Architecture Portfolio 2018 - Jakkrawan Suthum.

Page 1

PORT FOLIO JAKKRAWAN SUTHUM

{ Architecture Portfolio by Jakkrawan Suthum, 2018 }



INDEX

PROFILE RESUME I’m Jimmy, Jakkrawan Suthum Student Architect | B.Arch | 2013-2017 Architect | Chapman Taylor (Thailand) | 2017-Present Nationality : Thai Current Location : Bangkok, Thailand Date of Birth : 31/ January/ 1994 SOCIAL pinterest.com/jimmycartulor/ issuu.com/jakkrawan linkedin.com/in/jakkrawan-suthum-1a8442120/

I’m enjoy designing projects that responds well to the context while keeping an eye on sustainability. Being part of the young generation of architects, he is particularly fond of developing innovative design solutions and giving architecture a modern touch,with focus on implementing BIM modeling as part of the design phase. IT SKILLS OS : MS Windows : Mac Os X MS office : Word : Excel : PowerPoint Adobe : Photoshop : Illustrator : InDesign Autodesk : Revit : Flow Design : Auto CAD : 3ds Max Graphisoft : ArchiCAD Sketchup + Vray Enscape DIALux Lumion 3D OTHER SKILLS Model Making, Laser cutting software, Drafting, Drawing and Photography.

CONTACT +6687 359 6462 {M} Thailand Web address : issuu.com/jakkrawan Email : cartulor@gmail.com

Smart City Project Location : Bangkok, Thailand Type : Residents / Mall / Office Skill Program : Autodesk Revit / PDF.

* University Architect Design Projects - 2016

Urban Planning and Design

HON THI ISLANDS RESORT

* University Architect Design Projects - 2016

Resort Location : Hon-Thi, Vientnam *Architect Design Projects - 2017

A BOUTIQUE HOTEL

RESORT HOTEL

* University Architect Design Projects - 2015

Ao Nang Resort Location : Krabi, Thailand *Architect Design Projects - 2017

KINDERGARTEN.

MUI DINH ECO RESORT ECO Resort Location : Mui-Dinh, Vietnam *Architect Design Projects. 2016-2017

YANGON OFFICE TOWER Office Building Location : Yangon, Myanmar *Architect Design Projects - 2017

WASTE MANAGEMENT LEARNING PARK

* University Thesis Architect Design Projects - 2017

High School Matthayomvitthaya School, Lampang, Thailand Expected Gradution : March 2012 GPA : 3.47 INTERESTS Graphic Design, Photo Editing, Collage Business, Movie, Game, Foreign Music andTravel

* University Architect Design Projects - 2016

MUSEUM OF WATER.

Resort Location : Jayasom, India *Architect Design Projects - 2017

worked as a trainee with Architect groups, to refine schematic drawings using Autodesk Revit and Auto CAD, produced from concept design to be present BIM modeling Request for Environmental Permit package on the project condominium. EDUCATION Bachelor of Architecture Naresuan University, Phitsanulok, Thailand Expected Gradution : May 2017 Current GPA : 3.42

OFFICE BUILDING AND SHOPPING ARCADE

M6 NGAMWONGWAN NEW CARPARK BUILDING

JAYASOM WELLNESS RESORT

worked as an Architect Helped in model making and designed the presentation boards for residential and commercial project, Worked mostly with Autodesk Revit, Auto CAD, Sketchup and the Adobe Creative Suite.

Trainee Architect | 3 month | 2016 DWP - design worldwide partnership (Thailand)

* University Architect Design Projects - 2016

Car Parking Location : Ngamwongwan, Thailand *Architect Design Projects. 2017 - 2018

WORK EXPERIENCE

Architect | 1 year 1 month | 2017 - Present Chapman Taylor Thailand Global Architects and Masterplanners

Retirement Condominium

ONE BANGKOK SMART CITY

ARCHITECTURE PORTFOLIO Jakkrawan Sutham Contact +6687 359 6462 {M} Thailand cartulor@gamil.com

* University Architect Design Projects - 2015

. . เส้น สาย สับ ทอ - 2014 Oriental Style - 2014 Hotel Lounge - 2015 Sunray House - 2015 House - 2015 Sale Office - 2015 Steel Structure - 2015 Steel House - 2016 Cafe’ Shop - 2016


ONE BANGKOK SMART CITY Smart City Project Location : Bangkok, Thailand Type : Residential / Commercial Phase : Smart Service Design Develop Company : Chapman Taylor (Thailand) Skill Program : Autodesk Revit / Micresoft Office *Smart Service Design Projects. 2017 - 2018


ONE BANGKOK SMART CITY

C CT V , A QS, 3DS STRATEGY BUILDING BANGKOK, THAILAND 14 TH DECEMBER 2017


Phase 1: DCC

Phase 2: DCC

Phase 3: DCC

Phase 4: Final Design

Extract of Deliverables

Extract of Deliverables

Extract of Deliverables

Extract of Deliverables

For Phase 3, work activities of HCC and Chapman Taylor on DCC include:

Work activities on DCC include:

Work activities on DCC include:

For Phase 2, work activities of HCC and Chapman Taylor on DCC include:

• Ensure and advise that FM smart services specified have interface into DCC • Evaluate Smart Services impact on DCC and A Day in a Life of staff who will be working in DCC (Note: This work activity is included in a Day in a Life section: Phase 1 Deliverable.)

A. Conceptual plan and approach for DCC. Here, we provide design philosophy, standards and technologies on (1) evolution of design (2) physical factors (3) ISO standards for ergonomic design of control centers (4) framework for ergonomic design process and (5) detailed considerations

A. Review, and where needed provide comments on existing architectural design of DCC floor provided by OBH. On the review of DCC floor, HCC together with Chapman Taylor have had several meetings with A49 on the existing floor plan and DCC practicality and functional and technical requirements. A49 has produced 4 options for DCC floor plan based on the discussions from the meetings.

