ARCHITECTURE
WORK SAMPLES JANGHWA PARK
WASHINGTON UNIVERSITY IN ST. LOUIS MASTER OF ARCHITECTURE
JANGHWA PARK
+ INFORMATION 314.762.7630 janghwa@wustl.edu 1241 Strassner Drive, APT 1302 Brentwood, MO 63144
Portfolio Available for View at : https://issuu.com/janghwapark
+ EDUCATION 2013 - 2015
WASHINGTON UNIVERSITY IN ST. LOUIS Sam Fox School of Design & Visual Arts Master of Architecture
2003 - 2011
DANKOOK UNIVERSITY Department of Architecture, South Korea Bachelor of Architecture *2004 - 2006 Military Service
+ EXPERIENCE 11. 2017 - Present
VESTAL CORPORATION, St. Louis, Missouri, United States | Architectural Intern Created presentational renderings of projects. Participation in the design of administration buildings of new brewery projects
05. 2016 - 10. 2017
TRIVERS ASSOCIATES, St. Louis, Missouri, United States | Architectural Designer Produced and updated Revit project models for sets in all project phases Developed critical details with project architect in all project phases Explored materials to property fit project cost and aesthetic requirements Worked with various complex project types and sizes Coordinated Construction Administration for six months
06. 2009 - 08. 2009
GUNWON ARCHITECTS PLANNERS ENGINEERS, Seoul, South Korea | Summer Internship Participation in 3D modeling, physical modeling and preparation of drawing set for Kimpo New Town residence
06. 2008 - 08. 2008
DA GROUP, Urban Design & Architecture, Seoul, South Korea | Summer Internship Participation in the schematic design, data research and physical modeling for Competition for Shenyang Lotte World in China
10. 2004 - 12. 2006
Branch of Military, Tongyeong, South Korea | Korea Coast Guard Joined as a Seaman Recruit and discharged as a Petty officer 2nd Class Served as an Operations Specialist(OS) on patrol boat(vessel #122, 6 months) and at Tactical Operation Center(18 months)
+ HONORS | AWARDS 05. 2014 10. 2012 07. 2010 03. 2010 2008 - 2009
FEATURED PROJECT, Approach publication, Sam Fox school of Design & Visual Arts,Washington University in St. Louis Mentioned, Artphil Institute Collaborative Project Competition Mentioned, 29th Korean Institute of Architects Competition (KIA)
1st prize, Library Design Competition, Dankook University ACADEMIC SCHOLARSHIP, Dankook University
+ EXHIBITION | PUBLICATION 04. 2015
MISI-ZIIBI BEER : An Exhibition of Breweries’ Evolving Place in St. Louis
Research and Studio works, Givens hall, Sam Fox School of Design & Visual Arts, Washington University in St. Louis 2014
PUBLICATION ‘MISI-ZIIBI BEER’,
Research and Studio works, Sam Fox School of Design & Visual Arts, Washington University in St. Louis 07. 2010
College of Architecture Graduate Exhibition_Design ‘Urban Stitch’, Dankook University
+ SKILLS BIM Software 3D Modeling Physical Modeling Drafting Rendering Others Languages
Advanced / Proficient
Autodesk Revit Rhino 3D, Rhino Grasshopper, Google Sketchup, Form.Z Laser Cutting, CNC Milling, 3D Printing, Thermoforming, Vacuum forming, Wood+Metal Shop Autodesk AutoCAD Vray render, Maxwell render Adobe Design Suite(Photoshop, Illustrator, InDesign, Premiere), Diva for Rhino, Microsoft Office Korean (Native), English(Proficient), Japanese(Intermediate)
CONTENTS PROFESSIONAL WORK
1 2 3
1400 RUSSELL APARTMENT
02 - 03
MULTI-FAMILY APARTMENT
St. Louis, Missouri Trivers Associates / Architectural Designer
AMERICAN CANCER SOCIETY HOPE LODGE
04 - 05
HOSPITALITY HOUSING
Jackson, Mississippi Trivers Associates / Architectural Designer
CBI MEXICALI - NEW BREWERY
06 - 07
BREWERY
Mexicali, Mexico Vestal Corporation / Architectural Intern
ACADEMIC WORK
4 5 6 7
RE-TOOLING LIVING ENVIRONMENT
08
CONSTRUCTION LABOR UNION
Washington University in St. Louis / Master of Architecture Degree Preoject / Critic _Heather Woofter
HOUSING FOR THE ELDERLY
09
SELF-SUFFICIENT HOUSING
Washington University in St. Louis / Master of Architecture Studio 419 / Critic_Pablo Moyano Fernandez
BERLIN BERLIN
10
GALLERY OF THE 20TH CENTURY
Washington University in St. Louis / Master of Architecture Performance Enhancing / Critic_Jan Ulmer
PLUG ‘N’ PLAY MISI-ZIIBI BREWERY
Washington University in St. Louis / Master of Architecture Atmospheric Animations / Critic_Derek Hoefferlin
11
PROFESSIONAL WORK : Trivers Associates PROJECT NAME : 1400 Russell Apartment
01
RUSSELL APARTMENT
PROJECT TYPE : Multi-family Apartment LOCATION : St. Louis, Missouri
This neighborhood projects was a complex one. Our objective was to create a new building that would contextually fit within the Soulard neighborhood. This challenge involved much investigation of the surrounding area to ensure a building would fit correctly into this location.
MULTI-FAMILY NEW CONSTRUCTION
DESIGN DEVELOPMENT Assisted in design of elevations and prepared the presentations for CRO meeting. Created interior renderings as required.
+ NORTH PERSPECTIVE - Create renderings
+ ELEVATIONS - Assist in design of elevations and create colored elevations
North elevation facing Russell Blvd.
South elevation facing Ann Ave.
East elevation facing S 13th St.
West elevation facing Route 55
+ INTERIOR RENDERINGS - Assist in design of lobby and create renderings
View of Lobby JANGHWA PARK
View of Lobby ARCHITECTURE PORTFOLIO
View of Lobby JANGHWA@WUSTL.EDU
View of Pool Kitchen
2
ADA HOOD
6'-2"
1'-10"
1'-10"
1
PROFESSIONAL WORK : Trivers Associates PROJECT NAME : 1400 Russell Apartment
1
PROJECT TYPE : Multi-family Apartment LOCATION : St. Louis, Missouri
WOO WOOD BLOCKING
6'-6 3/4"
36" REF
2'-10"
2'-10"
MICRO D.W.
