?What should I do now If you are the homeowner, property developer or electrician follow :these simple steps .Decide on wiring for Grade 1 or Grade 2 - 1 Mark up house plans (where you want the ‘stuff’). Record which - 2 rooms have which services within them in the table below. Record which room the ELVHE is located, and also the AVHE (if located in .(a remote location from the ELVHE Begin the installation of cable, backboxes, sockets, ELVHE and - 3 .AVHE equipment Continuity check the cables and record any speaker coil locations - 4 .for future reference before the walls are closed up .Finish installation of sockets, ELVHE and AVHE equipment - 5 Mark up ‘as built’ drawings and installation for future reference - 6 These must include dimensions showing where cables coils can ) .(be located within ceiling voids or wall voids .Get the cabling CEDIA verifi ed - 7 .You’re done - 8
ماذا علي أ؟ن أفعل ال؟ن؟ أو التطوير العقاري كهربائي متابعة،إذا كنت صاحب المنزل :الخطوات البسيطة التالية الرسالة . 2 أو للصف1 اتخاذ قرار بشأ؟ن السل ك للصف- 1 كل الذي سجل.(' وضع علمة على مخططات المنازل )أي؟ن تريد 'الشياء- 2 سجل.جميع الغرف التي لديها خدمات ضم؟ن 'م في الجدول أدناه . )اذا كانت واقعة فيهAVHE aussi و،ELVHE كل الذي يقع في غرفة .(ELVHE موقع بعيد م؟ن ELVHE و، مآخذ، تبدأ تركيب كابلوالخلف صناديق- 3 . المعداتAVHE التحقق م؟ن استمرارية الكابلت ورئيس لفائف أي عطلة سجل- 4 .لتكو؟ن مرجعا في المستقبل قبل الجدرا؟ن وأغلق مرتفعا .ELVHE AVHE وتجهيزات، تركيب إنهاء م؟ن مآخذ- 5 علمة حتى 'كما بنيت "رسومات والمرفق كمرجع مستقبلي- 6 )يجب أ؟ن تشمل هذه مقاييس تظهر المكا؟ن الكابلت لفائف يمك؟ن .(تقع داخل فراغات السقف أو الجدار تكو؟ن فراغات الطبعهCEDIA verifi الحصول على الكابلت- 7 . لقد انتهيت- 8