BASE 1/2” GALVANIZED ANCHOR BOLT 1'-2" (3) #3 AT 4” O.C AT TOP OF PIER (4) #5 VERTICAL (5) #4 BOTTOM EACH WAY 18” SONOTUBE PIER COMPACTED OR UNDISTURBED SUBGRADE SHRUB PLANTING 4'-0" 1'-6" LUS210-2 ZMAX COATED JOIST HANGER DOUBLE 2X12 EDGE BEAM DOUBLE 2X12 BLOCKING AT GUARDRAIL ATTACHMENT POST DETAIL - SECTION THROUGH JOISTS 1" = 1'-0" 1 ZMAX COATED POST CAP 6X6 PT POST SIMPSON ABU66 ZMAX COATED POST BASE 1/2” GALVANIZED ANCHOR BOLT (3) #3 AT 4” O.C AT TOP OF PIER (4) #5 VERTICAL (5) #4 BOTTOM EACH WAY 4'-0" 1'-2" 18” SONOTUBE PIER COMPACTED OR UNDISTURBED SUBGRADE 4'-0" SIMPSON ABU66 ZMAX COATED POST BASE SHRUB PLANTING 1'-6" SOLID 2X12 BLOCKING OVER BEAM SIMPSON H8SS HURRICANE TIE AT EACH JOIST ON INSIDE OF BEAM 5/4” WOOD DECKING DOUBLE 2X12 JOIST STAINLESS STEEL AND WOOD GUARDRAIL WITH SLOPED TOP SEE 6/L-732 QUADRUPLE 2X10 #1 DENSE SOUTHERN YELLOW PINE BEAM POST DETAIL - SECTION THROUGH BEAM 1" = 1'-0" 2 TOP OF PIER 628.29 4'-0" TYP 1/2” GALVANIZED STEEL CROSS-BRACING WITH THREADED ENDS PASS THROUGH WOOD POST PROVIDE WASHER AND NUT ATTACHMENT FINISH GRADE NOTE: ALL ELEVATIONS TO BE REVIEWED IN FIELD WITH LANDSCAPE ARCHITECT 1'-9 1/2" TOP OF PIER 631.63 TOP OF PIER 631.63 MOUNT THREADED ROD TO PIER WITH GALVANIZED BRACKET AND CORE ANCHOR BOLTS TOP OF PIER 629.80 FULL DECK SECTION AT POSTS 1/2" = 1'-0" 3
FRAMING PLAN CANTILEVER FOUNDATION DETAIL SECTION THROUGH CONCRETE PIERS @ CANTILEVER FOOTING DETAIL TOURISTS / PROFESSIONAL 19
Revisions Number Date Description POOL DECK AT PLANTING SECTION THROUGH BEAMS 1-1/2" = 1'-0" 1 COMPACTED OR UNDISTURBEDSUBGRADE COMPACTED OR UNDISTURBEDSUBGRADE DOUBLE 2" X 10” PT EDGE BEAM; SCREW TOGETHER WITH GALVANIZED SDS SCREWS 6” X 5/4” THERMALLY TREATED WOOD DECKING FASTENED WITH SS SCREWS FLUSH DECK SECTION THROUGH JOISTS - AT POOL EDGE 1'-4" O.C TYP 2'-0" 1'-0" 1" 4" CLR MIN “Z” MAX COATED JOIST HANGER FASTENED WITH GALVANIZED SDS SCREWS FLUSH WOOD DECKING DOUBLE 2" X 10” PT LEDGER HOLD BACK LEDGER 1” MIN FROM DECKING ABOVE; SEE PLAN POOL COPING & SIDEWALL CAST IN PLACE REINFORCED CONCRETE GRADE BEAM CONTINUOUS AROUND POOL PERIMETER DECK SECTION THROUGH BEAMS - AT POOL EDGE Scale: 1 1/2" = 1'-0" 3 VARIES; SEE PLAN 3 4'-0" 2'-0" 1'-0" (2) #5 TOP AND BOTTOM CONTINUOUS OFFSET REINFORCING TO AVOID ANCHOR BOLT TYP 3/16” JOINT TYP 2" X 8" PT JOIST AT 16” O.C “Z” MAX COATED JOIST HANGER FASTENED WITH GALVANIZED SDS SCREWS 4” HDPE PERFORATED PIPE FRENCH DRAIN SLOPE TO DRAIN 1" 2" MIN TYP POOL SAFETY COVER ANCHOR TYP INSTALL PER MANUFACTURER INSTRUCTIONS; SPACING TO BE DETERMINED BY MANUFACTURER; SET FLUSH WITH TOP OF DECK POOL DECK AT PLANTING SECTION THROUGH JOISTS 1-1/2" = 1'-0" 2 POOL DECK AT POOL EDGE SECTION THROUGH BEAMS 1-1/2" = 1'-0" 3 POOL DECK AT POOL EDGE SECTION THROUGH JOISTS 1-1/2" = 1'-0" 4 POOL DECK PLAN 1/4" = 1'-0" 5 7'-0 1/2" 6'-6 3/8" 8'-0" 6'-6 3/8" 6'-7 3/8" 1'-1 1/2" O .C TYP 1'-4" O .C TYP 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 7'-5" DOUBLE 2" X 10” PT EDGE BEAM DOUBLE 2" X 10” PT BEAM HOLD BACK BEAM 1” FROM EDGE OF DECKING ABOVE METAL EDGING 6” WOOD DECKING DOUBLE 2" X 10” PT BEAM HOLD BACK BEAM 1” FROM EDGE OF DECKING ABOVE POOL COPING & SIDEWALL REINFORCED C .P GRADE BEAM CONTINUOUS AROUND POOL PERIMETER DOUBLE 2" X 10” PT BEAM HOLD BACK BEAM 1” FROM EDGE OF DECKING ABOVE STAGGER BOARD ENDS OVER SONOTUBE FOOTINGS TYP SKIMMER; SEE POOL ENGINEER DRAWINGS SKIMMER HAUNCH ACCESS LIFT ANCHOR AND FOOTING ASSEMBLY SEE 3-6/L-752 82'-4 1/2" OUTSIDE-TO-OUTSIDE (5) FOOTINGS AT