ADA 30" RANGE
2'-0"
2'-6"
REMOVABLE
2'-1"
CONSTRUCTION DOCUMENTATION
2'-6"
3'-2 3/8"CLEAR
1'-0"
2'-6"
1'-3"
2'-0"
2 3/16" MIN. FILLERE
(2A, ACCESSIBLE) 2 BEDROOM- UNIT 226
KITCHEN ELEVATION A - UNIT 226
1
998 SQ. FT.
NET AREA
KITCHEN ELEVATION B - UNIT 226
2
1/2" = 1'-0"
3'-3"
1
1/2" = 1'-0"
Assisted in the preparation of numerous sheets in the final construction drawing set. My primary focus was the development of building including unit layout and section details. 61 SQ. FT.
BALCONY
1059 SQ. FT.
GROSS AREA
BATH ELEVATION B2 - UNIT 226
7
10
1/2" = 1'-0"
+ ENLARGED FLOOR PLAN - ANSI TYPE 10
11
10
36'-4 3/16" 8'-7 7/8" P8
2
2'-3"
A-417A
5
EQ
EQ
1'-1 1/4"
4
3
56X60 CLEAR FLOOR SPACE
56X60 CLEAR FLOOR SPACE
P8
1
30X FULL LENGTH OF TUB CLEAR FLOOR SPACE
WH
C2
15
2'-4 3/4"
B1
11'-3 1/2"
G
E
C4
S
2 BED 226 2A
27'-4 7/16"
4'-0" ø 5'-0" TURNING CIRCLE
S
T-SHAPED AREA RADIUS
D
ø 5'-0" TURNING CIRCLE
P8 B1
2 BED 226 2A
E 7'-7 1/2"
C4
3'-4"
C4
W
2'-4 3/4"
A-417A
S
22'-0 1/2"
1'-3"
P12 E
EQ
DW
D
EQ
56X60 CLEAR FLOOR SPACE
5'-0"
3'-6 1/4"
C7
EQ
D
B1
7
A-417A
EQ
P12
6'-1 1/4"
1
A-417A
B1
8'-4 1/4"
A1
6
1
EQ
12 A-417A
1
2'-10 1/4"
EQ
13'-8 5/8" P8
10
1/2" = 1'-0"
+ ENLARGED FLOOR PLAN (BATH) - ANSI TYPE
11'-1 7/16" 11 A-417A
BATH ELEVATION B3 - UNIT 226
G.2
11'-5 3/4"
11
11'-2 15/16"
11'-1 7/16" 11'-6 1/8"
ENLARGED FLOOR PLAN -10UNIT 226 - ANSI TYPE A - BATH 1/2" = 1'-0"
E1 J
J
D E EQ
COMPOSITE TILE STARTER PIECE
1/2" PLYWD. SHEATING
2X WOOD BLOCKING
2
CORNER BEAD
BOTTOM OF MASONRY OPENING EL VARIES: SEE A303
3/8"
KEY
SST DRIP EDGE; W/ CONT. SEALANT BED AT ANGLE STEEL LINTEL, PAINT, RE: STRUC.
5/8" GYP. BD., PAINT
NORTH PT PT PT/CT PT PT PT
2
E
STOREFRONT DETAIL - HEAD @ COMPOSITE TILE
4
3" = 1'-0"
PT PT PT/CT PT PT PT
FLEXIBLE FLASHING
2
30x48 CLEAR FLOOR SPACE CENTERED ON SINK
7
TYP. WINDOW HEAD - FIBER CEMENT - ALUM. 3" = 1'-0"
12
2
2 5/8"
GYP. BD.
CORNER BEAD
CONT. SEALANT JT.
PRESSURE TREATED 1X CONTINUOUS WOOD BLOCKING
5/8" GYP. BD., PAINT
1/2"
CAVITY SEAL WEATHER RESISTANT BARRIER, WRAP INTO OPENING, TYP.
CONT. SEALANT JT.
2
BATT. INSULATION
1/2" PLYWD SHEATING
BRICK VENEER
WEATHER RESISTANT BARRIER, WRAP INTO OPENNING, TYP.
MASONRY ANCHOR
FLASHING COMPOSITE TILE
STOREFRONT DETAIL - JAMB @ COMPOSITE TILE 5
TYP. WINDOW JAMB- BRICK WALL 3" = 1'-0"
ALUM. STOREFRONT SYSTEM
ALUM. SILL RECEIVER SET IN CONT. SEALANT JT. BY ALUM. STOREFRONT MFR.
6 3/8"
3 1/4"
2'-4 1/8"
2
8"
RECESSED FIXTURE ALUM. WINDOW
EXHAUST FAN
3" = 1'-0"
CEILING FAN CEILING FAN ROUGH IN
2 5/8"
7
2
OVERHEAD DOOR JAMB 1 1/2" = 1'-0"
A. B. C.
CONT. SEALANT JT.
CORNER BEAD
PROVIDE FRONT LOADING ACCESSIBLE WASHING AND 2 DRYING MACHINES AT ALL ANSI UNITS. THE LOCATION OF CONTROLS FOR COOKTOP RANGE AND CONT. SEALANT JT. 5 3/8" ALUM. WINDOW OVEN SHALL BE FRONT FACING. REMOVABLE CABINETRY ALLOWED AT/BELOW FUTURE WORK SURFACE PROVIDED FLOOR FINISH EXTENDS WEATHER STRIPPING WOOD SHIM AS REQ'D UNDER CABINET, ADJACENT WALLS ARE FINISHED. CONT. SEALANT JOINT W/ BACKER ROD 1 1/4" FIBER CEMENT BOARD TRIM, PAINT FLEXIBLE FLASHING
5/8" GYP. BD., PAINT
WATER PROOF MEMBRANE
2
PEDESTAL PAVER SYSTEM
1
CONT. SEALANT JT. BOTH SIDES
ALUM. WINDOW
CONT. SEALANT JT.
5 3/8"
5/8" GYP. BD., PAINT ROOF MEMBRANE WRAP UP & UNDER WINDOW SILL
CONT. SEALANT JT CAST STONE SILL
CORNER BEAD 5/8" 1
2
CONT. WATERPROOF MEMBRANE WRAP UP FACE OF W.R.B.
TOP OF MASONRY EL VARIES: SEE A303 THROUGH WALL SILL FLASHING BRICK VENEER
WOOD SHIM PRESSURE TREATED CONTINUOUS WOOD BLOCKING
2
4"
11
TYP. WINDOW JAMB - COMPOSITE TILE 3" = 1'-0"
AT STONE VENEER
1
2
CONC. COMPOSITE DECK
ALUM. WINDOW
CONT. SEALANT JOINT W/ BACKER ROD 2 1 1/4" FIBER CEMENT BOARD TRIM, PAINT
WEATHER STRIPPING METAL FLASHING
"F" ALUM REVEAL 1/2" TO COVER GAP
FIBER CEMENT PANEL MIN 3/8" FURRING @ 16" O.C.
