Jash soni portfolio

Page 1

architecture PORTFOLIO selected works

JASH SONI

1


Curriculum Vitae

Education :

JASH SONI

jashsoni01@gmail.com +91 9833910893 Interests

Sketching, Cycling, Frisbee, rock climbing,trekking.

2017

Chauhan Institute of science, Vile Parle,Mumbai.

2011

Jashudben M.L. school, Khar,Mumbai.

2009

Work Experience

Relevant Experience

Competitions

Organizational Experience

- Internship at Patch Design Studio, Mumbai; mid April to mid August, 2016.

- Teaching Assistant for first year Introductory Workshop ‘Pets’ in KRVIA; July, 2015.

Participated and shortlisted in top 50 works for GMZ competition, 2015.

- Co-headed documentation of Bayul Demazong, Sikkim (Pemayangste, Dubdi, khecheopalri & Tashiding) exhibited and published at KRVIA.

Contributed to various interior design projects in terms of representation, 3d modelling, rendering and GFC drawings. - Junior architect at Madras Office for Architects and Designers, Chennai; October, 2017 to March, 2018. - Project incharge for a 3 storey office interior. worked on design conception, development and tender drawings. -worked on furniture design for a 10,000 sq.ft. house in Chennai. - worked on a competition for a town square design in

2

Kamla Raheja Vidyanidhi Institute of Architecture,Juhu,Mumbai.

- Internship at YUVA(NGO) for Research of alternatives to clauses in Mumbai Development Plan; May 2013. Technical Skills 2d & 3d drafting: Autocad Google Sketchup Rhino Digital graphics: Adobe Photoshop Adobe illustrator Adobe Indesign Hand skills: Sketching , Hand drafting, Inking & color rendering Hand modelling.

Participated and awarded Editor’s choice in an International based competition by PinArchitecture,2015. - Participated in 120 Hours Competiton, Preserving Pyramiden, 2014. - Participated in 120 Hours Competiton, Beacon for Oya Music Festival, 2013. Exhibited Works - Drawing used for KRVIA Newsletter(2012) cover page. - First and second year work exhibited at KRVIA annuals 2012, 2013.

- Volunteered for 361 degree conference, 2013. - Class representative for First year B-Arch, 2011-12. - Co-organized a heritage walk along eastern waterfront of Mumbai, 2014. - Volunteered for KRVIA symposium 2011,2012. - The narrative (8x9m approx. Canvas) documenting Harihareshwar,work exhibited in annual KRVIA exhibition.


40

04

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT CONSTRUCTED IN THREE SEGMENTS

CONSTRUCTED IN THREE SEGMENTS

Monument to faith, 2nd year.

A Bathouse

48

HORIZONTAL/VERTICAL SEGMENT BAMBOO FRAME

Thesis

PERIPHERY SEGMENT BAMBOO FRAME Revisiting the

LEGEND:

container through the body re-coding workspace in BKC, 5th Year

Construction Drawings, fifth Year ISOMETRIC VIEW

16

X

1MM THK PTFE 3MM THK M.S. PLATE TO HOLD TENSILE FABRIC AT 300MM C/C M.S. SCREW TO HOLD METAL PLATES AT 300MM C/C 8MM THK M.S. BAR FOR ALIGNMENT OF BAMBOOS 5MM THK M.S.GUTTER 5MM THK M.S. PLATE FOR SPACING AT 1000MM C/C 25MM DIA. BAMBOO 1MM THK M.S. PLATE AT 1400C/C TO HOLD BAMBOOS TOGETHER

CONSTRUCTED IN THREE SEGMENTS

30 Institution

46

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

X

Tourist Information Centre, Fourth Year

Internship at Patch Design Studio

X100MM BAMBOO BEAM PERIPHERAL SEGMENT M THK PTFE

Alternate Research and healing Centre, 3rd Year

DIAGNOL SEGMENT BAMBOO FRAME

50X560MM T.W. HERRINGBONE STRUT AT 1010MM C/C 50X150MM T.W.JOIST 200X2000MM T.W. BOARDING

PLASTIC CRATE FILLED WITH EARTH 100X85MM BAMBOO BEAM 400X400MM PRECAST CONCRETE FOOTING 50X150MM T.W.JOIST 50X560MM T.W. HERRINGBONE STRUT AT 1010MM C/C

Institution

3MM THK M.S. PLATE TO HOLD TENSILE FABRIC AT 300MM C/C M.S. SCREW TO HOLD METAL PLATES AT 300MM C/C 5MM THK M.S.PLATE 5MM THK M.S. PLATE FOR SPACING AT 1000MM C/C 25MM DIA. BAMBOO 1MM THK PTFE

Z

36

Competitions

Temporary housing Ephemeral City, Fourth year

Back to the Future; 120 hours; PinArchitecture, Fourth Year

DETAIL A T Z SCALE 1:2

1MM THK PTFE 3MM THK M.S. PLATE TO HOLD TENSILE FABRIC AT 300MM C/C 25MM THK T.W. BOARDING M.S. SCREW TO HOLD METAL PLATES AT 300MM C/C 5MM THK M.S.GUTTER 25MM DIA. BAMBOO 1MM THK M.S. STRIP AT 1400C/C TO HOLD BAMBOOS TOGETHER PROJECTION FOR SUPPORTING THE END

42

50 SHELLS SCALE :VARIES

3


4


A THESIS PROJECT

REVISITING THE CONTAINER THROUGH THE BODY: RE-CODING WORK-SPACE IN BKC Looking at the work-space that is BKC through the idea of a working and desiring body and hence reconfiguring the idea of an office to see how the body, city and the workspace can work as one space.

The

floor

plates

have

grown

wider

and

he

inconspicuous, Light doesn’t need to come from the outside; When he can have a controlled one from inside. He faces the others, but never the outside The ones who are outside can see right through him and the others, But they can never be a part of them. The elevators are hidden deep within the heart of the structure, They grow ever so tall. At the very top, where everything only seems lighter, the focus lies on the distant horizon; what is near remains a blur. The air is controlled up above within the chambers of our glass towers they tell him he is guarded from the toxic fumes that spread down below. But he feels his body, weak and sick He is contained.

5


CONTAINMENT AND CONTROL OF HUMAN MIND AND SENSES

Intent

Live

Current trends of office complexes are looked at as the modern way of accommodating work spaces and housing its often termed ‘machinic workers’.

Flows

After the transition in the capitalist development since the 70s, the idea of efficiency is one of the major focus of the new lifestyle. Very little space is being left behind for transgression of the body in space. Negligible design thought is oriented around the idea of the human body in space.

Technology has networked the mind, placing a new system with a new type of architecture for us to flow through, which in turn shapes how we think. So, where does that leave the sensing body?

Evoke the sensorial part of the spatial experience that remains detached from the office spaces

Play

There has been an eccentric rise in white collar jobs post liberalization in 1990s. Yet the architecture of work has not evolved beyond simple furniture configurations, slab on slab construction as the only outcome of increasing density and high rise glass facades with no relationship to its surroundings.

“The relationship between architecture and the human body delves deep into why those behaviors manifest in the first place, as it calls upon the experiential characteristics and qualities that spark when the two unite — impacting not only occupant behavior through the body, but also impacting occupants intellectually, e m o t i o n a l l y , physiologically and even spiritually through the body as well.”

How can city play an active part within the office complex ?

To see current trends of office production and work towards preparing a different lens of building by reconfiguring elements of the office and its relationship to the city and its public.

-Maria Lorena Lehman

6

Senses

Work

Intent

The body becomes a passive version of itself in the city : functions separate like organs

To understand or look at the human body within the city

The ‘architecture of work’ especially ignores the body with senses. The design of workplace misses to realize the living needs of the human body while perfectly serving to the functional needs of an office employee(robot) Buildings are also imagined as large objects devoid of any service to the greater totality of the city.

Body constructed by architecture vs architecture constructed by body


STANDARDISED ORGANIZATION OF ELEMENTS AND CONSTRUCTION TECHNIQUES Core

What if the core remained on the skin of the building ? What if it was not looked at as an ugly space, used only for circulation ? What if it became an object of pleasure ?

Skin Can the skin go beyond transparency of glass ?

the

Can it offer a softer edge to the city and its inhabitants ? Can it breathe ?

Threshold What if the workspace can be an integrated system of finger like projections that hover above each other and allow healthy interaction. What if the workspace worked as a balcony, that extended beyond the facade ?

Workspace What if the lobby was a giant public portal ? What if it was a place of celebration which also became a part of the office above ?

MULTIPLIED, COPIED, ROTATED, MIRRORED FLOOR PLANS AND FURNITURE LAYOUTS

7


BANDRA KURLA COMPLEX AS A META WORK-SPACE A COMPOSITION OF ISLAND

A typical programmed island within Bandra Kurla Complex

8


The Diagrams explore the city that is BKC, in its purest form. Broken down into what it projects onto its visitors. The ordered everyday, and the containers they are kept in. The transparency in the facades fail to comfort and provide visual pleasure on site. Far from the organic growth of the city around it. BKC blossoms in between it all, growing ever so tall.

The vertical transition in most shells/containers is a conversion of the lively , dynamic city streets into a banal introverted non stimulating,passive and linear circulation.

9


Introducing some Hybridity

An office building that allows the city and public come in, to become a part of it, is the aim. Such a building breathes with a thin skin that wraps itself around the office and allows for better exchanges to occur . A large stomach occupies itself in the middle of the building making itself a prominent void that exposes circulation around the structure and promotes interaction with all levels of workspace and public functions.

A cavity is formed within the form. This cavity is outlined by the public functions.

10

The workspace resembles the cellular projections seen in the diagram. It projects the idea of a constant moment of transition in which things want to move out and come in and the organism allows for it to do so.


SITE SELECTION SITE CHOSEN TO ACT AS GATEWAY BETWEEN BKC AND THE CITY -BRIDGING BKC Kurla station

Bharat diamond booz

BKC G block

M C G A cricket ground

Mithi river

RE-CODING THROUGH FORM/SHIFTING LAYOUT

Though BKC being in the center of the city it remains cut off from the city, accessible by the four/two wheelers and very few pedestrian pathways. The plot marked at the edge of BKC serves as the site as it was chosen to be a gateway into BKC from the Kurla side. Close to the railway station the site proves to have ample opportunities for enabling and constructing a new flow through the complex and other pedestrian activities which otherwise remains in-acknowledged and commonly traveled towards by an automobile.

11


DESIGN PROCESS

RE-CODING THROUGH ORGANISATION OF ELEMENTS

Circulation pushed out into the cavity. Always exposed to the outside.

The ground that is fluid

A stomach/ void around the circulation core, with functions hanging around

The hovering circulation cores are exposed.

A gateway that is the building through BKC and out.

12

The ground that is the natural but functional mounds

Finger like projections that is the workspace.


Site Plan

Site Section

Site Section 13


The Charged Ground

14


Ground Floor Plan

First Level Plan 15


Section A-A’

16


Section B-B’

Section C-C’

Inside the void of the building, on the activated ground.

17


Shizusan Lower Parel

Restaurant Interior Work done : -Toilet design & tender drawings. -Furniture tender drawings. -Facade design options -Proposal views (photoshop rendering) -3d model of existing shell

18

Option 1 The library bar is the prime focus of this space which is offset with the use of a turquoise tinted epoxy floor. The blue is a recurring motif in this option,appearing in the tile clad on the bar front as well as the paint finish on the window frames.


