PORT FOLIO JAKKRAWAN SUTHUM
{ Architecture Portfolio by Jakkrawan Suthum, 2018 }
INDEX
PROFILE RESUME I’m Jimmy, Jakkrawan Suthum Student Architect | B.Arch | 2013-2017 Architect | Chapman Taylor (Thailand) | 2017-Present Nationality : Thai Current Location : Bangkok, Thailand Date of Birth : 31/ January/ 1994 SOCIAL pinterest.com/jimmycartulor/ issuu.com/jakkrawan linkedin.com/in/jakkrawan-suthum-1a8442120/
I’m enjoy designing projects that responds well to the context while keeping an eye on sustainability. Being part of the young generation of architects, he is particularly fond of developing innovative design solutions and giving architecture a modern touch,with focus on implementing BIM modeling as part of the design phase. IT SKILLS OS : MS Windows : Mac Os X MS office : Word : Excel : PowerPoint Adobe : Photoshop : Illustrator : InDesign Autodesk : Revit : Flow Design : Auto CAD : 3ds Max Graphisoft : ArchiCAD Sketchup + Vray Enscape DIALux Lumion 3D OTHER SKILLS Model Making, Laser cutting software, Drafting, Drawing and Photography.
CONTACT +6687 359 6462 {M} Thailand Web address : issuu.com/jakkrawan Email : cartulor@gmail.com
Smart City Project Location : Bangkok, Thailand Type : Residents / Mall / Office Skill Program : Autodesk Revit / PDF.
* University Architect Design Projects - 2016
Urban Planning and Design
HON THI ISLANDS RESORT
* University Architect Design Projects - 2016
Resort Location : Hon-Thi, Vientnam *Architect Design Projects - 2017
A BOUTIQUE HOTEL
RESORT HOTEL
* University Architect Design Projects - 2015
Ao Nang Resort Location : Krabi, Thailand *Architect Design Projects - 2017
KINDERGARTEN.
MUI DINH ECO RESORT ECO Resort Location : Mui-Dinh, Vietnam *Architect Design Projects. 2016-2017
YANGON OFFICE TOWER Office Building Location : Yangon, Myanmar *Architect Design Projects - 2017
WASTE MANAGEMENT LEARNING PARK
* University Thesis Architect Design Projects - 2017
High School Matthayomvitthaya School, Lampang, Thailand Expected Gradution : March 2012 GPA : 3.47 INTERESTS Graphic Design, Photo Editing, Collage Business, Movie, Game, Foreign Music andTravel
* University Architect Design Projects - 2016
MUSEUM OF WATER.
Resort Location : Jayasom, India *Architect Design Projects - 2017
worked as a trainee with Architect groups, to refine schematic drawings using Autodesk Revit and Auto CAD, produced from concept design to be present BIM modeling Request for Environmental Permit package on the project condominium. EDUCATION Bachelor of Architecture Naresuan University, Phitsanulok, Thailand Expected Gradution : May 2017 Current GPA : 3.42
OFFICE BUILDING AND SHOPPING ARCADE
M6 NGAMWONGWAN NEW CARPARK BUILDING
JAYASOM WELLNESS RESORT
worked as an Architect Helped in model making and designed the presentation boards for residential and commercial project, Worked mostly with Autodesk Revit, Auto CAD, Sketchup and the Adobe Creative Suite.
Trainee Architect | 3 month | 2016 DWP - design worldwide partnership (Thailand)
* University Architect Design Projects - 2016
Car Parking Location : Ngamwongwan, Thailand *Architect Design Projects. 2017 - 2018
WORK EXPERIENCE
Architect | 1 year 1 month | 2017 - Present Chapman Taylor Thailand Global Architects and Masterplanners
Retirement Condominium
ONE BANGKOK SMART CITY
ARCHITECTURE PORTFOLIO Jakkrawan Sutham Contact +6687 359 6462 {M} Thailand cartulor@gamil.com
* University Architect Design Projects - 2015
. . เส้น สาย สับ ทอ - 2014 Oriental Style - 2014 Hotel Lounge - 2015 Sunray House - 2015 House - 2015 Sale Office - 2015 Steel Structure - 2015 Steel House - 2016 Cafe’ Shop - 2016
ONE BANGKOK SMART CITY Smart City Project Location : Bangkok, Thailand Type : Residential / Commercial Phase : Smart Service Design Develop Company : Chapman Taylor (Thailand) Skill Program : Autodesk Revit / Micresoft Office *Smart Service Design Projects. 2017 - 2018
ONE BANGKOK SMART CITY
C CT V , A QS, 3DS STRATEGY BUILDING BANGKOK, THAILAND 14 TH DECEMBER 2017
Phase 1: DCC
Phase 2: DCC
Phase 3: DCC
Phase 4: Final Design
Extract of Deliverables
Extract of Deliverables
Extract of Deliverables
Extract of Deliverables
For Phase 3, work activities of HCC and Chapman Taylor on DCC include:
Work activities on DCC include:
Work activities on DCC include:
For Phase 2, work activities of HCC and Chapman Taylor on DCC include:
• Ensure and advise that FM smart services specified have interface into DCC • Evaluate Smart Services impact on DCC and A Day in a Life of staff who will be working in DCC (Note: This work activity is included in a Day in a Life section: Phase 1 Deliverable.)
A. Conceptual plan and approach for DCC. Here, we provide design philosophy, standards and technologies on (1) evolution of design (2) physical factors (3) ISO standards for ergonomic design of control centers (4) framework for ergonomic design process and (5) detailed considerations
A. Review, and where needed provide comments on existing architectural design of DCC floor provided by OBH. On the review of DCC floor, HCC together with Chapman Taylor have had several meetings with A49 on the existing floor plan and DCC practicality and functional and technical requirements. A49 has produced 4 options for DCC floor plan based on the discussions from the meetings.
