Javon's 2022 Architecture Portfolio

Page 1

2 0 2 2

Architecture Por tfolio

2020 / 2022 Selected Works

Javon Adryan Morgan JMorganArchitecturalDesigns@gmail.com Javon.Morgan@mail.citytech.cuny.edu (347) - 776 - 9098 www.citytech.cuny.edu

Passive Home Design

Façade Design

Interior Design

Public Use Architecture



ABOUT ME.ME. ABOUT WORK EXPERIENCE

AWA R D S / A C H I E V E M E N T S

CURRENT WORK

- D e a n ’s L i s t ( 2 0 2 0 ) ( 2 0 2 1 S p r i n g / Fa l l S e m e s t e r s )

C o m p a n y N a m e | Ta s k ( E x : R e a l i s t i c V i s u a l i z a t i o n )

INTERN ARCHITECT

- I’m passionate in learning new softwares.

Company Name | Date Beginning - Present W h a t Ty p e O f I n t e r n s h i p ? | A rc h i t e c t u r a l D e s i g n | P ro j e c t N a m e

JAVON ADRYAN MORGAN ARCHITECTURAL DESIGNER

I’m a 20 years old architectural designer student and currently a second year student a t N e w Yo r k C i t y C o l l e g e o f Te c h n o l o g y ,

# -We e k s

w w w. x x x x x . c o m

U SA , N YC

ACTIVITIES / INTERESTS

S O F T WA R E S K I L L S

- I enjoy seeking inspiration of architecture in different countries. - I have great appreciation for new implementations in design concepts.

in Architectural Design 75%

50%

35%

AutoCAD

Revit

SketchUp

50%

65%

50%

B r o o k l y n , N Y, U S A . I e n j o y w o r k i n g i n c o n -

- Fú t b o l i s m y f a v o r i t e s p o rt d u e t o its international presence.

c e p t u a l d e s i g n , b u i l d i n g t e c h n o l o g y,

graphic design, and realistic visualization. Architecture is my sole outlet for creativity and attention to details.

Lumion Fútbol

Learning

65%

75% Tr a v e l i n g

LANGUAGE SKILLS

Conceptualizing

T R AV E L

Born in United States of America and curr e n t l y i n N e w Yo r k .

Photoshop

Indesign Illustrator Rhino

CURRENT ACADEMICS

United Arab Emirates, Dubai (2016) Curaçao (2017)

A S O C I AT E ’ S D E G R E E I N A R C H I T E C T U R E

ENGLISH “native”

S PA N I S H

N e w Yo r k C i t y C o l l e g e o f Te c h n o l o g y | 2 0 2 0 2021 2 -Ye a r

3

Pa r i s , F r a n c e ( 2 0 2 1 ) ( 2 0 2 2 ) Milan, Italy (2023)

| U . S . A G PA : X . X X X |

Javon Adryan Morgan | Selected Works 2020 - 2022

U.S.A, NYC

T R AV E L M A P


CONTENTS. CONTENTS. Academic

H

8-9

V

1 0 - 11

P

12-15

C

4

GARTTE-CIE, MAISON CASE STUDY

VERTICAL STAGE UTOPIAN UPLIFT

ADVANCED PERFORMANCE PASSIVE HOUSE DESIGN

PLACE FOR PROTEST - Part 1 FRAGMENTED LANDSCAPE

MUSEUM OF CULTURE MUSEUM DESIGN

Bachelor - Architectural Design Studio II INDIVIDUAL WORK - Bridge Design Spring Semester 2021

Bachelor - Building Technology II INDIVIDUAL WORK - Technical Drawings Fall Semester 2021 -2022

Bachelor - Architectural Design Studio II INDIVIDUAL WORK - Urban Design Spring Semester 2021

Bachelor - Building Technology II INDIVIDUAL WORK - Technical Drawings Fall Semester 2021 -2022

Bachelor - Architectural Design Studio III INDIVIDUAL WORK - Urban Design Fall Semester 2021 -2022

Bachelor - Architectural Design Studio IV INDIVIDUAL WORK - Technical Drawings Spring Semester 2022

Level 3 24' - 0"

Level 3 24' - 0"

Level 2 12' - 0"

Level 2 12' - 0"

JAVON ADRYAN MORGAN

COMMUNITY CENTER - Part 2 ENVIRONMENTAL AWARNESS

Bachelor - Architectural Design Studio III INDIVIDUAL WORK - Urban Design Fall Semester 2021 - 2022

Javon Adryan Morgan | Selected Works 2020 - 2022

FAÇADE STUDIES DRAWING SETS Level 1 0"

1

Consultant Address Address Phone Fax e-mail

PROF. PAUL KING ARCH.2431 BUILDING TECHNOLOGY III SECTION: HD20

Level 1 0"

Elevation South - Shildan ALPHATON Full Assembled (3) With Building 3 1/4" = 1'-0"

Elevation East - Shildan ALPHATON Full Assembled (3) With Building 4 1/4" = 1'-0"

SHILDAN ALPHATON SOLID WALL SYSTEM & YCW 750 GLASS CURTAIN WALL SYSTEM

2

A

B

Bachelor - Building Technology III INDIVIDUAL WORK - Technical Drawings Spring Semester 2022 Level 4 28' - 0"

No.