EQUAL SPACING TYP OUTLET FRENCH DRAIN TO RAIN GARDEN; COORDINATE WITH GENERAL CONTRACTOR 1 2 3 1 L-752 4 2 L-752 POOL SAFETY COVER ANCHOR TYP INSTALL MANUFACTURER INSTRUCTIONS; SPACING BY MANUFACTURER; SET FLUSH WITH TOP Revisions Job number Drawn Scale Number Date Description Sheet Sheet Stamp 1 06/15/17 BID SET REVISED 08/25/17 PERMIT SET DOUBLE 2" X 10” PT EDGE BEAM DOUBLE 2" X 10” PT BEAM HOLD BACK BEAM 1” FROM EDGE OF DECKING ABOVE METAL EDGING 6” WOOD DECKING DOUBLE 2" X 10” PT BEAM HOLD BACK BEAM 1” FROM EDGE OF DECKING ABOVE POOL COPING & SIDEWALL REINFORCED C.I.P GRADE BEAM CONTINUOUS AROUND POOL PERIMETER DOUBLE 2" X 10” PT BEAM HOLD BACK BEAM 1” FROM EDGE OF DECKING ABOVE STAGGER BOARD ENDS OVER SONOTUBE FOOTINGS TYP 8'-4 1/4" 6'-6 1/2" 8'-4 1/4" SKIMMER; SEE POOL ENGINEER DRAWINGS SKIMMER HAUNCH ACCESS LIFT ANCHOR AND FOOTING ASSEMBLY SEE 3-6/L-752 82'-4 1/2" OUTSIDE-TO-OUTSIDE 27'-9 1/4" OUTSIDE-TO-OUTSIDE 3 L-752 2 L-752 SONOTUBE CONCRETE FOOTING WITH BIGFOOT BASE 1-1/2" = 1'-0" 6 4'-0" 8" 20" 10” SONOTUBE FOOTING BIGFOOT ATTACHMENT; SCREW INTO BOTTOM OF SONOTUBE PRIOR TO FILLING 6" DECK ASSEMBLY COMPACTED SUBGRADE POOL SAFETY COVER ANCHOR TYP INSTALL PER MANUFACTURER INSTRUCTIONS; SPACING TO BE DETERMINED BY MANUFACTURER; SET FLUSH WITH TOP OF DECK #57 CRUSHED STONE Revisions Job number Drawn by Checked by Scale Date Number Date Description Sheet Title Sheet Number 25 AUGUST 2017 JP JM TOURISTS Landscape Architecture 130 Bishop Allen Drive Cambridge MA 02139 P617 923 2422 F617 923 3740 www.reedhilderbrand.com Stamp NORTH ADAMS MA AS NOTED 06/15/17 BID SET REVISED 08/25/17 PERMIT SET POOL DETAILS L-750 COPING REINFORCED GUNITE SHELL CRUSHED STONE UNDISTURBED SUBGRADE/ COMPACTED FILL TOE SHELF WITH CONTRASTING COLOR SAFETY TILE STAINLESS STEEL LADDER CLEAR POOL SECTION B Scale: 1/4" = 1'-0" 6 POOL PLAN Scale: 1/4" = 1'-0" 4 POOL ENGINEERING DRAWINGS PLAN THINSET BLUESTONE SKIMMER COVER ABOVE POOL SKIMMER; SET TO CENTER OF STONE COPING POOL COPING STONE ABOVE ANGLE POOL TILE ALONG INTAKE GUNITE SHELL EQ EQ 1'-6" 1/4” GROUT JOINT SKIMMER HAUNCH; SEE POOL ENGINEER DRAWINGS STONE SKIMMER COVER WOOD DECK COMPACTED SUBGRADE 3" 1/4” GROUT JOINT SKIMMER WEIR 1'-6" SKIMMER DETAIL Scale: 1" = 1'-0" 2 COPING DECK ASSEMBLY; SEE L-751 UNDERWATER LIGHTS TYP REINFORCED GUNITE SHELL UNDISTURBED SUBGRADE/ COMPACTED FILL SKIMMERS TYP TOE SHELF WITH CONTRASTING COLOR SAFETY TILE SLOPE TO DRAIN DEPTH MARKER POOL TILE FLOOR DRAIN STAINLESS STEEL HANDRAIL STAINLESS STEEL LADDER FILL SPOUT CRUSHED STONE WATER LEVEL GUNNITE STEPS WITH CONTRASTING COLOR SAFETY TILE COPING REINFORCED GUNITE SHELL CRUSHED STONE UNDISTURBED SUBGRADE/ COMPACTED FILL A B C (5) UNDERWATER LIGHTS POOL DECKING POOL SAFETY TILE LINE AT 5’ WATER DEPTH NO DIVING 3 1/4 NO DIVING 7 1/2FT NO DIVING 1/2 NO DIVING 7 1/2FT NO DIVING FT NO DIVING 1/2FT SELF-ADHESIVE DEPTH AND SAFETY MARKINGS ON COPING STAINLESS STEEL LADDER AND RAILINGS ACCESS LIFT SLEEVE AND FOOTING; SEE L-752 STAINLESS STEEL HANDRAIL 3'-2" CLEAR NO DIVING FT NO DIVING 1/2FT SKIMMER TYP FILL SPOUT POOL WALL RETURN TYP 4'-0" CLEAR ENTRY STAIR 4'-8" 5'-3" V .I .F Revisions Job number Drawn by Checked by Scale Date Number Date Description Sheet Title Sheet Number 25 AUGUST 2017 JP JM Stamp AS NOTED 1 06/15/17 BID SET REVISED 08/25/17 PERMIT SET POOL DECK DETAILS
