Jae Hyun Kim_Portfolio_2023

Page 1

JAE HYUN KIM Portfolio 2022


JAE HYUN KIM

5241 Center Blvd, #501, Long Island City, NY 11101 jaehkim1103@gmail.com +1. 646. 901. 7484.

EDUCATION B.Arch., School of Architecture, Syracuse University Syracuse, NY, USA

Aug 2009 - Dec 2015

EXPERIENCE Studios Architecture - Project Architect New York, New York Project HYC, New York, New York Newport, Atlanta, Georgia Rafael Vinoly Architects - Project Manager New York, New York 101 Franklin Street, New York, New York Southampton Hospital Association, Southampton, New York Highway behind the pond Renovation, East Hampton, New York 36 Project, Bankok, Thailand 277 Fifth Ave, New York, New York Project + Project - Associate Seoul, Korea LOOF, Khelmati English School, Assam, India NOMAD, Ulaanbaatar, Mongolia WRAP, Pahang, Malaysia Sanin Architects - Internship Syracuse, New York / London Baeksa Village, Seoul, S.Korea Jeju Villas, Jeju-Island, S.Korea

Oct 2022 - Current

March 2016 - Oct 2022

July 2019 - Current

August 2014 - Nov 2014

Studio SUMO - Junior Designer New York, New York Josai International University Dormitory Josai International University Cafeteria Offices Renovation for Queens DA/OCA

Jun 2014 - Aug 2014

OFIS Architekti - Internship Ljubljana, Slovenia 3D-models of facade for Basket Apartments in Paris Physical models for Exhibition

Dec 2010 - Jan 2011

CERTIFICATION LICENSED ARCHITECT

New York, USA

Sep 2023

ACHIEVEMENT Prime Minister's Commendation Seoul, Korea Project + Project

Dec 2021

[AC-CA] Competition New York, NY, USA Pariscope, [Paris] River Champagne Bar, Honorable Mention

Jul 2014

d3 Space Competition New York, NY, USA Primitive Rise, d3 Housing Tomorrow 2014, Second Prize

Jan 2014

Seoul International Ideas Competition Seoul, S.Korea The Bounce-cape, Toward Urban Integration, Honorable Mention

Oct 2013

SKILL Computer Revit, AutoCAD, Rhino, Enscape, Photoshop, Illustrator, Indesign, Bluebeam Modeling 3D Print, Laser Cut, CNC Mill, Vacuum Foam, Wood, Museum board, Chipboard, Foam Language Korean, English


5241 Center Blvd, #501, Long Island City, NY 11101 jaehkim1103@gmail.com +1. 646. 901. 7484.

Work Project HYC - Project Architect New York, New York

July 2023 - Current

NEWPORT - Project Architect New York, New York

Dec 2022 - Feb 2023

Dormitory (Reposition) / PD - SD - DD - CD - CA - Designing, Developing and Detailing by Digital modeling and Drafting - Coordinate with MEP consultant, Interior Design team and Construction Management team Residential / PD - SD - DD - CD - CA - Designing, Developing and Detailing by Digital modeling and Drafting (Facade)

277 Fifth Ave - Junior/Senior Designer New York, New York

Residential / PD - SD - DD - CD - CA - Developing and Detailing by Digital modeling and Drafting - Coordinate with MEP consultant, Interior Design team and Construction Management team - Complete comprehensive code complianance evaluation - Periodic on-site observation of work during construction

March 2016 - April 2019

36 Project - Senior Designer/Project Manager Bangkok, Thailand

May 2018 - April 2019

Highway behind the pond Renovation - Project Manager East Hampton, New York

July 2019 - June 2021

Southampton Hospital New Facility - Project Manager Southampton, New York

July 2020 - March 2021

Hospitality / PD - SD - DD - CD - CA - Zoning study and Code complianance evaluation by Coordination with local architecture office - Designing, Developing and Detailing by Digital modeling and Drafting - Coordinate with Ownership, Interior design Team and all local consultants House Renovation / PD - SD - DD - CD - CA - Design evaluation with Ownership and Presentation delivering - Developing and Detailing by Digital modeling and Drafting - Periodic on-site observation of work and Review payment requisition