B. Advice on practicality of existing DCC floor layout and functionality regarding DCC functions supported. Here, we provide content on (1) interface relationship matrix for DCC, (2) circulation diagrams, (3) link diagrams, and (4) other command center related guidelines & standards

B. Develop the requirements and propose 1. Functional requirements: Number and profile of personnel needed to man the DCC, size of the room(s) 2. Technical requirements: Estimated quantity and types of equipment, e.g., workstations, video walls

FM Director

FM Smart Services – FM Director

A Day in a Life

Smart Services highlighted in a Day in a Life

6.00

1

FM Director’s house

Energy

1. Before leaving his house, he receives notifications on his smart device reminding him about FM updates on his FM Dashboard.

6.45 6.30

15.30

2. After parking his car, he goes to his office at CUP for FM Morning Brief. As all the systems are integrated, enabling an automatic report to be generated and shown on his FM dashboard. His Facility Manager goes over: • Today’s work orders (deliveries, subcontractors, meetings, possible heavy rain, event: wedding with VVIP PM) • Future events (upcoming concert, AHU maintenance) • Past incidents (slip at O4) 3. He walks back to his office after FM Morning Brief and monitors overall buildings’ functioning and sustainability efficiency through the smart FM Dashboard (Predictive maintenance).

2

2

4

7.30 11.30 13.30

4

13.00 15.00

4 9.20

4. Throughout the day, he receives various FM notifications, i.e., • Excessive elevator vibration • Wastewater flow fluctuations • Power drop • Medical emergency red alert • Vandalism alert Later, the system alerts that everything is back to normal.

E1: Energy monitoring and control system E2: Demand side management E4: Distribution mgmt. system E5: Grid stability management E8: Transformer load measurement E9: Electricity consumption smart metering E22: Elevator supervisory system

Water & Wastewater W3: Wastewater flow meter monitoring

Security S1: Activity visualizer (CCTV) S6: Facial recognition and face collector (CCTV) S9: Intelligent multi-camera human tracking (CCTV) S10: Body worn cameras S12: Emergency response management S32: Geo-location and tracking

4 16.00

6

5. He goes for a lunch meeting with One Bangkok’s executive at H4 to discuss about energy and water consumption targets for all buildings. 6. He receives a notification from his team that prior work orders for a wedding and VVIP arrival are completed. He conducts final FM check and waits to welcome the Prime Minister who is the VVIP for a wedding event tonight.

Parking

Waste

Conceptual Plan & Approach to DCC

A.3 ISO Standard for Ergonomic Design of Control Centers

Integrated Maintenance

ISO 110641:2000 Part 2 : Principles for the Arrangement of Control Suites (Ratified in 2010)

ISO 110641:2000 Part 3 : Control Room Layout (Ratified in 2009)

ISO 110641:2000 Part 4 : Layout and Dimensions of Workstations (Ratified in 2013)

ISO 110641:2000 Part 5 : Displays and Controls (Ratification pending)

ISO 110641:2000 Part 6 : Environmental Requirements for Control Centers (Ratified in 2014)

ISO 110641:2000 Part 1 : Principles for the Design of Control Center (Ratified in 2010)

What value can be expected from ISO 11064? • •

M1: Predictive maintenance M2: Data analytics M3: Statistics and reports

• •

Minimize human errors. It is a guideline of ergonomic and human factors. Safely fulfil growing demands on safe, secure and efficient operation o Modernizing of data processing technologies and software o Fielding of automated and centralized control and operational management systems o The operator/dispatcher : Interface man and machine Avoid consequences of mechanical and human failure! o Same as automation increases, so do the sources of errors Helps to observe legal requirements o Labor laws, employer’s liability, insurance issues…

20

5

For presentation purpose and internal use only.

Advice on DCC Practicality

Advice on DCC Practicality

B.3 Link Diagram of Functions Control Centre

B.4 Guidelines & Standards

C. Develop budgetary cost estimates for DCC technical requirements and fit-out for DCC floor

A.5 Detailed Considerations: Control Room

4

For presentation purpose and internal use only.

Indicative

Conceptual Plan & Approach to DCC ISO 110641:2000 Part 1 : Principles for the Design of Control Center (Ratified in 2010)

5

4

• Cost estimates for DCC fit-out and provisioning of DCC floor based on revised design. In this case, as of 25 May 2018, there has been no updates given to HCC on the changes in the DCC design. • Guidelines for data protection and privacy, per Thailand standards, for data or resulting reports as used within the DCC. This will include guidelines for proper handling of video and audio data by DCC staff as part of their operational duties.

Conceptual plan and approach: ISO standards for ergonomic design of control enters

2

For presentation purpose and internal use only.

23 positions : 290 sq.m (circulation 40%, 9-15 sq.m. per person Aspects to be considered: Usually, control and monitoring tasks and associated task zones are situated in the control room. The location of the control room within a control suite should be determined by applying such considerations as: • Security and safety (for example direct entrance, special entrance doors/gates, entrance route via several security checks) Can also have dedicated area per building 5 BAS areas, 3 staff per area, plus supervisor area Operational and social links related to the level of the control room (ground level or not).The control and monitoring task zones may be in the same room, or might be integrated with the following task zones: o Documentation task and associated task zone o Administrative task and associated task zone o Shift book, notes and so on (see previous item) o Analysis/diagnostic tasks and associated task zone o Apply the same considerations as for documentation task, including the possibility that several persons will be discussing certain problems o Supervisory tasks and associated task zone o Consider possible conflicting factors such as the work organization (team work versus hierarchical distance between operating personnel and supervisory staff), privacy aspects, a general view on the process and so on o Permit and visitor handling task and associated task zone o Shift turnover • Work stations have the regular desktops are augmented with adjustable height work location which allow a change from always sitting to having a standing work stations and discussion locations. • 9 m2 to 15 m2 (100 ft2 to 160 ft2) should be allowed per control • • •

35

22

Conceptual plan and approach: Detailed considerations for control rooms

Advice on DCC practicality: Link diagram

36

Advice on DCC practicality: Other command center related guidelines & standards

For presentation purpose and internal use only.

3

For presentation purpose and internal use only.

For presentation purpose and internal use only.

4

For presentation purpose and internal use only.

For presentation purpose and internal use only.