POOL DECK AT PLANTING - SECTION THROUGH BEAMS 1-1/2" = 1'-0" 1 SONOTUBE CONCRETE FOOTING WITH BIGFOOT BASE TYP “Z” MAX COATED ANCHOR PLATE WITH 1/2" GALVANIZED LAG BOLT “Z” MAX COATED JOIST HANGER FASTENED WITH GALVANIZED SDS SCREWS #57 CRUSHED STONE 11" COMPACTED OR UNDISTURBEDSUBGRADE 6" TYP SLOPE TO DRAIN SONOTUBE CONCRETE FOOTING COMPACTED OR UNDISTURBEDSUBGRADE “Z” MAX COATED ANCHOR PLATE WITH 1/2" GALVANIZED LAG BOLT #57 CRUSHED STONE DOUBLE 2" 10” PT EDGE BEAM; SCREW TOGETHER WITH GALVANIZED SDS SCREWS 6” X 5/4” THERMALLY TREATED WOOD DECKING FASTENED WITH SS SCREWS WOOD DECKING DOUBLE 2" X 10” PT BEAM HOLD BACK BEAM 1” MIN FROM DECKING ABOVE; SEE PLAN POOL COPING SIDEWALL FLUSH DECK SECTION THROUGH JOISTS - AT POOL EDGE 1'-4" O.C TYP 2'-0" 1'-0" CAST IN PLACE REINFORCED CONCRETE GRADE BEAM CONTINUOUS AROUND POOL PERIMETER 1" SLEEVE PIPING THROUGH CONCRETE GRADE BEAM; PROVIDE OVERSIZED SLEEVE INLET PIPING CAST INTO POOL WALL 3/16” JOINT TYP SEE POOL ENGINEER DRAWINGS 4" CLR MIN (2) #5 TOP AND BOTTOM CONTINUOUS “Z” MAX COATED JOIST HANGER FASTENED WITH GALVANIZED SDS SCREWS 2" X 8” PT JOIST “Z” MAX COATED JOIST HANGER FASTENED WITH GALVANIZED SDS SCREWS EXTEND INLET PIPING BEYOND CONCRETE GRADE BEAM SLOPE TOP OF GRADE BEAM TO DRAIN 4” HDPE PERFORATED PIPE FRENCH DRAIN FLUSH WOOD DECKING DOUBLE 2" X 10” PT LEDGER HOLD BACK LEDGER 1” MIN FROM DECKING ABOVE; SEE PLAN POOL COPING & SIDEWALL CAST IN PLACE REINFORCED CONCRETE GRADE BEAM CONTINUOUS AROUND POOL PERIMETER DECK SECTION THROUGH BEAMS - AT POOL EDGE Scale: 1 1/2" = 1'-0" 3 VARIES; SEE PLAN 3 4'-0" 2'-0" 1'-0" (2) #5 TOP AND BOTTOM CONTINUOUS OFFSET REINFORCING TO AVOID ANCHOR BOLT TYP 3/16” JOINT TYP 2" X 8" PT JOIST AT 16” O.C “Z” MAX COATED JOIST HANGER FASTENED WITH GALVANIZED SDS SCREWS 4” HDPE PERFORATED PIPE FRENCH DRAIN SLOPE TO DRAIN 1" 2" MIN TYP POOL SAFETY COVER ANCHOR TYP INSTALL PER MANUFACTURER INSTRUCTIONS; SPACING TO BE DETERMINED BY MANUFACTURER; SET FLUSH WITH TOP OF DECK POOL DECK AT PLANTING SECTION THROUGH JOISTS 1-1/2" = 1'-0" 2 POOL DECK AT POOL EDGE SECTION THROUGH BEAMS 1-1/2" = 1'-0" 3 POOL DECK AT POOL EDGE - SECTION THROUGH JOISTS 1-1/2" = 1'-0" 4 POOL DECK PLAN 1/4" = 1'-0" 5 7'-0 1/2" 6'-6 3/8" 8'-0" 6'-6 3/8" 6'-7 3/8" 1'-1 1/2" O .C TYP 1'-4" O .C TYP 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 7'-5" DOUBLE 2" X 10” PT EDGE BEAM DOUBLE 2" X 10” PT BEAM HOLD BACK BEAM 1” FROM EDGE OF DECKING ABOVE METAL EDGING 6” WOOD DECKING DOUBLE 2" X 10” PT BEAM HOLD BACK BEAM 1” FROM EDGE OF DECKING ABOVE POOL COPING & SIDEWALL REINFORCED C .P GRADE BEAM CONTINUOUS AROUND POOL PERIMETER DOUBLE 2" X 10” PT BEAM HOLD BACK BEAM 1” FROM EDGE OF DECKING ABOVE STAGGER BOARD ENDS OVER SONOTUBE FOOTINGS TYP 8'-4 1/4" 6'-6 1/2" 8'-4 1/4" SKIMMER; SEE POOL ENGINEER DRAWINGS SKIMMER HAUNCH ACCESS LIFT ANCHOR AND FOOTING ASSEMBLY SEE 3-6/L-752 82'-4 1/2" OUTSIDE-TO-OUTSIDE 27'-9 1/4" OUTSIDE-TO-OUTSIDE (5) FOOTINGS AT EQUAL SPACING TYP OUTLET FRENCH DRAIN TO RAIN GARDEN; COORDINATE WITH GENERAL CONTRACTOR 2 1 L-752 4 2 L-752 SONOTUBE CONCRETE FOOTING WITH BIGFOOT BASE 1-1/2" = 1'-0" 6 4'-0" 8" 20" 10” SONOTUBE FOOTING BIGFOOT ATTACHMENT; SCREW INTO BOTTOM OF SONOTUBE PRIOR TO FILLING 6" DECK ASSEMBLY COMPACTED SUBGRADE POOL SAFETY COVER ANCHOR TYP INSTALL PER MANUFACTURER INSTRUCTIONS; SPACING TO BE DETERMINED BY MANUFACTURER; SET FLUSH WITH TOP OF DECK #57 CRUSHED STONE POOL DECK FRAMING IN PROGRESS YOGA CLASS ON A SUMMER MORNING POOL DECK FRAMING AND FINISH GRADING IN PROGRESS POOL DECK FRAMING PLAN POOL SECTION POOL DECK EDGE DETAIL @ POOL WALL CONCRETE PIER FOOTING DETAIL TOURISTS / PROFESSIONAL 20
L-751