Option 2 Tiles have been used as accents throu g h o ut the space, highlighting the arched niches and accentuating the window openings. The trusses have been painted the Shizusan shade of red and the same color has been used as accents in linings around the space.

19


Toilet Design

EXISTING JACK ARCH ROOF 6"X6" WALL HANDMADE FISHSCALE TILES + IPS FINISH 3"X 2" TIMBER FRAME FOR DOOR CYLINDRICAL LIGHT FIXTURE 1" THK T.W. PIECE ON TOP OF LEDGE WALL 1 4" THK MIRROR WITH PLY BASE & 18 THK M.S. FRAME

7'

7'

WALL MOUNTED SINGLE LEVER TAP

5'-8"

WALL MOUNTED FLUSH VALVE 3'

3'-5"

TWO WAY BIBCOCK WITH JET SPRAY 3" HIGH GREY VITRIFIED FLOOR TILE SKIRTING (TO ALIGN WITH FLOOR TILES)

1'-6"

2'-8"

3'-5"

WALL MOUNTED WC

3'-2" 3'-7"

CUSTOM MADE CONCRETE TROUGH (REFER TO DWG. NO.106)

1'

1'

A 101

ELEVATION

B 101

3'-9"

4"

5'-11"

ELEVATION

C 101

ELEVATION

D 101

ELEVATION

ALL DIMENSIONS ARE FINISHED LEVEL DIMENSIONS PDS_1609_102 GENTS TOILET_ELEVATION

GENERAL NOTES :

6"X6" WALL HANDMADE FISHSCALE TILES + IPS FINISH

THIS DRAWING IS NOT TO BE SCALED AND ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED

DO NOT REFER TO ARCHITECTURAL DRAWINGS FOR STRUCTURAL DETAILS

MUMBAI- 400050. TEL: 022 6697 9002

SHIZUSAN_LOWER PAREL

WALL MOUNTED SINGLE LEVER TAP

5'-8"

7'

2'-8"

TWO WAY BIB-COCK WITH JET SPRAY

THK CEMENT SCREEDING 4" THK BRICK BAT COBA

EQ

4"

1 2 " THK WATERPROOFING LAYER

3'-5"

3" DARK GREY VITRIFIED TILE SKIRTING

SECTION

EQ

EQ

EQ

6" 4"

1'

THK DARK GREY VITRIFIED TILE

1'-2"

3

1'-2"

2"

1'-2"

1

3'-1"

3'-5"

3'-8"

TOILET PAPER DISPENSER

02 101

3'-6"

WALL MOUNTED FLUSH VALVE

WALL MOUNTED WATER CLOSET

20

HOTEL, S.V. ROAD, BANDRA (W)

BRICK LEDGE WALL WITH IPS FINISH(AS PER SPECIFICATION) 3'

01 101

patch design studio 10, SUJATA NIWAS, OPP. SIDDHARTH

DRAWING

PROJECT ARCHITECT : RIKA

4" THK MIRROR WITH PLY BASE & 18 THK M.S. FRAME

EXECUTION OF THE WORK.

RIKA

LAYOUT

NOT TO SCALE

1

REFERENCE SHALL BE MADE TO THE ARCHITECTS FOR CLARIFICATION PRIOR TO

30/07/2016 JASH

CHKD BY

CYLINDRICAL LIGHT FIXTURE

IN CASE OF ANY DISCREPANCIES OR DIFFERENCES BETWEEN THE ARCHITECTURAL/ INTERIOR DRAWINGS OR THE SITE CONDITIONS IMMEDIATE

4.

DEALT BY

SECTION

1'-6"

3.

DATE

1'-6"

2.

ALL DIMENSIONS SHALL BE CHECKED AT THE SITE BEFORE TAKING UP THE WORK

3'-7" 3'-2"

1.

3'-5"

EQ

EQ


3'-10"

T.W. DOOR FRAME FLUSH DOOR WITH VENEER ON BOTHSIDES WALL MOUNTED FAUCET 2'

FLUSH DOOR WITH VENEER ON BOTHSIDES

CERAMIC COUNTERTOP BASIN 2' X 2' GREY VITRIFIED FLOOR TILE

01 101

MS FOLDED PLATE EXPOSED BY 3" 2'

1'

1'-3"

1'-3"

2'

6"X6" WALL HANDMADE FISHSCALE TILE + IPS FINISH

0"

1 4"THK

BLACK GRANITE COUNTER TOP

2'-10"

FLUSH DOOR WITH VENEER ON BOTHSIDES

2'

1'-3"

0"

WALL MOUNTED 1' 2" SINGLE LEVER TAP

CUSTOM MADE CONCRETE TROUGH (REFER TO DWG.106)

WALL MOUNTED SINGLE LEVER TAP 3

4"

TOILET PAPER ROLL DISPENSER WALL MOUNT WATER CLOSET

THK SLIT IN CONCRETE

TWO WAY BIBCOCK WITH JET SPRAY 1'

3

4" THK GRANITE WITH EQ CUTOUT FOR CONNECTION

6" 3"

1 12

EQ

7"

EQ

BRICK LEDGE WALL WITH IPS FINISH

1'

2"

4"

TO BOTTLE TRAP

4"

EQ

4"

EQ

6"

1'-4"

EQ

WALL MOUNT WATER CLOSET

5" S.S. GRATING FOR 3 4" GAP IN CONCRETE

1'-4"

1'-4"

2"

7"

BOTTLE TRAP

2"

11" 7"

2"

BRACKET MADE OF M.S. BOX SECTIONS TO SUPPORT CONCRETE TROUGH

2"

2"

2"

TOILET PAPER ROLL DISPENSER

5'-11"

7 1 4"

1'

7"

7 1 4"

3"

6"X6" WALL HANDMADE FISHSCALE TILE + IPS FINISH

10"

RANITE WITH CONNECTION BOTTLE TRAP

2' X 2' GREY VITRIFIED FLOOR TILE

1'-4"

2"

5'-11"

7"

02 101

1 12

4"

1'-4"

2' X 2' GREY VITRIFIED FLOOR TILE

ATING FOR 3 4" N CONCRETE

EQ

WALL MOUNTED FAUCET

2"

THK MIRROR WITH PLY BASE & 18 11" THK M.S. FRAME

5'-11"

4"

5'-11"

1

EQ

2"

OF M.S. BOX TO SUPPORT ETE TROUGH

2'-11"

CUSTOM MADE CONCRETE TROUGH (REFER TO DWG. NO.106)

5'-11"

" THK SLIT IN CONCRETE

2'-11"

6"

NTED SINGLE LEVER TAP

1'-5"

1'-6"

1'-6"

6"

S.S. BOTTLE TRAP

TWO WAY BIBCOCK WITH JET SPRAY BRICK LEDGE WALL WITH IPS FINISH 3'-10"

ELEVATION

01 A' 101

ELEVATION 03 101

ELEVATION

02 101

ELEVATION

01 101

51 4"

1'-51 2"

41 4"

1'-01 4" 1 1/2" DIA. TIMBER ARMREST

03 106

02 106

1 1/2" DIA. SPLIT TIMBER HINDE LEGS 1" THK FOAM CLADDED WITH REXIN OF APPROVED MAKE AND COLOUR

1'-6"

3'

1'-33 4"

1/2" THK TIMBER SEAT

ALL DIMENSIONS ARE FINISH LEVEL DIMENSIONS

1"X1 1/2" TIMBER SECTION FOR SUPPORT

2'-4"

9"

2'-4"

5"

1'-612"

11 2"

01 106

03

concrete wash basin

ELEVATION 33 4"

1"

1 1/2" DIA. TIMBER BACKREST

11 2"

02 101

3'-5"

3'-6"

11 2"

6"X6" WALL HANDMADE FISHSCALE TILES + IPS FINISH

111 4"

1 1/2" DIA. SPLIT TIMBER FRONT LEGS

9"

1'-5"

REFERENCE SHALL BE MADE TO THE ARCHITECTS FOR CLARIFICATION PRIOR TO EXECUTION OF THE WORK.

EQ DO NOT REFER TO ARCHITECTURAL DRAWINGS FOR STRUCTURAL DETAILS 2'-5" 3'

04 106

EQ

2'-5"

ELEVATION

02

1'-91 2"

CHKD BY

patch design studio

LAYOUT

RIKA

NOT TO SCALE

1" 3 " 4

PROJECT ARCHITECT : RIKA

1. 2.

ELEVATION

1'-512"

ALL DIMENSIONS SHALL BE CHECKED AT THE SITE BEFORE TAKING UP THE WORK

NORTH

PERSPECTIVE

DATE

1/2" THK TIMBER SEAT

THIS DRAWING IS NOT TO BE SCALED AND ONLY WRITTEN DIMENSIONS SHALL BE

DEALT BY

1'-6"

112"

PERSPECTIVE 3

11 2"

1'-6"

01 622

4" THK SLIT IN CONCRETE

30/07/2016 JASH

CHKD BY

RIKA

DETAIL

patch design studio 10, SUJATA NIWAS, OPP. SIDDHARTH

DRAWING

HOTEL, S.V. ROAD, BANDRA (W)

NOT TO SCALE

MUMBAI- 400050.

PROJECT ARCHITECT : RIKA

TEL: 022 6697 9002

SHIZUSAN_LOWER PAREL

02

DO NOT REFER TO ARCHITECTURAL DRAWINGS FOR STRUCTURAL DETAILS

PLAN CHAIR 4

1609_614

GENERAL NOTES :

2"

51 4"

TEL: 022 6697 9002

13 4"

33 4"

1"X1 2"THK T.W. HINDE LEGS

MUMBAI- 400050.

1 " THK FOAM CLADDED WITH REXIN OF APPROVED MAKE AND COLOUR 1/2" THK T.W. SEAT

1'-21 4"

1 3/4" DEEP T.W. SUPPORT FOR SEAT

2"

7"

HOTEL, S.V. ROAD, BANDRA (W) MUMBAI- 400050.

A

SHIZUSAN_LOWER PAREL

1

1

2

3"

1'-4"

1'

7"

2" 4" THK GRANITE WITH CUTOUT FOR CONNECTION TO BOTTLE TRAP

1"X1 12" THK T.W. FRONT LEGS

3"

S.S. BOTTLE TRAP

1'-33 4"

1'

7"

1"X1 12" THK T.W. TIE MEMBER

2"

113 4"

1 12" 2

1'

1'

3

2" 3'-31 4"

2"

GAP IN CONCRETE

3 4" THK GRANITE WITH CUTOUT FOR CONNECTION TO BOTTLE TRAP

7"

S.S. GRATING FOR 3 4" GAP IN CONCRETE

1'-4"

10, SUJATA NIWAS, OPP. SIDDHARTH

2'-612"

1'

11"

2"

7"

patch design studio

FURNITURE DRAWING

1

2'-71 4"

2"

1'-4"

7 1 4"

7"

3"

1 12

3/4" THK FOAM CLADDED WITH REXIN OF APPROVED MAKE AND COLOUR

3'-312"

BRACKET MADE OF M.S. BOX SECTIONS TO SUPPORT CONCRETE TROUGH

1'-63 4"

HOTEL, S.V. ROAD, BANDRA (W) TEL: 022 6697 9002

S.S. GRATING FOR 4" SHIZUSAN_LOWER PAREL

DO NOT REFER TO ARCHITECTURAL DRAWINGS FOR STRUCTURAL DETAILS

RIKA

NOT TO SCALE PROJECT ARCHITECT : RIKA

1/2" THK T.W. BACKREST

3

2"

7"

THK SLIT IN CONCRETE

1'-4"

2"

11"

PROJECT ARCHITECT : RIKA

EXECUTION OF THE WORK. 4.

