Jarred Beall Landscape Portfolio

Page 1



Ta b l e o f C o n t e n t s r e c e n t l a n d s c a p e d e s i g n 2 p r o f e s s i o n a l l a n d s c a p e d e s i g n e x p e r i e n c e

urban & transit

landscape

r e s i d e n t i a l & m i x e d - u s e

3 6

8

h a r d s c a p e d e t a i l s

11

design process & graphics

13

i n t e r n s h i p

s c h o o l p r o j e c t s

15 1 7

i n t e r e s t s 2 6


(Above) A quick SketchUp model with V-Ray rendering that I made to learn V-Ray.

This is a concept for a performing arts center somewhere near Denver, CO. The building and site does * (Above) not exist; I chose to draw this out of thin air as a drawing and design exercise. I have always been fascinated with architecture, so I wanted the building to have something significant, which is why I gave it a beacon-like tower. No perspective chart, model, or photograph was used for the linework. The linework was drawn on trash paper with a black color pencil, but I took this opportunity to learn a new method of rending by using a Wacom pen tablet to digitally apply color and still have the control of a marker or pencil. I am still experimenting this method of drawing and rendering and have expectations of it being a permanent graphic style for my skill set. Similar rendering techniques of using Adobe Photoshop with a mouse can be seen on pages 16 & 17. (Right) A SketchUp model of a conceptual plaza next to a commuter rail stop, restaurants, bars, retail shops, commercial businesses, and residential high rises in downtown Orlando, FL (see page 3). This image was also rendered with V-Ray as a learning exercise.

recent landscape design

Concept Design / Graphics

2


bAmbOO bEHINd ORANgE PEEl

CONCRETE SEAT / RETAININg wAll PARkINg gARAgE

S t r e e t

mETAl ORANgE SPHERE wITH ORANgE PEEl lININg PARkINg gARAgE fACAdE

bENCH

G E R T R U D E ’ S

W A L K

S o u t h

glASS TO fIll mETAl ORANgE

C h u r c h

S t r e e t

SEATINg AREA wITH TAblES

HISTORIC dEPOT bUIldINg

SHIfT ENTIRE PlATfORm TOwARdS SOUTH STREET TO OPEN UP CONNECTION TO PlAzA

PlATfORm

CONNECTION TO PlATfORm

CONCRETE SEAT / RETAININg wAll

INTEgRAl COlOREd CONCRETE wAlkINg PATH THROUgH lANdSCAPE AREA

HIlTON HOTEl

CONCEPT ‘A’

mETAl ORANgE fIllEd wITH glASS TO bE lIT AT NIgHT. mETAl ORANgE PEEl wIll flOw fROm SPHERE. INSPIRATION

4’ - 5’ wAlkINg PATH. l.E.d. lIT RUNNEl TO bE INSET IN THE mIddlE Of PATH.

mETAl ORANgE PEEl

INTEgRAl COlOREd CONCRETE SEATS

*

E ’ S T R U D G E R

HISTORIC dEPOT bUIldINg

INTEgRAl COlOREd CONCRETE SEAT

SHIfT ENTIRE PlATfORm TOwARdS SOUTH STREET TO OPEN UP CONNECTION TO PlAzA

bAmbOO bEHINd ORANgE PEEl

W A L K

VIEw fROm SOUTH STREET

S t r e e t

PARkINg gARAgE

S o u t h

C h u r c h

S t r e e t

OPEN SEATINg AREA wITH TAblES

PlATfORm CONNECTION TO PlATfORm HIlTON HOTEl

INTEgRAl COlOREd CONCRETE wAlkINg PATH THROUgH lANdSCAPE AREA

CONCEPT ‘b’

= 30’ I was given sole responsibility to design and present concepts to the City of Orlando for the Church Street urbanScale: plaza1”site of SunRail, central Florida’s commuter rail. I was also Plaza Concept CHURCH STREET STATION responsible for the inventory and analysis of the site’s existing conditions. August 28, 2008

urban & transit

0’

30’

60’

- Church Street station

SunRail

[ Orlando, FL ]

3


commuter rail system in central Florida is a two phase * This project along existing railroad from DeLand to Poinciana. There are 6 park-n-ride and 6 urban stations in the first phase including DeBary, Sanford, Lake Mary, Longwood, Altamonte Springs, Maitland, Winter Park, Florida Hospital, Lynx Central Station, Church Street, Orlando Health Center, and Sand Lake Road. Both county and city jurisdictions approve and comment on designs. I was involved in many meetings and was involved with much project coordination between jurisdictions, the client, and consultants. typical parking area island walkway cost estimate study

municipality code landscape plan

urban & transit

design development landscape plan - St. Mary station

SunRail

[ St. Mary, FL ]