NOTE: ALL CONNECTION HARDWARE TO MATCH CABLE WORKING LOAD

SEE ATTACHMENT DETAIL 2/L-712

LODGE-SPANNING CATENARY CABLE ATTACHMENT

GUY-CABLE ATTACHMENT OPPOSITE LODGE-SPANNING CATENARY CABLE

1/2” GALV STEEL GUY-CABLE; 4,000 LB WORKING LOAD MINIMUM EMBEDDED CONDUIT

DRILL HOLE THROUGH POLE FOR CONDUIT AT CABLE ATTACHMENT ELEVATON, AS NECESSARY

1/4” GALV STEEL 7X19 CATENARY CABLE; 1400LB WORKING LOAD

INSTALL POLE 2” OUT OF PLUMB FROM CENTERLINE AT TOP TO CENTERLINE AT GRADE OPPOSITE OF FIXTURE SIDE

LOUIS PAULSON LP ICON MINI CABLE HANGER LIGHT FIXTURE

TAPERED WOOD POLE; SANDED FINISH, SEALED WITH NON-VOC SEALER

TURNBUCKLE

1/2” GALV STEEL GUY-CABLE; 4000LB WORKING LOAD MINIMUM

LODGE BUILDING BEYOND

ANGLE VARIES; SEE 3/L-712

TAPERED WOOD POLE

1/2” GALV STEEL THIMBLE EYE BOLT, TYP

1/4” GALV STEEL 7X19 CATENARY CABLE WITH THIMBLE THROUGH EYE BOLT; 1400 LB WORKING LOAD MINIMUM

MULTIPLE CATENARY CABLE ATTACHMENT DETAIL

TOURISTS

NORTH ADAMS, MA

Parking Lot Catenary Lighting

1'-0"

ELECTRICAL CONDUIT AWAY FROM PARKING LOT, TYP

1'-6" CENTERLINE TO EDGE OF SIDEWALK

1/2” GALV STEEL GUY CABLE; 4,000 LB WORKING LOAD MINIMUM EMBEDDED CONDUIT

1/4” GALV STEEL 7X19 CATENARY CABLE WITH THIMBLE THRU EYEBOLT; 1,400 LB WORKING LOAD MINIMUM

(3) STEEL WIRE ROPE CLAMPS

3"

DRILLED IN DEAD MEN; DEVELOP 4000LB WORKING LOAD MINIMUM

AGGREGATE COMPACTED IN 6” LIFTS

This system was not included in the original scope of construction documents, but when we proposed an upgrade from more conventional pole lights, the client was enthusiastic about the added value to the project. We documented the catenary lighting system as an LSK and worked closely with the contractor to incorporate it into the project as the parking lot neared completion.

LOT CATENARY LIGHTING

TAPERED WOOD POLE

1/2” GALV STEEL THIMBLE EYE BOLT, TYP

1/4” GALV STEEL 7X19 CATENARY CABLE WITH THIMBLE THROUGH EYE BOLT; 1,400 LB WORKING LOAD MINIMUM

Landscape Architecture 130 Bishop Allen Drive Cambridge MA 02139 P617 923 2422 F617 923 3740 www.reedhilderbrand.com

3"