Healthcare / PD - SD - DD - CD - CA - Prepare and develop fund raising presentation - Designing, Developing and Detailing by Digital modeling and Drafting - Coordination with all consultants and local authorities

101 Franklin Street - Project Manager New York, New York Office (Reposition) / PD - SD - DD - CD - CA - Manage Design specificaiton and Construction Documents - Direct design team to ensure quality and compliance - Coordination with Ownership and all consultants

Dec 2021 - Current

LOOF - Associate Assam, India

May 2019 - July 2019

NOMAD - Associate Ulaanbaatar, Mongolia

January 2020 - Current

WRAP - Associate Pahang, Malaysia

February 2022 - Current

Education / PD - SD - DD - CD - CA - Research, Design evaluation and Drafting in all phases - Coordiantion with local contractor Education / PD - SD - DD - CD - CA - Research, Design evaluation and Drafting in all phases - Coordiantion with local contractor Education / PD - SD - DD - CD - CA - Research and Design evaluation in all phases


01

277 Fifth Avenue

02

36 Project

03

Highway behind the pond Renovation

04

Southampton Hospital New Facility

Residential

Hospitality

House Renovation

Healthcare

Mar 2016 - Apr 2019

May 2018 - Apr 2019

Jul 2019 - Jun 2021

Jul 2020 - Mar 2021


05

101 Franklin Street

06

LOOF

07

NOMAD

08

Selected Work

Office Renovation

Education

Education

Academic & Internship

Dec 2021 - Current

May 2019 - July 2019

Jan 2020 - Current

2009 - 2016


6


01 277 Fifth Avenue Residential Junior / Senior Designer March 2016 - April 2019

This new condominium tower is located on the southeast corner of Fifth Avenue and East 30th Street in Manhattan, in the newly emerging residential neighborhood north of Madison Square Park known as NoMad. The integration of the façade with the building structural system allows for column-free interiors that might obstruct views and compromise interior space usage. The building’s structural elements are enclosed in reinforced concrete panels tinted indigo, a palette and texture intended to acknowledge the character of the area’s historic landmark towers. A series of double-height loggias appear to spiral down the building from the upper floors, creating “an interesting typology of open space and terracing.” These terraces bring variety to the exterior building appearance and provide covered outdoor space for select units.

7


preview - 3br living

8

preview - loggia

13

15


9


10


11


12


13


14


02 36 Project Hospitality Senior Designer / Project Manager May 2018 - April 2019

Located in the center of Sukhumvit Road, 36 Project is planned as the tallest tower in Bangkok, including underground automated parking, private garden, hotel and hotel residence. The exoskeleton building structural system with “internal basket” not only provides a rigidity against high pressure of wind but also maximizes interior space usage. The operative vent wall behind columns allows natural ventilation for all occupied floors without any obstruction of views, while it keeps simplicity of the monolithic structure.

15


16


17


18


03 Highway Behind the Pond Renovation House Renovation Project Manager July 2019 - June 2021

The house, Highway behind the pond, was origianl designed by Rafael Vinoly and built in 1990-1992 for an elderly single woman with extensive art colleciton. Over the years the house changed owners several times. The clients purchased the house which used for their summer weekends and requested for the renovation in 2002 and in 2004 by RVA. The beach house contains over 15,000 sqaure feet on three levels, which terrace up with the local topography from the garage to the west through the master bedroom to the east. In 2019, the clients had requested third renovation to reinforce a privacy for master suite from the adjacent living room. To be saparate visually and acoustically, white oak millwork wall has been installed but the continous reflective surface expands a infinity of curved roof.

19


21


22


23


24


S Architects Joint Venture

26

The New Stonybrook Southampton Hospital

Transforming C


04 Southampton Hospital New Facility Healthcare Project Manager July 2020 - March 2021

The hospital building consists of four stories of new construction housing Diagnostic & Treatment Services and Clinical Support Services on Level 1; Public and Administrative Services Level 2; direct entrance from the Parking Garage to the Hospital on Level 1M; and Patient Care Units on Levels 3 and 4. The roof consists of exterior screened mechanical equipment. Inpatient floors are arranged with setbacks of individual rooms which result in corner windows – with light and views from two directions – in each private space. The stepping of the building mass results in outdoor terraces at Level 2, offering opportunities for patients and their families as well as visitors and staff to experience outdoor space from the Hospital grounds.