DINNING CHAIR 1 30/07/2016 JASH

CHKD BY

1'-4"

ARCHITECTURAL/ INTERIOR DRAWINGS OR THE SITE CONDITIONS IMMEDIATE REFERENCE SHALL BE MADE TO THE ARCHITECTS FOR CLARIFICATION PRIOR TO

2'-10"

1' 2"

2"

4"

"

DATE DEALT BY

FOLLOWED

2"

3

DRAWING

NOT TO SCALE

WALL MOUNTED SINGLE LEVER TAP

10, SUJATA NIWAS, 11 OPP. SIDDHARTH

THIS DRAWING IS NOT TO BE SCALED AND ONLY WRITTEN DIMENSIONS SHALL BE IN CASE OF ANY DISCREPANCIES OR DIFFERENCES BETWEEN THE

7 1 4"

7"

2"

30/07/2016 BRACKET MADE OF M.S. BOX JASH SECTIONS TO SUPPORT DETAIL CHKD BY RIKA CONCRETE TROUGH

DEALT BY

ALL DIMENSIONS SHALL BE CHECKED AT THE SITE BEFORE TAKING UP THE WORK

2. 3.

7 1 4"

DATE

1' patch design studio2"

512"

2"

13 4"

1.

PDS_1609_106 TOILET_DETAIL_CONCRETE TROUGH

PERSPECTIVE VIEW

1" THK FOAM CLADDED WITH REXIN OF APPROVED MAKE AND COLOUR

REFERENCE SHALL BE MADE TO THE ARCHITECTS FOR CLARIFICATION PRIOR TO 4.

04

PDS_1609_106 TOILET_DETAIL_CONCRETE TROUGH

IN CASE OF ANY DISCREPANCIES OR DIFFERENCES BETWEEN THE

WALL MOUNTED SINGLE EXECUTION OF THE WORK. LEVER TAP

TEL: 022 6697 9002

1 1/2" DIA. SPLIT TIMBER ARMREST

03

ARCHITECTURAL/ INTERIOR DRAWINGS OR THE SITE CONDITIONS IMMEDIATE

MUMBAI- 400050.

03 SHIZUSAN_LOWER PAREL

ELEVATION

FOLLOWED 3.

HOTEL, S.V. ROAD, BANDRA (W) 1 " 2

51 4" 1'-31 2" 1'-5"

ELEVATION

1'-33 4"

Plan

10, SUJATA NIWAS, OPP. SIDDHARTH

DRAWING 2"

1 1/2" DIA. SPLIT TIMBER HINDE LEGS

04 101

PLAN

04 101

1'-2" 1'-612" 1'-912"

30/07/2016 JASH

1 1/2" DIA. TIMBER BACKREST

GENERAL NOTES :

Elevation

1'-5"

3' 2"

ARCHITECTURAL/ INTERIOR DRAWINGS OR THE SITE CONDITIONS IMMEDIATE

4.

EQ 2'-5"

1'-

7"

IN CASE OF ANY DISCREPANCIES OR DIFFERENCES BETWEEN THE

EQ

1"

FOLLOWED 3.

DATE DEALT BY

1'-6"

1'-6"

THIS DRAWING IS NOT TO BE SCALED AND ONLY WRITTEN DIMENSIONS SHALL BE

1'

2.

1'-4"

5"

ALL DIMENSIONS SHALL BE CHECKED AT THE SITE BEFORE TAKING UP THE WORK

7"

PDS_1609_101 TOILET_PLAN

GENERAL NOTES : 1.

S.S. BOTTLE TRAP

1'-71 2" 1'-51 2"

ELEVATION

02

ELEVATION

03

04

PERSPECTIVE VIEW

81 4"

101

ELEVATION

section 1

01 ELEVATION 101 02 ELEVATION

101

1"X1 12" THK TIMBER TIE MEMBER

1'-51 4"

02

1'-41 2" 1'-6"

GENERAL NOTES : 1. 2.

ALL DIMENSIONS SHALL BE CHECKED AT THE SITE BEFORE TAKING UP THE WORK THIS DRAWING IS NOT TO BE SCALED AND ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED

3.

IN CASE OF ANY DISCREPANCIES OR DIFFERENCES BETWEEN THE

03 106

02 106

01 106

ARCHITECTURAL/ INTERIOR DRAWINGS OR THE SITE CONDITIONS IMMEDIATE REFERENCE SHALL BE MADE TO THE ARCHITECTS FOR CLARIFICATION PRIOR TO EXECUTION OF THE WORK.

1"X1 12" THK TIMBER FRONT LEGS

01 621

PLAN 01 101

31 2"

51 " 4 312"

3"

11 2"

section 2

01 ELEVATION 02 101 101 ELEVATION

31 4"

Side Elevation 03

ELEVATION 03 ELEVATION 101

1 " 6 4

03 31 4"

02 101

1'-21 4"

1'-61 4"

3/4" THK FOAM CLADDED WITH REXIN OF APPROVED MAKE AND COLOUR

51 4"

23 4"

1/2" THK T.W. BACKREST

ELEVATION DETAIL AT A 23 4"

61 4"

312"

03

1609_620 DATE DEALT BY

BARSTOOL 2 30/07/2016 JASH

CHKD BY

RIKA

FURNITURE DRAWING

NOT TO SCALE PROJECT ARCHITECT : RIKA

patch design studio 10, SUJATA NIWAS, OPP. SIDDHARTH HOTEL, S.V. ROAD, BANDRA (W) MUMBAI- 400050. TEL: 022 6697 9002

21


Facade options in corten steel cladding

Backlit patterns a traditional brickwork style reminiscent of colonial shophouse.

Backlit patterns cut in an oversized oriental lotus pattern.

1

2"

THK CUTOUT IN CORTEN STEEL 7'-23 4"

13'-41 4"

3'-9"

13'-93 4"

14'-512"

6'-91 2"

6'-912"

2'

2'-31 4"

15'-101 2"

60'-212"

1'-11 4"

CUTOUTS IN CORTEN. STEEL

HVAC DUCTS CORTEN STEEL FACADE

1 " THK CUTOUT IN CORTEN STEEL.

6'-21 2"

6'-21 2"

BUILDING EDGE LINE

2'-6"

2'-6"

38'-7"

5'-51 4"

5'-51 4"

6'-21 4"

5'-7"

4'-71 4" 5'-812"

6'-03 4"

8'-1"

5'-5"

5'-43 4"

5'-5"

13'-81 4"

14'-13 4"

16'-212"

4'-71 4"

CUTOUT IN CORTEN STEEL FOR EXISTING GLASS WINDOW

PROJECTION ON WEST FACE TO HIDE DUCTS.

5'-812"

9'-5"

9'-5"

CORTEN STEEL FACADE.

CUTOUT IN CORTEN STEEL. FOR EXISTING WINDOW 14'-61 4"

PROJECTION IN CORTEN STEEL

1

2"

THK CUTOUT IN CORTEN STEEL

SOUTH FACE

GENERAL NOTES : 1.

22

2.

ALL DIMENSIONS SHALL BE CHECKED AT THE SITE BEFORE TAKING UP THE WORK THIS DRAWING IS NOT TO BE SCALED AND ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED

3.

IN CASE OF ANY DISCREPANCIES OR DIFFERENCES BETWEEN THE ARCHITECTURAL/ INTERIOR DRAWINGS OR THE SITE CONDITIONS IMMEDIATE

6"

6"

60'-21 2"

28'-03 4"

WEST FACE

NORTH FACE

1609_801 DATE DEALT BY

FACADE_ELEVATION 30/07/2016 JASH

CHKD BY

RIKA

FACADE

NOT TO SCALE PROJECT ARCHITECT : RIKA

patch design studio ELEVATION

10, SUJATA NIWAS, OPP. SIDDHARTH HOTEL, S.V. ROAD, BANDRA (W) MUMBAI- 400050. TEL: 022 6697 9002


212 All good

Lower Parel, Mumbai Restaurant Interior

Work done : -Photoshop rendering.

Space below escalator

Swing-seating

Bar and dinning

23


Dr. Barfiwala’s apartment,

STUDY TABLE+ STORAGE

Baroda

GUEST BED

BED 6' X 5'6"

10'0" x 11'1"

Work done : -Furniture layout, -Furniture design & tender drawings.

DRESS/ TOILET

5'0"x11'7"

CHILDREN'S BEDROOM 12'0" x

SOFA / BED 3' X 6'

14'312"

BALCONY

9'0" x 5'0.5" CUPBOARD

BALCONY

2'

1'-41" 2

5'9" x 4'6"

3'

3'-6"

2'

CUPBOARD 6'6" X 2'

3'

LIVING ROOM

MASTER BED

BED 6' X 5'6"

12'0.5" x 17'0.5"

12'0" x 15'0"

COM.TOILET 4'1112"

KITCHEN DINNING TABLE

x 7'10"

8'712" x 10'912"

BENCH

8'-71" 2

DRAWER CABINET CUPBOARD 7'10" X 2'

T.V.CONSOLE

FOYER

6'9" x 5'1"

SEATING+ SHOE STORAGE

STORE

TOILET

WASH

5'0" x 5'212"

12'10" x 5'2.5"

8'7.5" x 5'6.5"

DUCT

Apartment plan LIFT

5'6" x 5'3"

Master bedroom bed

GENERAL NOTES : 1.

ALL DIMENSIONS SHALL BE CHECKED AT THE SITE BEFORE TAKING UP THE WORK

2.

THIS DRAWING IS NOT TO BE SCALED AND ONLY WRITTEN DIMENSIONS SHALL BE

Master bedroom wardrobe

PDS_1615 DATE

FOLLOWED 3.

CHKD BY NOT TO SCALE

ARCHITECTURAL/ INTERIOR DRAWINGS OR THE SITE CONDITIONS IMMEDIATE

PROJECT ARCHITECT : RIKA

X

DRAWING

10

HO

MU

TEL

1'

1'

DO NOT REFER TO ARCHITECTURAL DRAWINGS FOR STRUCTURAL DETAILS

1'

p

DR.BARFIWALA APARTMENT U

U

EXECUTION OF THE WORK. 4.

RIKA

LAYOUT

IN CASE OF ANY DISCREPANCIES OR DIFFERENCES BETWEEN THE REFERENCE SHALL BE MADE TO THE ARCHITECTS FOR CLARIFICATION PRIOR TO

X

HOUSE PLAN 25/05/2016

DEALT BY

1'-3 1/2"

24

B

2'-4 3/4"

5 3/4"5 3/4"

2'-4 1/4"

3'-5 3/4"

8 1/4"

1'

EQ

DR

OPEN ELEVATION

EQ

DR

1'-3 3/4"

A

U

EQ

SECTION AT X

6'-1 1/4"

EQ

B

STORAGE W MOVABLE SH

1" WIDE T.W. PATTI FOR PATTERN

STORAGE

EQ

A

B 6"

9 1/2" 1'-0 1/2"

3/4" 1'-0 1/2"

A

EQ

DIFFERENTLY STAINED PLYWOOD (3 SHADES) 1" THK T.W. HANDLE

5'-3"

2'

SECTION AT Y

EQ2'-8 1/2"

DR

BA

1'-3 3/4"

3 3/4"

6"

6'-3"

DR

11 1/4"

1' 11 1/4"

EQ

STORAGE SECTION AT X

5'-10" 6 3/4"

CASTOR WHEELS

DR

EQ

BOX B HEADBOARD MADE OF 19MM PLYWOOD

5'-3"

2'-0 1/2"

3/4" 1'-0 1/2"

9 1/2" 1'-0 1/2"

3 3/4"

DR

STORAGE

STORAGE

STORAGE

B

2'-8 1/2"

X

FOR LOCKER

STORAGE

1'

BOX HEADBOARD MADE OF 19MM PLYWOOD

BOX HEADBOARD MADE OF 19MM A PLYWOOD

3'-10 1/4"

A AT B PLAN

5'-9"

PLAN AT A

Y

1'-11 3/4"

MOVABLE SHELFS

PLAN AT B

X

6"X22" PLYWOOD DRAWER

0.5" THK T.W. 19MM THK PATTIPLYWOOD FOR

5 3/4"5 3/4"

Y

2'-5 3/4"

Y

0.5" THK T.W.