3/4” GALV STEEL THIMBLE EYE BOLT NUT AND WASHER TYP

1/2” GALV STEEL GUY CABLE WITH THIMBLE THRU EYEBOLT; 4,000 LB WORKING LOAD MINIMUM

TAPERED WOOD POLE

(3) STEEL WIRE ROPE CLAMPS

SINGLE CATENARY CABLE ATTACHMENT DETAIL CATENARY CABLE AND GUY-CABLE ATTACHMENT DETAILS

CABLE ATTACHMENTS TO LIGHT POLE

= 1'-0" 2

15 JUNE 2017 Revisions Job number Drawn by Checked by Scale Date Number Date Description Sheet Title Sheet Number JP JM TOURISTS Landscape Architecture 130 Bishop Allen Drive Cambridge MA 02139 P617 923 2422 F617 923 3740 www.reedhilderbrand.com Stamp NORTH ADAMS, MA 0' 20' 40' FOR BIDDING AND COORDINATION ONLY NOT FOR CONSTRUCTION 1 06/15/17 BID SET REVISED PARKING LOT CATENARY LIGHTING DETAILS L-712 14 FEB 24'-0" TYP 16'-0" TYP 6'-0" TYP +/- 11 5/8" CUT POLE FROM BOTTOM TO 30'-0" 9" TAPERED WOOD POLE; SANDED FINISH SEALED WITH NON-VOC SEALER LOUIS PAULSON LP ICON MINI CABLE HANGER LIGHT FIXTURE 1/4” GALV STEEL 7X19 CATENARY CABLE; 1400LB WORKING LOAD MIN ELECTRICAL CONDUIT AWAY FROM PARKING LOT TYP DRILL HOLE THROUGH POLE FOR CONDUIT AT CABLE ATTACHMENT ELEVATON AS NECESSARY 1/2” GALV STEEL GUY-CABLE; 4000LB WORKING LOAD MINIMUM 2'-1" TURNBUCKLE 2'-0" DEFLECTION TYP SEE ATTACHMENT DETAIL 2/L-712 LODGE BUILDING BEYOND 30'-0" 1'-0" 20'-9" TYP AGGREGATE COMPACTED IN 6” LIFTS DRILLED IN DEAD MEN; DEVELOP 4000LB WORKING LOAD MINIMUM 3'-3" INSTALL POLE 2” OUT OF PLUMB FROM CENTERLINE AT TOP TO CENTERLINE AT GRADE OPPOSITE OF FIXTURE SIDE 1'-6" CENTERLINE TO EDGE OF SIDEWALK 9'-0" TYP 28'-0" 26'-9" LODGE-SPANNING CATENARY CABLE ATTACHMENT GUY-CABLE ATTACHMENT OPPOSITE LODGE-SPANNING CATENARY CABLE 2'-0" MAX LIGHT POLE AT PARKING LOT CATENARY LIGHTING 1/4" = 1'-0" 1 L .O .W L.O.W L.O.W BUILDING D BUILDING A BUILDING E LODGE BASELINE D ALIGN BASELINE WITH END OF BUILDING D ALIGN BASELINE WITH OUTSIDE END OF BUILDING E BASELINE E2 1'-6" 8'-0" 92'-0" 100'-0" 91'-11" 42'-6" 100'-0" 100'-0" 42'-2" V.I.F 1'-0" 9 1/2" 48'-6" CATENARY FIXTURE TYP WOOD POST TYP 98.1° 99.3° 84.8° 83.2° 87.9° 92.9° 92.9° 92.9° 92.9° 87.3° 82.8° 99.0° 1/4” GALV STEEL CATENARY CABLE TYP CABLE-CABLE ATTACHMENT AT 20’-9” HEIGHT GUY CABLE TYP 97'-2" 99'-8" 98'-2" 100'-4" 3/8” STAINLESS STEEL CATENARY CABLE SPANNING LODGE; ATTACH TO EAST POLE AT 26’-9” HEIGHT TYPCIAL 1/2” GUY-CABLE WITH 4000 LB WORKING LOAD 1/2” STAINLESS STEEL GUY-CABLE WITH 5000 LB WORKING LOAD; ATTACH TO POLE 2’ MAXIMUM BELOW LODGE-SPANNING CABLE ATTACHMENT 1'-6" 1'-0" 1 L-712 FROM BASELINE D VERIFY RELATIVE TO SPACING SHOWN AND BASELINE E2 OFFSET 37'-5" 41'-7" 48'-6" 1'-0" 52'-8" CENTERLINE TO CENTERLINE ALONG SIDEWALK EDGE EAST LOT CATENARY POLE LAYOUT 1" = 20'-0" 3 ANGLE VARIES; SEE 3/L-712 EQ EQ 1/2” GALV STEEL GUY-CABLE; 4,000 LB WORKING LOAD MINIMUM EMBEDDED CONDUIT 1/4” GALV STEEL 7X19 CATENARY CABLE WITH THIMBLE THROUGH EYE BOLT; 1400 LB WORKING LOAD MINIMUM TAPERED WOOD POLE 1/2” GALV STEEL THIMBLE EYE BOLT TYP EQ 1/2” GALV STEEL GUY CABLE; 4,000 LB WORKING LOAD MINIMUM EMBEDDED CONDUIT 1/4” GALV STEEL 7X19 CATENARY CABLE WITH THIMBLE THROUGH EYE BOLT; 1,400 LB WORKING LOAD MINIMUM TAPERED WOOD POLE 1/2” GALV STEEL THIMBLE EYE BOLT TYP EQ 1/2” GALV STEEL GUY CABLE WITH THIMBLE THRU EYEBOLT; 4,000 LB WORKING LOAD MINIMUM 3/4” GALV STEEL THIMBLE EYE BOLT NUT AND WASHER TYP TAPERED WOOD POLE 1/4” GALV STEEL 7X19 CATENARY CABLE WITH THIMBLE THRU EYEBOLT; 1,400 LB WORKING LOAD MINIMUM (3) STEEL WIRE ROPE CLAMPS 3" NOTE: ALL CONNECTION HARDWARE TO MATCH CABLE WORKING LOAD MULTIPLE CATENARY CABLE ATTACHMENT DETAIL SINGLE CATENARY CABLE ATTACHMENT DETAIL CATENARY CABLE AND GUY-CABLE ATTACHMENT DETAILS 3" (3) STEEL WIRE ROPE CLAMPS CABLE ATTACHMENTS TO LIGHT POLE 1-1/2" = 1'-0" 2 Landscape 130 Bishop Cambridge P617 923 www.reedhilderbrand NORTH 16'-0" TYP +/- 11 5/8"
9"
CUT POLE FROM BOTTOM TO 30'-0"
MIN
2'-1"
2'-0" DEFLECTION TYP
28'-0" 26'-9"
2'-0" MAX
BUILDING A
EQ EQ
EQ
EQ
1-1/2"
16'-0" TYP 2'-1" 2'-0" DEFLECTION TYP LODGE BUILDING BEYOND 1'-6" CENTERLINE TO EDGE OF SIDEWALK 28'-0" 26'-9" LODGE-SPANNING CATENARY CABLE ATTACHMENT
ATTACHMENT OPPOSITE LODGE-SPANNING CATENARY CABLE 2'-0" MAX ANGLE VARIES; SEE 3/L-712 EQ EQ 1/2” GALV STEEL GUY-CABLE; 4,000 LB WORKING LOAD MINIMUM EMBEDDED CONDUIT 1/4” GALV STEEL 7X19 CATENARY CABLE WITH THIMBLE THROUGH EYE BOLT; 1400 LB WORKING LOAD MINIMUM TAPERED WOOD POLE 1/2” GALV STEEL THIMBLE EYE BOLT, TYP 1/2” GALV STEEL GUY CABLE; 4,000 LB WORKING LOAD MINIMUM EMBEDDED CONDUIT 1/4” GALV STEEL 7X19 CATENARY CABLE WITH THIMBLE THRU EYEBOLT; 1,400 LB WORKING LOAD MINIMUM (3) STEEL WIRE ROPE CLAMPS 3" NOTE: ALL CONNECTION HARDWARE TO MATCH CABLE WORKING LOAD MULTIPLE CATENARY CABLE ATTACHMENT DETAIL 3"
GUY-CABLE
CATENARY LIGHTING SYSTEM DETAIL CATENARY CABLE ATTACHMENT DETAILS TOURISTS / PROFESSIONAL 21