4


BLACK vINyL ChAIN LINK FENCE

RAIL INSET

RAIL INSET IN hARDSCAPE

PLATFORM ACCESS

BIKE RACKS

MATChLINE - SEE BELOw

SCORED CONCRETE

CONCRETE SEATING AT PALM TREE NOTCh

KISS N RIDE PALM TREE IN LANDSCAPE NOTCh

SANDBLASTED ExPOSED AGGREGATE BANDS IN CONCRETE PAvING 6x9 LyNx CANTILEvERED BUS ShELTER

SANDBLASTED ExPOSED AGGREGATE BANDS IN CONCRETE PAvING

PLA TFO

TRASh RECEPTACLE

RM

6x9 LyNx CANTILEvERED BUS ShELTER

METAL RAIL INSET AT PAvING SCORED CONCRETE

PALM TREES & LANDSCAPE BEhIND BOLLARDS

M

AT Ch

LIN

E

-S

EE

AB

O vE

CONCRETE SEATING AT KISS N RIDE

PLATFORM ACCESS

PALM TREE IN DECORATIvE GRAvEL PLANTER BU SD DECORATIvE LEAN RO P- O RAILS FF BENCh LEAN RAIL/PEDESTRIAN BARRIER

DECORATIvE LEAN RAIL / PEDESTRIAN BARRIER

BIKE RACKS BENCh

SPECIMEN DATE PALM OR LARGE CANOPy TREE

Scale: 1” = 200’

*

ExISTING TREES

4 3 6

6x9 LyNx CATILEvERED BUS ShELTER

DECORATIvE 2-RAIL FENCE ALONG FRONTAGE

S . R .

Site Plan

KISS N RIDE

PLAzA LIGhTING

20’ plaza and pedestrian drop off area. I was lead designer for this project. During the design development stage for this particular station, I was to Scale: design1”the= bus Plaza Concept ALTAMONTE SPRINGS STATION This station will be a super stop for all the 17 stops in the commuter rail system. September 16, 2008 0’ 20’ 40’

urban & transit

- Altamonte Springs station

SunRail

[ Altamonte Springs,

FL ]

5


the landscape plan * Ifordesigned this site and had much input for the landscape palette for all other stations. At this site, bioswales and a native, low water use plant palette was utilized. Plants are also arranged to comply with CPTED safety guidelines.

landscape

- Altamonte Springs station

SunRail

[ Altamonte Springs,

FL ]

6


project * This development

is a mixed-use with a town center area designated by a central road with mixeduse buildings. I had several roles with this project. I designed small park areas, amenities areas, garden areas, art features, a pavilion, sculptural trellises and fences, arbors, and walls. I produced final landscape and hardscape packages, selected site furnishings and materials, selected lighting fixtures, and selected paving patterns.

southeast corner of project

I designed the landscape plan. With certain exceptions to light requirements, the plan had an overall theme of planting by product type. Identity was given to certain streets by being planted with smaller flowering trees, palm trees, oaks, or elm trees.

landscape

Parkside at Southwood [ Ta l l a h a s s e e ,

FL ]

7


SIGNAGE EXISTING TREE

ART/RETAIL DETAILS

898 SF OUTDOOR DINING

1 SF 1,44 L I A T RE

aerial ofGarrison Tampa Bay - project location Station Site A erial 0 7. 0 7 0 4 2 . 0 0

::

3 SF 5,23 L I A T RE

1,844 SF OUTDOOR DINING

F E B R UA RY 12, 20 0 8

0 SF 1,81 NG I S LEA

2S 1,75 L I RETA

0 SF 1,85 L I RETA

Hillsborough Bay

TA MPA, FLORIDA

F

9 SF 3,06 L I A RET

1 SF 3,86 L I RETA

SF 450 SPACE FLEX

SF 932 L I RETA

4 SF 1,05 SPACE X E FL

BIKE RACKS SCALE: 1” = 20’

EXISTING TREES SIGNAGE

*

hardscape and landscape concept plan

GARRISON STATION - TAMPA, FLORIDA ZOM FLORIDA, INC. MAY 15, 2008

retail corner concept with restaurant

project consisted of a mixed-use * This apartment building with an enclosed pool area. Retail and commercial units were on first floor along the East, West, and North side streets. I took the role of performing grading exercises and coordinated with the civil engineer and architect for water drainage and building stem walls usage. I also put together design development landscape and hardscape packages for port authority and Channelside District review.