WOOD SHIM AS REQ'D
CONT. SEALANT JT.
5/8" GYP. BD., PAINT
SILL FLASHING BY WINDOW MFR. 2
2
WEATHER RESISTANT BARRIER, WRAP INTO OPENNING, TYP.
ALUM. REVEAL 1/2"
WEATHER RESISTANT BARRIER, WRAP INTO OPENING, TYP.
B
A
1/2" PLYWD. SHEATING
WEATHER RESISTANT BARRIER, WRAP INTO OPENING, TYP.
BATT INSUL.
1/2" PLYWD. SHEATING BATT INSUL.
JOEL FUOSS - ARCHITECT MO# A-2008004388
COMPOSITE TILE 2
WEATHER RESISTANT BARRIER,WEATHER RESISTANT BARRIER, WRAP INTO OPENNING, TYP. WRAP INTO OPENING, TYP.
2
1/2" PLYWD SHEATING
MIN 3/8" FURRING @ 16" O.C.
RIGID INSULATION
FIBER CEMENT PANEL
CONC. SLAB, RE: STRUC.
STOREFRONT DETAIL - SILL @ ROOF TERRACE
6
3" = 1'-0"
TYP. WINDOW SILL - BRICK WALL 3" = 1'-0"
9
TRIVERS ASSOCIATES, INC. ORIGINAL CERTIFICATE/ LICENSE #000549
OUTSIDE CORNER
TYP. WINDOW SILL - FIBER CEMENT - ALUM.
12
3" = 1'-0"
TYP. WINDOW SILL - COMPOSITE ALUM. TILE REVEAL 3" = 1'-0"
CAST STONE SILL BELOW
1
Trivers Associates, Inc. 2016
ALUMINUM PATIO DOOR
JANGHWA PARK
15
PROJECT #:
OVERHEAD DOOR JAMB AT FIBER CEMENT BOARD
1610.00
1 1/2" = 1'-0"
2 PEDESTAL PAVER SYSTEM
ROOF MEMBRANE WRAP UNDER DOOR SILL PROTECTION BOARD
ARCHITECTURE PORTFOLIO TAPERED RIGID INSULATION
JANGHWA@WUSTL.EDU CONT. SEALANT JT. TMENTS
1/2" MAX.
DOOR SILL SET IN CONT. SEALANT JT.
2
KEY
2
1/2" PLYWD SHEATING
CORNER BEAD
CONT. SEALANT JOINT W/ BACKER ROD
5/8" GYP. BD., PAINT
ENLA
COMPOSITE TILE
5/8" GYP. BD., PAINT
WOOD SHIM AS REQ'D
CORNER BEAD
1"
3"
TAPERED RIGID INSULATION
3"
TOP OF WALL EL VARIES
2 5/8"
PROTECTION BOARD
SEALE
8
CONT. SEALANT JT.
ALUM. WINDOW
CONT. SEALANT JT. 5/8" GYP. BD., PAINT
LUXU J
CONT. SEALANT JT.
5 3/8"
CONCRETE TOPPING SLAB
PORC
RESIL
2 X 2 LAY-IN LIGHT FIXTURE
4'-5"
TYP. WINDOW HEAD - COMPOSITE TILE
SILL FLASHING
3
SMOKE DETECTOR
ACCESSIBLE UNIT NOTES (ALL ANSI UNITS)
ALUM. WINDOW
B.
1
FLASHING
1 1/4" FIBER CEMENT BOARD TRIM, PAINT CONT. SEALANT JT.
3" = 1'-0"
1"
10
ALL DIMENSIONS ARE TO FACE OF PARTITION, 2 COLUMN CENTERLINE, OR FINISHED WOOD SHIM FACE AS REQ'D OF EXTERIOR WALL. UNLESS OTHERWISE CONT. SEALANTNOTED. JOINT W/ BACKER ROD CONSTRUCT RATED ASSEMBLIES COMPLETE AND ALUM REVEAL 1/2" UNINTERRUPTED PRIOR TO CONSTRUCTION 2OF NON-RATED ASSEMBLIES. FLEXIBLE FLASHING A TO BE C. ALL RESIDENTIAL UNIT INTERIOR PARTITIONS MIN 3/8" FURRING B @ 16" O.C. P1 UNLESS NOTED OTHERWISE. D. SEE SHEETS G-003 AND G-004 FOR P-TYPES. E. WHERE U.L. DESIGN OR GYPSUM ASSOCIATED NUMBERS ARE REFERENCED,FIBER REFER CEMENTTO PANEL WEATHER RESISTANT BARRIER, UNDERWRITERS LABORATORIES, INCLUDING FIRE 2 WRAP INTO OPENING, TYP. DIRECTORY AND / OR GYPSUM ASSOCIATION BATT INSUL. DESIGN MANUAL FOR COMPLETE REQUIREMENTS. F. PROVIDE SILICON SELANT AT ALL INTERSECTING COUNTERTOPS (CLEAR) AND TUB-TILE (2) LAYERS OF WEATHER INTERSECTIONS (TO MATCH GROUT). RESISTANT BARRIER G. ALL CEILINGS TO BE 9'-0"(B.O. STRUCTURE), UNLESS 1 NOTED. 2 OTHERWISE STONE VENEER MORTAR H. REFERENCE ELECTRICAL DRAWINGS FOR ALL LIGHT FIXTURES AND SWITHCING. TYP. WINDOW JAMB - FIBER CEMENT - ALUM. STONE VENEER 8 3" = 1'-0" I. REFER TO TYPICAL CLEARANES SHEET G-010 FOR INSTALLATION OF ALL TOILET ACCESSORIES, VENEER POINTING MORTAR JOINT MIRROS, FIXTURES, ETC.
CORNER BEAD
WOOD SHIM
5/8" GYP. BD., PAINT
2
S 5 3/8"
1/2" = 1'-0"
A.
CONT. SEALANT JT.
CONT. SEALANT JT.
1
Prepared reponses to RFI’s and submittals Created and distributed ASI’s 2
CONT. SEALANT JT.
2
CONSTRUCTION ADMINISTRATION WOOD SHIM AS REQ'D.
BOARD TRIM, PAINT
SUSPENDED FIXTURE
ENLARGED FLOOR PLAN - UNIT 226 - ANSI TYPE A - KITCHEN
UNIT 5 3/8" GENERAL NOTES
ALUM. WINDOW
CONT. SEALANT JT.
5/8" GYP. BD., PAINT
ALUM. STOREFRONT SYSTEM
RECESSED FIXTURE 1 1/4" FIBER CEMENT
CORNER BEAD CONT. SEALTANT JT.