B. Advice on practicality of existing DCC floor layout and functionality regarding DCC functions supported. Here, we provide content on (1) interface relationship matrix for DCC, (2) circulation diagrams, (3) link diagrams, and (4) other command center related guidelines & standards
B. Develop the requirements and propose 1. Functional requirements: Number and profile of personnel needed to man the DCC, size of the room(s) 2. Technical requirements: Estimated quantity and types of equipment, e.g., workstations, video walls
FM Director
FM Smart Services – FM Director
A Day in a Life
Smart Services highlighted in a Day in a Life
6.00
1
FM Director’s house
Energy
1. Before leaving his house, he receives notifications on his smart device reminding him about FM updates on his FM Dashboard.
6.45 6.30
15.30
2. After parking his car, he goes to his office at CUP for FM Morning Brief. As all the systems are integrated, enabling an automatic report to be generated and shown on his FM dashboard. His Facility Manager goes over: • Today’s work orders (deliveries, subcontractors, meetings, possible heavy rain, event: wedding with VVIP PM) • Future events (upcoming concert, AHU maintenance) • Past incidents (slip at O4) 3. He walks back to his office after FM Morning Brief and monitors overall buildings’ functioning and sustainability efficiency through the smart FM Dashboard (Predictive maintenance).
2
2
4
7.30 11.30 13.30
4
13.00 15.00
4 9.20
4. Throughout the day, he receives various FM notifications, i.e., • Excessive elevator vibration • Wastewater flow fluctuations • Power drop • Medical emergency red alert • Vandalism alert Later, the system alerts that everything is back to normal.
E1: Energy monitoring and control system E2: Demand side management E4: Distribution mgmt. system E5: Grid stability management E8: Transformer load measurement E9: Electricity consumption smart metering E22: Elevator supervisory system
Water & Wastewater W3: Wastewater flow meter monitoring
Security S1: Activity visualizer (CCTV) S6: Facial recognition and face collector (CCTV) S9: Intelligent multi-camera human tracking (CCTV) S10: Body worn cameras S12: Emergency response management S32: Geo-location and tracking
4 16.00
6
5. He goes for a lunch meeting with One Bangkok’s executive at H4 to discuss about energy and water consumption targets for all buildings. 6. He receives a notification from his team that prior work orders for a wedding and VVIP arrival are completed. He conducts final FM check and waits to welcome the Prime Minister who is the VVIP for a wedding event tonight.
Parking
Waste
Conceptual Plan & Approach to DCC
A.3 ISO Standard for Ergonomic Design of Control Centers
Integrated Maintenance
ISO 110641:2000 Part 2 : Principles for the Arrangement of Control Suites (Ratified in 2010)
ISO 110641:2000 Part 3 : Control Room Layout (Ratified in 2009)
ISO 110641:2000 Part 4 : Layout and Dimensions of Workstations (Ratified in 2013)
ISO 110641:2000 Part 5 : Displays and Controls (Ratification pending)
ISO 110641:2000 Part 6 : Environmental Requirements for Control Centers (Ratified in 2014)
ISO 110641:2000 Part 1 : Principles for the Design of Control Center (Ratified in 2010)
What value can be expected from ISO 11064? • •
M1: Predictive maintenance M2: Data analytics M3: Statistics and reports
• •
Minimize human errors. It is a guideline of ergonomic and human factors. Safely fulfil growing demands on safe, secure and efficient operation o Modernizing of data processing technologies and software o Fielding of automated and centralized control and operational management systems o The operator/dispatcher : Interface man and machine Avoid consequences of mechanical and human failure! o Same as automation increases, so do the sources of errors Helps to observe legal requirements o Labor laws, employer’s liability, insurance issues…
20
5
For presentation purpose and internal use only.
Advice on DCC Practicality
Advice on DCC Practicality
B.3 Link Diagram of Functions Control Centre
B.4 Guidelines & Standards
C. Develop budgetary cost estimates for DCC technical requirements and fit-out for DCC floor
A.5 Detailed Considerations: Control Room
4
For presentation purpose and internal use only.
Indicative
Conceptual Plan & Approach to DCC ISO 110641:2000 Part 1 : Principles for the Design of Control Center (Ratified in 2010)
5
4
• Cost estimates for DCC fit-out and provisioning of DCC floor based on revised design. In this case, as of 25 May 2018, there has been no updates given to HCC on the changes in the DCC design. • Guidelines for data protection and privacy, per Thailand standards, for data or resulting reports as used within the DCC. This will include guidelines for proper handling of video and audio data by DCC staff as part of their operational duties.
Conceptual plan and approach: ISO standards for ergonomic design of control enters
2
For presentation purpose and internal use only.
23 positions : 290 sq.m (circulation 40%, 9-15 sq.m. per person Aspects to be considered: Usually, control and monitoring tasks and associated task zones are situated in the control room. The location of the control room within a control suite should be determined by applying such considerations as: • Security and safety (for example direct entrance, special entrance doors/gates, entrance route via several security checks) Can also have dedicated area per building 5 BAS areas, 3 staff per area, plus supervisor area Operational and social links related to the level of the control room (ground level or not).The control and monitoring task zones may be in the same room, or might be integrated with the following task zones: o Documentation task and associated task zone o Administrative task and associated task zone o Shift book, notes and so on (see previous item) o Analysis/diagnostic tasks and associated task zone o Apply the same considerations as for documentation task, including the possibility that several persons will be discussing certain problems o Supervisory tasks and associated task zone o Consider possible conflicting factors such as the work organization (team work versus hierarchical distance between operating personnel and supervisory staff), privacy aspects, a general view on the process and so on o Permit and visitor handling task and associated task zone o Shift turnover • Work stations have the regular desktops are augmented with adjustable height work location which allow a change from always sitting to having a standing work stations and discussion locations. • 9 m2 to 15 m2 (100 ft2 to 160 ft2) should be allowed per control • • •
35
22
Conceptual plan and approach: Detailed considerations for control rooms
Advice on DCC practicality: Link diagram
36
Advice on DCC practicality: Other command center related guidelines & standards
For presentation purpose and internal use only.
3
For presentation purpose and internal use only.
For presentation purpose and internal use only.
4
For presentation purpose and internal use only.
For presentation purpose and internal use only.