18"X6" PLYWOOD PATTI DRAWER

B

3'-2"

B

OVERHEAD STORAGE

EQ

DR

EQ

DR

EQ

OVERHEAD STORAGE

EQ

6' 2'-4"

EQ

SIDE TABLE SPRING ARM 19MM THK PLYWOOD HINGE 19MM THK SHUTTER PLYWOOD 1" WIDE CUT OUT IN 1"DIA. S.S. PIPE IN PLYWOOD SHUTTER 0.5" THK T.W. PATTI

EQ

2'-4"

2'-7"

YY

STORAGE

2'-7"

DR

EQ

2'-7"

2'-4"

STORAGE

6'-1 3/4"

6'

STORAGE

EQ

1'-3 1/2"

EQ

1'-3 1/2"

SPRING ARM SIDE TABLE HINGE 19MM THK PLYWOOD 1"X1" T.W. MEMBER SHUTTER TO SUPPORT 1" WIDE CUT OUT IN SHUTTER IN PLYWOOD 19MM THK SHUTTER PLYWOOD 0.5"FOR THK T.W. SUPPORT PATTI

DR

EQ

EQ

EQ

DR

SHUTTER ELEVATION

U

SECTION


X

X

4' EQ

EQ

1'-10"

EQ

1'-10"

1'-10"

1'-10" 1'-10"

19MM THK PLYWOOD FOR TABLE TOP

Children’s bedroom study EQ

EQ

4'

EQ

EQ

2'-8 1/4" 3'-10 1/4"

3'-10 1/4"

3'-7 1/4"

5'-6"

3'-0 1/4"

DR 1'-11" 2'-5 3/4"

1'-10" 1'-11" 2'-5 3/4"

1'-11" 2'-5 3/4"

4'

PDS_1615

DO NOT REFER TO ARCHITECTURAL DRAWINGS FOR STRUCTURAL DETAILS

ALL DIMENSIONS SHALL BE CHECKED AT THE SITE BEFORE TAKING UP THE WORK

EXECUTION OF THE WORK. DO NOT REFER TO ARCHITECTURAL DRAWINGS FOR STRUCTURAL DETAILS

4'4'

VV WW

U U U V V V W W W

10, SUJATA NIWAS, OPP. SIDDHARTH U U RIKA WARDROBE DRAWING HOTEL, S.V. ROAD, BANDRA (W) MUMBAI- 400050. U UU UU U V V TEL: 022 6697 9002 19MM THK PLYWOOD 19MM THK PLYWOOD V V TABLE TOP V TABLE TOP DR.BARFIWALA APARTMENT V VW V 19MMTHK THK PLYWOOD 19MM PLYWOOD 19MM THK THK PLYWOOD WTHK 19MM THK 19MM THK 19MM PLYWOOD 19MM THK PLYWOOD 19MM PLYWOOD TABLE TOP TABLE TABLE TOP TABLE TABLE TOP PLYWOOD SHELFTOP PLYWOOD SHELF TABLE TOP TOP W W THK W W19MM THK 19MM THK W19MM W

DEALT BY CHKD BY

4' 4' 4'

4'4'

NOT TO SCALE PROJECT ARCHITECT : RIKA

3'-1 1/2"

3'-1 1/2"

AT B SECTION AT B SECTIONELEVATION AT AELEVATION 3'-11/2" 1/2" 3'-11/2" 1/2" 3'-1 3'-1 3'-1 1/2"1/2" 3'-1 SECTION SECTION ATBB SECTION SECTION ELEVATION AT B B ELEVATION ELEVATION ATAAELEVATION ELEVATION SECTION ATAT B B ELEVATION ATAT AA SECTION AT AT AT 3'-10"

6"

6"

3'-10"

" 6"6

6"

6"

6"6"

6"

6"

6" " 6

4'

4'4'

B BB

3'-10" 3'-10"

6" 6"

3'-10" 3'-10"

6"

6"

3'-10" 3'-10"

THK 19MM THK THK 38 MM19MM THK DOUBLE 38 MM19MM THK DOUBLE PLYWOODSHELF SHELF PLYWOOD SHELF PLYWOOD SHELF PLYWOOD SHELF PLYWOOD PLYWOOD PLY SHELF VERTICAL PLY VERTICAL MMTHK THKDOUBLE DOUBLE 38 MM DOUBLE 38 MM THK DOUBLE 3838 MM 38 MM THKTHK DOUBLE 38 19MM MMTHK THKDOUBLE PLYWOOD 19 MM THK PLYWOOD PLY VERTICAL PLY VERTICAL PLY VERTICAL PLY VERTICAL PLY VERTICAL PLY VERTICAL HORIZONTAL MEMBER HORIZONTAL MEMBER MMTHK THKPLYWOOD PLYWOOD 19 MM PLYWOOD 19 MM MM THK THK PLYWOOD PLYWOOD 1919MM 19 MM THKTHK PLYWOOD 19 19MM THK PLYWOOD 19MM HORIZONTAL MEMBER HORIZONTAL HORIZONTAL MEMBER MEMBER AT ATHK PLYWOOD HORIZONTAL HORIZONTAL MEMBER MEMBER HORIZONTAL MEMBER MEMBER MEMBER 19MM THK PLYWOOD 19MM THK PLYWOOD 19MM THK PLYWOOD 38MM THK DOUBLE 38MM THK DOUBLE 19MM 19MM THK PLYWOOD 19MM THK PLYWOOD AT A ATHK PLYWOOD AT MEMBER MEMBER MEMBER MEMBER PLY VERTICAL PLY VERTICAL MEMBER MEMBER 38MM THKDOUBLE DOUBLE 38MM DOUBLE 38MM THK THK DOUBLE DOUBLE 38MM THKTHK DOUBLE 38MM THK 38MM THK 19MM THK PLY VERTICAL PLY VERTICAL PLY19MM VERTICAL PLY VERTICALPLY VERTICAL PLY VERTICAL PLYWOOD TOP PLYWOOD TOP 19MMTHK THK 19MM 19MM 19MM THK THK 19MM THKTHK 19MM PLYWOODTOP TOP PLYWOOD PLYWOOD TOP TOP PLYWOOD PLYWOOD TOPTOP PLYWOOD

4' 4' 4'

B B B

B BB

3'-1 1/2"

3'-1 1/2"

4'4'

3'-11/2" 1/2" 3'-1

BB

B B B

B BB

X YX Y X

YX X YYX

XYYX

BB

B B B

X YX Y X

Y YY

3'-1 3'-1 1/2"1/2"

3'-11/2" 1/2" 3'-1

B BB

1'-6"

1'-6" 1'-6" 1'-6"

7

2" 1'-6"1'-6" B

6"

REFERENCE SHALL BE MADE TO THE ARCHITECTS FOR CLARIFICATION PRIOR TO 4.

4'

UU

TEL: 022 6697 9002

patch design studio

25/05/2016

1'-6" 1'-6"

1/

" 2"/2 1/ 1 77

" 2" /2 1/ 1 7 7

"

ARCHITECTURAL/ INTERIOR DRAWINGS OR THE SITE CONDITIONS IMMEDIATE

4"

IN CASE OF ANY DISCREPANCIES OR DIFFERENCES BETWEEN THE

4"4"

U UU V V VW W W

THIS DRAWING IS NOT TO BE SCALED AND ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED

3.

DATE

CHILDREN'S BEDROOM

6"6

4.

HOTEL, S.V. ROAD, BANDRA (W) MUMBAI- 400050.

Dr.Barfiwala apartment

EXECUTION OF THE WORK.

2'-2 2'-2 3/4" 2'-23/4" 3/4"

2.

PROJECT ARCHITECT : RIKA

REFERENCE SHALL BE MADE TO THE ARCHITECTS FOR CLARIFICATION PRIOR TO

10, SUJATA NIWAS, OPP. SIDDHARTH

FURNITURE DRAWING

ARCHITECTURAL/ INTERIOR DRAWINGS OR THE SITE CONDITIONS IMMEDIATE MUMBAI400050.

4"

1.

RIKA

6" 1'-8" 1'-8" 1'-8"6 1'-2" 1'-2" 1'-2" "

Dr.Barfiwala apartment GENERAL NOTES : Dr.Barfiwala apartment

CHKD BY

TEL: 022 6697 9002

patch design studio

25/05/2016

DEALT BY NOT TO SCALE

6"

TEL: 022 6697 9002

STUDYTABLE

DATE

3. IN CASE OF ANY BANDRA DISCREPANCIES HOTEL, S.V. ROAD, (W) OR DIFFERENCES BETWEEN THE

6" 6"

PROJECT ARCHITECT : RIKAMUMBAI- 400050.

PROJECT ARCHITECT : RIKA

patch design studio 2. THIS DRAWING IS NOT TO BE SCALED AND ONLY WRITTEN DIMENSIONS SHALL BE 10, SUJATA NIWAS, OPP. SIDDHARTH FOLLOWED

2'-3 1/2"

patch design studio

1'-8" 1'-2"1'-8" 1'-8"2'-3 1/2" 2'-3 1/2" 2'-3 1/2" 1'-2" 1'-2"

25/05/2016

DEALT BY

NOT TO SCALE

2'-3 1/2" 2'-3 1/2" 2'-3 1/2"

DATE

10, SUJATA NIWAS, OPP. SIDDHARTH BY RIKA FURNITURE DRAWING DRAWING FURNITURECHKD HOTEL, S.V. ROAD, BANDRA (W)

4"

NOT TO SCALE

RIKA

2'-2 3/4"

Children’s bedroom sofa/bed

CHKD BY

ALL DIMENSIONS SHALL BE CHECKED AT THE SITE BEFORE TAKING UP THE WORK

2'-2 3/4"

25/05/2016

DEALT BY

SECTION AT X

GENERAL NOTES : 1.