Wetland Boardwalk

The wetland boardwalk is the main access point for visitors to enjoy the riverfront on the hotel property. The path of the boardwalk descends from the main courtyard path, along the river bluff and restored wetlands, and lands at the riverfront, capping an existing concrete manhole for a storm sewer lift station. Through close coordination with the structural engineer, we detailed a helical pile system, which allowed the us to minimize the boardwalk’s footprint through the wetlands and on embankment side slopes. Helical piles also allowed the overlook deck to hover above the existing manhole in a way that both hides the structure and preserves access through a built-in hatch in the deck.

TOE RAIL TYP TOE RAIL STEEL ANGLE BELOW TYP TOE RAIL STEEL ANGLE BOLTED TO MOUNTING PLATE TYP GUARDRAIL POST MOUNTED TO PLATE TYP GUARDRAIL C GUARDRAIL AND TOE RAIL PLAN Revisions Job number Drawn by Checked by Scale Date Number Date Description Sheet Title Sheet Number 15 JUNE 2017 JP JM Stamp FOR BIDDING AND COORDINATION ONLY NOT FOR CONSTRUCTION AS NOTED 06/15/17 BID SET REVISED WETLAND BOARDWALK DETAILS L-902 03 APRIL 2018 1 Existing conditions and topography data are from a survey prepared by Hill Engineers 50 Depot St Dalton MA 01226 06/06/2016 2 Contractor shall verify location of any existing utilities and services and provide protection during construction Utilities damaged during construction shall be repaired at contractors expense 3 Contractor shall obtain permits for the work as required and comply with all laws ordinances rules and regulations of the local jurisdiction the state and all other authorities having jurisdiction 4 Contractor shall leave site clean and orderly during construction process Remove from site all excess materials soil debris and equipment Store materials only in an approved location STEEL DIAGONAL BRACE; SEE STRUCTURAL DRAWINGS PROVIDE PIPE EXTENSION AS NECESSARY EX GRADE HELICAL PILES W/ 2 7/8” PIPE SHAFT INSTALLED TO A MINIMUM WORKING LOAD OF 5000 PSI BOARDWALK CL PER LAYOUT DRAWINGS WALKWAY BRACKETS TYP 4X8 PT BEAM/PILE CAP AT 8’-0” O.C VARIES 6'-1" MAX EQ 4'-0" EQ STEEL AND WOOD GUARDRAIL BOTH SIDES WHERE WALKING SURFACE HT IS > 30” ABOVE GRADE 2X6 WHITE OAK DECKING WITH GROOVED SURFACE 2X8 PT JOISTS 13” O.C FASTEN WITH SIMPSON STRONG TIE 9" TYP BATTER PILE; ALTERNATE DIRECTIONS; SEE STRUCTURAL FOR SPACING AND LOCATIONS 2'-9" O.C TYP A SECTION @ GUARDRAILS WETLAND BOARDWALK DETAIL SECTIONS Scale: 1/2" = 1'-0" 3 TYPICAL BOARDWALK PLANS Scale: 1/2" = 1'-0" 2 4X8 PT BEAM/PILE CAP AT 8’-0” O.C EX GRADE 2X8 JOISTS EQUALLY SPACED; FASTEN WITH CONCEALED FLANGE JOIST HANGERS 4X8 PT BEAM/PILE CAP AT 8’-0” O.C PROVIDE PIPE EXTENSION AS NECESSARY HELICAL PILES W/ 2 7/8” PIPE SHAFT INSTALLED TO A MINIMUM WORKING LOAD OF 5000 PSI WALKWAY BRACKETS TYP 2X4 WHITE OAK TOE RAIL BOLTED TO STEEL ANGLE VARIES 8'-2" MAX 7'-11" MIN.; SEE PLAN VARIES SEE FULL SECTION 2X4 WHITE OAK TOE RAIL MOUNTED WITH 1/2” STEEL ANGLE BOTH SIDES WHERE WALKING SURFACE HT IS < 30” ABOVE GRADE STEEL AND WOOD GUARDRAIL SEE GUARDRAIL & TOE RAIL INSTALLATION NOTES TOE RAIL STEEL ANGLE TYP ALIGN TYP LAP JOISTS OVER