5


O2-1

O2-2

O2-3

O2-4

O2-5

NOTE :

10500

10500

10500

10500 8750

1700

900

900

CCTV 02

CCTV 01 : 90-degree Super Dynamic HD Network Camera CCTV 02 : 180-degree Super Dynamic HD Dome Network Camera CCTV 03 : 360-degree Network Camera

10350 1310 4986

455

3DS 03

IDENTIFICATION (250 ppm RESOLUTION)

3DS 01

3DS 03

3DS 03

CCTV 02

800

O2-A 10500

CCTV 02

IDENTIFICATION (250 ppm RESOLUTION) CCTV 02

CCTV 02

CCTV 02 CCTV 02

CCTV 01

O2-B 7374

3194

7122

14449

3194

CCTV 01

CCTV 02

10500

CCTV 02

CCTV 02 CCTV 01

IDENTIFICATION (250 ppm RESOLUTION)

CCTV 01

O2-C

AXONOMETRIC - LOBBY - CCTV_A

CCTV 02 CCTV 01

RECOGNITION (125 ppm RESOLUTION) CCTV 01

CCTV 01

CCTV 01 CCTV 02

CCTV 01

A

10500

CCTV 01

CCTV 01

SECTION A_3D Sensors 1 : 50

CCTV 02

CCTV 01 CCTV 01

ENTRANCE 2

CCTV 01

O2-213

O2-D

CCTV 02 IDENTIFICATION (250 ppm RESOLUTION) CCTV 01

2-17 O2-5

3200

7122

3200

2-18

10500

CCTV 02

1123

14443

3DS 01

3DS 01

CCTV 01

IDENTIFICATION (250 ppm RESOLUTION)

O2-E

CCTV 02

CCTV 02

RECOGNITION (125 ppm RESOLUTION)

CCTV 01

CCTV 02

2050

5500

L4 TOS 19700 TOFF 19700

L3 TOS 14200

OPEN

AXONOMETRIC - LOBBY - CCTV

4450

6500

CCTV 02

NOTE : L2 TOFF 7700 TOS 7700

02 - LOBBY - CCTV SENSOR LOCATION

SECTION - L02 - CCTV

1 : 350

1 : 250

CCTV 01 : 90-degree Super Dynamic HD Network Camera CCTV 02 : 180-degree Super Dynamic HD Dome Network Camera CCTV 03 : 360-degree Network Camera

AXONOMETRIC - LOBBY - CCTV_B

B

ONE BKK SMART CITY, OFFICE O2 - LOBBY LAYOUT-L02-CCTV

ONE BKK SMART CITY, OFFICE O2 - AXONOMETRIC-LOBBY-CCTV

PROJECT REFERENCE: C139/OBS ISSUE DATE: 12/Dec/2017 SCALE : As indicated @ A3

PROJECT REFERENCE: C139/OBS ISSUE DATE: 12/Dec/2017 SCALE : @ A3

DRAWING No.:

O2-213

DRAWING No.:

SECTION B_3D Sensors 1 : 50

12/Dec/2017

O2-202

O2-1

1700

1800

11300

3DS 02

O2-D

3430

KEY PLAN-L16 FLOOR 3DS 02

NOTE : 3DS 01 : Door Learn ,Dual Relay output pedestrian door activation + monitored safety (Installation above the door) 3DS 02 : Door Learn ,Dual Relay output pedestrian door activation + monitored safety (Installation under the ceiling ) 3DS 03 : Sensors escalator

3DS 02

3

3304

O2-110

2000

3130

4365

3DS 02

AQS 01

3DS 02

3DS 02

3DS 02 3DS 02

3DS 02

AXONOMETRIC - L16 - 3D SENSORS_A

3DS 02

O2-E

3DS 02

O2-1

3DS 02

A

3DS 01 3DS 01 3DS 01

SECTION A_AIR Quality Sensors 1 : 50

3DS 02

3DS 02

3DS 02

3DS 02

L16 TOS 79200 3DS 02

3DS 02

L15 TOS 74700

AQS 01

AXONOMETRIC - L16 - 3D SENSORS L16 - 3D SENSORS LOCATION

SECTION - L16 - 3D SENSORS LOCATION

NOTE :

1 : 150

1 : 100

3DS 01 : Door Learn ,Dual Relay output pedestrian door activation + monitored safety (Installation above the door) 3DS 02 : Door Learn ,Dual Relay output pedestrian door activation + monitored safety (Installation under the ceiling ) 3DS 03 : Sensors escalator

AXONOMETRIC - L16 - 3D SENSORS_B B

ONE BKK SMART CITY, OFFICE O2 - OFFICE LAYOUT-L16-3D SENSORS

ONE BKK SMART CITY, OFFICE O2 - AXONOMETRIC-L16-3D SENSORS

PROJECT REFERENCE: C139/OBS ISSUE DATE: 12/Dec/2017 SCALE : As indicated @ A3

PROJECT REFERENCE: C139/OBS ISSUE DATE: 12/Dec/2017 SCALE : @ A3

DRAWING No.:

O2-110

DRAWING No.:

O2-2

O2-1

O2-3

O2-4

SECTION B_AIR Quality Sensors 1 : 50

12/Dec/2017

O2-100

O2-5

NOTE : AQS 01 : Room Air quality sensors

O2-A 1700

AQS 01

10801

AIRQ 01

AQS 01

O2-B

AIRQ 01

3209

7368

3200

7122

3200

7088

7355

AQS 01

2 O2-211

AXONOMETRIC - LOBBY - AIR QULITY SENSORS_A

AIRQ 01

AIRQ 01

18250

AIRQ 01

O2-C

AIRQ 01

AIRQ 01

A

AQS 01 AIRQ 01

AIRQ 01

AIRQ 01

SECTION A_CCTV 1 : 50

AQS 01

ENTRANCE

AIRQ 01 AIRQ 01

O2-D

AIRQ 01

5922

AIRQ 01

2-K O2-D

2-J O2-C

AIRQ 01

7603

AIRQ 01

O2-E

AQS 01

5500

L4 TOFF 19700 TOS 19700 OPEN

6500

5000

L3 TOS 14200 OPEN

AXONOMETRIC - LOBBY - AIR QULITY SENSORS

1500

AIRQ 01

L2 TOFF 7700 TOS 7700

02 - LOBBY - AIR QUALITY SENSOR LOCATION

SECTION - L02 - AIR QULITY SENSORS

1 : 350

1 : 250

NOTE : AQS 01 : Room Air quality sensors

AXONOMETRIC - LOBBY - AIR QULITY SENSORS_B B

ONE BKK SMART CITY, OFFICE O2 - LOBBY LAYOUT-L02-AIR QULITY SENSORS

ONE BKK SMART CITY, OFFICE O2 - AXONOMETRIC-LOBBY-AIR QULITY SENSORS

PROJECT REFERENCE: C139/OBS ISSUE DATE: 12/Dec/2017 SCALE : As indicated @ A3

PROJECT REFERENCE: C139/OBS ISSUE DATE: 12/Dec/2017 SCALE : @ A3

DRAWING No.:

O2-211

DRAWING No.:

O2-201

SECTION B_CCTV 1 : 50

12/Dec/2017

AQS 01


M6 NGAMWONGWAN NEW CARPARK BUILDING Car Parking Location : Ngamwongwan, Thailand Type : Residential Phase : Design Development / Design Construction / Construction Company : Chapman Taylor (Thailand) Skill Program : Autodesk Revit *Architect Design Projects. 2017 - 2018





JAYASOM WELLNESS RESORT Resort Location : Jayasom, India Type : Residential Phase : Design Concept Company : Chapman Taylor (Thailand) Skill Program : Autodesk Revit / InDesign. / PS. *Architect Design Projects. 2017 - 2018





HON THI ISLANDS RESORT Resort Location : Hon-Thi, Vientnam Type : Residential Phase : Design Concept Company : Chapman Taylor (Thailand) Skill Program : Autodesk Revit / Indesign *Architect Design Projects - 2017





AO NANG RESORT

Resort Hotel Location : Krabi, Thailand Type : Residential Phase : Design Concept / Design Development Company : Chapman Taylor (Thailand) Skill Program : Autodesk Revit / InDesign. *Architect Design Projects. 2017 - 2018





MUI DINH ECO RESORT ECO Resort Location : Mui-Dinh, Vietnam Type : Eco Residential Phase : Design Concept Company : Chapman Taylor (Thailand) Skill Program : Skatchup + Vray / PS. *Architect Design Projects. 2016-2017





YANGON OFFICE TOWER Office Building Location : Yangon, Myanmar Type : Commercial Phase : Design Development Company : Chapman Taylor (Thailand) Skill Program : Autodesk Revit *Architect Design Projects - 2017





WASTE MANAGEMENT LEARNING PARK 701594 Thesis in Architectural Location : Samudprakran, Thailand Type : Community Park Level : Year 5, (Thesis Project) Supervivor : Asst. Prof. Watcharin Jinwut Skill Program : Autodesk Revit / PS. /AI.

* University Thesis Architect Design Projects - 2017


อุทยานการเรียนรูจัดการขยะชุมชน Waste Management Learning Park

{Preparation} Thesis in architecture. 701594 9 (0-18) วิทยานิพนธทางสถาปตยกรรม 2. 55711758 นายจักรวาล สุธรรม. มหาวิทยาลัยนเรศวร คณะสถาปตยกรรมศาสตร ภาควิชาสถาปตยกรรม.


อุทยานการเรียนรูจัดการขยะชุมชน

Repark™ Waste Management Learning Park Concept ขยะครัวเรือน/สถานประกอบการ ระบบการจัดการขยะ ธนาคารขยะชุมชน

View access

Empty space

Exhibition space

Connect Exhibition

ศูนยใหขอมูล และความรู 1. การจัดการของเสีย และความสำคัญ 2. ผลกระทบสิ่งแวดลอม 3. REUSE การใชซ้ำ 4. RECOVER การกูคืนของเสีย 5. REDUCE การลดการใช กับการจัดการ 6. ทรัพยากร 7. ประเด็นสังคมสูการเปลี่ยนแปลง 8. การจัดการของเสียทั่วโลก 9. นวัตกรรม 10. RECYCLE การรีไซเคิล

การจัดการขยะที่ดีชวยลดลด การปลอยกาซเรือนกระจก : 15-20%

เมืองที่สะอาดเปนเมืองที่ประสบความสำเร็จ • การมีสุขภาพที่ดีและปลอดภัยในสถานที่ที่จะมีชีวิตอยู • สถานที่ที่ดีในการทำธุรกิจและในฐานะนักทองเที่ยว • สงเสริมความรูสึกที่ดีของชุมชนและการเปนเจาของ

นักทองเที่ยว

นิทรรศการ

Zoning mass 01

Zoning mass 02

Zoning mass 03

1. ศิลปะกับงานรีไซเคิล 2. แฟชั่นกับงานรีไซเคิล 3. วัสดุงานรีไซเคิล

นักเรียนนักศึกษา

ผูเขารับการอบรม

กิจกรรมศูนยการเรียนรูจัดการขยะชุมชน เปนการสงเสริมการเรียนรูความเขาใจใหแกภาคประชาชนไดเรียนรู กระบวนการจัดการที่ถูกตองและเหมาสม มีประสิทธิภาพโดยวัตถุประสงคของการเรียนรู เพื่อ 1. 2. 3. 4. 5. • •

'ขยะเพื่อความมั่งคั่ง' ใหสามารถดำรงชีวิตอยางยั่งยืนและ การสนับสนุนการพัฒนาทางเศรษฐกิจ