3'-4"
3" = 1'-0"
3 1/4"
5/8" GYP. BD., PAINT
CARP
CARP
EXTER
WEATHER RESISTANT BARRIER, WRAP INTO OPENNING, TYP.
GALVANIZED METAL THRU. WALL FLASHING
ALUM. WINDOW
2 5/8"
TYP. WINDOW HEAD - BRICK WALL
6 3/8"
1/2" PLYWD. SHEATING SURFACE MOUNTED LIGHT FIXTURE COMPOSITE TILE
STARTER PIECE PENDANT LIGHT FIXTURE2
WALL MOUNTED FIXTURE
1/2" MIN GAP DO NOT CAULK DRIP CAP TRIM 5 3/8"
WOOD CEILING
WORK SPACE
30x48 CLEAR FLOOR SPACE AT WORK SPACE
2
VENT STRIP
GYP BOARD CEILING
COMMENTS
AT OVEN PT PT B PT PAT MIN 3/8" FURRING @ 16" O.C. PWEATHER T/CT RESISTANT PT/CT BARRIER, 30x48 CLEAR WRAP INTO OPENING, TYP. PT PT 2 FLOOR SPACE AT DISHWASHER PT PT PT PT FIBER CEMENT PANEL
DESCRCORNER IPTBEAD ION
ALUM. WINDOW 3 1/4"
6 3/8"
WALL 30x48 CLEAR 2 1/2" PLYWD. SHEATING SOUTH EAST WEST FLOOR SPACE
CONT. SEALTANT JT.
CONT. SEALANT JT.
ALUM. STOREFRONT SYSTEM
1/2"
1
PT PT PT PT PT 5/8" GYP. BD., PTPAINT
KEYED ENLARGED FLOOR PLAN NOTES
WOOD SHIM AS REQ'D. CONT. SEALANT JT. BOTH SIDES 1
CEILING
PRESSURE TREATED 2X CONTINUOUS WOOD BLOCKING FLEXIBLE TRHU-WALL FLASHING
GALVANIZED METAL THRU. WALL FLASHING 1 1/4" FIBER CEMENT BOARD TRIM, PAINT CORNER BEAD
BASE
314.241.2900 241.2909 www.trivers.com
BEDROOM CPT-1 BEDROOM CLOSET CPT-1 BATHROOM CONT. MORTAR NET LVT MECH. CLOSET LVT LIVING ROOM LVT FLEXIBLE FLASHING KITCHEN WALL CAVITY VENT (BEYOND) LVT
ACOUSTIC PANEL CEILING
100 North Broadway Suite 1800 St Louis Missouri 63102
WEATHER RESISTANT BARRIER,
WRAP INTO OPENING, TYP. ROOM NAME FLOOR 1/2" PLYWD. SHEATING
FINISH PLAN
RCP LEGEND
1400 RUSSELL BOULEVARD SAINT LOUIS, MO 63104
FINISH
BRICK VENEER MASONRY ANCHOR
WEATHER RESISTANT BARRIER, WRAP INTO OPENING, TYP.
30x48 CLEAR FLOOR SPACE CENTERED ON REFRIGERATOR
UNIT FINISH SCHEDULE
DESCRIPTION
architecture planning urban design interiors
KEY
LANDSCAPE ARCHITECT:
KEYED UNIT ELEVATION NOTES
DESCRIPTION
DW
KEYED UNIT ELEVATION NOTES
CIVIL ENGINEER: CIVIL DESIGN, INC. 1522 South 7th Street, St. Louis, MO 63104 314.880.4427 STRUCTURAL ENGINEER: SSC ENGINEERING, INC. 18207 Edison Avenue , Chesterfield, MO 63005 636.530.7770 MEP ENGINEER:
+ DETAIL DRAWINGS - WINDOW DETAILS KEY
30x48 CLEAR FLOOR SPACE CENTERED ON COOKTOP
TRIVERS
1/4" = 1'-0"
RUSSELL APARTMENTS
CEILING PLAN - UNIT 226
6'-2 1/16"
9
1/4" = 1'-0"
4'-0 7/16"
ENLARGED FLOOR PLAN - UNIT 226 - ANSI TYPE A
8
EQ 22'-0 1/2"
11'-10 7/8"
1"
11'-5 3/4"
4'-2 1/4"
12'-11 9/16"
3 2 1 B
3
ASI 04 ASI 02 ASI 01 ADDENDUM B
Date 5 05.24.2017 05.04.2017 2/28/2017
1/4" =
02
PROFESSIONAL WORK : Trivers Associates PROJECT NAME : American Cancer Society Hope lodge
AMERICAN CANCER SOCIETY HOPE LODGE
PROJECT TYPE : Hospitality Housing LOCATION : Jackson, Mississippi
The new design combines valuable knowledge gained through experience with other ACS Hope Lodge projects with local ACS Jackson priorities. We worked to maintain the original design total square footage while strengthening important program connections and simplifying circulation.
CONSTRUCTION DOCUMENTATION
HOSPITALITY HOUSING
Assisted in the preparation of numerous sheets in the final construction drawing set. My primary focus was the development of elevations and wall details.
+ SOUTH PERSPECTIVE - by others
+ SOUTH ELEVATION - by others
SIM. 6
7
7.4
A-301
4.05
9
8
3
7.07
A-504
KEYED ELEVATION NOTES
10
KEY
4.05
4.05
SIM.
12 A-500
T.O. WINDOW 3RD 132'-8"
W1 W2
W1 W2
W1 W2
W1 W2
W1 W2
W1 W2
W1 W2
W1 W2
W1 W2
8.02
SIGNAGE 7.01
19'-4"
T.O. WINDOW 2ND 120'-8"
4.04
4.04 W2
SIM.