BEAMS TYP C LONGITUDINAL SECTION 2X8 PT JOISTS EQUALLY SPACED; FASTEN WITH CONCEALED FLANGE JOIST HANGERS STEEL AND WOOD GUARDRAIL ONE SIDE ONE SIDE WHERE WALKING SURFACE HT IS > 30” ABOVE GRADE 2X4 WHITE OAK TOE RAIL MOUNTED WITH 3X2 WHITE OAK BOARD ONE SIDE WHERE WALKING SURFACE HEIGHT IS < 30” ABOVE GRADE 2X6 WHITE OAK DECKING WITH GROOVED SURFACE 4X8 PT BEAM/PILE CAP AT 8’-0” O.C HELICAL PILES W/ 2 7/8” PIPE SHAFT INSTALLED TO A MINIMUM WORKING LOAD OF 5000 PSI EX GRADE BOARDWALK CL PER LAYOUT DRAWINGS WALKWAY BRACKETS TYP 4'-0" 2'-9" O.C TYP EQ EQ VARIES SEE FULL SECTION 2X4 WHITE OAK TOE RAIL MOUNTED WITH 1/2” STEEL ANGLE BOTH SIDES WHERE WALKING SURFACE HT IS < 30” ABOVE GRADE 2X8 JOISTS AT 13” O.C.; FASTEN WITH SIMPSON STRONG TIE B SECTION @ TOE RAILS TOE RAIL AND GUARDRAIL ATTACHMENT DETAILS Scale: 1 1/2" = 1'-0" 1 TOE RAIL STEEL ANGLE BOLTED TO MOUNTING PLATE TYP GUARDRAIL POST MOUNTED TO PLATE TYP Revisions Job number Drawn by Checked by Scale Date Number Date Description Sheet Title Sheet Number 15 JUNE 2017 JP JM Stamp FOR BIDDING AND COORDINATION ONLY NOT FOR CONSTRUCTION AS NOTED 1 06/15/17 BID SET REVISED WETLAND BOARDWALK DETAILS L-902 03 APRIL 2018 Utilities damaged during construction shall be repaired at contractors expense 3 Contractor shall obtain permits for the work as required and comply with all laws ordinances rules and regulations of the local jurisdiction the state and all other authorities having jurisdiction 4 Contractor shall leave site clean and orderly during construction process Remove from site all excess materials soil debris and equipment Store materials only in an approved location TYPICAL BOARDWALK PLANS Scale: 1/2" = 1'-0" 2 4X8 PT BEAM/PILE CAP AT 8’-0” O.C EX GRADE 2X8 JOISTS EQUALLY SPACED; FASTEN WITH CONCEALED FLANGE JOIST HANGERS 4X8 PT BEAM/PILE CAP AT 8’-0” O.C PROVIDE PIPE EXTENSION AS NECESSARY HELICAL PILES W/ 2 7/8” PIPE SHAFT INSTALLED TO A MINIMUM WORKING LOAD OF 5000 PSI WALKWAY BRACKETS TYP 2X4 WHITE OAK TOE RAIL BOLTED TO STEEL ANGLE VARIES 8'-2" MAX 7'-11" MIN.; SEE PLAN VARIES SEE FULL SECTION 2X4 WHITE OAK TOE RAIL MOUNTED WITH 1/2” STEEL ANGLE BOTH SIDES WHERE WALKING SURFACE HT IS < 30” ABOVE GRADE STEEL AND WOOD GUARDRAIL SEE GUARDRAIL & TOE RAIL INSTALLATION NOTES TOE RAIL STEEL ANGLE TYP ALIGN TYP LAP JOISTS OVER BEAMS TYP C LONGITUDINAL SECTION SPACED; FLANGE WALKING GRADE OAK WALKING ABOVE 2X6 WHITE OAK DECKING WITH GROOVED SURFACE 4X8 PT BEAM/PILE CAP AT 8’-0” O.C HELICAL PILES W/ 2 7/8” PIPE SHAFT INSTALLED TO A MINIMUM WORKING LOAD OF 5000 PSI EX GRADE BOARDWALK CL PER LAYOUT DRAWINGS WALKWAY BRACKETS TYP 4'-0" 2'-9" O.C TYP EQ EQ VARIES SEE FULL SECTION 2X4 WHITE OAK TOE RAIL MOUNTED WITH 1/2” STEEL ANGLE BOTH SIDES WHERE WALKING SURFACE HT IS < 30” ABOVE GRADE 2X8 JOISTS AT 13” O.C.; FASTEN WITH SIMPSON STRONG TIE B SECTION @ TOE RAILS TOE RAIL TYP TOE RAIL STEEL ANGLE BELOW TYP TOE RAIL STEEL ANGLE BOLTED TO MOUNTING PLATE TYP GUARDRAIL POST MOUNTED TO PLATE TYP GUARDRAIL TYP SEE GUARDRAIL & TOE RAIL INSTALLATION NOTES GUARDRAIL & TOE RAIL INSTALLATION NOTES - ATTACH OVERSIZED BOARDS TO POST BRACKET OR TOE RAIL ANGLE - MITER AS NECESSARY FOR