27


Diagnostic & Treatment Waiting Area

Healing Garden

Rafael Viñoly Architects HKS Architects Joint Venture 28

The New Stonybrook Southa


LEVEL 4 Acute Care Units Maternity Unit

LEVEL 3 Acute Care Units

LEVEL 2 Public Space, Administration

ADMINISTRATIVE SERVICES

GIFT SHOP

ACCESS / ADMITTING

PRE-SURGICAL RESIDENT TESTING LOUNGE

LOBBY

CAFETERIA

TERRACE

MEDITATIVE SPACE

CONFERENCE CENTER

PHYSICIAN LOUNGE

Stonybrook Southampton Hospital

SURGICAL INTERVENTIONAL PLATFORM

IMAGING SERVICES

PRE-OPERATIVE / POST-OPERATIVE

IMAGING SERVICES

EMERGENCY DEPARTMENT

CLINICAL DECISION UNIT

EMERGENCY DROP-OFF

LOADING DOCK

LEVEL 1 Diagnostics & Treatment

Site Plan and Floor Plans 29


1

2

3

4

5

6

101 F

A

NEW YOR

FINAL CO MARCH 2

B

C

D

E

F

30


05 101 Franklin Street Office Renovation Project Manager December 2021 - Current

101 Franklin Street was built for the future 70 years ago, and although the building is now in need of a major intervention to continue its initial promise, the rigorous and consistent structural grid still offers the opportunity to reimagine this building to be customizable for tenants in need of more creative environments and to provide flexibility for their future needs. Terraces have been added at various levels, in coordination with the Client’s marketing team, to provide exterior amenity spaces that adds value to the tenant floor. Locations of terraces consider both the potential workplace configuration, views, and overall mass of the building. The exterior enclosure concept is based on improving the quality of the office environment, increasing the visual connection between the interior and exterior, and strengthening the concept for the office plan by articulating the noble grid of the existing utilitarian structural frame. Large insulated glass units span between columns laterally and slab beams vertically to enhance the workplace by increasing the visual connection to the city skyline and neighborhood streetscape.

31


1

2

3

4

5

6

7

GENER 1.

C R

2.

C ST W

3.

R PR BY SH

A

REFER TO 5.

A

EXTER EWS 01

EWS 01B

EWS 02

B

EWS 02B

EWS 02C

UHPC PANEL AT COLUMN AND SPANDREL

EWS 03

EWS 04

EWS 05

C

EWS 06

EWS 07

EWS-01: INSULATED GLASS UNIT

EWS 08A

EWS 08B-1

UHPC PANEL AT COLUMN AND SPANDREL D

EWS 08B-2

EWS 09A

EWS 09B

EWS 10

EWS 11

EWS 12

E EWS 13

EWS 15

GR 01

GR 02

GR 03

F

32


E 1' - 4 11/16"

1 3/8" F.O.G. 3 1/16"

7 3/4"

C

5

PTD ALUMINUM CAP

6

7

6"

5" 7 1/4"

2-HR RATED SHAFT WALL ASSEMBLY

4

JT.

1/2"

CRITICAL ALIGNMENTS BETWEEN UHPC, ALUMINUM FRAMING AND INTERIOR FINISHS.

8 PROJECT:

101 FRANKL STREET 101 FRANKLIN STREET NEW YORK, NY 10013

Level Level 3 3 31' 31' -- 0" 0"

LEVEL TYPICAL

PROJECT NUMBER:

748.000 D

STN-01, UHPC ROUND CLADDING PANEL

OWNER / CLIENT :

MAPLE C 250 CHURCH OWNER, LLC 53 MAPLE AVENUE, MORRITOWN, NJ 079

INS-03, MINERAL WOOL THERMAL INSULATION

O IUS RAD

F

MEP ENGINEER :

HIGHLAND ASSOCIATES ONE EAST 33RD STREET, NEW YORK, NY T. 212.681.0200 CIVIL ENGINEER :

BOHLER ENGINEERING 225 W 34TH STREET, SUITE 1118, NEW YO T. 646.661.4200

F.O.G.