ในศตวรรษหนามนุษยเรา สามารถใชทรัพยากรไดอยางมีประสิทธิภาพกวาเดิมถึง 10 เทา โดยการพัฒนาการใชทรัพยากรไปพรอมกับการเติบโตทางเศรษฐกิจ พัฒนาขอดี ขอเสีย ของกระบวนการีไซเคิลใหมีประสิทธิภาพ มนุษยสามารถอยูอยางยั่งยืน และอยูอยางมีประสิทธิภาพมากที่สุด มนุษยสามารถอยูอาศัยบนโลกใบนี้ไดอยางมีความสุขที่มีความสุข โดยไมตองทำลายธรรมชาติ กิจกรรมกระบวนการคัดแยกขยะรีไซเคิล เพื่อนำผลิตภัณฑตั้งตนสามารถไปผลิตเปนผลิตภัณฑใหม กิจกรรมกระบวนการแปรรูปขยะเปนพลังงาน โดยนำขยะประเภทขยะทั่วไปมาแปรรูป เพื่อสงเสริมกระวนการแปรรูป พลังงานทดแทน โดยการดำเนินงานจากภาคเอกชน และไดรับการสนับสนุนโดยรัฐบาล กระทรวงทรัพยากรธรรมชาติ และสิ่งแวดลอม และกระทรวงพลังงาน

N

Layout

Waste Management Learning Park Scale 1 : 3000

8.70 %

ประเทศไทย มีปริมาณขยะมูลฝอยเกิดขึ้น ประมาณ 26.78 ลานตัน/ป

กระดาษ

26.8 ลานตัน/ป ขยะมูลฝอยชุมชน > 3 ลานตัน/ป กาก อุตสาหกรรม > 0.56 ลานตัน/ป ของเสียอันตราย จากชุมชน

สามารถนำมารีไซเคิลได อีก 22.59% > พลาสติก 17.65 % > แกว 3% > อลูมิเนียม 1.04% > โลหะ 0.9%

>

> 50,500 ตัน/ป ขยะมูลฝอย ติดเชื้อ > ที่มา: กรมควบคุมมลพิษ, 2558

Ensure by 2020

Ensure by 2030

W1. W2.

W3. W4. W5.

8.6 ลานตัน/ป ขยะมูลฝอยตกคาง สะสม

ทุกคนสามารถเขาถึงบริการจัดการ ขยะมูลฝอยได และราคาไมแพง หยุดการเททิ้ง สูการเผาทำลาย

การจัดการของเสียอยางยั่งยืนและเปนมิตร ตอสิ่งแวดลอม และขยะอันตรายจัดการเหมาะสม ลดการสรางขยะอยางจริงจัง วิธี 3Rs และ การสรางงานสีเขียว ลดการสรางขยะและเศษอาหารจากการคา

สุขภาพของทุกคน / เมืองที่ดี / การบริโภคอยางยั่งยืน / น้ำสะอาดและสุขอนามัยที่ดี / ทรัพยากรทะเล / ระบบนิเวศบนบก

การจัดการของเสีย / การเปลี่ยนแปลงภูมิอากาศ / เขาถึงพลังงาน กระบวนการ 3Rs / การจางงาน / ลดความยากจน / อุตสหกรรมที่ยั่งยืน ลดการสรางเศษอาหาร / ทรัพยากรอาหารที่มั่นคง

บางสวน ลับลอบทิ้ง ! ทิ้งปะปนกับ ขยะทั่วไป !

กลุมกิจกรรมหลักของโครงการ • กิจกรรมจัดแสดงงานผลิตภัณฑจากวัสดุรีไซเคิล เพื่อสงเสริมชองทาง ทางเศรษฐกิจ • กิจกรรมสงเสริมความรู และการประชุม สัมมนาที่เกี่ยวของ • กิจกรรมของการวิจัยและพัฒนากระบวนการจัดการขยะ เพื่อพัฒนากระบวนการที่มี ประสิทธิภาพมายิ่งขึ้น • กิจกรรมการดำเนินการโครงการดวยกระบวนการบำรุงรักษาน้ำ เพื่อนำมาใชในโครงการ โดยการรักษาบำรุง และเปลี่ยนแปลงจากน้ำเสียนำมาเขาสูกระบวนการกลั่นใหม เพื่อนำ มาใชกับกระบวนการแปรรูปพลังงานจากขยะ

RE : PARK 51.93 %

27%

เศษอาหาร 5.77% ขยะไมคุมคาตอการรีไซเคิล > 0.31% ยาง > 0.2% หนัง > 1.37% ใบไม ,กิ่งไม > 3.17% อื่นๆ (ฝุน ,ขี้เถา ,เศษอิฐ)

กำจัดอยางถูกตอง 7.2 ลานตัน/ป

ขยะครัวเรือน /สถานประกอบการ

Waste from > Households > Industry > Agricuture > Forestry > Waste water

ชุมชน

RE : COVER RE : USE RE : DUCE RE : CYCLE

Image Space Exhibition

ลำดับความสำคัญของการจัดการขยะ

Reduction Reuse Recycling

RE : THINK !

Composing & Digestion Energy recavery

ปญหาขยะ

Landfill & methane capture

บริหารจัดการอยางเหมาะสม

Landfilling


Perspective 04

กลุมกิจกรรมหลักของโครงการ • กิจกรรมศูนยการเรียนรูการบริหารจัดการขยะ เปนการสงเสริมกาเรียนรูความเขาใจใหแกภาคประชาชนไดเรียนรู กระบวนการจัดการที่ถูกตองและเหมาสม มีประสิทธิภาพโดยวัตถุประสงคของการเรียนรู เพื่อ 1. ในศตวรรษหนามนุษยเรา สามารถใชทรัพยากรไดอยางมีประสิทธิภาพกวาเดิมถึง 10 เทา 2. โดยการพัฒนาการใชทรัพยากรไปพรอมกับการเติบโตทางเศรษฐกิจ 3. พัฒนาขอดี ขอเสีย ของกระบวนการีไซเคิลใหมีประสิทธิภาพ 4. มนุษยสามารถอยูอยางยั่งยืน และอยูอยางมีประสิทธิภาพมากที่สุด 5. มนุษยสามารถอยูอาศัยบนโลกใบนี้ไดอยางมีความสุขที่มีความสุข โดยไมตองทำลายธรรมชาติ • กิจกรรมกระบวนการคัดแยกขยะรีไซเคิล เพื่อนำผลิตภัณฑตั้งตนสามารถไปผลิตเปนผลิตภัณฑใหม • กิจกรรมกระบวนการแปรรูปขยะเปนพลังงาน โดยนำขยะประเภทขยะทั่วไปมาแปรรูป เพื่อสงเสริมกระวนการแปรรูป พลังงานทดแทน โดยการดำเนินงานจากภาคเอกชน และไดรับการสนับสนุนโดยรัฐบาล กระทรวงทรัพยากรธรรมชาติ และสิ่งแวดลอม และกระทรวงพลังงาน