Description

Date

Level 3 24' - 0"

B

Level 2 12' - 0"

PROFESSOR PAUL KING BUILDING CASE STUDY Building Tech 3 – Spring 2022 Solid Panel System Assembly

A

1

Isometric @SE - Shildan ALPHATON Full Assembled (3)

Level 1 0"

Project number Date

Drawn by

Checked by

Shildan ALPHATON Full Assembled (3) With Building - Callout 2 1/4" = 1'-0"

Long Section @ Shildan ALPHATON Full Assembled (3) With Building 5 1/4" = 1'-0"

Project Number Issue Date JAVON ADRYAN MORGAN Checker

SP-03.4

Scale

1/4" = 1'-0"

5/23/2022 11:10:42 AM

6-7

HORIZONTAL CONNECTOR DISPLACED MOVEMENT

G

16-17

A

18-19

M

20-25

F

26-31



Horizontal Connector Displaced Movement Bridge Design Architectural Design Studio II INDIVIDUAL WORK - Spring Semester 2021 Supervisor: Prof. TSACHRELIA & OIKONOMOU

6

ACADEMIC - Bridge Design Architecture

TOOLS:


H

Displaced Movement | January 2021

ABSTRACT & DISPLACED Project Scope In this project, the objective is to design a new bridge or link of the site at Prospect Street, between Pearl Street and Cadman Plaza, Brooklyn. This new link will replace the existing two-level connection, enhancing the vibrant connectivity among the new and diverse tenants and programs, between the buildings and this unique urban context, creating a gateway into DUMBO. Based on the dramatic changes in the DUMBO neighborhood, formerly owned by the Watchtower society, the buildings are linked by several existing walkways. In the near future, the Brooklyn Tech Triangle will take ownership of the buildings and open them to local artists and their studios as well as their offices. General Concept Inspiration for the form making and design of the bridge comes from the collages and notations. These collages and notations represent the verb “Displacement” and bridge’s design represents displacement due to the circulation of people and form of the bridge. A series of rectangular basswood sheets are connected together to represent a complex formality.

NEXT PROJECT

VERTICAL STAGE

7


Vertical Stage Utopian Uplift Vertical Movement Design Architectural Design Studio II INDIVIDUAL WORK - Spring Semester 2021 Supervisor: Prof. TSACHRELIA & OIKONOMOU

8

ACADEMIC - Vertical Movment Design Architecture

TOOLS:


V

Vertical Movement | March 2021

UTOPIAN & JOURNEY Project Scope In this project, the objective is to develop a site-specific design proposal that creates a vertical structure to experiment with vertical circulation while hosting performative functions. It’s important for the design proposal to thoughtfully develop a design language that achieves a meaningful connection to the site while interweaving given programmatic and environmental parameters. The site is located at the south west corner lot at the intersection of 10th Avenue and E20th street. The current use of the lot will be replaced with the design proposal of the Urban Threshold. Henceforth, the main goal is to amplify systematic thinking. General Concept Inspiration for the form making and design of vertical structure comes from the collages. These collages represent the “Journey” and “Utopia” that the High Line creates for people. This vertical structure creates the journey for people when acending to the High Line by displaying arts, projected theatre, and performances.

NEXT PROJECT

PLACE FOR PROTEST

9


Place For Protest Fragmented Landscape Design Architectural Design Studio III - Part 1 INDIVIDUAL WORK - Fall Semester 2021 Supervisor: Prof. TING CHIN & IAN GORDAN

10

ACADEMIC - Landscape Design Architecture

TOOLS:


P

Fragmented Landscape | August 2021

FRAGMENTED & ENVIRONMENTAL Given the enormous challenges society is facing from harmful enviornmental issues, the task for this project is to think about how design can be a transformative agent for change, an advocate for inclusion and equality, and a vehicle for community-building. How can a space become designed where the individual and collective voices can be heard? How can this place support activism, awareness, education, and protest? This project is the first part of a two-part project. This initial project focuses on designing a place for protest. The design and program of the site orinignates from the social or political issue chosen. General Concept Inspiration for the form making and design of the protest landscape comes from the notations. The notations represent how Earth is fragmenting due to the harm and neglect caused by society. Humanity has the opportunity to unite and confront these environmental issues

NEXT PROJECT

COMMUNITY CENTER

11


Community Center Environmental Awareness Design Architectural Design Studio III - Part 2 INDIVIDUAL WORK - Fall Semester 2021 Supervisor: Prof. TING CHIN & IAN GORDAN

12

ACADEMIC - Community Center Design Architecture

TOOLS:


Environmental Awareness | December 2021

FRAGMENTED & ENVIRONMENTAL

After completing the first project, there is a thorough development in understanding of the site and have developed a formal response to the research about environmental issue. For this second project the challenge is to design and integrate a community education center into the site designed in Project 01. How can this facility help to bring awareness about the issue chosen to explore? How can design and architecture help to inspire change?

General Concept The design for the community center had to relate and connect to the overall protest landscape. This community center is meant to educate the residents within proximity on how to plant most effectively and how to improve the environment on a daily basis. Community Center Design Architecture - ACADEMIC

13


SECOND FLOOR PLAN

Circulation Throughout Building

Occupants can enter the community center through the ground level main entrance or the entrance within the protest landscape on the level below grade. The ground floor consists of three classrooms to educate the residents within the neighborhood on how to improve their environment by including elements of greenery throughout their daily lives. The sceond floor has an additional classroom and a majority of non-public spaces are loacted to one side of the building. The community room and an otudoor demonstration garden is also located on this level. Finally, the level below grade consists of an exhibit hall.

