RAFAEL V IĂ‘ OLY ARC HIT EC T S 06/2011 - 02/2012
PROGRAM: Healthcare SIZE: 810,000 sq. ft. COMPLETION: 2017 New Stanford Hospital is the next generation of diagnostic and treatment facility at Stanford Hospital & Clinics and aims to embody the institution’s outstanding reputation for medical care. Utmost consideration for patron hospitality coupled with expert medical care has been a parameter to track the success of design evolution. Accommodations including an expansive atrium lobby, executive dining, outdoor garden, cafeteria, public lounges, and convention amenities are planned to achieve this underlying principal. Public and medical program throughout the facility incorporate cutting edge technologies to meet the expectation of Silicon Valley residents for the life of the building. Design assist project delivery and model sharing ensures a successful, cost controlled product.
NEW STA NFO RD H O S P I TA L Palo Alto, CA
DCDA
GV
GV
DN DN
DN
22' - 9"
AMBULANCE DROP-OFF
GV
FAMILY RESOURCE CENTER
IMAGING DEPARTMENT MEDICAL CENTER PROMENADE
DN
NORTH STAIR
BOOK STORE
UP DN
IMAGING SUPPORT
DEPARTMENT
PASS. ELEVATOR
WEST STAIR UP
UP
EAST STAIR
NEW PARKING STRUCTURE
PASS. ELEVATOR
CAFE
ATRIUM
PASS. ELEVATOR
UP
SOUTH STAIR DN
VALET
MAIN DROP-OFF
SPECIAL SERVICES
ED WAITING LOBBY
WALK-IN ENTRY NE KE
LEVEL 1 FLOOR PLAN
GIFT SHOP
CAMPUS INFO FLORIST SHOP
DISCHARGE BUS STOP
PASTEUR DRIVE
N
SCALE:
NEW STANFORD HOSPITAL
1/32" = 1'-0"
RAFAEL VINOLY ARCHITECTS
MEDITATION SPACE MECHANICAL
INTERVENTIONAL CANTEEN
DN DN
WELLNESS CENTER
6E
DN
UP
CONFERENCE CENTER
MECHANICAL
MECHANICAL
PRIVATE DINING
DN
FL. LT.
CAFETERIA
MECHANICAL
3/23/2011 7:11:55 PM
N
SCALE:
LEVEL 3 FLOOR PLAN
NEW STANFORD HOSPITAL
1/32" = 1'-0"
RAFAEL VINOLY ARCHITECTS
1
2
3
4
5
6
ROOM DEMISING PARTITION,W.O.
STEEL CHANNEL FRAME CEILING PANEL 3 SEE STEEL CHANNEL FRAME CEILING PANEL
5 SEE
A8106
FOR ADDITIONAL NOTES AND DIMENSIONS
A8106
FOR ADDITIONAL NOTES AND DIMENSIONS
OWNER: STANFORD HOSPITAL AND CLINICS DEPARTMENT OF PLANNING DESIGN AND CONSTRUCTION 300 PASTEUR DRIVE, M/C 5871 STANFORD, CA 94304 TEL: 650.380.6858 FAX: 650.498.5833
STEEL ANGLE
STEEL CHANNEL FRAME WALL PANEL
A
ARCHITECT: RAFAEL VINOLY ARCHITECTS PC 149 NEW MONTGOMERY, 5TH FLOOR SAN FRANCISCO, CA 94105 TEL: 415.671.4600 FAX: 415.671.4610
9 SEE
A8106
MEDICAL PLANNER: LEE, BURKHART, LIU 13335 MAXELLA AVENUE MARINA DEL REY, CA 90292 TEL: 310.829.2249 FAX: 310.829.1673
FOR ADDITIONAL NOTES AND DIMENSIONS
WIRE PARTITION - CEILING AT REAR WALL 6" = 1'-0"
WIRE PARTITION - CEILING PANEL CONNECTION
15
6" = 1'-0"
A8106
A8106
A8106
FOR ADDITIONAL NOTE AND DIMENSIONS
5 SEE