องคกรกับการจัดการขยะ

019

สังคมสูการเปลี่ยนแปลง

018

RESOUCE วัฒนกรรมและการแกไขปญหา

017

E-Waste

016

RECYCLES

015

REUSE การใชซ้ำ

014

ทรัพยากร กับการเกิดขยะ

013

Reduce Idea

012

การคัดแยกประเภทขยะ

011

REDUCE การลดขยะ

10

Water Wheel ขยะจากแหลงน้ำ

09

ภาพรวมการเกิดขยะ

08

ผลกระทบ

07

ปญหาขยะ

06

เมืองจำลอง และการเกิดปญหาขยะ

05

จุดเริ่มตน เนื้อหาการจัดแสดง การจัดการของเสีย คือ ?

04

นิทรรศการแฟชั่นจากงานวัสดุรีไซเคิล

03

นิทรรศการนิทรรศการศิลปะจากวัสดุรีไซเคิล

02

นิทรรศการผลิตภัณฑจากวัสดุรีไซเคิล

01

10,580 sq.m. > > > >

4,953 sq.m. 1,527 sq.m. 1,280 sq.m. 2,820 sq.m.

กลุมกิจกรรมยอยของโครงการ • กิจกรรมจัดแสดงงานผลิตภัณฑจากวัสดุรีไซเคิล เพื่อสงเสริมชองทาง ทางเศรษฐกิจ • กิจกรรมสงเสริมความรู และการประชุม สัมมนาที่เกี่ยวของ • กิจกรรมของการวิจัยและพัฒนากระบวนการจัดการขยะ เพื่อพัฒนากระบวนการที่มีประสิทธิภาพมายิ่งขึ้น • กิจกรรมการดำเนินการโครงการดวยกระบวนการบำรุงรักษาน้ำ เพื่อนำมาใชในโครงการ โดยการรักษา บำรุง และเปลี่ยนแปลงจากน้ำเสียนำมาเขาสูกระบวนการกลั่นใหม เพื่อนำมาใชกับกระบวนการแปรรูปพลังงานจากขยะ

180 sq.m. 12

13

15 14

10

2 4

150 sq.m.

5

6

1

3 7 8

4

3

1

01 11

29 2827

5

9

120 sq.m.

18 19

120 sq.m. 21 23

20

22 24 25 200sq.m.

02 6 200 sq.m.

700 sq.m.

200 sq.m.

8 04

6 34

12 05

4

1017sq.m.

8

120 sq.m.33 32

31

17

200 sq.m. 03 7 200 sq.m.

13

200 sq.m.5

10

1

14

15 26

30

100 sq.m.

75 sq.m.

100 sq.m.

3

120sq.m.

190 sq.m.

9

2 2

16

400 sq.m.

11

327 sq.m.

37 1200 sq.m.

1 การจัดการของเสีย กับความสำคัญ 1 > ความทาทายกับการจัดการที่ยั่งยืน 2 > การจัดการขยะ และทรัพยากร 3 > จุดเริ่มตนของการพัฒนาที่ยั่งยืน Special Toppic 01 . ของเสียและการเปลี่ยนแปลง Special Toppic 02 . ของเสียและการเปลี่ยนแปลง

2 พื้นฐาน นิยม แนวคิด และตัวชี้วัด 4 > The Global Waste Management Outlook (GWMO) การจัดการของเสียสากล 5 > ขอบเขต และความคุมครอง 6 > รูปแบบการจัดการของเสีย และทรัพยากร 7 > กรอบการวิเคราะห 8 > ขอมูลที่เกี่ยวของกับการจัดการของเสีย และตัวชี้วัด 9 > ตัวชี้วัดการบริหารจัดการทรัพยากร Special Toppic 03 . การบริโภคอยางยั่งยืน และการผลิต Special Toppic 04 . ของเสีย Special Toppic 05 . การจัดการขยะมูลฝอยในหมู เกาะ และประเทศกำลังพัฒนา

3 การจัดการของเสีย : สถานะทั่วโลก 10 > ความสำคัญของการจัดการ 11 > ภาพรวมของเสียทั่วโลก 12 > ภาพรวมของขยะ MSW generation 13 > การคุมครองสุขภาพประชาชน 14 > กระบวนการกูคืนทรัพยากร 15 > อุตสาหกรรมวัสดุทั่วโลก 16 > ขยะอื่นๆ และประเด็นที่เกิดขึ้น Special Toppic 06 . ขยะการกอสรางและการรื้อถอน Special Toppic 07 . ของเสียอันตราย Special Toppic 08 . ของเสียอิเล็คทรอนิกส Case Study 01 . เครือขายสำหรับการรีไซเคิล ขยะอิเล็คทรอนิกสในประเทศเคนยา และแอฟริกาอื่นๆ Special Toppic 09 . ขยะในทะเล Special Toppic 10 . ภัยพิบัติของเสีย Case Study 02 . ภัยพิบัติพายุไตฝุนไฮยาน ประเทศฟลิปปนส Special Toppic 11 . ขยะจากอาหาร Case Study 03 . การเปลี่ยนแปลงพฤติกรรม และการลดของเสีย Case Study 04 . มิลาน : มหานครแรกในยุโรป กับการคัดแยกขยะจากอาหาร