14

ACADEMIC - Community Center Design Architecture

GROUND FLOOR PLAN

LEVEL BELOW GRADE FLOOR PLAN


C

Environmental Awareness | December 2021

NEXT PROJECT

GARTTE-CIE, MAISON

15


Gartte-cie, Maison Case Study Technical Drawings Building Technology II INDIVIDUAL WORK - Fall Semester 2021 Supervisor: Prof. ALEXANDER APTEKAR In Module A, this project consists of study into the development of a series of drawings based on the case study. These drawings include floor plans, sections, elevations, and a 3D Model of the overall case study building. The case study utilized for this project is (4 Rue le Corbusier, 33600 Pessac, France) Cité Frugès de Pessac,1924 - 1927, Le Corbusier, Bordeaux, France. This project will establish developing proficiency in both analog and digital drawing techniques, and professional level construction drawing.

16

ACADEMIC - Gartte-cie, Maison

TOOLS:


G

Technical Drawings | August 2021

NEXT PROJECT

ADVANCED PERFORMANCE

17


Advanced Performance Passive House Design Technical Drawings Building Technology II INDIVIDUAL WORK - Fall Semester 2021 Supervisor: Prof. ALEXANDER APTEKAR In Module B, this project consists of study into the basic materials of construction as well as the theory and practice of building technology. The case study utilized for this project is 4 Lumber St. LLC. The project was to follow the precedent layout and overall form of the building, however, the framing and passive house concept was achieved through both conventional and unconventional means. The passive house exercise involved the research and understanding of the use of insulation, air barrier and thermal breaks to meet high performance. In addition, this project will consist investigation of the assembly of building components and methods of construction while developing proficiency in both analog and digital drawing techniques, and professional level construction drawing.techniques, and professional level construction drawing.

18

ACADEMIC - Advance Performance

TOOLS:


A

Lo

Passive House Technical Drawings | December 2021 ROOF MEMBRANE

SHEATHING (PLYWOOD OR OSB) 0'-5/8" (BUILDING STRUCTURAL SYSTEM)

DECK LEVEL TOS 31'-7"

BATT INSULATION FILLED IN BETWEEN JOISTS (THERMAL PROTECTION) METAL DRIP

VENT

2X3 FURRING STRIPS (ARCHITECTURAL FINISH) AIR BARRIER

WOOD EXTERIOR SIDING 0'-1" (ARCHITECTURAL FINISH & WATERPROOFING) VERTICAL BATTENS (ARCHITECTURAL FINISH) INSECT SCREEN (ARCHITECTURAL FINISH)

GLAZED WINDOW PANEL (ARCHITECTURAL FINISH, AIR BARRIER THERMAL PROTECTION, & WATERPROOFING)

Student Name:

MORGAN, JAVO

SLOPED WINDOW SILL (ARCHITECTURAL FINISH & WATERPROOFING)

2X4 STUD WALL (BUILDING STRUCTURAL SYSTEM) INTERIOR WALL FINISH (GYPSUM BOARD) 0'-5/8" (ARCHITECTURAL FINISH)

RIGID INSULATION 0'-2" (THERMAL PROTECTION)

AIR BARRIER

BATT INSULATION FILLED IN BETWEEN STUD WALL (THERMAL PROTECTION)

BATT INSULATION FILLED IN BETWEEN 2X3 FURRING STRIPS (THERMAL PROTECTION)

WATER BARRIER (WATERPROOFING)

2X3 FURRING STRIPS (ARCHITECTURAL FINISH)

BEDROOM LEVEL TOS 20'-1"

FINISHED FLOORING (ARCHITECTURAL FINISH)

VERTICAL BATTENS (BUILDING STRUCTURAL SYSTEM)

SUB FLOOR 0'-5/8" (BUILDING STRUCTURAL SYSTEM) BATT INSULATION FILLED IN BETWEEN JOISTS (THERMAL PROTECTION)

2X3 FURRING STRIPS (ARCHITECTURAL FINISH) AIR BARRIER

Brooklyn Office:

Department of Architectura 186 Jay Street, Brooklyn N Professor Name:

Alexander Aptekar

Class Time, Number, & Se

ARCH 2331, 2:30 - 4:35 p LEC (15362)

INSECT SCREEN (ARCHITECTURAL FINISH)

Foundation Type: Crawl S Facade Type: Red Brick w Wall Assembly Group: #3

GLAZED WINDOW PANEL (ARCHITECTURAL FINISH, AIR BARRIER THERMAL PROTECTION, & WATERPROOFING)

SLOPED WINDOW SILL (ARCHITECTURAL FINISH & WATERPROOFING)

2X4 STUD WALL (BUILDING STRUCTURAL SYSTEM) INTERIOR WALL FINISH (GYPSUM BOARD) 0'-5/8" (ARCHITECTURAL FINISH)

RIGID INSULATION 0'-2" (THERMAL PROTECTION)

AIR BARRIER

BATT INSULATION FILLED IN BETWEEN STUD WALL (THERMAL PROTECTION)