5
O2-1
O2-2
O2-3
O2-4
O2-5
NOTE :
10500
10500
10500
10500 8750
1700
900
900
CCTV 02
CCTV 01 : 90-degree Super Dynamic HD Network Camera CCTV 02 : 180-degree Super Dynamic HD Dome Network Camera CCTV 03 : 360-degree Network Camera
10350 1310 4986
455
3DS 03
IDENTIFICATION (250 ppm RESOLUTION)
3DS 01
3DS 03
3DS 03
CCTV 02
800
O2-A 10500
CCTV 02
IDENTIFICATION (250 ppm RESOLUTION) CCTV 02
CCTV 02
CCTV 02 CCTV 02
CCTV 01
O2-B 7374
3194
7122
14449
3194
CCTV 01
CCTV 02
10500
CCTV 02
CCTV 02 CCTV 01
IDENTIFICATION (250 ppm RESOLUTION)
CCTV 01
O2-C
AXONOMETRIC - LOBBY - CCTV_A
CCTV 02 CCTV 01
RECOGNITION (125 ppm RESOLUTION) CCTV 01
CCTV 01
CCTV 01 CCTV 02
CCTV 01
A
10500
CCTV 01
CCTV 01
SECTION A_3D Sensors 1 : 50
CCTV 02
CCTV 01 CCTV 01
ENTRANCE 2
CCTV 01
O2-213
O2-D
CCTV 02 IDENTIFICATION (250 ppm RESOLUTION) CCTV 01
2-17 O2-5
3200
7122
3200
2-18
10500
CCTV 02
1123
14443
3DS 01
3DS 01
CCTV 01
IDENTIFICATION (250 ppm RESOLUTION)
O2-E
CCTV 02
CCTV 02
RECOGNITION (125 ppm RESOLUTION)
CCTV 01
CCTV 02
2050
5500
L4 TOS 19700 TOFF 19700
L3 TOS 14200
OPEN
AXONOMETRIC - LOBBY - CCTV
4450
6500
CCTV 02
NOTE : L2 TOFF 7700 TOS 7700
02 - LOBBY - CCTV SENSOR LOCATION
SECTION - L02 - CCTV
1 : 350
1 : 250
CCTV 01 : 90-degree Super Dynamic HD Network Camera CCTV 02 : 180-degree Super Dynamic HD Dome Network Camera CCTV 03 : 360-degree Network Camera
AXONOMETRIC - LOBBY - CCTV_B
B
ONE BKK SMART CITY, OFFICE O2 - LOBBY LAYOUT-L02-CCTV
ONE BKK SMART CITY, OFFICE O2 - AXONOMETRIC-LOBBY-CCTV
PROJECT REFERENCE: C139/OBS ISSUE DATE: 12/Dec/2017 SCALE : As indicated @ A3
PROJECT REFERENCE: C139/OBS ISSUE DATE: 12/Dec/2017 SCALE : @ A3
DRAWING No.:
O2-213
DRAWING No.:
SECTION B_3D Sensors 1 : 50
12/Dec/2017
O2-202
O2-1
1700
1800
11300
3DS 02
O2-D
3430
KEY PLAN-L16 FLOOR 3DS 02
NOTE : 3DS 01 : Door Learn ,Dual Relay output pedestrian door activation + monitored safety (Installation above the door) 3DS 02 : Door Learn ,Dual Relay output pedestrian door activation + monitored safety (Installation under the ceiling ) 3DS 03 : Sensors escalator
3DS 02
3
3304
O2-110
2000
3130
4365
3DS 02
AQS 01
3DS 02
3DS 02
3DS 02 3DS 02
3DS 02
AXONOMETRIC - L16 - 3D SENSORS_A
3DS 02
O2-E
3DS 02
O2-1
3DS 02
A
3DS 01 3DS 01 3DS 01
SECTION A_AIR Quality Sensors 1 : 50
3DS 02
3DS 02
3DS 02
3DS 02
L16 TOS 79200 3DS 02
3DS 02
L15 TOS 74700
AQS 01
AXONOMETRIC - L16 - 3D SENSORS L16 - 3D SENSORS LOCATION
SECTION - L16 - 3D SENSORS LOCATION
NOTE :
1 : 150
1 : 100
3DS 01 : Door Learn ,Dual Relay output pedestrian door activation + monitored safety (Installation above the door) 3DS 02 : Door Learn ,Dual Relay output pedestrian door activation + monitored safety (Installation under the ceiling ) 3DS 03 : Sensors escalator
AXONOMETRIC - L16 - 3D SENSORS_B B
ONE BKK SMART CITY, OFFICE O2 - OFFICE LAYOUT-L16-3D SENSORS
ONE BKK SMART CITY, OFFICE O2 - AXONOMETRIC-L16-3D SENSORS
PROJECT REFERENCE: C139/OBS ISSUE DATE: 12/Dec/2017 SCALE : As indicated @ A3
PROJECT REFERENCE: C139/OBS ISSUE DATE: 12/Dec/2017 SCALE : @ A3
DRAWING No.:
O2-110
DRAWING No.:
O2-2
O2-1
O2-3
O2-4
SECTION B_AIR Quality Sensors 1 : 50
12/Dec/2017
O2-100
O2-5
NOTE : AQS 01 : Room Air quality sensors
O2-A 1700
AQS 01
10801
AIRQ 01
AQS 01
O2-B
AIRQ 01
3209
7368
3200
7122
3200
7088
7355
AQS 01
2 O2-211
AXONOMETRIC - LOBBY - AIR QULITY SENSORS_A
AIRQ 01
AIRQ 01
18250
AIRQ 01
O2-C
AIRQ 01
AIRQ 01
A
AQS 01 AIRQ 01
AIRQ 01
AIRQ 01
SECTION A_CCTV 1 : 50
AQS 01
ENTRANCE
AIRQ 01 AIRQ 01
O2-D
AIRQ 01
5922
AIRQ 01
2-K O2-D
2-J O2-C
AIRQ 01
7603
AIRQ 01
O2-E
AQS 01
5500
L4 TOFF 19700 TOS 19700 OPEN
6500
5000
L3 TOS 14200 OPEN
AXONOMETRIC - LOBBY - AIR QULITY SENSORS
1500
AIRQ 01
L2 TOFF 7700 TOS 7700
02 - LOBBY - AIR QUALITY SENSOR LOCATION
SECTION - L02 - AIR QULITY SENSORS
1 : 350
1 : 250
NOTE : AQS 01 : Room Air quality sensors
AXONOMETRIC - LOBBY - AIR QULITY SENSORS_B B
ONE BKK SMART CITY, OFFICE O2 - LOBBY LAYOUT-L02-AIR QULITY SENSORS
ONE BKK SMART CITY, OFFICE O2 - AXONOMETRIC-LOBBY-AIR QULITY SENSORS
PROJECT REFERENCE: C139/OBS ISSUE DATE: 12/Dec/2017 SCALE : As indicated @ A3
PROJECT REFERENCE: C139/OBS ISSUE DATE: 12/Dec/2017 SCALE : @ A3
DRAWING No.:
O2-211