PERPENDICULAR EDGE - DADO BOTTOM OF GUARDRAIL BOARD AROUND POST BRACKET - MARK CURVATURE AT CONSISTENT WIDTH USING TANGENTIAL CURVES - REVIEW AND ADJUST CURVES WITH LANDSCAPE ARCHITECT PRIOR TO TRIMMING - TRIM OVERSIZED BOARDS - EASE CUT EDGES TO MATCH LODGE DECK GUARDRAIL C GUARDRAIL AND TOE RAIL PLAN Revisions Job number Drawn by Checked by Scale Date Number Date Description 15 JUNE 2017 JP JM TOURISTS Landscape Architecture 130 Bishop Allen Drive Cambridge MA 02139 P617 923 2422 F617 923 3740 www.reedhilderbrand.com Stamp NORTH ADAMS, MA FOR BIDDING AND COORDINATION ONLY NOT FOR AS NOTED 1 06/15/17 BID SET REVISED 03 APRIL 2018 GENERAL NOTES 1 Existing conditions and topography data are from a survey prepared by Hill Engineers 50 Depot St Dalton MA 01226 06/06/2016 2 Contractor shall verify location of any existing utilities and services and provide protection during construction Utilities damaged during construction shall be repaired at contractors expense 3 Contractor shall obtain permits for the work as required and comply with all laws ordinances rules and regulations of the local jurisdiction the state and all other authorities having jurisdiction 4 Contractor shall leave site clean and orderly during construction process Remove from site all excess materials soil debris and equipment Store materials only in an approved location 4X8 PT BEAM/PILE CAP AT 8’-0” O.C DECK EDGE ABOVE TYP HELICAL PILE AND WALKWAY BRACKET ASSEMBLY TYP MOUNTING PLATE TYPE 2 INSIDE OF BOARDWALK CURVE TYP 3 3/4" TYP EQ TYP EQ TYP EQ TYP 2X8 JOIST TYP 2X8 PT BLOCKING AT GUARDRAIL AND TOE RAIL MOUNTING LOCATIONS MOUNTING PLATE TYPE 1 OUTSIDE OF BOARDWALK CURVE TYP A FRAMING PLAN LAP JOISTS OUTSIDE TO MINIMIZE VIEW OF BOARD ENDS FROM POOL EQ TYP 2'-9" O .C TYP EQ TYP TYPICAL BOARDWALK PLANS Scale: 1/2" = 1'-0" 2 4X8 PT BEAM/PILE CAP AT 8’-0” O.C EX GRADE 2X8 JOISTS EQUALLY SPACED; FASTEN WITH CONCEALED FLANGE JOIST HANGERS 4X8 PT BEAM/PILE CAP AT 8’-0” O.C PROVIDE PIPE EXTENSION AS NECESSARY HELICAL PILES W/ 2 7/8” PIPE SHAFT INSTALLED TO A MINIMUM WORKING LOAD OF 5000 PSI WALKWAY BRACKETS TYP 2X4 WHITE OAK TOE RAIL BOLTED TO STEEL ANGLE VARIES 8'-2" MAX 7'-11" MIN.; SEE PLAN VARIES SEE FULL SECTION 2X4 WHITE OAK TOE RAIL MOUNTED WITH 1/2” STEEL ANGLE BOTH SIDES WHERE WALKING SURFACE HT IS < 30” ABOVE GRADE STEEL AND WOOD GUARDRAIL TOE RAIL STEEL ANGLE TYP ALIGN TYP LAP JOISTS OVER BEAMS TYP MOUNTING TOE RAIL STEEL ANGLE 2" 2" 8 3/4" 1/2" MOUNTING DECKING AND ARCHITECT 2X6 WHITE OAK DECKING WITH GROOVED SURFACE 4X8 PT BEAM/PILE CAP AT 8’-0” O.C BOARDWALK CL PER LAYOUT DRAWINGS WALKWAY BRACKETS TYP 4'-0" EQ VARIES SEE FULL SECTION 2X4 WHITE OAK TOE RAIL MOUNTED WITH 1/2” STEEL ANGLE BOTH SIDES WHERE WALKING SURFACE HT IS < 30” ABOVE GRADE 2X8 JOISTS AT 13” O.C.; FASTEN WITH SIMPSON STRONG TIE MOUNTING PLATE TYPE 2 INSIDE OF BOARDWALK CURVE, TYP DECKING TYP FRAMING BELOW TYP TOE RAIL STEEL ANGLE BELOW TYP TOE RAIL STEEL ANGLE MOUNTED TO BEAM TYP TOE RAIL STEEL ANGLE BOLTED TO MOUNTING PLATE TYP GUARDRAIL POST MOUNTED TO PLATE TYP 1 1/2" TYP B DECKING PLAN LAP JOISTS OUTSIDE TO MINIMIZE VIEW OF BOARD ENDS FROM POOL
TOURISTS / PROFESSIONAL 22