BATT INSULATION FILLED IN BETWEEN 2X3 FURRING STRIPS (THERMAL PROTECTION)

WATER BARRIER (WATERPROOFING)

GREAT ROOM FLOOR TOS 6'-2"

2X3 FURRING STRIPS (ARCHITECTURAL FINISH) FINISHED FLOORING (ARCHITECTURAL FINISH) RIM JOIST (BUILDING STRUCTURAL SYSTEM)

CANTILEVERED WALL (BUILDING STRUCTURAL SYSTEM)

SUB FLOOR 0'-5/8" (BUILDING STRUCTURAL SYSTEM) BATT INSULATION FILLED IN BETWEEN JOISTS (THERMAL PROTECTION)

2X3 FURRING STRIPS (ARCHITECTURAL FINISH) AIR BARRIER

INSECT SCREEN (ARCHITECTURAL FINISH)

GLAZED WINDOW PANEL (ARCHITECTURAL FINISH, AIR BARRIER THERMAL PROTECTION, & WATERPROOFING)

SLOPED WINDOW SILL (ARCHITECTURAL FINISH & WATERPROOFING)

2X4 STUD WALL (BUILDING STRUCTURAL SYSTEM) INTERIOR WALL FINISH (GYPSUM BOARD) 0'-5/8" (ARCHITECTURAL FINISH)

RIGID INSULATION 0'-2" (THERMAL PROTECTION)

AIR BARRIER

BATT INSULATION FILLED IN BETWEEN STUD WALL (THERMAL PROTECTION)

BATT INSULATION FILLED IN BETWEEN 2X3 FURRING STRIPS (THERMAL PROTECTION)

WATER BARRIER (WATERPROOFING)

RECREATIONAL ROOM FLOOR TOS -5'-0"

VERTICAL BATTENS (BUILDING STRUCTURAL SYSTEM)

STUCCO (ARCHITECTURAL FINISH) FOUNDATION (WATER PROOFING)

CRAWL SPACE TOS -10'-4"

03 A-503

WALL SECTION 1/4" = 1'

PERIMETER DRAINAGE (WATERPROOFING)

#7 STEEL REBAR 0'-7/8" (BUILDING STRUCTURAL SYSTEM)

2X3 FURRING STRIPS (ARCHITECTURAL FINISH) FINISHED FLOORING (ARCHITECTURAL FINISH)

SUB FLOOR 0'-5/8" (BUILDING STRUCTURAL SYSTEM) BATT INSULATION FILLED IN BETWEEN JOISTS (THERMAL PROTECTION)

MUD SILL ABOVE FOUNDATION WALL (BUILDING STRUCTURAL SYSTEM) CONCRETE FOUNDATION WALL (BUILDING STRUCTURAL SYSTEM)

GRAVEL (WATERPROOFING)

ANCHOR BOLT (BUILDING STRUCTURAL SYSTEM)

FOUNDATION FOOTING WITH KEY (BUILDING STRUCTURAL SYSTEM)

DATE OF FIRST ISSUE:

MONTH

YYYYMMDD

DWG TITLE

WALL LONG SE SECTION DETAI JOISTS FL1 & FO SEAL & SIGNATURE

NEXT PROJECT

MUSUEM OF CULTURE

19


Museum Of Culture Museum Design Architectural Design Studio IV INDIVIDUAL WORK - Spring Semester 2022 Supervisor: Prof. ELIZABETH PARKS

20

ACADEMIC - Museum Of Culture

TOOLS:


Museum Design | January 2022

Museum Of Culture - ACADEMIC

21


Museum Exhibit Spaces & Function

Each of the Museum’s exhibitions will demonstrate how Cuban culture consists of the merge between European (Spanish) and African influences and how this merge is repairing Cuban culture due to the past and existing harmful restrictions from political regime. Each exhibition will educate and consist its own unique element of Cuban culture. Therefore, the different levels of the Museum should each extend the knowledge and educate the occupants by utilizing circulation routes that wraps around the large exhibition spaces, and connects to the different programs of the Museum. When the occupants leaves the Museum they should have a greater understanding of how Cuban Culture represents that different cultures can merge together, which can fix or begin to repair any sort of existing damage to a culture 22

ACADEMIC - Museum Of Culture



Structure Of Museum

24

ACADEMIC - Museum Of Culture


M

Museum Design | Spring 2022

NEXT PROJECT

FAÇADE STUDIES

25


FAÇADE STUDIES Drawing Sets Building Technology III INDIVIDUAL WORK - Spring Semester 2022 Supervisor: Prof. PAUL KING In this project, the objective was understand the assembly of a Glass Curtain Wall and Solid Rain Screen Panel System. I had to select two manufacturers of façade materials, one Solid Panel System material and one Glass Curtain Wall. Each of the systems had to be applied onto a two-story façade with parapet, that includes both inside and outside corner plan conditions. When looking at the façade I had to focus on 6 primary questions which the drawings & presentation must address: • How does is function structurally? • What is the waterproofing strategy? • How does it function thermally? • How is it fireproofed? • How does it allow for movement? (expansion and contraction) & (assembly adjustment) • What was the order of assembly & installation?