DRAWING No.:
O2-201
SECTION B_CCTV 1 : 50
12/Dec/2017
AQS 01
M6 NGAMWONGWAN NEW CARPARK BUILDING Car Parking Location : Ngamwongwan, Thailand Type : Residential Phase : Design Development / Design Construction / Construction Company : Chapman Taylor (Thailand) Skill Program : Autodesk Revit *Architect Design Projects. 2017 - 2018
JAYASOM WELLNESS RESORT Resort Location : Jayasom, India Type : Residential Phase : Design Concept Company : Chapman Taylor (Thailand) Skill Program : Autodesk Revit / InDesign. / PS. *Architect Design Projects. 2017 - 2018
HON THI ISLANDS RESORT Resort Location : Hon-Thi, Vientnam Type : Residential Phase : Design Concept Company : Chapman Taylor (Thailand) Skill Program : Autodesk Revit / Indesign *Architect Design Projects - 2017
AO NANG RESORT
Resort Hotel Location : Krabi, Thailand Type : Residential Phase : Design Concept / Design Development Company : Chapman Taylor (Thailand) Skill Program : Autodesk Revit / InDesign. *Architect Design Projects. 2017 - 2018
MUI DINH ECO RESORT ECO Resort Location : Mui-Dinh, Vietnam Type : Eco Residential Phase : Design Concept Company : Chapman Taylor (Thailand) Skill Program : Skatchup + Vray / PS. *Architect Design Projects. 2016-2017
YANGON OFFICE TOWER Office Building Location : Yangon, Myanmar Type : Commercial Phase : Design Development Company : Chapman Taylor (Thailand) Skill Program : Autodesk Revit *Architect Design Projects - 2017
WASTE MANAGEMENT LEARNING PARK 701594 Thesis in Architectural Location : Samudprakran, Thailand Type : Community Park Level : Year 5, (Thesis Project) Supervivor : Asst. Prof. Watcharin Jinwut Skill Program : Autodesk Revit / PS. /AI.
* University Thesis Architect Design Projects - 2017
อุทยานการเรียนรูจัดการขยะชุมชน Waste Management Learning Park
{Preparation} Thesis in architecture. 701594 9 (0-18) วิทยานิพนธทางสถาปตยกรรม 2. 55711758 นายจักรวาล สุธรรม. มหาวิทยาลัยนเรศวร คณะสถาปตยกรรมศาสตร ภาควิชาสถาปตยกรรม.
อุทยานการเรียนรูจัดการขยะชุมชน
Repark™ Waste Management Learning Park Concept ขยะครัวเรือน/สถานประกอบการ ระบบการจัดการขยะ ธนาคารขยะชุมชน
View access
Empty space
Exhibition space
Connect Exhibition
ศูนยใหขอมูล และความรู 1. การจัดการของเสีย และความสำคัญ 2. ผลกระทบสิ่งแวดลอม 3. REUSE การใชซ้ำ 4. RECOVER การกูคืนของเสีย 5. REDUCE การลดการใช กับการจัดการ 6. ทรัพยากร 7. ประเด็นสังคมสูการเปลี่ยนแปลง 8. การจัดการของเสียทั่วโลก 9. นวัตกรรม 10. RECYCLE การรีไซเคิล
การจัดการขยะที่ดีชวยลดลด การปลอยกาซเรือนกระจก : 15-20%
เมืองที่สะอาดเปนเมืองที่ประสบความสำเร็จ • การมีสุขภาพที่ดีและปลอดภัยในสถานที่ที่จะมีชีวิตอยู • สถานที่ที่ดีในการทำธุรกิจและในฐานะนักทองเที่ยว • สงเสริมความรูสึกที่ดีของชุมชนและการเปนเจาของ
นักทองเที่ยว
นิทรรศการ
Zoning mass 01
Zoning mass 02
Zoning mass 03
1. ศิลปะกับงานรีไซเคิล 2. แฟชั่นกับงานรีไซเคิล 3. วัสดุงานรีไซเคิล
นักเรียนนักศึกษา
ผูเขารับการอบรม
กิจกรรมศูนยการเรียนรูจัดการขยะชุมชน เปนการสงเสริมการเรียนรูความเขาใจใหแกภาคประชาชนไดเรียนรู กระบวนการจัดการที่ถูกตองและเหมาสม มีประสิทธิภาพโดยวัตถุประสงคของการเรียนรู เพื่อ 1. 2. 3. 4. 5. • •
'ขยะเพื่อความมั่งคั่ง' ใหสามารถดำรงชีวิตอยางยั่งยืนและ การสนับสนุนการพัฒนาทางเศรษฐกิจ
ในศตวรรษหนามนุษยเรา สามารถใชทรัพยากรไดอยางมีประสิทธิภาพกวาเดิมถึง 10 เทา โดยการพัฒนาการใชทรัพยากรไปพรอมกับการเติบโตทางเศรษฐกิจ พัฒนาขอดี ขอเสีย ของกระบวนการีไซเคิลใหมีประสิทธิภาพ มนุษยสามารถอยูอยางยั่งยืน และอยูอยางมีประสิทธิภาพมากที่สุด มนุษยสามารถอยูอาศัยบนโลกใบนี้ไดอยางมีความสุขที่มีความสุข โดยไมตองทำลายธรรมชาติ กิจกรรมกระบวนการคัดแยกขยะรีไซเคิล เพื่อนำผลิตภัณฑตั้งตนสามารถไปผลิตเปนผลิตภัณฑใหม กิจกรรมกระบวนการแปรรูปขยะเปนพลังงาน โดยนำขยะประเภทขยะทั่วไปมาแปรรูป เพื่อสงเสริมกระวนการแปรรูป พลังงานทดแทน โดยการดำเนินงานจากภาคเอกชน และไดรับการสนับสนุนโดยรัฐบาล กระทรวงทรัพยากรธรรมชาติ และสิ่งแวดลอม และกระทรวงพลังงาน
N
Layout
Waste Management Learning Park Scale 1 : 3000
8.70 %
ประเทศไทย มีปริมาณขยะมูลฝอยเกิดขึ้น ประมาณ 26.78 ลานตัน/ป
กระดาษ
26.8 ลานตัน/ป ขยะมูลฝอยชุมชน > 3 ลานตัน/ป กาก อุตสาหกรรม > 0.56 ลานตัน/ป ของเสียอันตราย จากชุมชน
สามารถนำมารีไซเคิลได อีก 22.59% > พลาสติก 17.65 % > แกว 3% > อลูมิเนียม 1.04% > โลหะ 0.9%
>
> 50,500 ตัน/ป ขยะมูลฝอย ติดเชื้อ > ที่มา: กรมควบคุมมลพิษ, 2558
Ensure by 2020
Ensure by 2030
W1. W2.