4"

STUDYTABLE

DATE

STUDYTABLE

ELEVATION WITHOUT SHUTTER

2'-3 1/2"

ELEVATION WITH SHUTTERS

SECTION AT X SECTION AT X

4" 4"

ELEVATION WITHOUT ELEVATION WITHOUT SHUTTER SHUTTER

B

5'-6"

3'-0 1/4" 5'-6"

5'-6"

6 3/4"

6 3/4" 2'-5 3/4"

B 19MM THK PLYWOOD FOR TABLE TOP

4'

ALL DIMENSIONS SHALL BE CHECKED AT THE SITE BEFORE TAKING UP THE WORK TE BEFORE TAKING UP THE WORK THIS DRAWING IS NOT TO BE SCALED AND ONLY WRITTEN DIMENSIONS SHALL BE Y WRITTEN DIMENSIONS SHALL BE FOLLOWED

DO NOT REFER TO ARCHITECTURAL DRAWINGS FOR STRUCTURAL DETAILS FOR STRUCTURAL DETAILS

B

1'-10"

NERAL NOTES :

IN CASE OF ANY DISCREPANCIES OR DIFFERENCES BETWEEN THE CES BETWEEN THE ARCHITECTURAL/ INTERIOR DRAWINGS OR THE SITE CONDITIONS IMMEDIATE SITE CONDITIONS IMMEDIATE REFERENCE SHALL BE MADE TO THE ARCHITECTS FOR CLARIFICATION PRIOR TO TS FOR CLARIFICATION PRIOR TO EXECUTION OF THE WORK.

B

B

DR

DR

1'-11"

1'-11"

4'

ELEVATION WITH ATION WITH SHUTTERS HUTTERS

B

1'-10"

A

1'

19MM THK PLYWOOD FOR TABLE TOP

19MM THK PLYWOOD FOR TABLE TOP

A

1'-2 1/2"

5'-6"

B

B

STORAGE 2'-5 3/4"

5'-6"

B

B

A

1'

1'

B

A

A

EQ

A

1'-9 1/4"

10 1/4" EQ

A

6 3/4"

1'-2 1/2"

2'-8 1/4" 3'-10 1/4"

EQ 3'-10 1/4"

2'-5 3/4"

2'-8 1/4" 3'-10 1/4"

A

STORAGE

2'-5 3/4"

1'-2 1/2"

STORAGE

1'-11"

2'-5 3/4"

OPEN STORAGE

19MM THK PLYWOOD SHUTTERS 0.5" THK T.W. HANDLE

EQ

STORAGE

EQ

1'-9 1/4"

A

A

3'-10 1/4"

3'-7 1/4"

3'-7 1/4"

A

STORAGE

PLAN AT B

DOUBLE 19MM THK PLYWOOD

3'-0 1/4"

1'-9 1/4"

OPEN STORAGE

OPEN STORAGE

STORAGE

10 1/4"

1'-9 1/4"

OUBLE 19MM HK PLYWOOD

2'-5 3/4"

EQ

4'

10 1/4"

PLAN AT A

PLAN AT B

PLAN AT B

1'-9 1/4"

PLAN AT A

19MM THK PLYWOOD SHUTTERS 0.5" THK T.W. HANDLE

Children’s bedroom wardrobe

X

X

X

N AT A

EQ

EQ

EQ

4'

EQ

2'-2 3/4" 2'-2 3/4" 2'-2 3/4"

1'-10"

EQ 19MM THK PLYWOOD FOR TABLE TOP

19MM THK PLYWOOD FOR TABLE TOP

1'-10"

4'

4'

1'-9 1/4"

X

7

2"

1/

2"

DEALT BY NOT TO SCALE

CHKD BY PROJECT RIKAARCHITECT : RIKA NOT TO SCALE

IN CASE OF ANY DISCREPANCIES ORMADE DIFFERENCES BETWEEN THE REFERENCE SHALL BE TO THE ARCHITECTS FOR CLARIFICATION PRIOR TO

EXECUTION OF THE WORK. DO NOT REFER TO ARCHITECTURAL DRAWINGS FOR STRUCTURAL DETAILS

SHALL AT THE SITE BEFORE TAKING UP THE WORK NOT TOBE BECHECKED SCALED AND ONLY WRITTEN DIMENSIONS SHALL BE

S NOT TO BE SCALED AND ONLY WRITTEN DIMENSIONS SHALL BE

DISCREPANCIES OR DIFFERENCES BETWEEN THE

OR DIFFERENCES THEIMMEDIATE /DISCREPANCIES INTERIOR DRAWINGS OR THE SITEBETWEEN CONDITIONS

/ INTERIOR OR THE SITE CONDITIONS IMMEDIATE LL BE MADEDRAWINGS TO THE ARCHITECTS FOR CLARIFICATION PRIOR TO

ALL BE MADE TO THE ARCHITECTS FOR CLARIFICATION PRIOR TO HE WORK.

HE WORK. O ARCHITECTURAL DRAWINGS FOR STRUCTURAL DETAILS

O ARCHITECTURAL DRAWINGS FOR STRUCTURAL DETAILS

DRAWING

PROJECT ARCHITECT : RIKA

REFERENCE SHALL MADETO TOARCHITECTURAL THE ARCHITECTSDRAWINGS FOR CLARIFICATION PRIOR TO 4. DO NOTBE REFER FOR STRUCTURAL DETAILS

SHALL BE CHECKED AT THE SITE BEFORE TAKING UP THE WORK

PDS_1615 PDS_1615

CHILDREN'S BEDROOM CHILDREN'S BEDROOM

DATE 25/05/2016 DATE BY 25/05/2016 DEALT DEALTBY BY CHKD RIKA

SOFA-BED SOFA-BED

CHKD NOT TOBY SCALE RIKA NOT TO SCALE PROJECT ARCHITECT : RIKA

PROJECT ARCHITECT : RIKA

DRAWING DRAWING

DR.BARFIWALA APARTMENT DR.BARFIWALA APARTMENT

" 6"6

1'-8" 1'-2" 1'-8" 1'-2"

1'-8" 1'-8" 1'-8" 1'-2" 1'-2" 1'-2"

1'-8" 1'-2" 1'-8" 1'-2"

1'-8" 1'-2"1'-8" 1'-8" 1'-2" 1'-2" 6" 6"

6"

6" 6"

1'-6" 1'-6" 1'-6" 1'-4" 1'-4" 1'-4"

10, SUJATA NIWAS, OPP. SIDDHARTH

Guest bedroom bed

10, SUJATA NIWAS, OPP. SIDDHARTH MUMBAIGENERAL NOTES : GENERAL NOTES : 400050. HOTEL,1.S.V. ROAD, BANDRA 1. ALL DIMENSIONS SHALL CHECKED AT THE SITE BEFORE TAKING UP THE WORK ALL DIMENSIONS SHALL BE(W) CHECKED AT THE SITE BEFORE TAKING UP THEBE WORK TEL: 022 6697 9002 2. THIS DRAWING TO BEBE SCALED AND ONLY WRITTEN DIMENSIONS SHALL BE 2. THIS DRAWING BE SCALED AND: ONLY WRITTEN DIMENSIONS GENERAL NOTES : IS NOT TO GENERAL NOTES GENERAL NOTES : IS NOTSHALL MUMBAI400050. GENERAL NOTES : GENERAL NOTES : GENERAL NOTES :

DR.BARFIWALA APARTMENT TEL: 022 6697 9002 DR.BARFIWALA APARTMENT

ARCHITECTURAL/ INTERIOR EXECUTION OF DRAWINGS THE WORK. OR THE SITE CONDITIONS IMMEDIATE

4.

patch design studio patch design studio DRAWING HOTEL, S.V. ROAD, BANDRA (W)

SOFA-BED

SOFA-BED

FOLLOWED ARCHITECTURAL/ INTERIOR DRAWINGS OR THE SITE CONDITIONS IMMEDIATE 3.

CHILDREN'S BEDROOM 25/05/2016

RIKA

1'-6" 1'-4" 1'-6" 1'-4"

1'-6" 1'-6" 1'-6" 1'-4" 1'-4" 1'-4" DATE

6"6"

THIS DRAWING IS NOTOF TOANY BE DISCREPANCIES SCALED AND ONLY DIMENSIONS SHALL 3. IN CASE ORWRITTEN DIFFERENCES BETWEEN THEBE

BB

ATPERPECTIVE Y ELEVATION AT Y ELEVATION BENCH PLAN AT UPLAN AT BENCH PLAN AT VPLAN AT BENCH PLAN AT W BENCH PLAN AT BENCH U BENCH V BENCH W ELEVATION ELEVATION ATYYELEVATION ELEVATION Y AT BENCH PERPECTIVE BENCH P BENCHPLAN PLAN BENCH ATPLAN BENCH U PLAN PLAN UBENCH AT U U PLAN BENCH ATPLAN BENCH VPLAN PLAN V BENCH AT PLAN V PLAN BENCH ATPLAN BENCH W PLAN PLAN W AT W W ELEVATION ELEVATION AT ATAT YBENCH AT YYBENCH PERPECTIVE PER BENCH BENCH AT UBENCH ATAT PLAN U BENCH AT PLAN BENCH AT VBENCH ATAT PLAN V BENCH AT V BENCH AT W BENCH ATAT PLAN W AT

CHILDREN'S BEDROOM

DEALT BY 25/05/2016 CHKD BY

4'4'

Y 6"

Guest bedroom wardrobe

2.

DATE

6"

PDS_1615

4' 4'

6"

ALL DIMENSIONS SHALL BE CHECKED AT THE SITE BEFORE TAKING UP THE WORK

ALL DIMENSIONS SHALL BE CHECKED AT THE SITE BEFORE TAKING UP THE WORK FOLLOWED

3'-10"

6" " 6

PDS_1615

GENERAL NOTES : 1.

GENERAL NOTES : 2. THIS DRAWING IS NOT TO BE SCALED AND ONLY WRITTEN DIMENSIONS SHALL BE 1.

4'4'

Y

3'-10" X 3'-10" YYX 3'-10" 3'-10" 4'

6"

X XX

3'-10" 3'-10" 3'-10" 4'

6"

2/ " B TABLE 11/ PERPECTIVE B 77 TABLE PERPECTIVE PERPECTIVE TABLE A A A A TABLE TABLE PE A A A A PLAN AT U PLAN AT VPLAN AT W PLAN AT WSECTION AT X SECTION AT X PLAN AT U PLAN AT V A A A A A A A AAT AA AA PLANAAT A AA U A AA VPLANAAT A AAW A U PLAN AT PLAN U AT PLAN V PLAN AT PLAN V AT W PLAN AT PLAN W AT SECTION SECTION ATXX SECTION SECTION AT X X AT PLAN U AT PLAN V AT PLAN W PLAN ATPLAN U AT PLAN U ATPLAN V AT VPLAN ATPLAN W AT W SECTION ATAT X X AT SECTION AT