L ANE CP UHP

MCNAMARA SALVIA 45 WEST 45TH STREET, 10TH FLOOR, NE T. 212.246.9800

1 5/16"

" '-6

STRUCTURAL CONSULTANT :

1/2"

R1

RAFAEL VINOLY ARCHITECTS 375 PEARL STREET, 31ST FL. NEW YORK T: 212.924.5060

3' - 0"

2' - 0"

2' - 11 3/4"

1 1/16"

2-HR RATED SPANDREL

EXIST. 2-HR RATED CONCRETE BEAM

EXIST. 2-HR RATED CONC. STRUCTURAL BEAM, TYP.

ARCHITECT :

AVB-01, AIR/VAPOR BARRIER

EXTERIOR ENCLOUSRE CONSULTANT :

ENTUITIVE 28 W 44TH STREET, NEW YORK, NY 10036 T. 718.280.5935

E

FACADE MAINTERNANCE :

ENTEK ENGINEERING, PLLC 166 AMES STREET, HACKENSACK, NJ 076 T. 201.820.2803 FIRE PROTECTION :

1' - 3 9/16"

VERTICAL TRANSPORTATION :

1/2

FORTUNE SHEPLER SALING, INC. 8752 FORREST DRIVE, HIGHLANDS RANC T. 720.438.1540 LIGHTING CONSULTANT :

VENTRESCA 44-02 ELEVENTH ST, SUITE 203, LONG ISL T. 212.600.0033

6"

6"

JT.

1/2"

2-HR RATED SHAFT WALL ASSEMBLY

6" 9/1

PATCH GROOVE AFTER REMOVING EXISTING WINDOW, TYP

CODE CONSULTANT, INC. 215 W 40TH STREET, 10TH FLOOR, NEW Y T. 212.216.9596

CODE CONSULTANT / EXPEDITOR :

RIZZO GROUP 1333 BROADWAY, SUITE 500, NEW YORK T. 212.695.5980 IT CONSULTANT :

SAGE AVT 53 WEST 36TH STREET, SUITE 605, NEW T. 212.213.1523

GL-01, INSULATED GLASS UNIT F

3

1/2"

SCALE: 3" = 1'-0"

ARCHITECT / ENGINEER SEAL

SUBMISSION / REVISION

2 1

F.O.G.

E

50% CONSTRUCTION DOCUMENTS DESIGN DEVELOPMENT REV.2

REV DESCRIPTION DOB STAMP AND SIGNATURE

1/2"

1 5/16"

2' - 3"

2-HR RATED SPANDREL

Level Level 3 3 31' 31' -- 0" 0"

" L '-6 NE PA R1 PC UH OF S DIU RA

GL-01, INSULATED GLASS SEALANT W/ BACKER ROD, TYPICAL AT UHPC PANEL JT. 1' - 5"

AVB-01, AIR/VAPOR BARRIER

KEY PLAN: LEONARD STREET

INS-03, EXTRUDED MINERAL WOOL THERMAL INSULATION

1/2 "

1' - 3 9/16"

2-HR RATED SHAFT WALL ASSEMBLY

2' - 0"

STN-01, UHPC CLADDING PANEL PATCH GROOVE AFTER REMOVING EXISTING WINDOW,TYP

6"

6"

2

TYPICAL COLUMN CONDITION

3' - 0"

6"

EWS-01 SECTION DETAIL - SPANDREL - ROUND

EXIST. 2-HR RATED CONC. STRUCTURAL BEAM, TYP.

2' - 0"

2-HR RATED SHAFT WALL ASSEMBLY

JT.

REFER TO FLOOR PLAN FOR COL. CONDITION @ GRID "2", "3", "4" AND "5"

CHURCH STREET

PATCH 4 TRIANGLE GROOVES ON EXISTING COLUMN FASCIA,TYP

PROJECT PHASE:

CONSTRUCTION DOCUME SCALE:

3" = 1'-0"

PROPERTY LINE

DRAWING TITLE:

EXTERIOR WALL SYSTEM 01 - DET

UHPC PANEL JOINT, TYP. STN-01, UHPC HORIZONTAL CLADDING BELOW 1/2"

2' - 11 11/16"

1/2"

JT.

GLOSSY WHITE UHPC PANEL, STN-01

JT.