4

การกำกับดูแลของเสีย 17 > บทสรุป : ความสำคัญของการจัดการของเสีย 18 > บทนำของการกำกับดูแลของเสีย 19 > การควบคุมโดยตรง 20 > การดำเนินการ และการบังคับใช 21 > เครื่องมือทางเศรษฐศาสตร 22 > ประเด็นทางสังคม 23 > ผูมีสวนไดเสีย 24 > รัฐบาล และผูมีสวนไดเสีย 25 > ทางเลือกที่เหมาะสมกับนโยบาย Special Toppic 12 . เกณฑการกำจัดขยะ สูกระบวน การผลิตปุยในยุโรป Special Toppic 13 . ความคิดริเริ่ม ในกลุมองคกร ความรวมมือทางเศรษฐกิจและพัฒนา OECD countries Special Toppic 14 . ของเสียปกติ Special Toppic 15 . ประเภท และการจัดการของเสีย Case Study 05 . เมืองโบโกตา ประเทศโคลัมเบีย สถานการณการจัดเก็บของเสียสูกระบวนการรีไซเคิล

5 การจัดการของเสียทั่วโลก : หนทางในอนาคต

26 > แนวทางแบบองครวม 27 > สิ่งที่ตองทำเพื่อรับมือการจัดการของเสีย 28 > การรีไซเคิลและการกูคืนพลังงาน 29 > ขอเสนอแนะ 30 > ขอเรียกรองทั่วโลกสำหรับการดำเนินการจัดการขยะ

35

7

38

2820 sq.m.36 39

1280 sq.m.

6 พื้นที่จัดแสดงงานรีไซเคิล 31 > การจัดแสดงศิลปะจากงานรีไซเคิล 32 > การจัดแสดงฟอนิเจอรจากวัสดุรีไซเคิล 33 > การจัดแสดงศิลปะแฟชั่นจากวัสดุรีไซเคิล 34 > รวมทั้งผลงานความคิดสรางสรรตจากวัสดุรีไซเคิล

7 นิทรรศการกลางแจง 35 > พื้นที่สำหรับงานนิทรรศการตามชวงเวลากิจกรรม 36 > กิจกรรมสงเสริมโครงการ

8 นิทรรศการชั่วคราว 37 > พื้นที่สำหรับงานนิทรรศการตามชวงเวลากิจกรรม 38 > กิจกรรมสงเสริมโครงการ 39 > พื้นที่สำหรับเชาแตละหนวยงานเพื่อนำจัดกิจกรรม


รวมพื้นที่สุทธิ ประมาณพื้นที่ชั้นแรก พื้นที่สีเขียว รอยละ 50 ของที่วาง

11,911.87 5,955.94 11,911.88

sq.m. sq.m. sq.m. (8.5 ไร)

Water wheel

sq.m. sq.m./ (2 ชั้น ละ 304.74 sq.m.) sq.m./ (3 ชั้น ละ 2,061 sq.m.) sq.m./ (2 ชั้น ละ 493.71 sq.m.) sq.m. sq.m.

พื้นที่ริมน้ำ

319.36 609.48 6,183 987.42 237.39 3,581.21

นิทรรศกลางแจง

1.สวนสำนักงานบริหาร 2.สวนงานวิชาการ วิจัยและพัฒนา 3.สวนจัดแสดงนิทรรศการ 4.สวนบริการสาธารณะ 5.สวนสนับสนุนโครงการ 6.พื้นที่จอดรถ

ลานกิจกรรม กลางแจง

ภาพรวมของโครงการอุทยานเรียนรู จัดการขยะชุมชน เพื่อกลุมนักทองเที่ยว และผูสนใจ ไดตระหนักถึงปญหาการเกิด ขยะที่สงผลตอสิ่งแวดลอมของโลก ซึ่งประกอบไปดวยสวน สงเสริม พื้นที่ แกชุมชนบริเวณโดยรอบ


Bird eye view 01

Perspective 01

Bird eye view 02

Perspective 02

Bird eye view 03

Perspective 03


First Floor Plan

Waste Management Learning Park Scale 1 : 300

N

Second Floor Plan Waste Management Learning Park Scale 1 : 300

N


Cooling tower SDB

SDB

ถังเก็บน้ำชั้นดาดฟา

Cooling tower

SDB

AHU

SDB

Service lift

SDB

SDB

AHU AHU

SDB

Service lift

Main lift

Service lift

AHU SDB

SDB

AHU

SDB

split type

Service lift

Main lift

split type

Service lift

Main lift

Service lift

Main lift

SDB

SDB

SDB

AHU

SDB split type SDB

SDB

AHU

split type

split type

ถังบำบัดน้ำเสีย ถังเก็บน้ำใตดิน

Transformer

split type

SDB Generator SDB

Main lift

Chiller

Service lift

Pump SDB

AHU

Service lift

split type

Main lift

SDB split type

เชื่อมตอกับระบบไฟฟาสาธารณะ

Main lift Service lift

เชื่อมตอกับระบบน้ำประปาสาธารณะ เชื่อมตอกับระบบระบายน้ำเสีย

SDB

Building electrical system

Water supply and sewage systems

Air conditioning system

Building transport system


Detail Design

Waste Management Learning Park

Section B

Waste Management Learning Park Scale 1 : 200

รายละเอียดสถาปตยกรรม สวนหนาตางรับแสง

รายละเอียดสถาปตยกรรม สวนโครงสราง

รายละเอียดสถาปตยกรรม สวนฝาเพดาน

รายละเอียดสถาปตยกรรม สวนหองประชุมใหญ Section D

Waste Management Learning Park

Scale 1 : 200

รายละเอียดสถาปตยกรรม สวนหลังคาสวนหิน

Elevation E

Elevation D

Waste Management Learning Park

Waste Management Learning Park

Scale 1 : 300

Scale 1 : 300


Section A

Waste Management Learning Park

Scale 1 : 200

Section C

Waste Management Learning Park

Scale 1 : 200

Elevation A

Elevation B

Waste Management Learning Park

Waste Management Learning Park

Scale 1 : 300

Scale 1 : 300


สวนนิทรรศการ แสดงภาพรวมของการ เกิดขยะแสดง การสรางขยะ สูปญหาที่ เกิดขึ้น โดยเลาเรื่อราวตั้งแตการนำ ทรัพยากรในธรรมชาติมาใชงาน

สวนนิทรรศการแฟชั่น จากงานวัสดุรีไซเคิล โดยจัดแสดงบนบริเวณพื้นที่โปรง มีเวที สำหรับการเดินแสดง