COMPELLING IMAGE

1

26

ACADEMIC - Façade Studies

Isometric @SE - Shildan ALPHATON Full Assembled (3)

TOOLS:


A104 A105 A200 A201 A202 A203 A204 A205 A206 A207 A300 A301 A302 A303 A304 A401 A402 A404

MEZZANINE LEVEL PLAN ROOF LEVEL PLAN RCP REFLECTED CEILING PLAN RCP REFLECTED CEILING PLAN RCP REFLECTED CEILING PLAN RCP REFLECTED CEILING PLAN RCP REFLECTED CEILING PLAN W/ COLOR RCP REFLECTED CEILING PLAN W/ COLOR RCP REFLECTED CEILING PLAN W/ COLOR RCP REFLECTED CEILING PLAN W/ COLOR ELEVATIONS ELEVATIONS WINDOW TYPES CURTAIN WALL ISOMETRIC WALL SECTION – SOLID WALL SYSTEM WALL SECTION – CURTAIN WALL SYSTEM PLAN DETAILS

05/06/22 05/19/22 04/28/22 05/12/22 05/12/22 05/12/22 05/12/22 05/12/22 05/12/22 05/12/22 03/11/22 04/29/22 04/28/22 04/29/22 04/29/22 04/28/22 04/29/22 04/29/22

JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN

Name SERIES MECHANICAL PLANS

Sheet Issue Date 05/04/22

MEZZANINE LEVEL PLAN ROOF LEVEL PLAN RCP REFLECTED CEILING PLAN RCP REFLECTED CEILING PLAN RCP REFLECTED CEILING PLAN RCP REFLECTED CEILING PLAN RCP REFLECTED CEILING PLAN W/ COLOR RCP REFLECTED CEILING PLAN W/ COLOR RCP REFLECTED CEILING PLAN W/ COLOR RCP REFLECTED CEILING PLAN W/ COLOR ELEVATIONS ELEVATIONS WINDOW TYPES CURTAIN WALL ISOMETRIC WALL SECTION – SOLID WALL SYSTEM WALL SECTION – CURTAIN WALL SYSTEM PLAN DETAILS SERIES MECHANICAL PLANS SERIES STRUCTURAL PLANS SERIES STRUCTURAL PLANS SERIES STRUCTURAL PLANS SERIES STRUCTURAL PLANS

Drawing Sets | March 2022

Mechanical Drawings Number M101

A104 A105 A200 A201 A202 A203 A204 A205 A206 A207 A300 A301 A302 A303 A304 A401 A402 A404 M101 S100 S101 S102 S103

Drawn By JAVON MORGAN

05/06/22 05/19/22 04/28/22 05/12/22 05/12/22 05/12/22 05/12/22 05/12/22 05/12/22 05/12/22 03/11/22 04/29/22 04/28/22 04/29/22 04/29/22 04/28/22 04/29/22 04/29/22 05/04/22 04/29/22 04/29/22 05/19/22 05/19/22

JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN JAVON MORGAN

Javon Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail

No.

PROFES BUILDIN Building Te

Project number Date Drawn by Checked by

1

A

Perspective View Scale

Façade Studies - ACADEMIC

27


VERTICAL AND HORIZONTAL MULLION MEMBER

MULLION FACE COVER VERTICAL AND HORIZONTAL MULLION MEMBER

COPING TO PROVIDE WATER DRAINAGE TO PARAPET

VISION GLASS PANEL

VISION GLASS PANEL

SUPPORT SHIM AND SPRING (CREATES PRESSURE ONTO THE COPING) VISION GLAZED GLASS USED TO CREATE TRANSPARENCY OR VISUAL CONTACT

WOOD BLOCKING

3" LW CONCRETE ON 2" METAL DECK

CANT STRIP PROTECTION BOARD OR 3/4" PLYWOOD SHEATHING TAPERED RIGID INSULATION AND 2" RIGID INSULATION

JAVON ADRYAN M

SPANDREL OR OPAQUE GLASS USED TO PREVENT TRANSPARENCY OR VISUAL CONTACT OF THE BEAMS UNDER TEH SLAB OR ANY STRUCTURAL & THERMAL COMPONENTS

Consultant Address Address Phone Fax e-mail

PERIMETER FRAME PERIMETER PRESSURE PLATE STANDARD 7

PROF. PAUL K

PERIMETER PRESSURE PLATE STANDARD

Isometric @SE - YCW 750 OG Curtain Wall Full Assembled (3) Mullion

PERIMETER PRESSURE PLATE BASE

4

YCW 750 OG Curtain Wall Full Assembled (3) 1/2" = 1'-0"

ARCH.2431 BUI TECHNOLOG

MULLION FACE COVER (HIDES VERTICAL MULLION & COMPONENTS)

FIRE PROOFING & SAVING

8

SECTION: H

Isometric @SE - YCW 750 OG Curtain Wall Full Assembled (3) Exploded Mullion

SHILDAN ALPH SOLID WALL SY & YCW 750 GL CURTAIN WALL S

2" RIGID INSULATION

9

Isometric @SE - YCW 750 OG Curtain Wall Full Assembled (3) Parapet & Coping 1

HALFEN CONNECTION PLATE

Isometric @SE - YCW 750 OG Curtain Wall Full Assembled (3) Inside Corner

HALFEN ANCHOR CHANNEL WITH REBAR ANCHOR FOR HIGH TENSION OADS IN THN SLAB

No.