DOB NOW JOB # M00512217-I1

CTION DETAIL - SPANDREL - ROUND SCALE: 3" = 1'-0"

2

EWS-01 PLAN DETAIL - COLUMN UHPC - ROUND SCALE: 3" = 1'-0"

1

© 2021 RAFAEL VINOLY ARCHITECTS PC

SHEET NUMBER:

33

A-513 .


52

34

53


06 LOOF Education Associate May 2019 - July 2019

The site is divided into a playground for children to play sports, a three buildings covered by a singular roof structure and protected and intimate courtyard in the created by the roof. The building is designed to face the adjacent road so that the usability of all spaces can be easily recognized by all users who enter through the main entrance. Surrounding the courtyard, there is first massing housing 3 elementary classrooms, a multipurpose room and another massing housing a teacher’s office and toddler classroom and lastly small massing allocated to outdoor bathrooms. Interstitial spaces between buildings can be used as an outdoor classrooms. On the elevations with openings, sliding sunscreens are installed to filter out the sunlight and excessive heat. The sunscreen is designed with bamboo and wood frame that are readily available in india, and integrated to the facade like a sliding wall.

35


T/ SLAB 0.0m

1 A-201

ROOF ABOVE

PARKING

2 A-202

ENTRY 3000

B

3000

C

3000

D

3000

E

3000

F

3000

G

3000

H

3000

I

3000

J

3000

K

1 GROUND FLOOR PLAN

2 A-201

-0.1m

1 A-202

A

ROOF HIGH 4.30 m

ROOF LOW 3.56 m

T/WALL 3.00 m

2 EXTERIOR ELEVATION WEST

Level B1 -0.50 m

1 : 100

K

3000

J

3000

I

3000

H

3000

G

3000

F

3000

E

3000

D

3000

C

3000

B

3000

A

ROOF HIGH 4.30 m ROOF LOW 3.56 m T/WALL 3.00 m

1 EXTERIOR ELEVATION EAST 1 : 100

36

LEVEL 1 0.00 m Level B1 -0.50 m

1 : 250

LEVEL 1 0.00 m


SITE

FOUNDATIONS

MASSING

The site is 1500 sqm (50m x 30m), located by the adjacent

50cm of site foundation is placed to level with adjacent road and 10cm of building foundation is placed to create a defined courtyard area.

The School is composed of Elementary massing, Kindergarten massing and outdoor Bathroom.

10m road.

SITE

FOUNDATIONS

MASSING

The site is 1500 sqm (50m x 30m), located by the adjacent

50cm of site foundation is placed to level with adjacent road and 10cm of building foundation is placed to create a defined courtyard area.

The School is composed of Elementary massing, Kindergarten massing and outdoor Bathroom.

10m road.

NTILATION SYSTEM

DETACH Roofs of the three massings are detached for passive ventilation effect.

DETACH

Solar Shading

Roofs of the three massings are detached for passive ventilation effect. LOOF I PROJECT - project

UNITE The roofs are united into one singular system to tie three massings into one structure.

UNITE The roofs are united into one singular system to tie three massings into one structure.

Oversized Roof with Extended Overhang Protects the Building from Direct Sunlight

LIFT Northern edge of roof is lifted to create optimum ventilation effect and also as a welcoming gesture.

LIFT

Rainwater Shelter

Northern edge of roof is lifted to create optimum ventilation effect and also as a welcoming gesture.

Roof Overhang Protects the Building from Rainwater and Sloping Corrugated Roof Panels Divert Rainwater to Building Edges

LOOF I PROJECT - project

Natural Ventilation Windows on Both East and West Elevations Allow cross Ventilation and Elevated Roof with Semi Open Bamboo Ceiling Allows NE Wind to Blow through the Building Sucking the Heated Air

37


38


07 NOMAD Education Associate January 2020 - Current

The massing of the project was done based on the weather analysis, which mainly oriented southward to maximize solar irradiance and configured as compact masses to minimize heat losses. The massing largely consists of three intersecting volumes. Despite dynamic exterior massings, the interior houses an efficient layout where the main corridor with maintenance programs. Considering site’s harsh winter, the main entrance is tucked between the two massing’s facade acting as wind barriers with MEP access hidden visually from the main public space. Mongolian Polystyrene Concrete Block (240x350x600mm), which provides a high insulation value, is normally not an ideal material for load-bearing wall system. A double-course typical red brick layer provides additional rigidity around openings. Light-gauge steel framing with sandwich panel infill system reduces the dead load of the entire roof.