W3. W4. W5.
8.6 ลานตัน/ป ขยะมูลฝอยตกคาง สะสม
ทุกคนสามารถเขาถึงบริการจัดการ ขยะมูลฝอยได และราคาไมแพง หยุดการเททิ้ง สูการเผาทำลาย
การจัดการของเสียอยางยั่งยืนและเปนมิตร ตอสิ่งแวดลอม และขยะอันตรายจัดการเหมาะสม ลดการสรางขยะอยางจริงจัง วิธี 3Rs และ การสรางงานสีเขียว ลดการสรางขยะและเศษอาหารจากการคา
สุขภาพของทุกคน / เมืองที่ดี / การบริโภคอยางยั่งยืน / น้ำสะอาดและสุขอนามัยที่ดี / ทรัพยากรทะเล / ระบบนิเวศบนบก
การจัดการของเสีย / การเปลี่ยนแปลงภูมิอากาศ / เขาถึงพลังงาน กระบวนการ 3Rs / การจางงาน / ลดความยากจน / อุตสหกรรมที่ยั่งยืน ลดการสรางเศษอาหาร / ทรัพยากรอาหารที่มั่นคง
บางสวน ลับลอบทิ้ง ! ทิ้งปะปนกับ ขยะทั่วไป !
กลุมกิจกรรมหลักของโครงการ • กิจกรรมจัดแสดงงานผลิตภัณฑจากวัสดุรีไซเคิล เพื่อสงเสริมชองทาง ทางเศรษฐกิจ • กิจกรรมสงเสริมความรู และการประชุม สัมมนาที่เกี่ยวของ • กิจกรรมของการวิจัยและพัฒนากระบวนการจัดการขยะ เพื่อพัฒนากระบวนการที่มี ประสิทธิภาพมายิ่งขึ้น • กิจกรรมการดำเนินการโครงการดวยกระบวนการบำรุงรักษาน้ำ เพื่อนำมาใชในโครงการ โดยการรักษาบำรุง และเปลี่ยนแปลงจากน้ำเสียนำมาเขาสูกระบวนการกลั่นใหม เพื่อนำ มาใชกับกระบวนการแปรรูปพลังงานจากขยะ
RE : PARK 51.93 %
27%
เศษอาหาร 5.77% ขยะไมคุมคาตอการรีไซเคิล > 0.31% ยาง > 0.2% หนัง > 1.37% ใบไม ,กิ่งไม > 3.17% อื่นๆ (ฝุน ,ขี้เถา ,เศษอิฐ)
กำจัดอยางถูกตอง 7.2 ลานตัน/ป
ขยะครัวเรือน /สถานประกอบการ
Waste from > Households > Industry > Agricuture > Forestry > Waste water
ชุมชน
RE : COVER RE : USE RE : DUCE RE : CYCLE
Image Space Exhibition
ลำดับความสำคัญของการจัดการขยะ
Reduction Reuse Recycling
RE : THINK !
Composing & Digestion Energy recavery
ปญหาขยะ
Landfill & methane capture
บริหารจัดการอยางเหมาะสม
Landfilling
Perspective 04
กลุมกิจกรรมหลักของโครงการ • กิจกรรมศูนยการเรียนรูการบริหารจัดการขยะ เปนการสงเสริมกาเรียนรูความเขาใจใหแกภาคประชาชนไดเรียนรู กระบวนการจัดการที่ถูกตองและเหมาสม มีประสิทธิภาพโดยวัตถุประสงคของการเรียนรู เพื่อ 1. ในศตวรรษหนามนุษยเรา สามารถใชทรัพยากรไดอยางมีประสิทธิภาพกวาเดิมถึง 10 เทา 2. โดยการพัฒนาการใชทรัพยากรไปพรอมกับการเติบโตทางเศรษฐกิจ 3. พัฒนาขอดี ขอเสีย ของกระบวนการีไซเคิลใหมีประสิทธิภาพ 4. มนุษยสามารถอยูอยางยั่งยืน และอยูอยางมีประสิทธิภาพมากที่สุด 5. มนุษยสามารถอยูอาศัยบนโลกใบนี้ไดอยางมีความสุขที่มีความสุข โดยไมตองทำลายธรรมชาติ • กิจกรรมกระบวนการคัดแยกขยะรีไซเคิล เพื่อนำผลิตภัณฑตั้งตนสามารถไปผลิตเปนผลิตภัณฑใหม • กิจกรรมกระบวนการแปรรูปขยะเปนพลังงาน โดยนำขยะประเภทขยะทั่วไปมาแปรรูป เพื่อสงเสริมกระวนการแปรรูป พลังงานทดแทน โดยการดำเนินงานจากภาคเอกชน และไดรับการสนับสนุนโดยรัฐบาล กระทรวงทรัพยากรธรรมชาติ และสิ่งแวดลอม และกระทรวงพลังงาน
องคกรกับการจัดการขยะ
019
สังคมสูการเปลี่ยนแปลง
018
RESOUCE วัฒนกรรมและการแกไขปญหา
017
E-Waste
016
RECYCLES
015
REUSE การใชซ้ำ
014
ทรัพยากร กับการเกิดขยะ
013
Reduce Idea
012
การคัดแยกประเภทขยะ
011
REDUCE การลดขยะ
10
Water Wheel ขยะจากแหลงน้ำ
09
ภาพรวมการเกิดขยะ
08
ผลกระทบ
07
ปญหาขยะ
06
เมืองจำลอง และการเกิดปญหาขยะ
05
จุดเริ่มตน เนื้อหาการจัดแสดง การจัดการของเสีย คือ ?