BB

FOLLOWED 1. FOLLOWED ALL DIMENSIONS SHALL 1. BE CHECKED ALL DIMENSIONS AT THE SITE 1. SHALL ALL BEFORE BE DIMENSIONS CHECKED TAKINGAT UP SHALL THE THESITE BE WORK CHECKED BEFORE TAKING AT THE SITE UP THE BEFORE WORKTAKING UP THE WORK ALL DIMENSIONS SHALL 1. BE ALL CHECKED DIMENSIONS AT THE SHALL SITE 1. BE BEFORE ALL CHECKED DIMENSIONS TAKING THE UP SHALL SITE THE WORK BEFORE BE CHECKED TAKING AT UP THE THE SITE WORK BEFORE TAKING WORK IN CASE OFAT ANY DISCREPANCIES OR DIMENSIONS DIFFERENCES BETWEEN THE UP THE 3. CASE OF ANYISDISCREPANCIES OR DIFFERENCES BETWEEN THEIS 2. IN THIS DRAWING NOT TO 2. BETHIS SCALED DRAWING AND ONLY IS3. 2. NOT WRITTEN THIS TO BE DRAWING SCALED DIMENSIONS AND NOT ONLY SHALL TO BE WRITTEN BE SCALED AND ONLY WRITTEN SHALL BE DIMENSIONS SHALL BE 2. THIS DRAWING IS NOT 2. TOTHIS BE SCALED DRAWING AND IS ONLY NOT 2. TO WRITTEN BE THIS SCALED DRAWING DIMENSIONS AND IS ONLY NOT SHALL WRITTEN TO BE BEDRAWINGS SCALED DIMENSIONS AND SHALL WRITTEN BECONDITIONS DIMENSIONS SHALL BE ARCHITECTURAL/ INTERIOR ORONLY THE SITE IMMEDIATE ARCHITECTURAL/ INTERIOR DRAWINGS CONDITIONS IMMEDIATE FOLLOWED FOLLOWED OR THE SITE FOLLOWED FOLLOWED FOLLOWED FOLLOWED SHALL BE MADE TO THE ARCHITECTS FOR CLARIFICATION PRIOR TO REFERENCE SHALL BE MADE TO THE ARCHITECTS FOR CLARIFICATION PRIOR TOBETWEEN 3. IN CASE OF ANY DISCREPANCIES 3. IN CASE OR OF DIFFERENCES ANY DISCREPANCIES 3. REFERENCE IN BETWEEN CASE OF OR ANY THEDIFFERENCES DISCREPANCIES OR DIFFERENCES THE BETWEEN THE 3. IN CASE OF ANY DISCREPANCIES 3. IN CASE OR OF ANY DIFFERENCES DISCREPANCIES 3. BETWEEN IN CASE OR OF DIFFERENCES THE ANY DISCREPANCIES BETWEEN OR THE DIFFERENCES BETWEEN THE EXECUTION OF THE WORK. EXECUTION OF THE WORK. DRAWINGS ARCHITECTURAL/ INTERIOR ARCHITECTURAL/ OR THEINTERIOR SITE ARCHITECTURAL/ CONDITIONS DRAWINGS IMMEDIATE OR INTERIOR THE SITE DRAWINGS CONDITIONS OR THE IMMEDIATE SITE CONDITIONS IMMEDIATE ARCHITECTURAL/ INTERIOR ARCHITECTURAL/ DRAWINGS OR INTERIOR THE SITE ARCHITECTURAL/ CONDITIONS DRAWINGS OR IMMEDIATE THE INTERIOR SITE CONDITIONS DRAWINGS IMMEDIATE OR THE SITE CONDITIONS IMMEDIATE 4. FOR NOT REFER TO ARCHITECTURAL DRAWINGS FOR STRUCTURAL DETAILS 4. REFERENCE DO NOT REFER TO ARCHITECTURAL STRUCTURAL DETAILS SHALL BE MADEREFERENCE TO THEDRAWINGS ARCHITECTS SHALL BEDO REFERENCE FOR MADE CLARIFICATION TO THE SHALL ARCHITECTS BE PRIOR MADETO FOR TO THE CLARIFICATION ARCHITECTS PRIOR FOR CLARIFICATION TO PRIOR TO REFERENCE SHALL BE MADE REFERENCE TO THE ARCHITECTS SHALL BE MADE FOR REFERENCE TO CLARIFICATION THE ARCHITECTS SHALL PRIOR BE MADE FOR TOCLARIFICATION TO THE ARCHITECTS PRIORFOR TO CLARIFICATION PRIOR TO EXECUTION OF THE WORK. EXECUTION OF THE WORK. EXECUTION OF THE WORK. EXECUTION OF THE WORK. EXECUTION OF THE WORK.EXECUTION OF THE WORK. 4. DO NOT REFER TO ARCHITECTURAL 4. DO NOT DRAWINGS REFER TO4.ARCHITECTURAL FOR DOSTRUCTURAL NOT REFERDRAWINGS TO DETAILS ARCHITECTURAL FOR STRUCTURAL DRAWINGS DETAILS FOR STRUCTURAL DETAILS 4. DO NOT REFER TO ARCHITECTURAL 4. DO NOT REFER DRAWINGS TO ARCHITECTURAL 4. FORDO STRUCTURAL NOT REFER DRAWINGS DETAILS TO ARCHITECTURAL FOR STRUCTURAL DRAWINGS DETAILSFOR STRUCTURAL DETAILS

1.

LIVINGROOM

DATE

25/05/2016

DEALT BY

DINNING DINNING

Dr.Barfiwala Dr.Barf apartm Dr.Barfiwala Dr.Barfiwa apartme

patch design studio patch design studio HOTEL, S.V. ROAD, BANDRA (W) MUMBAI400050. MUMBAI400050. TEL: 022 6697 9002 TEL: 022 6697 9002

GENERAL NOTES : 2.

ALL DIMENSIONS SHALL BE CHECKED AT THE SITE BEFORE TAKING UP THE WORK THIS DRAWING IS NOT TO BE SCALED AND ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED

3.

IN CASE OF ANY DISCREPANCIES OR DIFFERENCES BETWEEN THE ARCHITECTURAL/ INTERIOR DRAWINGS OR THE SITE CONDITIONS IMMEDIATE REFERENCE SHALL BE MADE TO THE ARCHITECTS FOR CLARIFICATION PRIOR TO EXECUTION OF THE WORK.

4.

DO NOT REFER TO ARCHITECTURAL DRAWINGS FOR STRUCTURAL DETAILS

T TA DIN

Dr.Barfiwala apartm

10, SUJATA NIWAS, OPP. SIDDHARTH 10, SUJATA NIWAS,BANDRA OPP. SIDDHARTH HOTEL, S.V. ROAD, (W)

1.

DAT

DEA JASH LIVINGROOM LIVING T LIVINGROOM LIVINGRO DINNING

CH CHKD BY 25/05/2016 RIKA DATE DATE DAT 25/05/2016 DATE 25/05/2016 DATE 25/05/2016 DAT NO NOT TOBY SCALE DEALT JASH DEALT BY JASH DEA DEALT BY JASHDEALT BY JASH DEA PRO PROJECT CHKD BY ARCHITECT RIKA : RIKA CHKD BY RIKA CH CHKD BY RIKACHKD BY RIKA CHK NOT TO SCALE NOT TO SCALE NO NOT TO SCALE NOT TO SCALE NOT PROJECT ARCHITECT : RIKA PROJECT ARCHITECT PRO ARCHITECT : PRO RIK PROJECT ARCHITECTPROJECT : RIKA

25


Greenply walllpaper exhibition stall, Goregaon

Work done : -Design option, 3d model & views.

26


Godrej sales office, Thane

Work done : -Photoshop rendering options.

27


TOURIST INFORMATION CENTRE Vanvihar, Bhopal

An Institution Project SEM7, 4TH YR|2014

28


The Diagrams explore placements of programs keeping the operational ideas in mind.

plot

programs along axis

object as public space

private|public

porous object

slowing down path

intersection

29


Site Plan 30


The path of a devotee, his kinetics and change in speed at different point

Shade altering the preferred path and usage

Planted trees divide space and control movement flow

Water body for cleansing feet usable object

CAUSE

CHANGE

TERRAIN SPEED/ TRANSITION VISUAL FIELD

SHADE

SPEED MOVEMENT DIRECTION

PAUSE

PAUSE/ OBJECT DIRECTION/ SPEED PAUSE/ DIRECTION/ TRANSITION

OBJECT DIRECTION

acts as a

MOMENT PAUSE

LONG PAUSE LEVEL

TRANSITION

ENCLOSURE LIGHT QUALITY

In the diagramming exercise at Taj-ul Masjid the focus was to study the paths of people in a public space and understand the attributes affecting a given path. The attributes were studied and used suitably for the tourist information centre.

31


B’ A’

B A

Plan at +23.0 m

Section A-A

Section A-A’

A’

B’


Section B-B

B

A

Plan at +16.0m

A

B

A

Plan at +19.0m

B


EPHEMERAL CITY Nashik, Maharashtra

MA

Temporary housing for Kumbhmela SEM7,4TH YR.|2014.

In 2015 , the kumbh comes to Nashik after 12 years. with people in numbers ranging from 20-30 million visiting the city for a period of 60 days, the city will have to organize and deploy systems that maintain order within this chaos, an important part of which is a pop up city , with an infrastructure enough to support 1015 million for around 50 days. consisting of tents,

public spaces ,clinics , police stations and various other temporary public structures, this city is elemental to the functioning of the Kumbh.

D

A O R IN

RELIGIOUS TRUST

The aim of the studio was to design for a fraction of the total housing on a 65 acre plot of land.

PUBLIC CENTRE

Artificially made stream

GODAVARI RIVER NATIONAL HIGHWAY STATE HIGHWAYS MAJOR MAIN ROADS PEDESTRIAN FREE ZONE SADHU PATH THE PLANNED PATH AMARDHAM CREMATORIUM MELA CAMP INTERNAL SETTLEMENT S.T.P. W.T.P.

34

/ KUMBH / MAIN ACCESS / SITE ACCESS / PUBLIC ACCESS / KUMBHSTHAL / SHAHI MARG / ACTUAL SHAHI MARG / THE PROBLEM / PRAYAG MELA CAMP / THE SPILLOUT

SEWAGE TREATMENT PLANT

JNNURM GARDEN

Godavari river


Finding shade along the flow, making faith in its water. It’s a tent galore that creates the city; it’s that very canvas that shapes the atmosphere. Do I have to comment, but for I would like to experience it before. The rituals are done and the river is overwhelmed. Now it’s time for the nomads to find their way to another home.

Typical housing cluster Axonometric

35


Y V

X

X’

Unit 1

Wall Section

Plan at +2.0m

Unit 2

V’

Plan at +2.0m

Section x-x’

Section u-u’

Section y-y’

Section v-v’

Exploded axonometric of single unit house 36

Y’

U’

U


Section A-A’

Section B-B’

A’

B’

A Cluster volume evolution

Typical cluster plan

B

37


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Y

Y

CONSTRUCTED IN THREE SEGMENTS

CONSTRUCTED IN THREE SEGMENTS

1MM THK PTFE 1MM THK PTFE M.S. BOLT & M.S. WASHER M.S. BOLT & M.S. WASHERTO HOLD METAL PLATES TO HOLD METAL PLATES 3MM M.S. PLATE TO 3MM M.S. PLATE TO HOLD TENSILE FABRIC HOLD TENSILE FABRIC THK M.S. GUTTER 5MM THK M.S. GUTTER 5MM APPROX. 25MM DIA. BAMBOO APPROX. 25MM DIA. BAMBOO 30X25MM T.W. BLOCK SPACER 30X25MM T.W. BLOCK SPACER 1MM THK M.S. STRIP TO 1MM THK M.S. STRIP TO HOLD BAMBOOS TOGETHER HOLD BAMBOOS TOGETHER

CONSTRUCTED IN THREE SEGMENTS

CONSTRUCTED IN THREE SEGMENTS

HORIZONTAL/VERTICAL HORIZONTAL/VERTICAL SEGMENT BAMBOO FRAMESEGMENT BAMBOO FRAME

PERIPHERY SEGMENTPERIPHERY SEGMENT BAMBOO FRAME BAMBOO FRAME

LEGEND:

1MM THK PTFE M.S. BOLT & M.S. WASHER TO HOLD METAL PLATES 3MM M.S. PLATE TO HOLD TENSILE FABRIC 5MM THK M.S. GUTTER APPROX. 25MM DIA. BAM 30X25MM T.W. BLOCK SPA 1MM THK M.S. STRIP TO HOLD BAMBOOS TOGETH