39


AN

X=0, Y=29.31m

A1

A2.01 1

A2

8100 4050 600

1565

1685

1465

600

N E W YO R K / S E O U L / C H A T LA N T A / A N N A R B

CLASSROOM 1 100

660 100

1000

600

KITCHEN

2735

150

3

3

1200

LOAD BEARING WALL

3075

600

1255

3835

815

1200

150

2.2

600

4160

1 A3.01

CLASSROOM 2 24 m²

DESK

1475

600 865

OFFICE

1565

600

A3.01

1685 1225

SLIDER DOOR TYPE 4; 900 X 2100

1

4550

600

600

1700

ALL STRUCTURAL MEMBERS TO BE REVIEWED AND CONFIRMED BY STRUCTURAL ENGINEER & LOCAL ARCHITECT.

16600

4

1200

250

GENERAL NOTES:

600

11 m² 300

The Contract Documents Issued for Schematic Des be at that level of development and as such, may be coordinated. The Local Contractor is responsible f coordinated pricing [and execution] of the Work, an necessary for the proper execution and completion shown, specified, reasonably inferred or required fo Project. For Work of delegated designs; systems, a components and materials shall comply with nation code requirements. The Contractorshall inform the Architect (PJ-pj), in timely fashion, of any discovere inconsistencies or errors in the Contract Documen

WALL EDGE ABOVE

1200

3750

1.3

SCOPE DOCUMENTS

1 A2.02

3

100 100

3

5950

1225

8 m²

100 1000

100

25 m²

1025

RESTROOM

1200

4015

835

1200

3045

8550

2.1

SHOWER

+0.25 m

1.2

SITE SETBACK LINE

1650

6150

600

4390

2 A2.04

600

PROJEC project

PROPERTY LINE

4050

835

1.1

1700

A3

300

300

X=10.5m, Y=30.0m

3

1000

+0.20 m

2

950

2.3

2750

RESTROOM

1800

1000

A3.01

A5.03

3

5075

5 m² STEP

2000

2

2.4

4 m² 200

A5.03 A5.03

2000

ET

MEP

OSET

2000

2

100

600

3

5500

A3.01

600

5000

3450

1565

CLASSROOM 3 21 m²

1050 900

550

3

3950

1485

LOAD BEARING WALL

20 m²

OE CL T & SH

1 1665

1 A2.04

2150

CORRIDOR NE CABI

200

700

+0.00 m

3000

1910

300

200

500

3

SHOERACK

1955

CLOS

1 A2.03

1665

2.5

2700

600

250

NoMaD

1500 200

600 1350 600

2550

200 200

1665

1500 200

B4

3050 200

8100 2500

B2

3270

3045

200

B1

2 A2.03

B3

Ulaanbaatar Sukhbaatar, Mongol Duureg 12-khoroo Khangai 17-697-B

12.84°

700

200

PLAYGROUND 700

GROUND FLOOR PLAN

500 2700

PROVISION FOR FREE STANDING FUTURE SIGNAGE LOCATION

JOP, SHAD, SC, TKTN

04/27

Project Leader

Date

DOW Technical Director

10600

A

JAE, JAY

LAN

Design Collaborator

Scale 1/200

40

Drwaing


Dryvit. Including Insulation

Mongolian Polystrene Concrete Block 240 x 350 x 600 mm

Red Brick For Window / Door Framing, typ Interior Finish

TURAL SYSTEM - ROOF Concrete Footing

The extreme cold weather condition in Mongol is the main design criteria in the discussion of wall system. Mongolian Polystyrene Concrete Block (240x350x600mm), which provides a high insulation value, is normally not an ideal material for load-bearing wall system. However, such such material is structurally durable enough to support the dead and live loads of the roof of single-story building. A double-course typical red brickRigid/Spray layer provides additional rigidity around Form openings.Insulation

구조벽 시스템을 고려할 때 가장 중요한 디자인 결정 요소로는 몽골 겨울의 극한의 기후 조건입니다. 우수한 단열성능을 지닌 Mongolian Polystyrene Concrete Block (240x350x600mm)은 Metal Sandwich Panel

일반적으로 구조벽으로 사용되기에는 적합하지 않으나, 단층건 물의 지붕을 받쳐주기에는 충분히 견고하다는 구조계산에 따라 적용되었습니다. 시공성과 안정성을 고려하여 창문과 문을 포함 한 건물 오프닝 주변에는 적벽돌을 쌓아 올려 프레이밍이 가능하 도록 벽체시스템을 구성하였습니다.