Description

COPING TO PROVIDE WATER DRAINAGE TO PARAPET SUPPORT SHIM AND SPRING (CREATES PRESSURE ONTO THE COPING) WOOD BLOCKING

12 SOLID CAST IN PLACE CONCRETE WALL

Short Section @ YCW 750 OG Curtain Wall Full Assembled (3) Halfen Connection & Fire Proofing 3" = 1'-0"

COPING TO PROVIDE WATER DRAINAGE TO PARAPET SUPPORT SHIM AND SPRING (CREATES PRESSURE ONTO THE COPING)

PROTECTION BOARD OR 3/4" PLYWOOD SHEATHING WATER BARRIER MEMBRANE FIRE PROOFING & SAVING CANT STRIP TAPERED RIGID INSULATION AND 2" RIGID INSULATION 2

Isometric @SE - YCW 750 OG Curtain Wall Full Assembled (3) Middle Condition

PROFESSOR PAU BUILDING CASE Building Tech 3 – Sp Curtain Wall System

P

Project number Date Drawn by Checked by

3

Isometric @SE - YCW 750 OG Curtain Wall Full Assembled (3) Outside Corner

10

Long Section @ YCW 750 OG Curtain Wall Full Assembled (3) Parapet & Coping 1" = 1'-0"

Long Section @ YCW 750 OG Curtain Wall Full Assembled (3) Parapet & Coping Callout 11 3" = 1'-0"

6

Isometric @SE - YCW 750 OG Curtain Wall Full Assembled (3) Exploded

5

CW-05.

Elevation South - YCW 750 OG Curtain Wall Full Assembled (3) 1/2" = 1'-0"

Scale

JAVON A Consultant Address Address Phone Fax e-mail

PRO

ARCH. TEC

SEC 5

Elevation South - YCW 750 OG Curtain Wall Full Assembled (3) With Building 1/4" = 1'-0"

4

4

5

Elevation East- YCW 750 OG Curtain Wall Full Assembled (3) With Building 1/4" = 1'-0"

SHILD SOLID & YC CURTAI

6 D 9

E 8

F 7

F

No.

E

PROFES BUILDIN Building Te Curtain Wa

D

Project number Date Drawn by Checked by

1

Isometric @SE - YCW 750 OG Curtain Wall Full Assembled (3) Final Display With Slab

YCW 750 OG Curtain Wall Full Assembled (3) With Building - Callout 2 1/4" = 1'-0"

Long Section @ YCW 750 OG Curtain Wall Full Assembled (3) With Building 3 1/4" = 1'-0"

CW Scale


10 SP-03.2

FOUR CORNER METAL C STUD

CEMENT BOARD OR 3/4" PLYWOOD OR OSB SHEATHING

COPING TO PROVIDE WATER DRAINAGE TO PARAPET SUPPORT SHIM AND SPRING (CREATES PRESSURE ONTO THE COPING)

CEMENT BOARD OR 3/4" PLYWOOD OR OSB SHEATHING

GYPSUM BOARD 0'-0 5/8" (INTERIOR FINISH)

VERTICAL TRACK

COPING TO PROVIDE WATER DRAINAGE TO PARAPET

WOOD BLOCKING

3/4" PLYWOOD OR OSB SHEATHING

SHILDAN APLHATON TERRACOTTA PANEL

SUPPORT SHIM AND SPRING (CREATES PRESSURE ONTO THE COPING)

GYPSUM BOARD 0'-0 5/8" (INTERIOR FINISH)

3" LW CONCRETE ON 2" METAL DECK

2" RIGID INSULATION

PROTECTION BOARD OR 3/4" PLYWOOD SHEATHING

WOOD BLOCKING

WATER BARRIER MEMBRANE

3/4" PLYWOOD OR OSB SHEATHING STEEL Z GIRT

CANT STRIP

CANT STRIP

3 5/8" METAL STUD TRACK

PROTECTION BOARD OR 3/4" PLYWOOD SHEATHING TAPERED RIGID INSULATION AND 2" RIGID INSULATION

TAPERED RIGID INSULATION AND 2" RIGID INSULATION

JAVON ADRYAN MORGAN

METAL BEAM W 12 X 26

Consultant Address Address Phone Fax e-mail

PROF. PAUL KING ARCH.2431 BUILDING TECHNOLOGY III 6

Short Section @ Shildan ALPHATON Full Assembled (3) Parapet Coping 8 1" = 1'-0" GYPSUM BOARD 0'-0 5/8" (INTERIOR FINISH)

7

Isometric @SE - Shildan ALPHATON Full Assembled (3) Parapet Coping

2

SECTION: HD20

Shildan ALPHATON Full Assembled (3) Callout 3/4" = 1'-0"

SHILDAN ALPHATON SOLID WALL SYSTEM & YCW 750 GLASS CURTAIN WALL SYSTEM

Isometric @SE - Shildan ALPHATON Full Assembled (3) Inside Corner

METAL COLUMN

VERTICAL TRACK (MIDDLE CONDITION)

GYPSUM BOARD 0'-0 5/8" (INTERIOR FINISH)

METAL C STUD 16" OC

METAL C STUD 16" OC

3/4" PLYWOOD OR OSB SHEATHING

3/4" PLYWOOD OR OSB SHEATHING

ALUMINUM ENCASEMENT

2" RIGID INSULATION

2" RIGID INSULATION

1" GLAZED GLASS PANEL

VERTICAL JOINT 0'-0 3/8" CAN BE SEALED WITH BACKER ROD AND CAULKING

3

HORIZONTAL JOINT 0'-0 3/8" CAN BE SEALED WITH BACKER ROD AND CAULKING No.