5
3 SEE
STEEL MOUNTING PLATE
FOR ADDITIONAL NOTES AND DIMENSIONS
FOR ADDITIONAL NOTES AND DIMENSIONS
6" = 1'-0"
STEEL ANGLE SLIDING DOOR TRACK CARRIER SIZE BY MFR
13 SEE
14 SEE
WIRE PARTITION - PANEL CEILING CONNECTION
10
A8106
FOR ADDITIONAL NOTES AND DIMENSIONS STEEL CHANNEL FRAME WALL PANEL
B
STEEL FRAME BEYOND
STEEL CHANNEL FRAME OF SLIDING DOOR
SLIDING DOOR TRACK STEEL CHANNEL FRAME OF SLIDING DOOR STEEL DOOR FRAME BEYOND
SLIDING DOOR TRACK ABOVE
SLIDING DOOR LATCH
STEEL CHANNEL FRAME OF SLIDING DOOR
WIRE PARTITION - SLIDING DOOR JAMB-LATCH 6" = 1'-0"
SEE
WIRE PARTITION - SLIDING DOOR JAMB-TRACK
19
6" = 1'-0"
WIRE PARTITION - SLIDING DOOR HEAD
14
6" = 1'-0"
WIRE PARTITION - HORIZ PANEL CONNECTION
9
6" = 1'-0"
4
13 A8106 5
12
FOR ADDITIONAL NOTES AND DIMENSIONS
SEE
SEE
A8106
A8106
FOR ADDITIONAL NOTES AND DIMENSIONS
FOR ADDITIONAL NOTES AND DIMENSIONS
STEEL FRAME BEYOND ROOM DEMISING PARTITION, W.O.
WOVEN WIRE MESH, AS SPECIFIED STEEL CHANNEL FRAME WALL PANEL
C
STEEL SHOE ANCHORED TO FLOOR SLAB
STEEL POST OUTLINE OF CEILING PANELS ABOVE
STEEL CHANNEL FRAME OF SWING DOOR W/ STRIKE ANGLE
FINSH FLOOR SLAB STEEL CHANNEL FRAME OF SWING DOOR
STEEL CHANNEL FRAME FOR SWING DOOR OPTION 100% CD - CONSTRUCTION DOCUMENTS
WIRE PARTITION - SWING DOOR-LATCH 6" = 1'-0"
WIRE PARTITION - SWING DOOR-HINGE
18
6" = 1'-0"
WIRE PARTITION - SWING DOOR HEAD
13
6" = 1'-0"
WIRE PARTITION - TYP FLOOR CONNECTION
8
6" = 1'-0"
3
5 13 SEE 5 SEE
A8106
A8106 4
A8106
SEE
6' - 0 3/4"
6' - 0"
04-29-2011
100% DESIGN DEVELOPMENT
10-01-2010
50% DESIGN DEVELOPMENT
05-28-2010
100% SCHEMATIC DESIGN
01-29-2010
ISSUE NAME
3' - 8"
A8106
REV NO
FOR ADDITIONAL NOTES AND DIMENSIONS
FOR ADDITIONAL NOTES AND DIMENSIONS
REV DATE
FIN. CLG W.O. OSHPD NO.
FOR ADDITIONAL NOTES AND DIMENSIONS
02-03-2012
50% CD - CONSTRUCTION DOCUMENTS
IS-081923-43
INCREMENT NO.
CONSTRUCTION DOCUMENTS
PHASE:
REVIEWED IN ACCORDANCE WITH THE REQUIREMENTS OF T24, CCR
3' - 8 1/2"
ROOM DEMISING PARTITION
4
4 A8106
APPROVED
STEEL POST OUTLINE OF CEILING PANELS ABOVE
DATE: _________________________________________
D
IS-081923-43 19
12
A8106
A8106
Office of Statewide Health Planning & Development FACILITIES DEVELOPMENT DIVISION
4' - 3 1/2"
9 A8106 FULL HEIGHT METAL CLOSURE FASTENED TO DEMISING PARTITION
FIN. FLOOR STEEL ANGLE
STEEL CHANNEL FRAME WALL PANEL 3 A8106
WIRE PARTITION - CORNER CONNECTION 6" = 1'-0"
22
WIRE PARTITION - VERT PANEL CONNECTION 6" = 1'-0"
WIRE PARTITION - WALL END
17
6" = 1'-0"
WIRE PARTITION - WORKROOM PC TECH, 0C018
12
1/2" = 1'-0"
2
9 A8106
4' - 6"
4' - 0"
5' - 0"
5' - 0"
5' - 0"
3' - 5"
ARCHITECT OR ENGINEER OF RECORD FIN CLG W.O.