Rendering *perspective graphic produced by others

Garrison Station TA MPA, FLORIDA

residential & mixed-use

Retail Space

0 7. 0 7 0 4 2 . 0 0

::

F E B R UA RY 12, 20 0 8

Channelside [ Ta m p a ,

FL ]

8


quick sketches of clubhouse area

project consisted of high end multi-family apartments with a coastal * This classicism feel within the greater Nocatee planned unit development. Whitehall included a clubhouse, amenities area, and a linear park along an existing wetland. I had many roles in this project from its beginning. I took part in the initial direction of the project theme. I developed a conceptual imaging package, which included these quick sketches for the client. I produced concepts for the clubhouse parking area, mail kiosk area, and some parts of the amenities area. I also produced landscape and hardscape design development packages, a final hardscape package, and selected site furnishings and materials. Hardscape details that I produced included water fountains, arbors, a fireplace, columns, a vehicular gate, an entrance sign and logo, and paving details.

residential & mixed-use

Whitehall at Nocatee [ Ponte Vedra,

FL ]

9


14 TOWNHOME UNITS (TYP.)

13

12

11

GARAGE (TYP.) (4 SPACES)

9

10 WETLAND PARK TRAIL 8 PARALLEL PARKING

7

*clubhouse graphic drawn by others

COMPACTOR SECURITY GATES CLUBHOUSE

5

6

3 4

MAIN ENTRY

1 POOL 2

*masterplan graphic drawn by others

residential & mixed-use

clubhouse parking coordination graphic

Whitehall at Nocatee [ Ponte Vedra,

FL ]

10


*initial sketch

hardscape details

Parkside at Southwood [ Ta l l a h a s s e e ,

FL ]

11


rail inset for commuter rail station paving -Altamonte Springs station (see page 5) amenity area fountain detail -Nocatee (see page 10)

hardscape details

Dix.Lathrop & Associates [ Longwood,

FL ]

12


ra il ing det a il init ia l sket ches 1

2

3

initial sketches finalized urban plaza concept (more on page 3)

design process & graphics

design devel opment dra w ings

Dix.Lathrop & Associates [ Longwood,

FL ]

13


Palm Beach Gardens Clubhouse & carriage homes

October 9, 2007

clubhouse parking sketch

streetscape section - Garrison Station (see page 8)

art in transit concept - SunRail

water feature concept

Palm Beach Gardens Clubhouse & carriage homes

entrance redesign sketch

shower concept

design process & graphics

October 9, 2007

apartments / clubhouse sketch

Dix.Lathrop & Associates [ Longwood,

FL ]

14


university * My opportunity to

awarded me the take an extended internship. I worked 7 months at DTJ Design, Inc., a multidisciplinary firm with an office staff of 100 employees. My tasks included hand plan and section graphics, digital imaging, project research, technical drafting, parking lot studies, neighborhood conceptual design layouts, and logo design. s ec o nd home resort concept

ha nd rendered plan graphics p arki n g lo t D e si g n i n g d e si g n P arki n g Lo t s

internship

D TJ D e s i g n , I n c . [ Boulder, CO ]

15


particular skill * One I learned during

that my internship was combining my hand drawing skills with my knowledge of digital rendering. These particular section drawings combine hand drawn linework from a black color pencil with computer color rendering in Adobe Photoshop.

internship

D TJ D e s i g n , I n c . [ Boulder, CO ]

16


Legend Pedestrians Crossing Major Streets Light Rail Stop Light Rail Seasonal Stop

Athens Transit

A

travel

platform

travel

9’

18’ - 21’

9’

A’

Athens / Clarke County Multi-Modal Transportation Center - Light Rail Addition -

A

0

5'

10'

20'

40'

A’

plan 0

20'

40'

80'

120'

my senior * For I proposed how

project at The University of Georgia, existing railroad lines could be used to develop a commuter / light rail system linking Athens to other cities and the metro Atlanta area. Within Athens, I also proposed and designed a student housing complex that would be linked to this light rail system.