Description

Date

Isometric @SE - Shildan ALPHATON Full Assembled (3) Middle Condition

COPING TO PROVIDE WATER DRAINAGE TO PARAPET SUPPORT SHIM AND SPRING (CREATES PRESSURE ONTO THE COPING) WOOD BLOCKING

PROFESSOR PAUL KING BUILDING CASE STUDY Building Tech 3 – Spring 2022 Solid Panel System Assembly

CEMENT BOARD OR 3/4" PLYWOOD OR OSB SHEATHING

45 DEGREE MITER (HIDES TERRACOTTA PANEL VOIDS) HORIZONTAL JOINT 0'-0 3/8" CAN BE SEALED WITH BACKER ROD AND CAULKING

Project Number Issue Date Author Checker

Project number Date Drawn by

6 9

Isometric @SE - Shildan ALPHATON Full Assembled (3) Top Of Window Conditon

4

Isometric @SE - Shildan ALPHATON Full Assembled (3) Outside Corner

10

Short Section @ Shildan ALPHATON Full Assembled (3) Parapet Coping - Callout 3" = 1'-0"

Isometric @SE - Shildan ALPHATON Full Assembled (3) Window Detail (4)

5

2

Isometric @SE - Shildan ALPHATON Full Assembled (3) Window Condition

1

Shildan ALPHATON Full Assembled (3) Window Detail (6) - Callout 9 1:6

VERTICAL TRACK (MIDDLE CONDITION)

THE VERTICALTRACKS SUPPORT THE CLIPS THAT ARE HOLDING THE SHILDAN APLHATON TERRACOTTA PANELS. THERE ARE THREE CONDITIONS FOR THE VERTICAL TRACKS: INSIDE CORNER, OUTSIDE CORNER, & MIDDLE CONDITIONS

As indicated

JAVON ADRYAN MORGAN

2" RIGID INSULATION 3/4" PLYWOOD OR OSB SHEATHING

Consultant Address Address Phone Fax e-mail

STEEL Z GIRT

3 5/8" METAL STUD TOP TRACK

CRIPPLE METAL C STUD 16" OC

2" RIGID INSULATION

SHILDAN APLHATON TERRACOTTA PANEL

VERTICAL TRACK (MIDDLE CONDITION)

PROF. PAUL KING ARCH.2431 BUILDING TECHNOLOGY III

STEEL Z GIRT

CRIPPLE METAL C STUD 16" OC

Shildan ALPHATON Full Assembled (3) Window Detail (1) - Callout 1" = 1'-0"

SP-03.2 Scale

FOUR CORNER METAL C STUD

SHILDAN APLHATON TERRACOTTA PANEL

4

Elevation South - Shildan ALPHATON Full Assembled (3) 3/4" = 1'-0"

Checked by

TOP CLIP

THERE ARE THREE CONDITIONS FOR THE CLIPS THAT ARE HOLDING THE SHILDAN ALPHATON TERRACOTTA PANELS: TOP, MIDDLE, & BOTTOM CONDITIONS

9 SP-03.3

Isometric @SE - Shildan ALPHATON Full Assembled (3) Window Detail (2)

5/23/2022 11:05:18 AM

VERTICAL JOINT 0'-0 3/8" CAN BE SEALED WITH BACKER ROD AND CAULKING

2" RIGID INSULATION

MIDDLE CLIP

3/4" PLYWOOD OR OSB SHEATHING

STEEL Z GIRT

SECTION: HD20

SHILDAN APLHATON TERRACOTTA PANEL

2" RIGID INSULATION

3 5/8" METAL STUD BOTTOM TRACK

3/4" PLYWOOD OR OSB SHEATHING

VERTICAL JOINT 0'-0 3/8" CAN BE SEALED WITH BACKER ROD AND CAULKING

3 5/8" METAL STUD TOP TRACK

HORIZONTAL JOINT 0'-0 3/8" CAN BE SEALED WITH BACKER ROD AND CAULKING

ALUMINUM ENCASEMENT

SHILDAN ALPHATON SOLID WALL SYSTEM & YCW 750 GLASS CURTAIN WALL SYSTEM

1" GLAZED GLASS PANEL

ALUMINUM ENCASEMENT 1" GLAZED GLASS PANEL

No.

Project number

CRIPPLE METAL C STUD 16" OC

Date Drawn by

DOUBLE TRIMMER METAL C STUD 16" OC 7

Long Section @ Shildan ALPHATON Full Assembled (3) Window Detail (1) 1" = 1'-0"

1

Isometric @SE - Shildan ALPHATON Full Assembled (3) Window Detail (1)

METAL C STUD 16" OC

Checked by

8

Isometric @SE - Shildan ALPHATON Full Assembled (3) Window Detail (5)

3

Project Number Issue Date Author Checker

SP-03.3

Isometric @SE - Shildan ALPHATON Full Assembled (3) Window Detail (3) Scale

As indicated

5/23/2022 11:07:43 AM

ALUMINUM ENCASMENT

Elevation South - Shildan ALPHATON Full Assembled (3) Window Detail (1) 1" = 1'-0"