04
นิทรรศการแฟชั่นจากงานวัสดุรีไซเคิล
03
นิทรรศการนิทรรศการศิลปะจากวัสดุรีไซเคิล
02
นิทรรศการผลิตภัณฑจากวัสดุรีไซเคิล
01
10,580 sq.m. > > > >
4,953 sq.m. 1,527 sq.m. 1,280 sq.m. 2,820 sq.m.
กลุมกิจกรรมยอยของโครงการ • กิจกรรมจัดแสดงงานผลิตภัณฑจากวัสดุรีไซเคิล เพื่อสงเสริมชองทาง ทางเศรษฐกิจ • กิจกรรมสงเสริมความรู และการประชุม สัมมนาที่เกี่ยวของ • กิจกรรมของการวิจัยและพัฒนากระบวนการจัดการขยะ เพื่อพัฒนากระบวนการที่มีประสิทธิภาพมายิ่งขึ้น • กิจกรรมการดำเนินการโครงการดวยกระบวนการบำรุงรักษาน้ำ เพื่อนำมาใชในโครงการ โดยการรักษา บำรุง และเปลี่ยนแปลงจากน้ำเสียนำมาเขาสูกระบวนการกลั่นใหม เพื่อนำมาใชกับกระบวนการแปรรูปพลังงานจากขยะ
180 sq.m. 12
13
15 14
10
2 4
150 sq.m.
5
6
1
3 7 8
4
3
1
01 11
29 2827
5
9
120 sq.m.
18 19
120 sq.m. 21 23
20
22 24 25 200sq.m.
02 6 200 sq.m.
700 sq.m.
200 sq.m.
8 04
6 34
12 05
4
1017sq.m.
8
120 sq.m.33 32
31
17
200 sq.m. 03 7 200 sq.m.
13
200 sq.m.5
10
1
14
15 26
30
100 sq.m.
75 sq.m.
100 sq.m.
3
120sq.m.
190 sq.m.
9
2 2
16
400 sq.m.
11
327 sq.m.
37 1200 sq.m.
1 การจัดการของเสีย กับความสำคัญ 1 > ความทาทายกับการจัดการที่ยั่งยืน 2 > การจัดการขยะ และทรัพยากร 3 > จุดเริ่มตนของการพัฒนาที่ยั่งยืน Special Toppic 01 . ของเสียและการเปลี่ยนแปลง Special Toppic 02 . ของเสียและการเปลี่ยนแปลง
2 พื้นฐาน นิยม แนวคิด และตัวชี้วัด 4 > The Global Waste Management Outlook (GWMO) การจัดการของเสียสากล 5 > ขอบเขต และความคุมครอง 6 > รูปแบบการจัดการของเสีย และทรัพยากร 7 > กรอบการวิเคราะห 8 > ขอมูลที่เกี่ยวของกับการจัดการของเสีย และตัวชี้วัด 9 > ตัวชี้วัดการบริหารจัดการทรัพยากร Special Toppic 03 . การบริโภคอยางยั่งยืน และการผลิต Special Toppic 04 . ของเสีย Special Toppic 05 . การจัดการขยะมูลฝอยในหมู เกาะ และประเทศกำลังพัฒนา
3 การจัดการของเสีย : สถานะทั่วโลก 10 > ความสำคัญของการจัดการ 11 > ภาพรวมของเสียทั่วโลก 12 > ภาพรวมของขยะ MSW generation 13 > การคุมครองสุขภาพประชาชน 14 > กระบวนการกูคืนทรัพยากร 15 > อุตสาหกรรมวัสดุทั่วโลก 16 > ขยะอื่นๆ และประเด็นที่เกิดขึ้น Special Toppic 06 . ขยะการกอสรางและการรื้อถอน Special Toppic 07 . ของเสียอันตราย Special Toppic 08 . ของเสียอิเล็คทรอนิกส Case Study 01 . เครือขายสำหรับการรีไซเคิล ขยะอิเล็คทรอนิกสในประเทศเคนยา และแอฟริกาอื่นๆ Special Toppic 09 . ขยะในทะเล Special Toppic 10 . ภัยพิบัติของเสีย Case Study 02 . ภัยพิบัติพายุไตฝุนไฮยาน ประเทศฟลิปปนส Special Toppic 11 . ขยะจากอาหาร Case Study 03 . การเปลี่ยนแปลงพฤติกรรม และการลดของเสีย Case Study 04 . มิลาน : มหานครแรกในยุโรป กับการคัดแยกขยะจากอาหาร
4
การกำกับดูแลของเสีย 17 > บทสรุป : ความสำคัญของการจัดการของเสีย 18 > บทนำของการกำกับดูแลของเสีย 19 > การควบคุมโดยตรง 20 > การดำเนินการ และการบังคับใช 21 > เครื่องมือทางเศรษฐศาสตร 22 > ประเด็นทางสังคม 23 > ผูมีสวนไดเสีย 24 > รัฐบาล และผูมีสวนไดเสีย 25 > ทางเลือกที่เหมาะสมกับนโยบาย Special Toppic 12 . เกณฑการกำจัดขยะ สูกระบวน การผลิตปุยในยุโรป Special Toppic 13 . ความคิดริเริ่ม ในกลุมองคกร ความรวมมือทางเศรษฐกิจและพัฒนา OECD countries Special Toppic 14 . ของเสียปกติ Special Toppic 15 . ประเภท และการจัดการของเสีย Case Study 05 . เมืองโบโกตา ประเทศโคลัมเบีย สถานการณการจัดเก็บของเสียสูกระบวนการรีไซเคิล
5 การจัดการของเสียทั่วโลก : หนทางในอนาคต
26 > แนวทางแบบองครวม 27 > สิ่งที่ตองทำเพื่อรับมือการจัดการของเสีย 28 > การรีไซเคิลและการกูคืนพลังงาน 29 > ขอเสนอแนะ 30 > ขอเรียกรองทั่วโลกสำหรับการดำเนินการจัดการขยะ
35
7
38
2820 sq.m.36 39
1280 sq.m.