L
12
14
A8106
A8106
22 A8106
3' - 8 1/2"
19 A8106
4 A8106
12
F
C
H
E
B
G
D
A
8' - 0" 4
0 SCALE:
X
2X
As indicated
4' - 3"
13
N
IF THIS DRAWING IS NOT 36in x 48in IT IS A REDUCED PRINT; REFER TO GRAPHIC SCALE
A8106 3
M
KEY PLAN AND NORTH SIGN
A8106
E
J
A8106
P Name:
A8106
P Number:
NEW STANFORD HOSPITAL 631.004
WIRE PARTITION DETAILS 2/9/2012 8:50:03 PM
FIN. FLOOR SHEET TITLE: 19 A8106 WIRE PARTITION - VEST, 0C024 1/2" = 1'-0"
11
WIRE PARTITION - VEST., 0C024 1/2" = 1'-0"
1
A8106 SHEET NUMBER:
PROGRAM: Healthcare SIZE: 1,200,000 sq. ft. COMPLETION: 2012 New Hospital Pavilion (NHP) is planned to become the primary diagnostic and treatment facility at University of Chicago Medical Center for the next fifty years. Program was designed to support surgery, medical procedures and inpatient care to facilitate the owner’s pace with the continual advancement of medicine. The Sky Lobby is the architectural gem of the institution. Public spaces are planned in an expansive central area framing scenic views. Additional space is programmed for dining, tenant retail, executive conference, private offices and a sculpted wood chapel for spiritual reflection.
RAFAEL V IĂ‘ OLY ARC HIT EC T S 01/2007 - 06/2012
NEW HOS P I TA L P A VI L I O N Chicago, IL
OPERATING ROOMS BUILDING CORE / VERTICAL CIRCULATION PREP / RECOVERY
SURGERY SUPPORT UTILITY CORE
INPATIENT BEDS BUILDING CORE / VERTICAL CIRCULATION NURSING UNIT SUPPORT
FAMILY SPACE CHEMO PHARMACY SHARED SUPPORT
2
3
4
5
6
© 2008 RAFAEL VINOLY ARCHITECTS
1
THE UNIVERSITY OF CHICAGO MEDICAL CENTER NEW HOSPITAL PAVILION
OWNER: THE UNIVERSITY OF CHICAGO MEDICAL CENTER 5841 S. MARYLAND AVENUE CHICAGO, IL 60637 ARCHITECT: RAFAEL VINOLY ARCHITECTS PC 50 VANDAM ST NEW YORK, NY 10013 TEL: (212) 924-5060 FAX: (212) 924-5858 HEALTHCARE PLANNERS: CANNON DESIGN 111 WEST WASHINGTON ST., SUITE 2100 CHICAGO, IL 60602 TEL: (312) 332-9600 FAX: (312) 332-9601 STRUCTURAL ENGINEER: THORNTON TOMASETTI ENGINEERS 330 N. WABASH AVE. SUITE 1500 CHICAGO, IL 60611 TEL: (312) 596-2000 FAX: (312) 596-2001 DRUCKER ZAJDEL STRUCTURAL ENGINEERS, INC. 55 SOUTH MAIN STREET, SUITE 277 NAPERVILLE, IL 60540 TEL: (630) 305-5757 FAX: (630) 305-5787 MEP ENGINEER: AFFILIATED ENGINEERS,INC. 5802 RESEARCH PARK BLVD. MADISON,WI 53719 TEL: (608) 238-2616 PRIMERA ENGINEERS, LTD. 100 SOUTH WACKER DRIVE, STE 700 CHICAGO, IL 60606 TEL: (312) 606-0910 FAX: (312) 606-0415 CIVIL ENGINEER: DAVID MASON & ASSOCIATES 464 NORTH MILWAUKEE CHICAGO, IL 60610 TEL: (312) 884-5100 FAX: (312) 884-5101
THE UNIVERSITY OF CHICAGO MEDICAL CENTER NEW HOSPITAL PAVILION 5700 S. MARYLAND AVE.
DUCHOSSOIS CENTER FOR ADVANCED MEDICINE 5758 S. MARYLAND AVE.