1MM THK PTFE 5MM THK M.S. GUTTER 1MM THK PTFE 1MM THK PTFE APPROX. 25MM DIA. 3MM THK M.S. PLATE TO 3MM THK M.S. PLATE TO BAMBOO HOLD TENSILE FABRIC HOLD TENSILE FABRIC 8MM DIA M.S. DOWEL M.S. SCREW TO HOLD M.S. SCREW TO HOLD TO KEEP BAMBOOS METAL PLATES METAL PLATES ALIGNED 5MM THK M.S.GUTTER 5MM THK M.S.GUTTER 1MM THK M.S. STRIP 5MM THK M.S. PLATE FOR 5MM THK M.S. PLATE FOR TO HOLD BAMBOOS SPACING AT 1000MM C/C SPACING AT 1000MM C/C TOGETHER 25MM DIA. BAMBOO 25MM DIA. BAMBOO 400X400MM PRECAST 400X400MM PRECAST DIAGONAL SEGMENT DIAGONAL SEGMENT CONCRETE FOUNDATIONCONCRETE FOUNDATION HORIZONTAL SEGMENT HORIZONTAL SEGMENT PERIPHERRY SEGMENT PERIPHERRY SEGMENT RAISED T.W. PLATFORM RAISED T.W. PLATFORM PRECAST CONCRETE PRECAST CONCRETE FOOTING FOOTING PLASTIC RACK FILLED PLASTIC RACK FILLED WITH EARTH WITH EARTH 50X125 T.W. JOIST 50X125 T.W. JOIST

1MM THK PTFE 5MM THK M.S. GUTTER APPROX. 25MM DIA. BAMBOO 8MM DIA M.S. DOWEL TO KEEP BAMBOOS ALIGNED 1MM THK M.S. STRIP TO HOLD BAMBOOS TOGETHER

DETAIL AT Y

ISOMETRIC VIEW

DETAIL AT X

B

DETAIL AT X

X

DETAIL AT X

SCALE 1:2

A' B'

1MM THK PTFE 1MM THK PTFE 3MM THK M.S. PLATE TO 3MM THK M.S. PLATE TO HOLD TENSILE FABRIC AT HOLD TENSILE FABRIC AT 300MM C/C 300MM C/C M.S. SCREW TO HOLD METAL M.S. SCREW TO HOLD METAL PLATES AT 300MM C/C PLATES AT 300MM C/C 8MM THK M.S. BAR FOR 8MM THK M.S. BAR FOR ALIGNMENT OF BAMBOOSALIGNMENT OF BAMBOOS 5MM THK M.S.GUTTER 5MM THK M.S.GUTTER 5MM THK M.S. PLATE FOR 5MM THK M.S. PLATE FOR SPACING AT 1000MM C/CSPACING AT 1000MM C/C 25MM DIA. BAMBOO 25MM DIA. BAMBOO 1MM THK M.S. PLATE AT 1MM THK M.S. PLATE AT 1400C/C TO HOLD 1400C/C TO HOLD BAMBOOS TOGETHER BAMBOOS TOGETHER

SCALE 1:2

1MM THK PTFE 1MM THK PTFE 3MM THK M.S. PLATE 3MM THK M.S. PLATE M.S. BOLT & M.S. WASHERM.S. BOLT & M.S. WASHER TO HOLD METAL PLATES TO HOLD METAL PLATES 3MM THK M.S. L-PLATE 3MM THK M.S. L-PLATE WELDED TO GUTTER WELDED TO GUTTER

A' B'

1MM THK PTFE DIAGONAL SEGMENT HORIZONTAL SEGMENT PERIPHERRY SEGMENT PRECAST CONCRETE FOOTING

1MM THK PTFE DIAGONAL SEGMENT HORIZONTAL SEGMENT PERIPHERRY SEGMENT PRECAST CONCRETE FOOTING

PLASTIC CRATE FILLED DETAIL A T U DETAIL A T EARTH U WITH 100X85MM BAMBOO BEAM 400X400MM PRECAST CONCRETE FOOTING 50X150MM T.W.JOIST 50X560MM T.W. HERRINGBONE STRUT AT 1010MM C/C

PLASTIC CRATE FILLED WITH EARTH 100X85MM BAMBOO BEAM 400X400MM PRECAST CONCRETE FOOTING 50X150MM T.W.JOIST 50X560MM T.W. HERRINGBONE STRUT AT 1010MM C/C

Z

A

50X560MM T.W. HERRINGBONE STRUT AT 1010MM C/C 50X150MM T.W.JOIST 200X2000MM T.W. BOARDING

S E C T I O N B -B'

DETA SCA

A

A'

B

B'

PLAN AT +5.0M

DETAIL A T Z

PLAN AT +2.5M

SCALE 1:2

1MM THK PTFE 3MM THK M.S. PLATE TO 1MM THK PTFE HOLD TENSILE FABRIC AT 3MM THK M.S. PLATE TO HOLD TENSILE FABRIC AT 300MM C/C 25MM THK T.W. BOARDING300MM C/C 25MM THK T.W. BOARDING M.S. SCREW TO HOLD METAL M.S. SCREW TO HOLD METAL PLATES AT 300MM C/C PLATES AT 300MM C/C 5MM THK M.S.GUTTER 5MM THK M.S.GUTTER 25MM DIA. BAMBOO 25MM DIA. BAMBOO 1MM THK M.S. STRIP AT 1MM THK M.S. STRIP AT 1400C/C TO HOLD 1400C/C TO HOLD BAMBOOS TOGETHER BAMBOOS TOGETHER PROJECTION FOR PROJECTION FOR SUPPORTING THE END SUPPORTING THE END BOARDING BOARDING 400X600MM PRECAST 400X600MM PRECAST 1MM THK PTFE FOOTING CONCRETE CONCRETE FOOTING M.S. BOLTTHK & M.S. 10MM M.S.WASHER 10MM THK M.S. TO RE-INFORCEMENT HOLD METAL PLATES BAR RE-INFORCEMENT BAR 3MM M.S. PLATE 8MM DIA M.S.TO STIRRUP 8MM DIA M.S. STIRRUP 8MM DIA M.S. BAR TO HOLD TENSILE FABRIC 8MM DIA M.S. BAR TO HOLD BEAM 5MM THK BAMBOO M.S. GUTTER HOLD BAMBOO BEAM APPROX. 25MM DIA. BAMBOO 30X25MM T.W. BLOCK SPACER 1MM THK M.S. STRIP TO HOLD BAMBOOS TOGETHER

DETAIL A T A

DETAIL A T A

DETAIL AT Y

TEMPORARY BAMBOO Market,Kumbh mela, Nashik PAVILION SEM9,5TH YR.|2015

DETAIL A T B

CONSTRUCTED IN THREE SEGMENTS

SCALE :V

S E C T I O N A - A'

AL PRODUCT

A

1MM THK PTFE 5MM THK M.S. GUTTER APPROX. 25MM DIA. BAMBOO 8MM DIA M.S. DOWEL TO KEEP BAMBOOS ALIGNED 1MM THK M.S. STRIP TO HOLD BAMBOOS TOGETHER DIAGONAL SEGMENT

1MM THK PTFE 3MM THK M.S. PLATE TO HOLD TENSILE FABRIC M.S. SCREW TO HOLD METAL PLATES 5MM THK M.S.GUTTER 5MM THK M.S. PLATE FOR SPACING AT 1000MM C/C 25MM DIA. BAMBOO 400X400MM PRECAST CONCRETE FOUNDATION

S E C T I O N B -B'

5MM BUILD APP BAM 8MM CONSTRU TO K

1MM

DIAGNOL SEGMENT DIAGNOL SEGMENT BAMBOO FRAMEBAMBOO DETAIL FRAME DETAIL ELEVATION

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

38

ELEVATION

PRODUCED BY AN AU

Y

DETAIL A T B

1MM THK PTFE M.S. BOLT & M.S. W TO HOLD METAL PL 3MM M.S. PLATEDET TO HOLD TENSILE FABR 5MM THK M.S. GUT APPROX. 25MM DIA 30X25MM T.W. BLO 1MM THK M.S. STRIP HOLD BAMBOOS TO

SHEL

DETAIL AT Y

M

1MM THK DIAGON HORIZON PERIPHE PRECAS FOOTING

U

SCALE 1:2

X

1MM THK 3MM TH M.S. BOL TO HOLD 3MM TH WELDED

Z

DETAIL A T Z

X

DIAGONAL HORIZONTA PERIPHERRY RAISED T.W PRECAST C FOOTING PLASTIC RA WITH EARTH 50X125 T.W

B

M

75X100MM BAMBOO BEAM OF PERIPHERAL SEGMENT 75X100MM BAMBOO BEAM OF PERIPHERAL SEGMENT 1MM THK PTFE 5MM THK M.S. GUTTER ON1MM THK PTFE 5MM THK M.S. GUTTER ON DIAGONAL SEGMENT 5MM THK M.S. GUTTER ONDIAGONAL SEGMENT 5MM THK M.S. GUTTER ON VERTICAL SEGMENT 5MM THK M.S. GUTTER ONVERTICAL SEGMENT HORIZONTAL SEGMENT 5MM THK M.S. GUTTER ON HORIZONTAL SEGMENT APPROX. 25MM DIA BAMBOO APPROX. 25MM DIA BAMBOO 1MM THK PTFE 1MM THK PTFE 25MM THK T.W. BOARDING 25MM THK T.W. BOARDING FOR FLOOR FOR FLOOR 50X150MM T.W.JOIST 50X150MM T.W.JOIST 50X560MM T.W. HERRINGBONE STRUT AT 50X560MM T.W. HERRINGBONE STRUT AT 1010MM C/C 1010MM C/C 400X600MM PRECAST 400X600MM PRECAST CONCRETE FOOTING CONCRETE FOOTING PLASTIC CRATE FILLED WITH PLASTIC CRATE FILLED WITH EARTH EARTH

1MM THK P 5MM THK M APPROX. 2 BAMBOO 8MM DIA M TO KEEP BA ALIGNED 1MM THK M TO HOLD B TOGETHER

SEGMENT BAMBOO FRAME DIAGNOL SEGMENT DIAGNOL BAMBOO FRAME

3MM THK M.S. PLATE TO 3MM THK M.S. PLATE TO HOLD TENSILE FABRIC AT HOLD TENSILE FABRIC AT 300MM C/C 300MM C/C M.S. SCREW TO HOLD METAL M.S. SCREW TO HOLD METAL PLATES AT 300MM C/C PLATES AT 300MM C/C 5MM THK M.S.PLATE 5MM THK M.S.PLATE 5MM THK M.S. PLATE FOR 5MM THK M.S. PLATE FOR SPACING AT 1000MM C/C SPACING AT 1000MM C/C 25MM DIA. BAMBOO 25MM DIA. BAMBOO 1MM THK PTFE 1MM THK PTFE

DETAIL AT X

ELEVATION

S E C T I O N A - A'

50X560MM T.W. HERRINGBONE STRUT AT 1010MM C/C 50X150MM T.W.JOIST 200X2000MM T.W. BOARDING

X

CONSTRUCTED IN THREE SEGMENTS

CONSTRUCTED IN THREE SEGMENTS

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

A

A

ISOMETRIC VIEW

A

ALIG 1MM

TO H JASH S TOG

KAMLA RAHEJA DIAG INSTITUTE OFHOR AR

B

SIGNATURE 10-10-15

PERI RAIS PREC FOO PLAS WITH 50X1


W

V U

19.0M

NOTES: ALL DIMENSION DO NOT SCALE FOLLOW WRITT SPECIFICATION INCASE OF DISC NOTICE OF THE ALL ITEMS ARE SPECIFICATION INSTRUCTIONS.