5
W2
W1
W2
W1
4.04
W2
W1
W2
W1
4.04
4.04 W2
W1
W2
W1
W2
W1
4.02
W2
W1
W1 8.02
1'-4"
A-501
T.O. SLAB SECOND FLOOR 112'-0"
1
T.O. WINDOW 108'-8"
5.02
A-302
4.02 W11
3.01
W10
W10
4.01
W4
BRICK VENEER TYPE 'I' : SIZE - MODULAR COLOR - PALAMINO BLEND (TO BE SELECTED BY ARCHITECT)
T.O. SLAB FIRST FLOOR 100'-0" WALL VENT
4.01
8.02
2 A-210
8.01
BRICK VENEER TYPE 'II' : SIZE - MODULAR COLOR - PALAMINO
7.01
AMERICAN CANCER SOCIETY HOPE LODGE
T.O. SLAB THIRD FLOOR 124'-0"
DESCRIPTION
DIVISION 3: CONCRETE 3.01 CAST STONE CAP DIVISION 04: MASONRY 4.01 BRICK VENEER TYPE 'I' , SEE SPECS 4.02 BRICK VENEER TYPE 'II' , SEE SPECS 4.03 ADHERED STONE MASONRY VENEER 4.04 RECESSED BRICK 4.05 MASONRY EXPANSION JOINT DIVISION 05: METALS 5.01 METAL COPING 5.02 METAL CANOPY, PAINT, RE: STRUCT 5.03 STEEL COLUMN, PAINT 5.04 SIGNAGE, PROVIDE POWER FOR LIGHTING 5.05 METAL PICKET GUARDRAIL, W/ WOOD CAP, PAINT DIVISION 07: THERMAL AND MOISTURE PROTECTION 7.01 COMPOSITE WOOD PANEL SYSTEM 7.07 OVERFLOW SCUPPER THRU WALL - RE: DTL. 3/A-504 DIVISION 08: OPENINGS 8.01 ALUMINUM STOREFRONT SYSTEM 8.02 ALUMINUM CLAD WOOD WINDOW
5.01
1 BUILDING ELEVATION - NORTH A-200 1/8" = 1'-0"
G
F
2
E 4.05
4.04
T.O. ELEV. OVERRUN 139'-10" T.O. WALL 138'-0"
8.01
4.04
A-302
D
C
A
B
7.01
4.04
4.05
4.04
A
5.01
4.04
B 4.05
T.O. ROOF STEEL 136'-0"
C
3
4.04
4.05
A-301
T.O. ELEV. OVERRUN 139'-10" T.O. WALL 138'-0"
8.01
SIM. D
2
7.01
1 A-301
A-302
E
F 4.05
4.04
G
4.05 5.01
T.O. ROOF STEEL 136'-0"
T.O. WINDOW 3RD 132'-8"
W2
4.02
T.O. WINDOW 3RD 132'-8"
W2
W14
W1
W1
W2
W14
W1
W2
8.02
T.O. SLAB THIRD FLOOR 124'-0"
W14
W2
W1
5.05
T.O. SLAB THIRD FLOOR 124'-0"
19'-4"
T.O. WINDOW 2ND 120'-8"
W16
7.01
T.O. WINDOW 2ND 120'-8" 4.02
W1
W1
W2
W14
W1
W2
W16
5.02
5.05 6
1'-4"
T.O. SLAB SECOND FLOOR 112'-0" 3.01 4.01
W8
W12
W9
W10
T.O. SLAB SECOND FLOOR 112'-0"
A-503
T.O. WINDOW 108'-8"
3.01
W9
4.01
8.01
4.03
7.01
4.03
SIM.
A-504
11 7.01
8.01
A-503
4.03
3 BUILDING ELEVATION - WEST A-200 1/8" = 1'-0" 10
8
9 4.05
4.04
7
7.4
6
4
5 3
5.05
4.05
4
4.05
7.01
4.04
A-301
A-302
5.01
3.9
TRIVERS ASSOCIATES PC
3
4.05
4.05
4.05
A
1
2
T.O. SLAB SECOND FLOOR 112'-0" T.O. WINDOW 108'-8" 4.02
4.04 5.01
B 6
7
A-503
A-503
3.01 4.01
T.O. WINDOW 3RD 132'-8"
W2
W1
W2
W1
W15
W2
W2
W1
W1
W2
W1
W2
W1
W2
W2
W1
T.O. SLAB FIRST FLOOR 100'-0"
W1 8.02
8.02
T.O. SLAB THIRD FLOOR 124'-0"
4.04
4.04
T.O. WINDOW 2ND 120'-8"
W1
W2
W1
W2
W15
4.02
W1
W2
4.04 W1
W1
W2
4.04
W2
W1
W2
W1
W2
5 ELEVATION - GARDEN EAST A-200 1/8" = 1'-0"
4.02 W1
W2
5.04
5.02
B
4 A-210
T.O. SLAB SECOND FLOOR 112'-0" T.O. WINDOW 108'-8"
W12
W6
W10
W10
W10
W9
3.01
5 A-210
W10
A
T.O. SLAB SECOND FLOOR 112'-0" T.O. WINDOW 108'-8"
7.01 3.01
T.O. SLAB FIRST FLOOR 100'-0" T.O. SLAB FIRST FLOOR 100'-0" 8.01
4.03
7.01
4 BUILDING ELEVATION - SOUTH A-200 1/8" = 1'-0"
JANGHWA PARK
4.01
T.O. FOUNDATION 98'-0" 5.03
AMY GILBERTSON ARCHITECTURE, A-5134
3.01
W5
5.03
7.01
2 BUILDING ELEVATION - EAST A-200 1/8" = 1'-0"
T.O. ELEV. OVERRUN 139'-10" T.O. WALL 138'-0" T.O. ROOF STEEL 136'-0"
1
W3
4.01 T.O. SLAB FIRST FLOOR 100'-0"
T.O. SLAB FIRST FLOOR 100'-0"
5.03
5.02
3.01
ARCHITECTURE PORTFOLIO
7.01
8.01
4.03
8.02
4.01
4.03
6 ELEVATION - GARDEN WEST A-200 1/8" = 1'-0"
JANGHWA@WUSTL.EDU
07.21.2017 AMERICAN CANCER SOCIETY HOPE LODGE - 100% CONSTRUCTION DOCUMENTS
T.O. WINDOW 108'-8"
STRUCTURAL ENGINEER: KPFF CONSULTING ENGINEERS
3
4.05
Amy Gilbertson, Architect
5
7.07
A-504
LANDSCAPE ARCHITECT: LA SOUTH
3
4.05
2615 North State Street Jackson, MS 39216
T.O. ROOF STEEL 136'-0"
4.04
CIVIL ENGINEER: MCMASTER & ASSOCIATES, INC.
3.9
4.05
TRIVERS
3
2
5.01
architecture planning urban design interiors
1 T.O. ELEV. OVERRUN 139'-10" T.O. WALL 138'-0"
ASSOCIATE ARCHITECT+MEPFP ENGINEER: CDFL ARCHITECTS + ENGINEERS PA
+ ELEVATIONS
Trivers Associates PC 2017
1408.00
PROJECT #:
No.
SD SET Description
05.06.2015 Date
BUILDING ELEVATIONS
A-200
4
PROFESSIONAL WORK : Trivers Associates PROJECT NAME : American Cancer Society Hope lodge
PROJECT TYPE : Hospitality Housing LOCATION : Jackson, Mississippi
CONSTRUCTION DOCUMENTATION Assisted in the design of canopy and creadted detail drawings.