PROJECT NUMBER: 60600_UCH PHASE: PERMIT DOCUMENTS JAMES LANCIA
DRAWN BY:
ARCHITECT'S SEAL
2010/06/28 BULLETIN NO. 2 08 2010/06/15 PR-208 07 2010/06/15 PR-217R1 06 2009/12/07 PR #0107 05 2009/12/03 PR #0102 2009/10/23 PR #066 04 2009/08/19 PERMIT RESPONSE REVISIONS 03 2009/07/10 BULLETIN NO. 1 2009/06/01 FULL BUILDING PERMIT 02 2009/04/22 PERMIT COST PROPOSAL 01 2009/03/06 GMP ADDENDUM 3 00 2009/01/23 GMP ADDENDUM 2 00 2008/11/14 GMP REVISION ISSUE ISSUED NO. DATE FOR SHEET RECORDS A
B
C
D
E
F
G
H
J
KEY PLAN AND NORTH SIGN IF THIS DRAWING IS NOT 36"x48" IT IS A REDUCED PRINT; REFER TO GRAPHIC SCALE
SCALE:
1/4" = 1'-0"
DOOR TYPES
SHEET TITLE:
A5.24.1 SHEET NUMBER:
GILBANE | WE O'NEIL, JV Revise similar to detail 43/D13. Glazing will not be recessed into GWB enclosure. Provide 3/8" gap between GWB partition and edge of glass wall. Provide 1/2 patch fitting at 10'-0" for end panel condition.
RVA - 03/23/2011 Additional 1/2" layer GWB both sides per architectural detail 6/A5.27.8.1.
Project: The University of Chicago Medical Center/NHP GBCo. | WEOCC Job No. 4386 Submittal No. 0001-084126-0
See PR-434 to revise return glazing to IG-9, IG-10 - 3/4" laminated for consistency with all glass system.
X Reviewed Revised as Noted
RVA - 03/23/2011
RVA - 03/23/2011
Rejected Revise & Resubmit
Review does Not Relieve Subcontractor/Supplier From: Compliance with Contract Requirements Coordinating Work with Other Trades Verifying Field Dimensions Date:2.9.2011
By: JA
0001.084126.0 Interior Glass Walls and Doors - 7th Floor - Sh....pdf JLancia 03/30/2011
Contractor to revise patch fitting dimensions to match those shown in architectural detail 4/A5.27.8.1, or consult Architect otherwise.
X
RVA - 03/23/2011
6 1/4" RVA - 03/23/2011 Family Waiting clerestory glazing is designed as a recessed aluminum frame system, and shall comply with spec. 084110 Aluminum Framed Entrances and Storefronts. See applicable elevations on A5.26.3, enlarged components on A5.27.4, and details on A5.27.8. Submit product data for system. Submit substitution request if alternate manufacturer is required to comply with architectural details.
RVA - 03/23/2011 Provide #4 Brushed stainless finish.
Provide #4 Brushed stainless finish. RVA - 03/23/2011
Family Waiting clerestory glazing is an aluminum system, similar to Hotelling Office system, but designed to have frame recessed in GWB. See architectural detail 7/A5.27.8.1 RVA - 03/23/2011
RVA - 03/23/2011 Revise similar to detail 43/D13. Glazing will not be recessed into GWB enclosure. Provide 3/8" gap between GWB partition and edge of glass wall. Provide 1/2 patch fitting at 10'-0" for end panel condition. RVA - 03/23/2011
IG-2 - 1/2" tempered as scheduled. RVA - 03/23/2011
Partition type 0.14, 6 1/4" thickness RVA - 03/23/2011 Show corner patch fitting at 10'-0" per elevations 21/E7 & 22/E7. See also Design Team's comments on detail 47/D15. RVA - 03/23/2011 RVA - 03/23/2011 Provide #4 Brushed stainless finish.
Contractor to revise patch fitting dimensions to match those shown in architectural detail 4/A5.27.8.1, or consult Architect otherwise. RVA - 03/23/2011 X Match dimension of typical 1/2" patch fitting size at end panels. RVA - 03/23/2011 IG-9, IG-10 - 3/4" laminated as scheduled. RVA - 03/23/2011 See Design Team's notes on elevations 21/E7 & 22/E7 regarding requested locations. Contractor to advise. RVA - 03/23/2011
Additional 1/2" layer GWB both sides per architectural detail 6/A5.27.8.1. RVA - 03/23/2011
RVA - 03/23/2011 RVA - 03/23/2011 See PR-434 to extend aluminum frames full height to provide adequate structure, typ.