SEMI-SPHERICAL M.S. NODE WITH SPIDER CLAMP STAINLESS STEEL SPIDER CLAMP 20 MM THK TOUGHENED GLASS SEMI-SPHERICAL M.S. NODE

25MM DIA. M.S. WEB TIE 50 MM DIA. M.S. TOP CHORD 50 MM DIA. M.S. BOTTOM CHORD

LEGEND: 15MM THK INTERNAL PLASTER 150MM THK BRICK WALL 50MM LONG M.S. BOLT 3MM THK M.S.PLATE 1MM THK G.I. SHEET FOR GUTTER 12MM THK TOUGHENED GLASS CUSTOMIZED HALF SPIDER CLAMP

20 MM TOUGHENED GLASS SILICON GLUE M.S. SPIDER CLAMP BOLTED TO NODE 50 MM DIA M.S. TOP CHORD 30MM DIA. M.S. WEB TIE

50MM DIA. M.S. ROD 150X100MM G.I. GUTTER 20MM THK M.S. PLATE 100 MM THK RCC PARAPET WALL 12MM DIA. REINFORCEMENT BAR

X SECTION A-A'

M.S. NODE WELDED TO M.S. STEEL PLATE 150X100 MM G.I.GUTTER 5MM M.S. ANGLE

M.S. SPIDER CLAMP BOLTED TO NODE SILICON GLUE 50 MM DIA. M.S. TOP CHORD 10 MM DIA. M.S. BOLT SEMI-SPHERICAL M.S. NODE 25 MM DIA. M.S. WEB TIE

A'

10MM THK M.S. PLATE 50 MM DIA. M.S.PIPE 30MM DIA. M.S. PIPE 20MM THK M.S. PLATE 100MM THK R.C.C. BASE

DETAIL AT W 50MM DIA. M.S. BOTTOM CHORD 10MM DIA M.S. DOWEL 20MM THK M.S. BASE PLATE HALF SEMI-SPHERICAL M.S. NODE WELDED TO BASE PLATE 50MM LONG M.S. BOLT 16MM DIA M.S. RE-INFORCEMENT BAR 25MM THK EXTERNAL PLASTER

DETAIL AT U

SILICON GLUE 20 MM TOUGHENED GLASS M.S. SPIDER CLAMP BOLTED TO NODE

50 MM DIA. M.S. TOP CHORD 10 MM DIA. M.S. BOLT SEMI-SPHERICAL M.S. NODE 25 MM DIA. M.S. WEB TIE

+20.0M

DETAIL AT X

20 MM TOUGHENED GLASS 30MM DIA M.S. WEB TIE 50MM DIA. M.S. BOTTOM CHORD 50MM DIA. M.S. TOP CHORD SEMI-SPHERICAL NODE

+21.5M

TOURIST INQUIRY +21.0M

+20.0M

DETAIL AT V

U

+19.0M

A.V. ROOM +22.0M

+16.5M

+22.0M

+18.0M +18.0M +14.5M

+21.0M

BUILDING PLAN

+18.0M

RARY TION P

SPAC A

SCALE

A'

JASH SON

FIFTH YEAR

CON

DETAIL AT U

KAMLA RA INSTITUTE F2

3 5 5

ROOF PLAN

DATE: 05-03S

KEY PLAN

+20.0M

A.V. ROOM +22.0M

TOURIST INQUIRY +21.0M

+18.0M

PERMANENT EXHIBITION

+21.5M

25MM DIA. M.S. WEB TIE 50 MM DIA. M.S. TOP CHORD 50 MM DIA. M.S. BOTTOM CHORD +22.0M

+18.0M

+20.0M

+19.0M

TEMORARY EXHIBITION RAMP

A'

15MM THK INTERNAL PLASTER 150MM THK BRICK WALL 50MM LONG M.S. BOLT 3MM THK M.S.PLATE 1MM THK G.I. SHEET FOR GUTTER 12MM THK TOUGHENED GLASS CUSTOMIZED HALF SPIDER CLAMP

+14.5M

+14.5M

+21.0M

+16.5M

TEMORARY EXHIBITION RAMP

+18.0M

W

V +21.0M

BUILDING PLAN

U

+18.0M

+22.0M

+18.0M

BUILDING PLAN

A

+16.5M

KEY PLAN

+20.0M

+19.0M

A.V. ROOM +22.0M

PERMANENT EXHIBITION

TOURIST INQUIRY +21.0M

CAFE

+21.5M

U

DETAIL AT U

ROOF PLAN

For temporary exhibition. tourist-info centre,Bhopal. SEM9,5TH YR.|2015.

KEY SECTION

SPACE-FRAME ROOF

+20.0M

CAFE

SEMI-SPHERICAL M.S. NODE WITH SPIDER CLAMP STAINLESS STEEL SPIDER CLAMP 20 MM THK TOUGHENED GLASS TEMORARY SEMI-SPHERICAL M.S. NODE EXHIBITION TEMORARY RAMP EXHIBITION RAMP

20 MM TOUGHENED GLASS SILICON GLUE M.S. SPIDER CLAMP BOLTED TO NODE 50 MM DIA M.S. TOP CHORD 30MM DIA. M.S. WEB TIE

50MM DIA. M.S. ROD 150X100MM G.I. GUTTER 20MM THK M.S. PLATE 100 MM THK RCC PARAPET WALL 12MM DIA. REINFORCEMENT BAR

X

39


BACK TO THE FUTURE 2015 International architecture design competition Nanning, Guangxi, China. shortlisted #Top50projects SEM9,5TH YR|2015. COLLABORATORS: Surabhi Banerjee, Sanjana Mugeraya, Mrinali Gokani.

EARTH ANTIDOTE To introduce into the land as an injection what seemed like the only source of remedy that would aide the slow degenerative process through time. The antidote spreads through the veins of the earth below and serve as a reactivating agent.

movement

prolonged walk

wallls for free movement

1. Information desk 2. Library 3. Scripture room/ Archive 4. Courtyard of Visitor’s center 5. Parking 6. Cafe 7. Public Garden 8. Re-purposed 38-1 Tea house 9. Storage 10. Weaving pavilion

11. Medicinal plantations 12. Food Stalls and deck 13. Public toilet 14. Rammed earth exhibition 15. Garden market 16. Handicraft workshops 17. Multipurpose Terrace 18. Observation deck

wallls for free movement

Identifying two routes of movement 1 : traditional walk through the village 2 : walk through the park wallls for free movement

40

Identifying nodes of pause points for insertion of programs


Section through Weaving Pavilion

Rammed earth retaining wall section

repair strategies for rammed earth wall

wall section

38-1 house exploded axonometric

41


THE SPYING BALCONY

PRESERVING PYRAMIDEN

PIN-architecture MONTHLY MICRO-COMPETITION

120 HOURS COMPETITION

selected as the #Editor’s choice Collaborator : Surabhi Banerjee SEM9,5TH YR | OCT 2015

Balconies provide access to the exterior for floors above ground level. Yet, because of the elevated position, balconies remain removed and partially hidden from the environment below. The default role on a balcony is as an observer, while those below automatically become the observed. How might the design of a balcony embrace this oneway interaction? How can a balcony maintain a prominent presence on the facade while simultan-eously concealing an observer? What materials and forms would enhance the ability to track, record, and/or magnify the observed? What happens when balconies begin to spy?

42

EDITOR’S COMMENT /// “This entry was chosen as Editor’s Choice for its originality in addressing this month’s brief. I enjoyed the dichotomy of a mechanism that is hidden in a collapsed position and extremely apparent when activated. The ability of the balcony to not only violate visual privacy, but actually physically trespass on another building is intriguing.”

Experimental preservation. Pyramiden, Svalbard, Norway. Collaborators: Surabhi Banerjee, Nikita Mahajan SEM8,4TH YR.|2015

Sensitivity towards nature evokes the sense of protection like a mother cares for a child. Through the act of growing, one rediscovers a new kindness with which one looks at the site and allows visitors to engage with it in this process. To generate a sense of purity and rejuvenate the site by harnessing life and protection. With the intent of taking care, preservation occurs.

Why the test tubes ? Relationship with man and nature is explored in the process of revealing the earth through the use of transparent test tubes. Flower: Purple Saxifrage Charecteristics: The leaves are fringed with tiny hairs to capture heat.Born with capacity to withstand low temperatures it often flowers while the snow is melting.


RUINESQUE

120 HOURS COMPETITION Beacon for Oya music festival. Olso,Norway Collaborators : Akshay Aditya, Meghna Roy 3RD YR|2014

SUSTAINIBILITY AND THE RUIN In the basic understanding of sustainability ,the ‘ruin’ becomes the most sustainable architectural entity . The ruin exists forever in a state of adaptation and evolves different programs and uses over time,ranging from being a space of play to becoming the place where events are held,it sustains itself by adapting to the changing needs of the user and becomes timeless. The proposal is a structure which acts as a beacon for the festival,but has the potential to eventually degrade,decay and take up different roles over time.

43


ALTERNATE RESEARCH AND HEALING CENTRE Vajreshwari, Thane

B A

HEAD OF OFFICE

an institution project SEM6,3RD YR.|2013 The healing center sitting amongst a few trees on site becomes a pavilion like grove,providing shelter to the patients seeking refuge in the time of need. The building breaks away from conventional single corridor institutions ,allowing multiplicity and variety in experience for all kinds of users to interact within. The building forms its own pubic space by wrapping around a large open space. The continuous steps around the plinths becomes a gradual transition in the porous nature of the building.

LIBRARY

LECTURE ROOM

Plan at +5.0M

LECTURE ROOM

A’

B’

B A

ADMINISTRATION OFFICE

COMMUNITY HALL

TOILET WATER THERAPY WATER THERAPY

Site Plan

The open space in the healing centre is an entry to the site and allows multiple access points to various programs.

ACCUPUNCTURE

LIBRARY

RESEARCH LAB RESEARCH LAB

B’

Site Section 44

Plan at +2.0M

A’


Section A-A’

Section B-B’

Process Axonometric

Process models community hall

for 45


MONUMENT TO FAITH Yuksom, Sikkim

Bath-house SEM4,2ND YR.|2013 Buddhists express intangible ideas of faith through tangible mediums. Sacred flags,prayer wheels,chants etc sit all over the landscape of Sikkim and constantly blend with elements of nature,almost becoming natural themselves. The Public bath is created to involve tourists and local inhabitants in the sacred landscape of the Baayul demazong in Sikkim. It is not an intervention of special attention but aims to become a part of the everyday,natural in a way and timeless in the sense of purpose. The intervention sits next to the existing boundaries of the sacred grove,extending out to the valley on the other side. the bath intends to become an everyday object of faith, that becomes a ritual.

46


Curved walls create a smooth movement transition along the ramp & are also used to create intimate spaces within the bath.

CORRONATION THRONE

SECTION (through baayul demazong)

CORRONATION THRONE

INTERVENTION

Complementing the existing object of faith by inverting intervention

x

A

-5.0M

x’

Plan at -2.5m

A’

Section X-X’

Section A-A’

47


PRODUCT DESIGN/SKETCHES CONCRETE SKETCHBOOK|BOX

48



JASH SONI

jashsoni01@gmail.com +91 9833910893


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.