Module
We have developed our own modular construction system We offer a high-quality product with a very competitive price and delivery time. Any client may have a modern stadium according to whatever the possibilities are.
Scale Module
Through the use of ONLY TWO MODULES (one straight and one curved), we can shape any grandstand. . .
With an ONLY RING we get up to 15,000 seats
Recommended minimum plot: 3.5Ha + FIFA parking: 7.5Ha
30,000
Scale Module
With a SECOND RING we get up to 30,000 seats
Recommended minimum plot: 4.5Ha + FIFA parking: 15Ha
Scale Module
And with a THIRD RING we achieve the maximum capacity of 45,000 seats
Recommended minimum plot: 5Ha + FIFA parking: 22.5Ha
Morphology Module
VERSATILE SYSTEM
Applicable to any sport discipline: Football, American football, Athletics, Tennis, Swimming & Diving pool etc..
Roof Module
Possibility of installation a COVERING at any bowl
THIRD RING
30,000
Roof Module
Possibility of installation a COVERING at any bowl
Roof Module
Possibility of installation a COVERING at any bowl
Façade Module
There are different material options :
• Folded steel sheet
• PVC tensioned fabric mesh
30,000
Façade Module
There are different material options :
• Folded steel sheet
• PVC tensioned fabric mesh
Façade Module
There are different material options :
• Folded steel sheet
• PVC tensioned fabric mesh
Customizable Module
Possibility of customizing the enclosures
Customizable Module
30,000
Customizable Module
Possibility of customizing the enclosures
Assembly
It is a totally precast system, manufactured product in factory. The construction work is limited to assemble We get to accelerate the construction process and also improving the quality of finished product. The quality of the final product is not comparable with the traditional construction.
Designed by JAVIER GARCIA ALDA Architect ©Foundations Assembly
After a previous phase of CIVIL WORKS (earthworks, foundations etc....) Begins the works of assembly.
Estimated total volume of the FOUNDATION (considering that the resistance of the ground is good):
15,000 seats: 5,000m3
30,000 seats: 7,000m3
45,000 seats: 9,000m3
Structure Assembly
GENERAL STRUCTURE
)
Estimated total weight of the STRUCTURE (including roof and façade):
15.000 seats: 1,5 Tn
30.000 seats: 6Tn
45.000 seats: 7Tn
Grandstands Assembly
PRECAST GRANDSTANDS (metallic or precast reinforced concrete)
Estimated total length of GRANDSTANDS:
15,000 seats: 10,000m
30,000 seats: 20,000m
45,000 seats: 30,000m
Roof Assembly
ROOF STRUCTURE (made up by steel profiles with bolted joints)
Roof Assembly
COVERING
Estimated total COVER area:
15,000 seats: 8,000m2
30,000 seats: 14,000m2
45,000 seats: 20,000m2
Façade Assembly
sub-structure and enclosures of FAÇADE (made up by steel profiles Lined with Folded steel sheet or PVC tensioned fabric mesh)
Total estimated area of FACADE:
15,000 seats: 4,000m2
30,000 seats: 9,000m2
45,000 seats: 20,000m2
Seating Assembly
of P V C AND THE FACILITIES
of:
- Electricity
- Telecommunications
- PA system
- Plumbing
- Sewage
- Air conditioning
- Scoreboards
- Lifts
- Lighting
Assembly Lighting
Spotlights on the ROOF for lighting the grandstands and in TOWERS for lighting the playing field
According to the FIFA categories: -CLASS I (training), -CLASS II (local match without TV), -CLASS III (national match without TV), -CLASS IV (national televised match) and – CLASS V (international televised match)
Building Assembly
MAIN BUILDING (dressing rooms, VIP, Staff and Media areas) AND AUXILIARY MODULES (toilets, access, snack bars etc..)
Total estimated area
BUILDINGS (main + auxiliary):
15,000 seats: 4,500m2
30,000 seats: 6,500m2
45,000 seats: 9,000m2
Assembly Building Hospitality
The stadiums have Hospitality areas: PRIVATE SKYBOXES and VIP AREAS with lounges and cafeterias
Assembly
Building Media
The stadiums have Media areas: CONFERENCE ROOM and WORK AREAS with lounges and cafeterias
Advantages
The advantages of this system are many:
- VERSATILITY : possibility to get endless stadium typologies.
Designed by JAVIER GARCIA ALDA Architect ©Advantages
- QUALITY : by using the most advanced serial production technologies.
Advantages
- SPEED : the deadlines are reduced over 50% compared to a traditional building. (planning, production and execution).
Advantages
- FLEXIBILITY : possibility of implementation or decreasing the stadium capacity, according to needs.
Advantages
- MOBILITY : export possibilities to any countries.
Advantages
- ECONOMY : financial lower costs and fast return to investment.