Incorrect. Reference detail 16/D5 for end wall condition.
RVA - 03/23/2011
RVA - 03/23/2011
Detail 25/D8 is more appropriate to show this condition. Revise.
Detail 25/D8 is more appropriate to show this condition. Revise.
RVA - 03/23/2011 RVA - 03/23/2011 IG-5 as scheduled IG-5 as scheduled
RVA - 03/23/2011 IG-5 per schedule
IG-6 per schedule Gilbane/O'Neil to discuss resolution of end wall condition with RVA. See Design Team's Field Report #0097, typ.
Gilbane/O'Neil to discuss resolution of end wall condition with RVA. See Design Team's Field Report #0097, typ.
RVA - 03/23/2011 RVA - 03/23/2011 IG-6 per schedule
RVA - 03/23/2011
Incorrect. Reference detail 17/D5 for end wall condition. RVA - 03/23/2011
RVA - 03/23/2011
GILBANE | WE O'NEIL, JV Project: The University of Chicago Medical Center/NHP GBCo. | WEOCC Job No. 4386 Submittal No. 0001-084126-0
X Reviewed Revised as Noted
RVA - 03/23/2011 RVA - 03/23/2011 West elevation.
System is designed as aluminum framed. Remove all references to patch fittings at Hotelling Office glazing. Existing patch fitting details will be maintained for all glass system.
Date:2.9.2011
By: JA
07167
0001.084126.0 Interior Glass Walls and Doors - 7th Floor - Sh....p JLancia
To clarify this is South elevation of 07121 and 07161, opposite hand.
RVA - 03/23/2011 RVA - 03/23/2011
03/30/2011
RVA - 03/23/2011
See PR-434 to extend aluminum frames full height to provide adequate structure, typ.
X
RVA - 03/23/2011 RVA - 03/23/2011 Detail 25/D8 is more appropriate to show this condition. Revise.
Detail 25/D8 is more appropriate to show this condition. Revise.
RVA - 03/23/2011 IG-5 as scheduled
RVA - 03/23/2011 IG-5 as scheduled
RVA - 03/23/2011 IG-5 per schedule RVA - 03/23/2011 IG-6 as scheduled IG-6 per schedule
Gilbane/O'Neil to discuss resolution of end wall condition with RVA. See Design Team's Field Report #0097, typ.
Gilbane/O'Neil to discuss resolution of end wall condition with RVA. See Design Team's Field Report #0097, typ.
RVA - 03/23/2011 RVA - 03/23/2011 IG-6 per schedule
RVA - 03/23/2011
System is designed as aluminum framed. Remove all references to patch fittings at Hotelling Office glazing. Existing patch fitting details will be maintained for all glass system. RVA - 03/23/2011
RVA - 03/23/2011
RVA - 03/23/2011 West elevation.
Rejected Revise & Resubmit
Review does Not Relieve Subcontractor/Supplier From: Compliance with Contract Requirements Coordinating Work with Other Trades Verifying Field Dimensions
RVA - 03/25/2010 For friezes and reveals Provide stainless steel trim at perimeter and behind all reveals per 10/A4.4.9.
Reduce height of upper panels to provide 4" frieze dimension to lift panels off of Z-clip mounting.
For friezes and reveals - Provide stainless steel trim at perimeter and behind all reveals per 10/A4.4.9. RVA - 03/25/2010
RVA - 03/25/2010 Provide 1/4" reveal typical.
RVA - 03/25/2010
RVA - 03/25/2010 Upper panels not reviewed finish material pending approval of PR-121
See detail 2 RVA - 03/25/2010
RVA - 03/25/2010
1/4" Reveal, typ.
1/4" Reveal
1/4" Reveal
1/4" Reveal, typ.
1/4" Reveal, typ. RVA - 03/25/2010
Okay - RVA - 03/25/2010
RVA - 03/25/2010
1/4" Reveal, typ. RVA - 03/25/2010
1/4" Reveal, typ. RVA - 03/25/2010
RVA - 03/25/2010 1/4" Finish floor over platform. See section A-A 0013-142100-0 (Elevator Cab drawings I2,I3,I5,I6 & P1-P6)_LB2.pdf jlancia 03/26/2010
X
Reduce height of upper panels to provide 4" frieze dimension to lift panels off of Z-clip mounting.