6 พื้นที่จัดแสดงงานรีไซเคิล 31 > การจัดแสดงศิลปะจากงานรีไซเคิล 32 > การจัดแสดงฟอนิเจอรจากวัสดุรีไซเคิล 33 > การจัดแสดงศิลปะแฟชั่นจากวัสดุรีไซเคิล 34 > รวมทั้งผลงานความคิดสรางสรรตจากวัสดุรีไซเคิล
7 นิทรรศการกลางแจง 35 > พื้นที่สำหรับงานนิทรรศการตามชวงเวลากิจกรรม 36 > กิจกรรมสงเสริมโครงการ
8 นิทรรศการชั่วคราว 37 > พื้นที่สำหรับงานนิทรรศการตามชวงเวลากิจกรรม 38 > กิจกรรมสงเสริมโครงการ 39 > พื้นที่สำหรับเชาแตละหนวยงานเพื่อนำจัดกิจกรรม
รวมพื้นที่สุทธิ ประมาณพื้นที่ชั้นแรก พื้นที่สีเขียว รอยละ 50 ของที่วาง
11,911.87 5,955.94 11,911.88
sq.m. sq.m. sq.m. (8.5 ไร)
Water wheel
sq.m. sq.m./ (2 ชั้น ละ 304.74 sq.m.) sq.m./ (3 ชั้น ละ 2,061 sq.m.) sq.m./ (2 ชั้น ละ 493.71 sq.m.) sq.m. sq.m.
พื้นที่ริมน้ำ
319.36 609.48 6,183 987.42 237.39 3,581.21
นิทรรศกลางแจง
1.สวนสำนักงานบริหาร 2.สวนงานวิชาการ วิจัยและพัฒนา 3.สวนจัดแสดงนิทรรศการ 4.สวนบริการสาธารณะ 5.สวนสนับสนุนโครงการ 6.พื้นที่จอดรถ
ลานกิจกรรม กลางแจง
ภาพรวมของโครงการอุทยานเรียนรู จัดการขยะชุมชน เพื่อกลุมนักทองเที่ยว และผูสนใจ ไดตระหนักถึงปญหาการเกิด ขยะที่สงผลตอสิ่งแวดลอมของโลก ซึ่งประกอบไปดวยสวน สงเสริม พื้นที่ แกชุมชนบริเวณโดยรอบ
Bird eye view 01
Perspective 01
Bird eye view 02
Perspective 02
Bird eye view 03
Perspective 03
First Floor Plan
Waste Management Learning Park Scale 1 : 300
N
Second Floor Plan Waste Management Learning Park Scale 1 : 300
N
Cooling tower SDB
SDB
ถังเก็บน้ำชั้นดาดฟา
Cooling tower
SDB
AHU
SDB
Service lift
SDB
SDB
AHU AHU
SDB
Service lift
Main lift
Service lift
AHU SDB
SDB
AHU
SDB
split type
Service lift
Main lift
split type
Service lift
Main lift
Service lift
Main lift
SDB
SDB
SDB
AHU
SDB split type SDB
SDB
AHU
split type
split type
ถังบำบัดน้ำเสีย ถังเก็บน้ำใตดิน
Transformer
split type
SDB Generator SDB
Main lift
Chiller
Service lift
Pump SDB
AHU
Service lift
split type
Main lift
SDB split type
เชื่อมตอกับระบบไฟฟาสาธารณะ
Main lift Service lift
เชื่อมตอกับระบบน้ำประปาสาธารณะ เชื่อมตอกับระบบระบายน้ำเสีย
SDB
Building electrical system
Water supply and sewage systems
Air conditioning system
Building transport system
Detail Design
Waste Management Learning Park
Section B
Waste Management Learning Park Scale 1 : 200
รายละเอียดสถาปตยกรรม สวนหนาตางรับแสง
รายละเอียดสถาปตยกรรม สวนโครงสราง
รายละเอียดสถาปตยกรรม สวนฝาเพดาน
รายละเอียดสถาปตยกรรม สวนหองประชุมใหญ Section D
Waste Management Learning Park
Scale 1 : 200
รายละเอียดสถาปตยกรรม สวนหลังคาสวนหิน
Elevation E
Elevation D
Waste Management Learning Park
Waste Management Learning Park
Scale 1 : 300
Scale 1 : 300
Section A
Waste Management Learning Park
Scale 1 : 200
Section C
Waste Management Learning Park
Scale 1 : 200
Elevation A
Elevation B
Waste Management Learning Park
Waste Management Learning Park
Scale 1 : 300
Scale 1 : 300
สวนนิทรรศการ แสดงภาพรวมของการ เกิดขยะแสดง การสรางขยะ สูปญหาที่ เกิดขึ้น โดยเลาเรื่อราวตั้งแตการนำ ทรัพยากรในธรรมชาติมาใชงาน
สวนนิทรรศการแฟชั่น จากงานวัสดุรีไซเคิล โดยจัดแสดงบนบริเวณพื้นที่โปรง มีเวที สำหรับการเดินแสดง
สวนหองเรียนรู เปนหองสำหรับผูเขาเยี่ยม ชมที่สนใจ ขอมูลเชิงลึก เพื่อเรียนรูรวม ถึงการพัฒนา
สวนโถงบันไดเวียน โถงจัดแสดงงาน ศิลปะจากวัสดุรีไซเคิลขนาดใหญ
โถงพักคอย สวนชานพัก ทางขึ้นแตละชั้น จุดพักคอยสำหรับผูเขาชมนิทรรศการ
สวนนิทรรศการ Water wheel ขยะจากแหลงน้ำ สวนนิทรรศการ แสดงกระบวนการกักเก็บขยะจาก แมน้ำเจาพระยา โดยใชอุปกรณเก็บ ขยะจากแหลงน้ำอัตโนมัติ
สวนนิทรรศการจัดแสดงผลิตภัณฑ จากวัสดุรีไซเคิล โดยการจัดโชวแสดง ผลิตภํณฑ เพื่อนำเสนอ และจำหนาย สินคา จากผลิตภัณฑขยะ
สวนนิทรรศการกระบวนการ RESOUCE อธิบาย และนำเสนอขอมูล นวัตกรรม การแกไขปญหาที่ดีตอสิ่งแวดลอม
สวนฝายวิจัย และพัฒนา พื้นที่สวน เจาหนาที่รัฐเพื่อพัฒนา ศึกษานวัตกรรม สงเสริมสิ่งแวดลอมที่ดี
โถงตอนรับหลักโครงการ สวนตอนรับผู เขาใชงาน กลุมนักเที่ยว และผูสนใจศึกษา
Retirement Condominium