+ WALL SECTION
+ DETAIL SECTIONS - CANOPY G
9
ACOUSTIC GYP. BD. CEILING ASSEMBLY, RE: RCP
FLOOR DECK; RE: STRUCT.
BALLASTED ROOF SYSTEM
1'-5 1/4" METAL FRAMING
2 CANOPY DETAIL AT BRICK LEDGE A-500 3" = 1'-0"
FACE BRICK
T.O. MASONRY 20'-8"
2'-0"
38'-0"
38'-0"
3/4" HRZL MTL. FRAMING W/ 6" MTL. FRAMING, RE. STRUCT. WEEPS NOTE: APPLY FLUID-APPLIED THERMAL BREAK TO ALL STRUCT. STL. MEMBERS THAT PENTRATE THE BLDG. ENVELOPE
5/8" GYP. SHEATHING W/ FLUID APPLIED AIR/VAPOR BARRIER
3 CANOPY DETAIL AT HPL PANEL A-500 3" = 1'-0"
1 1/2" CONT. RIGID INSUL.
UNIT
10'-0"
VERTICAL SLIP CLIP; RE: STRUCT.
7'-4"
210
2" SPRAY INSUL.
1'-4"
12'-0"
HORIZONTAL BRICK BAND
5/8" GYP. BD.
2" RIGID MINERAL WOOL INSUL.
SPRAY FOAM INSUL.
1/2"
217
ALUM. CLAD WOOD WINDOW
B.O. MASONRY 13'-4"
HPL PANEL W/ EXPOSED FASTENER BEYOND
T.O. SLAB SECOND FLOOR 112'-0"
PRE FIN. MTL FLASHING; LET INTO REGLET AT CAP AND SEAL
1'-4" 2 G-005
2 1/4"
1/4" / 1'-0"
2"
STL. FRAMING, RE. STRUCT. MTL. COPING
6 A-500
B.O. CANOPY 8'-8"
BALLASTED ROOF SYSTEM
SLOPED CAST STONE CAP W/ CUT REGLET TO RECEIVE FLASHING
WOOD SOFFIT SYSTEM
FACE BRICK CAVITY VENT CMU; RE STRUCT
3/8"
1'-0"
1'-7 1/2"
12'-0"
EXT. GYP. BOARD
ALIGN STL. FRAMING, RE. STRUCT.
11 A-500
RIGID INSULATION
ALUM. STOREFRONT
1'-1"
B.O. MASONRY 8'-8"
SUSPENDED GYP. BD. CEILING, RE: RCP
10 STOREFRONT HEAD AT KITCHEN = 1'-0"SOFFIT SYSTEM A-500 3"WOOD
6 DETAIL AT CANOPY EDGE A-500 1 1/2" = 1'-0" 10
T.O. SLAB SECOND FLOOR 112'-0"
2 G-005
HPL SOFFIT PANEL W/ EXPOSED FASTENERS CANOPY COLUMN, PAINT RE: STRUCT.
10 A-500
ACOUSTICAL CEILING TILE;
G
1 9/16"
AIR BARRIER/ DRAINAGE PLANE
FIN. FLOOR, RE: FIN. SCHED.
1/2" STEEL PLATE, PAINT RE: STRUCTURAL B.O. STEEL PLATE 108'-8" 1" MTL CHANNEL PER HPL PANEL MANUF. 3/4" MTL. FRAMING
1/2"
THRU-WALL FLASHING W/ SST DRIP EDGE, EA. SIDE
RE: RCP 7 DETAIL AT RETAINING WALL A-500 3" = 1'-0"
1'-7"
1'-4"
112
NORTH DINING
FIN. FLOOR, RE: FIN. SCHED.
1"
CONC. SLAB, RE. STRUCT.
2'-0"
7"
ADHERED STONE MASONRY VENEER
11 7/8"
CONC. FOUNDATION, RE. STRUCT.
2" RIGID MINERAL WOOL INSUL. 3/4" HRZL MTL. FRAMING W/ WEEPS AIR BARRIER/ DRAINAGE PLANE; EXTEND 4" PAST T.O. SLAB 5/8" EXT. GYP. SHEATHING 6" MTL FRAMING; RE: STRUCT THRU-WALL FLASHING W/ METAL DRIP EDGE AND CONT CLEAT 2" SPRAY T.O. SLAB FIRST FOAM FLOORINSUL. ADHERED STONE 100'-0" MASONRY VENEER CONT. SEALANT JOINT W/ BACKER ROD; BREAK AT WEEPS THRU-WALL FLASHING WITH PREFIN. METAL DRIP EDGE T.O. FOUNDATION LIMESTONE MARBLE BASE COURSE 98'-0" INSULATED CEMENT BOARD PANEL CONT SILL GASKET VAPOR BARRIER (V.B.)
FACE BRICK 1 1/2" RIGID INSULATION
107
ARCHITECTURE PORTFOLIO
ALUMINUM STOREFRONT SYSTEM
MASONRY ANCHOR 6" MTL FRAMING; REF: STRUCT 2" SPRAY FOAM INSUL
FIN. FLOOR, RE: FIN. SCHED.
FLEXIBLE THRU-WALL FLASHING
CONC. SLAB, RE. STRUCT.
CONT. MORTAR NET WALL CAVITY VENT
ADHERED STONE MASONRY VENEER
CONT. SEALANT JT. W/ BACKER ROD SST DRIP EDGE EXPANSION JOINT
9 A-500
CONTINUOUS SEALANT 5/8" DRYWALL STOOL
6" MTL FRAMING; REF: STRUCT 2" SPRAY INSULATION T.O. SLAB FIRST FLOOR 100'-0" CONTINOUS SILL GASKET VAPOR BARRIER (V.B.)
CONCRETE SIDEWALK SOLID GROUT FILL
11 7/8" CONC. FOUNDATION, RE. STRUCT.
T.O. FOUNDATION 11 7/8" 98'-0"
VAPOR BARRIER (V.B.)
EXTEND V.B. UNDER FOOTING
3 WALL SECTION - LODGE CANTILEVER A-301 1/2" = 1'-0" 5 BRICK AT GRADE A-500 1 1/2" = 1'-0"
JANGHWA@WUSTL.EDU
1'-1"
5/8" EXT. GYP SHEATHING
2" RIGID INSUL; TO B.O. FTG
4 WALL SECTION - TYPICAL BRICK MASONRY WALL WITH CANOPY A-301 1/2" = 1'-0" 1 HPL AT GRADE A-500 1 1/2" = 1'-0"
9
AIR BARRIER/ DRAINAGE PLANE
2'-0"
HPL PANEL SYSTEM W/ EXPOSED FASTENER
1 9/16"
HPL PANEL W/ EXPOSED FASTENERS 1" VERT. MTL CHANNEL PER HPL PANEL MANUF.