Upper panels not reviewed - finish material pending approval of PR-121
RVA - 03/25/2010
RVA - 03/25/2010 All edges of composite stone panels shall be finished as specified in 097513 2.2.A.3 - "Return finish: factory bonded corners". Submit sample of finished edge condition for approval by architect. Provide 1/8" bevel per elevations. Router as required for venting where indicated. RVA - 03/25/2010
RVA - 03/25/2010 RVA - 03/25/2010
As specified.
1/4" Reveal, typ.
RVA - 03/25/2010
Okay - RVA 03/25/2010 For friezes and reveals - Provide stainless steel trim at perimeter and behind all reveals per 10/A4.4.9. RVA - 03/25/2010 RVA - 03/25/2010 1/4" Finish floor over platform.
1-1/4" per 8/A4.4.9
RVA - 03/25/2010
RVA - 03/25/2010
Make cove 8"
Revise for Z-clip mounting RVA - 03/25/2010 RVA - 03/25/2010 4"
RVA - 03/25/2010
1-1/4" per 8/A4.4.9
As specified. RVA - 03/25/2010
0013-142100-0 (Elevator Cab drawings I2,I3,I5,I6 & P1-P6)_LB2.pdf jlancia
Screw mounting from behind is unacceptable. All finish panels shall be hung on Z-clips per 8/A4.4.9 RVA - 03/25/2010
03/26/2010
X
1/4" Reveal
RVA - 03/25/2010
RVA - 03/25/2010 Revise detail 2 per 10/A4.4.9 - Rear panel shall extend into corner. Provide 1/4" reveals, typ.
1-1/4"
RVA - 07/19/2010
RVA - 07/19/2010
Provide sway bracing above finished ceiling if required.
Existing building steel is located at the work point of Level 3 deck above. Coordinate misc. support steel below building steel as required to avoid conflicts with mechanical work in this area. Revise mechanical as required.
RVA - 07/19/2010 RVA - 07/19/2010
ACT grid
Finish is to wrap around all vertical panel edges with no vertical trim per spec. 106540 2.3.A.4.
RVA - 07/19/2010 VERIFY THAT TOTAL WEIGHT OF PARTITION DOES NOT EXCEED LOADS SHOWN ON 11/S5.8.0. YR (TT) 07/21/10
10'-0" ceiling height
LEAD END: STACK END:
Continue ACT ceiling finish over partition track.
RVA - 07/19/2010
Revise to acoustic ceiling tile both sides of partition.
RVA - 07/19/2010
RVA - 07/19/2010
15'-6" Unit Width per PR-271. VIF.
RVA - 07/19/2010
Coordinate with enlarged plan detail.
Coordinate unit height with ceiling height and finish flooring thickness.
RVA - 07/19/2010 15'-6" per PR-271. VIF.
RVA - 07/19/2010 Coordinate with ceiling height and floor finish.
Revise per unit width as required. RVA - 07/19/2010
15'-6" per PR-271. VIF.
Coordinate hanger rods with MEP trades above the finished ceiling. May be necessary to provide additional support steel just above the partition track, spanning beneath MEP work to avoid conflict. Revise MEP as required to avoid conflict.
RVA - 07/19/2010
See architect's comments.
(DETAIL B)
RVA - 07/19/2010 Provide lever closure at stack end.
RVA - 07/19/2010
SEE DETAIL B FOR ALT SEAL CONDITION. HUFCOR DOES NOT REC. BECAUSE IT WILL NOT ACHIEVE A HIGH ACOUSTICAL RATING
RVA - 07/19/2010
This detail is not used for this partition. See architect's comments.
RVA - 07/19/2010 RVA - 07/19/2010
RVA - 07/19/2010
0001.106540.0_Operable_partitions_product_data_and_shop_d jlancia
Provide without vertical trim edge protection. Wrap finish per spec. 106540 2.3.A.4.
07/21/2010
X
Lead End
See architect's comments sheet in response to contractor's questions.
Stack End
Note I is not acceptable. Notice of change must be given and accepted. RVA - 07/19/2010
RVA - 02/14/2011 Shutter is connected to Fire Alarm System and supersedes fusible link specified in 083230 2.4.A.1.