school projects

0

proposed regional stations

750'

proposed north campus & downtown stations

Senior Project

Athens Area Light Rail

17


0

20' 40'

80'

120'

view from light rail stop

student village masterplan - 364 DU’s with 2,3, and 4 bedroom plans throughout - Covered parking for every resident - 36 exposed parking spots - 2 stories of livable space

school projects

- Community Building featuring fitness room, lounge, dining area, and outside courtyard - Pool and pool house - Athens/UGA Light Rail stop - Bus stop

east side open space

case study / inspiration - University Village at Boulder Creek - Boulder, CO

Senior Project

Athens Area Light Rail

18


0

20' 40'

80'

120'

The grading plan shows a basic grading plan that follows the local * (Above) codes. (Right) The planting plan shown to the right is for the student housing amenities building courtyard which faces the light rail stop (see page 18). There is a mix of mass plantings and turf grass areas for the walk up to the courtyard. The courtyard consists of a water feature, planting beds with ornamental trees, and tables with chairs for residents. The plant palette chosen consists of native and commonly found plants in the southeast.

school projects

0

5'

10'

20'

30'

Senior Project

Athens Area Light Rail

19


residence hall

Sanford Stadium

Art, Music, Ramsey Center, & East Campus Village existing condition proposed plaza & light rail stop

0

100'

200'

proposed light rail stop with shelters and paving to reflect the creativeness of the art and music schools in the area

400'

Sanford Stadium - Plan -create plaza bridge over East Campus Drive to link light rail system to stadium and nearby residence hall

Sanford Stadium existing condition

school projects

proposed plaza & light rail stop

Senior Project

Athens Area Light Rail

20


school project was * This to provide a proposed retail area with spaces for public seating, restaurant seating, and access to and from a parking deck. At the time this was designed, the lot consisted of a parking lot shared by a bank and the theatre. Recently, a mixeduse development was erected here consisting of restaurants on the ground level, several levels of parking above, and commercial offices on the top floor. No green space exists.

school projects

study m odel

Urban Pocket Park [ downtown Athens, GA ]

21


Existing Retail

restaurant with bosque for outdoor seating

Restaurant

existing conditions inventory

analysis

Clayton St.

outdoor theatre for music

parking entrance Pulaski St.

conceptual designs

8:00 AM

3:00 PM

Broad St. / Pulaski St. corner park with retail stores

Music Exchange

Existing Apartments

6:00 PM

shadow patterns Scale: 1” = 20’

Lofts / Retail A

A

section / elevation

school projects

A’

A’

Broad St.

school project was assigned to redevelop three corners in * This downtown Athens. I provided a mixed-use condominium building as well as restaurants. I also included a building to house the existing musicians store and provide a small outdoor performance space.

Urban Mixed-Use

[ downtown Athens, GA ]

22


Broad St.

Restaurant

ana lysi s

Condominiums / Retail / Commercial

proposed

Existing Asphalt Drive

i n ve n tory

School

Govt. Housing

existing conditions

section / elevation

concepts Parking Lot project was assigned to experiment with architectural design. We were * This to redesign a highly visible site that consisted of storage units in downtown 1st Floor

2nd & 3rd floors

school projects

Athens. I designed this mixed-use building, courtyard, and restaurant patio. Parking was placed at the rear of the site to preserve a desirable facade and dining area at the front.

Urban Mixed-Use

[ downtown Athens, GA ]

23


section / elevation

init ia l sket ch

is a garden planting plan I designed for * This a monastery in Orvieto, Italy. It was a class project while I studied abroad in Cortona, Italy one summer with The University of Georgia.

school projects

Monastery Garden [ Orvieto, Italy ]

24


For this project, I was to design a section of fence * (Right) and then actually build it. I could construct it out of whatever material that I desired, as long as it could be bolted to a 2x8 board that was bolted to a concrete wall outside of the school building. What I enjoyed about this project was that it allowed me to see how and why certain connections are used in construction. My inspiration for the design came from a visit to an art museum and seeing some geometric designs. I wanted my fence section to pop out from the rest of my colleagues’ fences, so I painted the sections bright red and neon green.

A dragonfly railing detail to be constructed out * (Left) of wood and metal. A mixture of regular copper that will patina and a treated copper that will turn matte brown is to be used. Hand drawn and color rendered in Adobe Photoshop.

school projects

Hardscape Details

25


interests

art / photography / sketching

26


thank you for viewing


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.