701419 Special Topic in Architictural Design Studio. (Hybrid Building Studio) Location : Chaingmai, Thailand Type : Residential Level : Year 4, Secound Semester (Final Project) Supervivor : Asst. Prof. Watcharin Jinwut Skill Program : Autodesk Revit / PS. /AI. * University Architect Design Projects - 2016
Elevation B
scale 1 : 450
scale 1 : 450
Section A
scale 1 : 450
OFFICE BUILDING AND SHOPPING ARCADE 701418 Architectural Design for Sustainability III Location : Phtsanulok , Thailand Type : Residential Level : Year 4 ,First Semester (Final Project) Supervivor : Dr. Sran Jransomsak Skill Program : Revit / PS. /AI. * University Architect Design Projects - 2016
MUSEUM OF WATER.
701418 Architectural Design for Sustainability III Location : Phtsanulok , Thailand Type : Residential Level : Year 4 ,First Semester (Final Project) Supervivor : Mr. Preecha Makthippachai Skill Program : Revit / PS. /AI. * University Architect Design Projects - 2016
Urban Planning and Design 701446 Urban Planning and Design Location : Phtsanulok , Thailand Type : Residential Level : Year 4 ,First Semester (Final Project) Supervivor : Assist.professor Dr. Nattika Nawapran Skill Program : Auto CAD / Skatchup + Vray / PS. /AI. * University Architect Design Projects - 2016
A BOUTIQUE HOTEL
701315 Architectural Design for Sustainability I Location : Phtsanulok , Thailand Type : Residential Level : Year 3 ,First Semester (Final Project) Supervivor : Asst. Prof. Watcharin Jinwut Skill Program : Autocad / Skatchup + Vray / PS. /AI. * University Architect Design Projects - 2016
ELEVATION A scale 1 : 125
ELEVATION B scale 1 : 125
ELEVATION C scale 1 : 125
ELEVATION D scale 1 : 125
KINDERGARTEN.
701315 Architectural Design for Sustainability I Location : Phtsanulok , Thailand Type : Education Level : Year 3 ,First Semester (Final Project) Supervivor : Asst. Prof. Nattika Nawapan Skill Program : Archicad / PS. /AI. * University Architect Design Projects - 2015
7
เส้น สาย สับ ทอ
“ซะป๊ะ สเปซ” (SAPA - SPACE) โครงการสถาปนิกล้านนนา 2557 (Lanna Architect 2014) Location : Promanda Resort Mall ,Chiangmai ,Thailand Type : Workshop Level : Year 3 ,Second Semester Skill Program : Sketchup + Vray / PS. * Workshop Design Projects - 2014
ORIENTAL STYLE
Oriental Style Home competition : SCG (Consolation Prize) Location : Phitsanulok ,Thailand Type : Residential Level : Year 2 ,First Semester * Sketch Design - 2014
HOTEL LOUNGE
701345 Interior Architecture Location : Pairin Hotel ,Phitsanulok ,Thailand Type : Renovate Lounge Level : Year 3 ,Second Semester Skill Program : Sketchup + Vray / PS. * University Design Projects - 2015
HOUSE
Sun Ray House Location : Phitsanulok ,Thailand Type : Residential Level : Year 3 ,First Semester Skill Program : Sketchup + Vray / PS. * Sketch Design - 2015
STEEL STRUCTURES ส่อง อดีตผ่านปัจจุบัน Location : Phitsanulok ,Thailand Type : Residential Level : Year 3 ,First Semester Skill Program : Sketchup + Vray / PS. * Sketch Design - 2015
STEEL STRUCTURES HOUSE
Pocket Garden Location : Phitsanulok ,Thailand Type : Residential Level : Year 4 ,First Semester Skill Program : Revit / PS. / AI. * Sketch Design - 2016
HOUSE Pocket Garden Home Location : Phitsanulok ,Thailand Type : Residential Level : Year 4 ,First Semester Skill Program : Revit / PS. / AI. * Sketch Design - 2015
CAFE’ SHOP
Shop Location : Thailand Type : Workshop Level : Year 4 ,Second Semester Skill Program : Autodesk Revit / PS. * Sketch Design - 2016
SALE OFFICE
Sale Office Location : Chaingmai ,Thailand Type : Residential Level : Year 3 ,First Semester Skill Program : Autodesk Revit / PS. * Sketch Design - 2015
THANK .
ARCHITECTURE PORTFOLIO Jakkrawan Sutham +6687 359 6462 {M} Thailand cartulor@gmail.com