GILBANE | WE O'NEIL, JV Project: The University of Chicago Medical Center/NHP GBCo. | WEOCC Job No. 4386 Submittal No.0001-083130-2
X Reviewed Revised as Noted
Rejected Revise & Resubmit
Note: 10'-0" Finish ceiling height. RVA - 02/14/2011
RVA - 02/14/2011
Review does Not Relieve Subcontractor/Supplier From: Compliance with Contract Requirements Coordinating Work with Other Trades Verifying Field Dimensions 12.17.2010 By: Date:
Door weight not indicated.
JA
Omit speaker strobe from all interior shutters.
RVA - 02/14/2011
RVA - 02/14/2011
6'-6"
RVA - 02/14/2011
3'-6" inside HM frame
Provide shutter with 3/4 HR fire rating.
3'-8" outside HM frame
RVA - 02/14/2011
RVA - 02/14/2011
3'-0" inside HM frame 3'-4" outside HM frame
Maintain thumb turn as indicated.
3'-6"
Provide above finished ceiling, if required.
GWB & metal framing partition. 7 1/4" thickness.
RVA - 02/14/2011
RVA - 02/14/2011 RVA - 02/14/2011 Material and finish not indicated. Submit 1/2" filler strip for review by architect.
RVA - 02/14/2011 Guide is aligned with HM frame. Remove 1/2" dimension.
Provide hand crank or push-up for emergency manual operation of shutters to be determined by manufacturer based on shutter weight.
See PR-418 to revise cased opening HM frame for coordination with counter height and shutter installation.
PROGRAM: Courthouse/Detention SIZE: 775,000 sq. ft. COMPLETION: 2007 The building’s program includes custom millwork courtrooms and grand jury rooms, judges’ chambers, defendant holding cells and support spaces to replace aging facilities. The jury assembly is housed in a cylindrical volume which stands apart to emphasize its reverence in the judicial process. Ceiling construction is minimized allowing abundant natural light to interior spaces. Separate circulation paths for the public, judges, jury and defendants create an intricate design scheme.
RAFAEL V IÑ OLY ARC HIT EC T S 04/2005 - 01/2007
BRONX C O U NTY H A L L O F J U S T I C E Bronx, NY
JUDGE’S SUITE
JUDGE’S SUITE
JUDGE’S SUITE
JUDGE’S SUITE
SOUTH
NORTH
MECHANICAL
LAW LIBRARY
HIGH PERFORMANCE, LOW-E CLEAR GLASS
SUMMER SOLSTICE LOW-E CLEAR GLASS W/ 40% FRIT
PRIVATE CORRIDOR JURY DELIB. ROOM
LOW-E CLEAR GLASS W/ 60% FRIT
2 LAYERS OF CLEAR GLASS FOR ACOUSTIC SEPARATION
JUDGE’S BENCH
COURTROOM
HIGH REFLECTANCE FINISHES
SPECTATOR SEATING
WITNESS ROOM
PUBLIC CORRIDOR
HIGH PERFORMANCE, LOW-E CLEAR GLASS
SUPPLEMENTAL ARTIFICIAL LIGHTING
COURTROOM
CUSTOM CURTAINWALL W/ TRIANGULAR LIGHT SHELVES EQUINOX TO CONTROL SUNLIGHT SUPPLEMENTAL ARTIFICIAL LIGHTING
ROBING ROOM
INTERIOR WINDOWS W/ 2 LAYERS OF FROSTED GLASS TO LET LIGHT INTO CONFERENCE ROOMS
ATTORNEY /CLIENT
2 LAYERS OF FROSTED GLASS FOR ACOUSTIC AND VISUAL SEPARATION
COURTROOM PUBLIC STAIR
VISOR SCREENS DIRECT LIGHT FROM PRIVATE ROOMS AND REFLECTS IT INTO COURTROOM
WINTER SOLSTICE
HIGH CEILING AND SLOPED PLANES TO DIRECT LIGHT
COURTROOM
100% DAYLIGHT IN CORRIDORS
CLERESTORY GLAZING ALLOWS DAYLIGHT INTO CLERK’S OFFICE
CLERK’S OFFICE
LIGHT MONITORS TRANSMIT DAYLIGHT TO LOWER LEVEL
LOCKER ROOM
GRATING OBSCURES DIRECT VISIBILITY WHILE ALLOWING DAYLIGHT TO ENTER LOWER LEVEL COURTROOMS CEILING PROFILE AIDS IN SPREADING DAYLIGHT ON THE LOWER LEVEL
ARRAIGNMENT COURTROOM
LOCKER ROOM
HOLDING CELLS
PUBLIC CORRIDOR 2 LAYERS OF ACOUSTIC GLASS
PROGRAM: Academic SIZE: 135,000 sq. ft. COMPLETION: 2009 This campus building was gut renovated to receive an emerging program which had outgrown its previous home. A central atrium space was cut into the existing floor slabs, allowing daylight to reach the exhibit space on ground level. New mezzanine levels were inserted between floor slabs of the existing structure allowing faculty offices to overlook the design studios. Stairs and bridges crisscross through the atrium adding a dynamic component to the space and encourage interaction. A rooftop amphitheater rests atop the atrium providing additional teaching space and framing views.