2'-0"
12'-0"
5/8" EXT. GYP. SHEATHING
FLOOR DECK; RE: STRUCT.
T.O. STEEL BEAM / B.M.D. 109'-6 STEEL STRUCTURE AT CANOPY, PAINT RE: STRUCTURAL
7/8" ROOF DECK; RE: 1'-2 STRUCT
1 A-500
MTL FRAMING
1-1/2" ROOF DECK, RE: STRUCT.
8'-8"
2 A-500
ADMIT
BATT INSUL.
PT BLOCKING
FIN. FLOOR, RE: FIN. SCHED.
12 DETA A-500 1 1/2" =
BRICK VENEER
9
FLOOR DECK; RE: STRUCT.
A
SIM.
3 A-500
BALLASTED ROOF SYSTEM PREFINISHED GALVANIZED METAL COPING. COLOR TO MATCH BUILDING COPING
8 COPING AT BRICK A-500 3" = 1'-0"
1 A-502
MTL CLOSURE TRIM HPL PANEL W/ EXPOSED FASTENERS 1" VERT. MTL CHANNEL PER HPL PANEL MANUF.
ACOUSTIC GYP. BD. CEILING ASSEMBLY, RE: RCP
AIR BARRIER/ DRAINAGE PLANE
5/8" EXT. GYP. SHEATHING
UNIT
HPL PANEL W/ EXPOSED FASTENERS
5/8" EXT. GYP. SHEATHING
AIR BARRIER/DRAINAGE PLANE 6" MTL FRAMING; RE: STRUCT
1 1/16" STL. FRAMING, RE. STRUCT.
2" MIN SPRAY INSUL.
2'-0"
Sim
1/2"
METAL FRAMING
STEEL STRUCTURE AT CANOPY RE: STRUCTURAL T.O. FRAMING SLAB THIRD FLOOR 3/4" MTL 124'-0" 1" MTL CHANNERL PER HPL PANEL MANUF. B.O. STEEL PLATE 108'-8"
2 G-005
1 3/8"
1'-4" 2'-0"
3 A-502
1/2" STEEL PLATE, PAINT RE: STRUCTURAL
FIN. FLOOR, RE: FIN. SCHED. WALL CAVITY VENT
MTL FRAMING
ACOUSTIC GYP. BD. CEILING ASSEMBLY, RE: RCP
FLOOR DECK; RE: STRUCT.
G
MASONRY ANCHOR
BRICK VENEER
STEEL STRUCTURE AT CANOPY RE: STRUCTURAL
BATT INSULATION
1-1/2" RIGID INSULATION
STL. FRAMING, RE. STRUCT.
1-1/2" ROOF DECK, RE:STRUCT.
317
AIR BARRIER/ DRAINAGE PLANE 2" RIGID MINERAL WOOL INSUL.
T.O. WALL 138'-0"
T.O. SLAB THIRD FLOOR 124'-0"
UNIT
2" MIN SPRAY INSUL. 5/8" EXT. GYP. SHEATHING
B.O. MASONRY 21'-4"
FIN. FLOOR, RE: FIN. SCHED.
2 G-005
12'-0"
PT BLOCKING
ACOUSTIC GYP. BD. CEILING ASSEMBLY, RE: RCP
TAPERED INSULATION
12'-0" 1" 2" 3"
SIM.
1 3/16"
ALUM. CLAD WOOD WINDOW
10'-0"
WALL CAVITY VENT
B.O. ANGLE 110'-2 1/2"
FULLY ADHERED ROOF MEMBRANE; WRAP OVER TOP & FACE OF AIR BARRIER (AB); APPLY PRIMER TO AB
7'-4"
310
1 A-502
JANGHWA PARK
1-1/2" RIGID INSULATION
STL. ANGLE, RE: STRUC.
10'-0"
12'-0"
UNIT
FLASHING TERMINATION BAR
T.O. ROOF STEEL CONT. MORTAR NET 136'-0"
STL. FRAMING; RE. STRUCT.
PREFIN. MTL COPING
12'-0"
FULLY ADHERED TPO SINGLEPLY ROOFING SYSTEM
AIR BARRIER/ DRAINAGE PLANE; WRAP UP & OVER T.O. WALL 5/8" EXT. GYP. SHEATHING 6" MTL FRAMING; RE: STRUCT
4 COPING AT HPL PANEL A-500 3" = 1'-0" 10'-0"
2'-0"
T.O. ROOF STEEL PREFIN. MTL TRIM TO MATCH 136'-0" COPING CONT. INSECT SCREENING HPL PANEL W/ EXPOSED FASTENERS 1" VERT. MTL CHANNEL PER HPL PANEL MANUF. 3/4" HRZL MTL. FRAMING W/ WEEP 2" RIGID MINERAL WOOL INSUL. T.O. MASONRY 1-1/2" RIGID INSULATION 28'-8"
Sim
3 A-502
5/8" EXT. GYP. SHEATHING T.O. WALL AIR BARRIER/ DRAINAGE PLANE 138'-0" CONT. SEALANT JOINT
38'-0"
1 1/2" 1"
2'-0"
STL. FRAMING; RE. STRUCT.
MTL. COPING
8 A-500
6 3/4"
PT WOOD BLOCKING
A
1'-7"
2'-0"
1'-5 1/4"
FULLY ADHERED TPO SINGLE-PLY ROOFING SYSTEM
6 3/4"
2'-0"
FULLY ADHERED ROOF T.O. WALL MEMBRANE; WRAP OVER TOP & 138'-0" FACE OF AIR BARRIER (AB); APPLY PRIMER TO AB
8 A-500
10
G
PREFIN. MTL COPING
MTL. COPING
2" RIGID INSUL.; TO B.O. FTG
A
9 STOREFRONT SILL AT KITCHEN A-500 1 1/2" = 1'-0"
5
03
CBI MEXICALI NEW BREWERY BREWERY
PROFESSIONAL WORK : Vestal Corporation PROJECT NAME : CBI Mexicali New Brewery
PROJECT TYPE : Brewery LOCATION : Mexicali, Mexico
There are three objectives in achieving architectural compatibility : Providing a unified campus as a whole, providing compatibility within a sub-area and providing exceptional design for individual buildings. The goal is to design productive, hygenic, efficient, sustainable, cohesive and attractive buildings I assisted in design of administration buildings and created interior and exterior renderings for presentations to owner and consultants
+ EXTERIOR RENDERING - Administration building
+ EXTERIOR RENDERINGS - Production Buildings
JANGHWA PARK
ARCHITECTURE PORTFOLIO
JANGHWA@WUSTL.EDU
6
PROFESSIONAL WORK : Vestal Corporation PROJECT NAME : CBI Mexicali New Brewery
PROJECT TYPE : Brewery LOCATION : Mexicali, Mexico
+ EXTERIOR RENDERING - Entry of Plaza
+ EXTERIOR RENDERING - Dining Building
JANGHWA PARK
ARCHITECTURE PORTFOLIO
JANGHWA@WUSTL.EDU
7
04
RE-TOOLING LIVING ENVIRONMENT CONSTRUCTION LABOR UNION
DEGREE PROJECT_CRITIC : Heather Woofter DATE : Fall 2015
PROJECT TYPE : Institutional LOCATION : St. Louis, Missouri
This proposal focuses on providing space for public education of basic construction technique to people who live in the neighborhoods. The education program works with the local resource of Ranken technical college. In addition, the project attempts to unify construction labor unions in St. Louis, Ranken College and residential experiences. The building provides space for apprenticeship training for labor unions and practice for Ranken students. As the site is located on a college campus, the building acts as a connector between buildings of disparate character. Moreover, by providing a new loop for pedestrians around campus, the project not only makes connectivity between campus buildings, it also encourages the inflow of residents seeking educational opportunities in the building.