Rafter

Interior Finish

OJECT - project Roof Truss w/ Anchor

41


42


08 Selected Work Academic, Competition and Internship 2009 - 2017

Academic Cayuga Wooden boatwork, Comprehesive Studio / Activist, Thesis Competition Pariscope, [AC-CA] Competition: River Champagne Bar in Paris Studio Sumo Wooden Louver Facade design for JIU Dormitory & Cafeteria project. Sanin Architects Master planning & Housing unit design for Baeksa Village project.

43


Cayuga Wooden Boatwork ARC 409 : Comprehensive Studio Prof. Elizabeth Kamell Spring 2015

LARGE BOAT WORKSHOP

44


TWORK ASSOCIATION BACKGROUND

CONCEPT

Adjacent to Cayuga Lake, one of Finger Lakes in New York, Cayaga Wooden Boatworks has dedicated to revitalize the wooden boat culture. Now it would like to expand its buisiness to establish Cayuga Wooden Boatworks Assocication, which is an institution and commercial space to produce a boat reparing education program for students and an wooden boat exhibition for visitors. This institution will be located in the middle of the Beacon Bay Marina. The sectional difference between the lake and roads allows for an opportunity to integrate the existing context with new programs.

This building is a metaphor of the boat. Modifying a repetitive primary structure system with a detached enclosure, this design can achieve the desired flexibility in space and the sustainble enclosure system. By exposing this distingtion, visitors acknowledge how the boat and this building are constructed in a similar language through exploring the space and the boat restoration process. Ultimately, this would produce a transitional moment from the ground into the water - the boat as an element to connect them.

ALBANY

WORLD MAP

WOODEN BOAT PLAN + SECTION

WOODEN BOAT EXPLODED AXON

SITE STRATEGY

CONCEPT

45


1.

LECTURE HALL BOAT DISPLAY

2.

MECHANICAL ROOM

3.

LECTURE HALL

4.

DRAWINGS EXHIBITION

5.

CHAIR STORAGE

6.

BATHROOMS

7.

VIDEO EXHIBITION

8.

BOAT EXHIBITION S

9.

FAN ROOM

10.

STORAGE 1 FOR LARGE WORKSHOP

11.

LARGE BOAT WORKSHOP

12.

COMPUTER LAB

13.

SEMI-PRIVATE COURTYARD

14.

STORAGE 2 FOR LARGE WORKSHOP

15.

LOCKER ROOM

16.

SMALL BOAT WORKSHOP 1

17.

SMALL BOAT WORKSHOP 2

18.

SMALL BOAT WORKSHOP 3

19.

PRIVATE ENTRANCE

A

1

2

3

4

5

A 1

2

B

3

4

C

5

6

7

D

8

E 9

10

11

F

12

B

B’

14

13

15

G

16

17

18

19

H

A’

LEVEL 1 SCALE : 1/8”=1’-0” 0

46

4’

8’

16’


1

1.

STEEL FLASHING

23.

CONNECTION OF REFLECTIVE ROOF PANELS TO GUTTER/LIGHT SYSTEM

2.

SMOOTH FINISHED ROOFING PANEL

24.

ANGLED LIGHT FIXTURE

3.

CUSTOMIZED STEEL CHANNEL TO FASTEN S.I.P. PANEL

25.

CUSTOMIZED STEEL FRAMING MEMBERS

4.

S.I.P. EXTERIOR SHEATHING

26.

STEEL BASE PLATE

4

5.

S.I.P. INSULATION CORE

27.

REINFORCEMENT BARS

5

6.

S.I.P. INTERIOR SHEATHING

28.