RAFAEL V IĂ‘ OLY ARC HIT EC T S 02/2005 - 06/2005
BERNARD & A NNE S P I TZE R S C HO O L O F A R C H I T E C T U R E New York, NY
ALFREDO DE V IDO ARC HIT EC T S 07/2004 - 12/2005
PROGRAM: SIZE: COMPLETION:
Single-family home 8,300 sq. ft. 2006
This home design responds to the client’s need to accommodate extended family and expatriate colleagues. Interior partitions are minimized and exposed roof trusses are planned to promote an open plan for both acoustic and visual continuity. These design components contribute not only to the concept of a shared space, but also aid in reducing construction cost. The extensive use of glazing throughout the exterior wall embraces the surrounding landscape and attempts to blur the separation of interior and exterior space.
YANG RE S I DE NCE Yorktown, NY
PROGRAM: SIZE: COMPLETION:
Single-family Home 900 sq. ft. (Addition) 2004
This addition adds functional area to a home originally designed by the same architect. The use of the same planning module and construction materials as designed in the existing structure achieves a near seamless integration of new program within site conditions. The liberal application of wood and glazing in this double-height space achieves warmth, volume and flexibility that did not previously exist for the owner.
ALFREDO DE V IDO ARC HIT EC T S 10/2003 - 01/2004
SABER R E S I DE NCE East Hampton, NY
PROGRAM: SIZE: COMPLETION:
Summer Home 2,900 sq. ft. Un-built
The underlying concept for this home is an open, light-filled, geometric form. Interior spaces and floor plates are accommodated within to meet the client’s programmatic requirements. Plan and elevation are organized around a rigid dimension module. Decking surrounds the home to extend the building geometry and connect the occupant with the surrounding landscape. Sculptural human figures and plant growth are playful experiments as structural components.
ALFREDO DE V IDO ARC HIT EC T S 10/2003 - 09/2004
KESSLER RE S I DE NCE Cold Spring, NY
PROGRAM: SIZE: COMPLETION:
Research/Office Shell Renovation 52,500 sq. ft. Un-built
An outdated office building became the new home of the client’s business in human genome research. This project is an exercise in conceptual design to imagine a new facade and infrastructure befitting the innovative program. The design scheme incorporates a new entrance atrium, double-envelope exterior wall system for regulating building temperature, light monitors for daylight harvesting, new mechanical distribution and light shelves for solar shading.
ALFREDO DE V IDO ARC HIT EC T S 05/2004 - 07/2004
HI STOG ENE TI CS Ossining, NY
PROGRAM: MATERIALS: COMPLETION:
Occasional Chair Plywood & Fabric 2006
Custom furniture was commissioned for a home designed by the same architect. Several design iterations were explored with the use of architectural models. Initial design incorporated solid wood and cushioned seats and evolved to make use of laminated plywood and woven fabric for a minimal design with reduced cost.
ALFREDO DE V IDO ARC HIT EC T S 05/2004 - 06/2004
CUSTOM CH A I R DE S I GN New York, NY
ALFREDO DE V IDO ARC HIT EC T S 09/2004 - 12/2004
PROGRAM: Estate Subdivision SIZE: 7.5 Acres COMPLETION: 2006 A large plot of land was acquired by the client with the intent to subdivide and a home was commissioned for each new plot. Architectural models were created to study topography and site planning. The architect used this opportunity to explore exercises in sustainable design.
ALLAVERDY GRE E N H O M E S Philipstown, NY