สวนหองเรียนรู เปนหองสำหรับผูเขาเยี่ยม ชมที่สนใจ ขอมูลเชิงลึก เพื่อเรียนรูรวม ถึงการพัฒนา

สวนโถงบันไดเวียน โถงจัดแสดงงาน ศิลปะจากวัสดุรีไซเคิลขนาดใหญ

โถงพักคอย สวนชานพัก ทางขึ้นแตละชั้น จุดพักคอยสำหรับผูเขาชมนิทรรศการ


สวนนิทรรศการ Water wheel ขยะจากแหลงน้ำ สวนนิทรรศการ แสดงกระบวนการกักเก็บขยะจาก แมน้ำเจาพระยา โดยใชอุปกรณเก็บ ขยะจากแหลงน้ำอัตโนมัติ

สวนนิทรรศการจัดแสดงผลิตภัณฑ จากวัสดุรีไซเคิล โดยการจัดโชวแสดง ผลิตภํณฑ เพื่อนำเสนอ และจำหนาย สินคา จากผลิตภัณฑขยะ

สวนนิทรรศการกระบวนการ RESOUCE อธิบาย และนำเสนอขอมูล นวัตกรรม การแกไขปญหาที่ดีตอสิ่งแวดลอม

สวนฝายวิจัย และพัฒนา พื้นที่สวน เจาหนาที่รัฐเพื่อพัฒนา ศึกษานวัตกรรม สงเสริมสิ่งแวดลอมที่ดี

โถงตอนรับหลักโครงการ สวนตอนรับผู เขาใชงาน กลุมนักเที่ยว และผูสนใจศึกษา


Retirement Condominium

701419 Special Topic in Architictural Design Studio. (Hybrid Building Studio) Location : Chaingmai, Thailand Type : Residential Level : Year 4, Secound Semester (Final Project) Supervivor : Asst. Prof. Watcharin Jinwut Skill Program : Autodesk Revit / PS. /AI. * University Architect Design Projects - 2016


Elevation B

scale 1 : 450

scale 1 : 450

Section A

scale 1 : 450




OFFICE BUILDING AND SHOPPING ARCADE 701418 Architectural Design for Sustainability III Location : Phtsanulok , Thailand Type : Residential Level : Year 4 ,First Semester (Final Project) Supervivor : Dr. Sran Jransomsak Skill Program : Revit / PS. /AI. * University Architect Design Projects - 2016



MUSEUM OF WATER.

701418 Architectural Design for Sustainability III Location : Phtsanulok , Thailand Type : Residential Level : Year 4 ,First Semester (Final Project) Supervivor : Mr. Preecha Makthippachai Skill Program : Revit / PS. /AI. * University Architect Design Projects - 2016



Urban Planning and Design 701446 Urban Planning and Design Location : Phtsanulok , Thailand Type : Residential Level : Year 4 ,First Semester (Final Project) Supervivor : Assist.professor Dr. Nattika Nawapran Skill Program : Auto CAD / Skatchup + Vray / PS. /AI. * University Architect Design Projects - 2016







A BOUTIQUE HOTEL

701315 Architectural Design for Sustainability I Location : Phtsanulok , Thailand Type : Residential Level : Year 3 ,First Semester (Final Project) Supervivor : Asst. Prof. Watcharin Jinwut Skill Program : Autocad / Skatchup + Vray / PS. /AI. * University Architect Design Projects - 2016



ELEVATION A scale 1 : 125

ELEVATION B scale 1 : 125


ELEVATION C scale 1 : 125

ELEVATION D scale 1 : 125


KINDERGARTEN.

701315 Architectural Design for Sustainability I Location : Phtsanulok , Thailand Type : Education Level : Year 3 ,First Semester (Final Project) Supervivor : Asst. Prof. Nattika Nawapan Skill Program : Archicad / PS. /AI. * University Architect Design Projects - 2015




7


เส้น สาย สับ ทอ

“ซะป๊ะ สเปซ” (SAPA - SPACE) โครงการสถาปนิกล้านนนา 2557 (Lanna Architect 2014) Location : Promanda Resort Mall ,Chiangmai ,Thailand Type : Workshop Level : Year 3 ,Second Semester Skill Program : Sketchup + Vray / PS. * Workshop Design Projects - 2014



ORIENTAL STYLE

Oriental Style Home competition : SCG (Consolation Prize) Location : Phitsanulok ,Thailand Type : Residential Level : Year 2 ,First Semester * Sketch Design - 2014


HOTEL LOUNGE

701345 Interior Architecture Location : Pairin Hotel ,Phitsanulok ,Thailand Type : Renovate Lounge Level : Year 3 ,Second Semester Skill Program : Sketchup + Vray / PS. * University Design Projects - 2015



HOUSE

Sun Ray House Location : Phitsanulok ,Thailand Type : Residential Level : Year 3 ,First Semester Skill Program : Sketchup + Vray / PS. * Sketch Design - 2015


STEEL STRUCTURES ส่อง อดีตผ่านปัจจุบัน Location : Phitsanulok ,Thailand Type : Residential Level : Year 3 ,First Semester Skill Program : Sketchup + Vray / PS. * Sketch Design - 2015

STEEL STRUCTURES HOUSE

Pocket Garden Location : Phitsanulok ,Thailand Type : Residential Level : Year 4 ,First Semester Skill Program : Revit / PS. / AI. * Sketch Design - 2016


HOUSE Pocket Garden Home Location : Phitsanulok ,Thailand Type : Residential Level : Year 4 ,First Semester Skill Program : Revit / PS. / AI. * Sketch Design - 2015


CAFE’ SHOP

Shop Location : Thailand Type : Workshop Level : Year 4 ,Second Semester Skill Program : Autodesk Revit / PS. * Sketch Design - 2016



SALE OFFICE

Sale Office Location : Chaingmai ,Thailand Type : Residential Level : Year 3 ,First Semester Skill Program : Autodesk Revit / PS. * Sketch Design - 2015



THANK .

ARCHITECTURE PORTFOLIO Jakkrawan Sutham +6687 359 6462 {M} Thailand cartulor@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.