South Elevation
Scale 1/8” = 1’-0”
0
10
20
40 ft
North Elevation
0
10 20
40 ft
View of Corridor on second floor
Short Section
0
5
20 ft
View of Shop Area (assembly work)
JANGHWA PARK
ARCHITECTURE PORTFOLIO
JANGHWA@WUSTL.EDU
10
8
05
HOUSING FOR THE ELDERLY SELF-SUFFICIENT HOUSING
STUDIO 419_CRITIC : Pablo Moyano Fernandez DATE : Fall 2013
As life expectancy increased over the past years, the rate of elderly single family household also increased. However, it is relatively harder for old people to have pleasant residential experience. Often, for example, elderly single person household is under consistent risk of dying alone, caused by stroke, heart attack, and more. The point of this proposal refers to ‘communication’ such as formation of symphony between same people in the same situation and relationship with other generation or physical and psychological rest from nature environment. This buildings allows for many different activities by providing a wide range of uses across the entire buildings. In the horizontally long site, the round shape of building is the most effective for resident to get access to the ground garden and metro station. I propose a very porous building to allocate a number of open spaces while providing openings to get the southern sun to penetrate the buildings.
Typical Tower Plan JANGHWA PARK
PROJECT TYPE : Residential LOCATION : St. Louis, Missouri
Short Section ARCHITECTURE PORTFOLIO
JANGHWA@WUSTL.EDU
9
06 BERLIN BERLIN GALLERY OF THE 20TH CENTURY
STUDIO 512_CRITIC : Jan Ulmer DATE : Fall 2014
PROJECT TYPE : Gallery LOCATION : Berlin, Germany
Designing a gallery for the art of the 20th century in Berlin, this project is focussing on fundamental questions of architecture, such as the relationship between body and space, structure and movement, view and display, inside and outside. In order to answer the question the design process starts with analysis and interpretation of an exhibition-typology and existing fragments of berlin. From the analysis I define the gallery for the art of the 20th century in Berlin as making relationship between opening and closing constantly. The architectural value of gallery can be explained as spatial experience from continuously connected exhibition spaces. On the other hand, I can say that the spatial characterisic of Berlin is the courtyard surrounded with city fragments such as roads and buildings.
1. Cafeteria 2. Sculpture Storage 3. Painting Storage 4. Technical Infrastructure 5. Entrance 6. Foyer 7. Permanent Exhibition Space 8. Delivery
9. Special Exhibition Space 10. Gift Shop 11. Outdoor Exhibition Space 12. Lecturehall 13. Education Rooms 14. House Management 15. Outdoor Space 16. Restoration & Management
Interior View of Atrium 16 14
11 13
12 11
10 5
A
Interior View of Exhibition Space JANGHWA PARK
ARCHITECTURE PORTFOLIO
6 1
2
8 3
A’
Section JANGHWA@WUSTL.EDU
10
EQUIPMENT AREA
EQUIPMENT
ASSEMBLING INSTALLATION OF BREWERY
EXPANDING S
PHASE #1
STUDIO 511_CRITIC : Derek Hoeferlin DATE : Spring 2014
07
PROJECT TYPE : Brewery PHASE #2 LOCATION : St. Louis, Missouri
EQUIPMENT AREA
PLUG ‘N’ PLAY
EQUIPMENT
This project focuses on how the traditional brewery can adapt or have different types of occupiable space other than the brewery itself. Breweries around the world hold beer festivals every year to attract new and existing consumers, in order to establish more than “the consumer and merchandiser relationship”. Unfortunately, traditional breweries are not capable of launching PHASE #2 beer festivals due to its limited architectural program. The majority of beer festivals are held in PHASE #1 local parks or other public spaces where large groups of people can PHASE be #3accommodated. The project aims to escape from the idea of the traditional brewery and introduces a new typology which functhions as a public space to accommodate different kinds of activities. ASSEMBLING INSTALLATION OF BREWERY
EXPANDING SPACE
SHIPPING
CONNECTION BETWEEN INSTALLATION AREA AND SPACE
MISI-ZIIBI BREWERY
OPENING
SHIPPING
EQUIPMENT AREA
EQUIPMENT
ASSEMBLING INSTALLATION OF BREWERY
CONNECTION BETWEEN INSTALLATION AREA AND SPACE
EXPANDING SPACE
+ PHASE # 1
+ PHASE # 2
PHASE #3 # 3 + PHASE OPENING
PHASE #2
SCALE AND PROGRAM
PHASE #1
EQUIPMENT AREA
SHIPPING
EQUIPMENT
OPENING
ASSEMBLING INSTALLATION OF BREWERY
ASSEMBLING INSTALLATION OF BREWERY EXPANDING SPACE EXPANDING SPACE
OPENING
OPENING
CONNECTION BETWEEN INSTALLATION AREA AND SPACE
CONNECTION BETWEEN INSTALLATION AREA AND SPACE
SCALE AND PROGRAM
SCALE AND PROGRAM
PHASE #3
PHASE #2
OPENING
SHIPPING
CONNECTION BETWEEN INSTALLATION AREA AND SPACE
SCALE AND PROGRAM
PHASE #3 OPENING
SCALE AND PROGRAM
View of outdoor corridor between Brewing Building and Restaurant JANGHWA PARK
ARCHITECTURE PORTFOLIO
Detail Section JANGHWA@WUSTL.EDU
11