9” x 18” CONCRETE BEAM

7.

BENT EXTERIOR SHEATHING PANEL

29.

CONCRETE DISK

8.

4” x 4” STEEL TUBE (3/16” THICK)

30.

10” CONCRETE COLUMN

9.

STEEL “C” CHANNEL

31.

HORIZONTAL MORTAR RAKING

10.

BATT INSULATION

32.

2” x 4” x 12” WHITE ROMAN BRICKS

11.

INTERIOR SHADING DEVICE

33.

EXPANSION JOINT

12.

TIMBER WEDGE

34.

SMOOTH FINISHED CONCRETE

13.

TYPICAL WINDOW SILL

35.

AIR CAVITY

14.

SLIDING DOUBLE PANE WINDOW SYSTEM (TOP)

36.

RADIANT TUBING

15.

CONCAVE REFLECTIVE STEEL PANELS

37.

REINFORCED CONCRETE SLAB

16.

CONCAVE STEEL FRAME TO SUPPORT REFLECTIVE PANELS

38.

SPECIALIZED ROMAN BRICK FOR CONNECTION TO CONCRETE

17.

OPERABLE DOUBLE GLAZING LOW-E COATED

39.

ADJUSTABLE ANCHOR SET INTO DOVE TAIL SLOT AND EMBEDDED IN MORTAR AT HEAD JOINTS

18.

SLIDING DOUBLE PANE WINDOW SYSTEM (BOTTOM)

40.

3” STEEL COLUMNS FOR SECONDARY SUPPORT

19.

STEEL GUTTER

41.

ACOUSTICALLY ENHANCED GYPSUM BOARD DROP CEILING PANELS

20.

STEEL RIGHT ANGLE BRACKET TO SUPPORT GUTTER

42.

RETURN AIR DUCTS

21.

INSULATED ELECTRICAL WIRING THROUGH RIGHT ANGLE BRACKET

43.

STEEL TRUSSES WITH SUPPORTING STEEL BEAMS

22.

INSULATED ELECTRICAL TUBING FOR LIGHT FIXTURE

44.

FOUNDATION FOOTING

2 3

6 7 8

9 10 11 12 13

14 15 16

31 17 18 32

33 19 34 20 21

35 36

22 23

24

37

25 38

26 27

39

28 40

29 30 DETAIL

4 0

1/2’

SAWTOOTH SKYLIGHT

DETAIL

5

SCALE : 3”=1’-0”

1’

2’

0

1/2’

BRICK TO CONCRETE CONNECTION SCALE : 3”=1’-0” 1’

G

2’

F

DETAIL

4

DETAIL

5

INTEGRATED STUDIO | SPRING 2015 FULAMBARKAR & KIM

DETAIL

1

WORKSHOP & SERVICE | SECTION + ELEVATION SCALE : 1”=1’-0” 0

INTEGRATED STUDIO | SPRING 2015 FULAMBARKAR & KIM

1/2’

1’

2’

47


Pariscope [AC-CA] Competition : River Champagne Bar in Paris In Collaboration with Hyungyu Kim & Kwangmin Lee Summer 2014

52


1

2

6 3

4

5

1st Floor Plan 1. Stage : 14.82 m2 2. Seating Area : 139.5m2 3. Bar Counter : 8.41m2

4. Kitchen : 9.91m2 5.Hall/Entrance : 23.16m2 6. VIP : 21.42m2 (x2)

1 2

3

4

6

5

Basement Plan 1. Administration : 40.01m2 2. Plant : 14.62m2 3. Janitor room : 8.29m2

1

2

7

8

3

9

10

4

4. Restroom : 40.60m2 5. Kitchen storage : 9.81m2 6. Cloakroom : 13.80m2

5

11

Longitudinal Section 1. Stage : 14.82 m2 2. Seating Area : 139.5m2 3. Bar Counter : 8.41m2 4. Kitchen : 9.91m2 5.Hall/Entrance : 23.16m2 6. VIP : 21.42m2 (x2)

6

12

7. Administration : 40.01m2 8. Plant : 14.62m2 9. Janitor room : 8.29m2 10. Restroom : 40.60m2 11. Kitchen storage : 9.81m2 12. Cloakroom : 13.80m2

53


54


55


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.