Date

PROFESSOR PAUL KING BUILDING CASE STUDY Building Tech 3 – Spring 2022 Solid Panel System Assembly

3 5/8" METAL STUD BOTTOM TRACK

5

Description


2

1

4

3

6

8

6.1

8.1

10

9

13' - 1" 27' - 6"

1

27' - 2"

2

27' - 5"

A401

A402 179' - 0" 17' - 11"

74' - 9"

MOTHER'S ROOM

27' - 9"

20

58' - 7"

20

20

20

78

20

0 .0

101

126

°

102

A

M

W

120

121

20

7

6' - 4 3/16"

B

20

3' - 11 5/32"

103

C

B

A

A

101

6' - 7"

11' - 11 31/32"

WORK AREA 103

126

VESTIBULE

A

107

5' - 9

B

D

6' - 7"

105

5/16"

UP

D

A

CONFERENCE 110

A

108

11/16

"

10' - 0"

109

STAFF PRIVACY

A

UNI. 109

B

112

23' - 0"

20 14' - 7"

B

A

27' - 2"

A

83' - 1"

122 83' - 1"

A

112

A

7' - 0"

A

20

A

A

D

TODDLER/PRESCHOOL

C

20 A

110

A

118

113 A

111 111

A

108

27' - 6"

S1.1

WATER SERVICE

119

STAFF LOUNGE

A

A

STAIR 1

A

UNI.

13' - 1"

STORAGE

A

113

A

B

105

117

A

HOMEWORK HELP

21' - 8

JAN.

WORKROOM

114

A

A

10' - 8 3/8"

A

OFFICE

D

RAMP 1

C

27' - 5"

B

20

B

A

ELEMENTARY

WELCOME ZONE

125

123

20

20

VESTIBULE 106

1

DN

B

A

A401

1/32"

---

R1.1

B

A

6' - 7"

S1.1B

11.38°

S1.1A

23' - 0

C

A

4' - 8 3/8"

STORAGE

116

A 107A

D

6 8.

A

A

E

A

A A

A

RECIEVING

A

A

115

115

73' - 8"

3 A401

DROP

17' - 5 1/8"

A

114

11' - 0 9/16"

FAMILY

116

6' - 10 7/16"

107B

E

A

124

B B

A

B

RAMP 2

9' - 5"

TEEN AREA

106A

20 2 A402

R1.2

A

A

A 17' - 11"

59' - 8"

27' - 7"

28' - 4"

45' - 6"

179' - 0"

1

2

3 A402

3

4

5

9

7

Door Schedule Entry Level Stairs Mark S1.1A S1.1B S1.2A S1.2B

1

30

Entry Level 1/8" = 1'-0"

ACADEMIC - Façade Studies

Family Single-Flush Single-Flush Single-Flush Single-Flush

Type 36" x 84" 36" x 84" 36" x 84" 36" x 84"

Thickness 2" 2" 2" 2"

9.1

10

Door Schedule Entry Level Type Mark 1 1 1 1

Mark 101 103 105 106A 107A 107B 108 109 110 111 112 113 114 115 116 126

Family Single-Flush Single-Flush Single-Flush Door-Double-Flush_Panel-Double-Acting Door-Double-Flush_Panel-Double-Acting Door-Double-Flush_Panel-Double-Acting Single-Flush Single-Flush Single-Flush Single-Flush Single-Flush Single-Flush Single-Flush Single-Flush Single-Flush Single-Flush

Type 36" x 84" 36" x 84" 36" x 84" 68" x 80" 68" x 80" 68" x 80" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84"

Thickness 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2"

Type Mark 1 1 1 17 17 17 1 1 1 1 1 1 1 1 1 1


Drawing Sets | March 2022

PANEL SYSTEM’S FURTHER INFORMATION

CURTAIN WALL SYSTEM’S FURTHER INFORMATION

The Terracotta Panels can be incorporated in both horizontal and vertical support systems. For additional design flexibility, the panels can be oriented in either a horizontal or vertical layout. The three conditions are the outside corner, inside corner, & middle condition. The terracotta panels are supported by the clips. This clip holds the panels and the bottom clips form the shape of a “J”, while the top is a mirrored version of this “J”. Overall, there are three conditions for the clips: Top clip, middle clip, & bottom clip. The clips are then connected to a series of vertical tracks that also occur in three conditions: Outside corner, inside corner, and middle condition. All the vertical tracks are connected to a horizontal Z Girt and the cavity or space in the Z Girt is stuffed with 2” of rigid insulation to prevent water from entering the building. The Z Girth then connects to the Metal C Studs that are 16” OC. The sheathing that separates the Z Girth and the Metal C Stud consists of a waterproofing membrane.

For the curtain wall company, I chose the YCW 750 OG Curtain walls system. The YCW 750 OG (Outside Glazed) is a pressure wall system that provides the flexibility required for today’s projects. The system offers a wide variety of face covers and several different depth back members that can accommodate taller spans and higher design pressures. The system provides improved thermal performance to conserve energy and lower operating costs. This curtain wall system is Stick built that uses concealed fasteners (NOT UNITIZED). A shear block is placed right into the horizontal mullion with ease and secures the system by fastening bolts into the vertical mullion and another set of screws on the top and/or bottom.

Façade Studies - ACADEMIC

F 31


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.