ARCHITECTURE
POR TFOL IO
JAYANT SHARMA
CURRICULUM VITAE JAYANT SHARMA Student of Architecture
EDUCATION
COMPUTER SKILLS AutoCAD
Vivekananda Global University, Jaipur(2020-2025)
Revit
Bachelor of Architecture
MS office
(ongoing)
Sketch UP
DAV , LKB , Shimla , HP
Adobe Photoshop
10th and 12th from DAV, LKB,
Adobe Indesign
Shimla
Canva
VOLUNTEER EXPERIENCE
WORK EXPERIENCE Zeste Studio AR. Anubhav Mittal 22-12-2022 to 28-12-2022 Assisted in working drawings Site visits Associated Engineering Co. AR. Arun Kumar Bhanwra 26-07-2023 to 28-07-2023
ABOUT ME As an aspiring architect, I prioritize minimalism and simplicity, seamlessly merging form and function. My work reflects clean lines, timeless elegance, and a rational, realistic approach. With a keen eye for precision, I uniquely balance aesthetics and practicality in every project.
Documented the existing
LANGUAGES HINDI ENGLISH
PERSONAL STRENGTHS Teamwork Rational Thinking Discipline + Punctuality
INTERESTS Chess
different sites working drawings
FGBM
Running
conditions and measurements of Assisted in design development ,
RAF
Geopolitics + History
CONTACT 8894861891 sharmajayant730@gmail.com
Sports Calisthenics + weightlifting
CONTENT
03
01 PRIMARY HEALTHCARE CENTER
TOURISM EXPERIENCE CENTER
05 TECHNICAL DRAWINGS
04
02 MULTI STOREY HOUSING
EDUCATIONAL INSTITUTION
01
PRIMARY HEALTHCARE CENTER
The conceptual design for the 30-35 bedded primary healthcare facility prioritizes a health-conscious and engaging environment.
Inspired by the benefits of nature and community, it integrates green spaces, ample natural light, and communal areas to foster well-being. Passive design strategies enhance energy efficiency, while sustainability, inclusivity, and flexibility are key considerations.
1
2 5.0000m
PLANS
4
3 6.0000m
5.0000m
4.6M X 3.6M CLASS 4 CHANGE AND TOILET (M) WARD 8.5M x 7M
A
CLASS 4 CHANGE AND TOILET (F)
TOILET 5M X 2.7M
4.6M X 3.6M
7.5000m
PARKING
4M X 2.1M TOILET (M)
TOILET (F)
B 3M X 1.6M
LIFT 2
3M X 1.6M
3M X 1.6M 3M X 1.6M
LOBBY
4M X 2.4M
HANDICAP TOILET 4M X 1.7M
6.5909m
LIFT 1
LIFT 1 LIFT 2
NURSE STATION 3.5 M 2.7
SITTING BELOW
TOILET 5M X 2.7M
C
5.9091m
ICU
O.P.D 4.9M X 3.5M
4.8m x 3m
STORES STORES
2.8m x 2.9m
STORES
8.6M X8.5M
O.P.D 4.9M X 3.5M
STORES
TOILET
O.P.D 4.9M X 3.5M
D
O.P.D
O.P.D 4.9M X 3.5M TOILET
SPECIAL ROOM
SPECIAL ROOM 8.5M X 4M
PATHOLOGY
7.5000m
8.8m x 7.3m
4.7M X 7.1
6.6m x 7.3m
DIAGNOSTIC
4M X 2.1M TOILET (M)
E
Entry
LIFT 1
3M X 1.6M
LIFT 2
3M X 1.6M
TOILET (F)
Exit
4M X 2.4M
SECOND FLOOR
LOBBY
HANDICAP TOILET 4M X 1.7M
BASEMENT FLOOR EMERGENCY 4.8M X 5.8M
RECEPTION 6M X 5.5M
OFFICE/COFFEE ROOM
STERILE ROOM/STORE
KITCHEN AND CANTEEN WARD
2.5M x 3.5M
13M X 4.77M
PRE/POST ROOM
8.5M x 7M
3.8M x 5.27M
5M X 2.7M TOILET 3M X 2M SCRUB AREA
PHARMACY + GROCERY 4M X 2.1M TOILET (M)
TOILET (F)
LIFT 1
3M X 1.6M
LIFT 2
3M X 1.6M
3.2M X 4.7M
1.8M x 2.4M 5.1M X 4.8M
LOBBY
1.8M x 2.4M
LIFT 1
3M X 1.6M
LIFT 2
3M X 1.6M
CHANGE (M) CHANGE (F)
O.T
4M X 2.4M
1.8M X 1.5M DIRTY ROOM
HANDICAP TOILET 4M X 1.7M 8.7M X 1.2M
NURSE STATION 3.5 M 2.7
TOILET 5M X 2.7M
5M X 5.8M
SITTING (DOUBLE HEIGHT)
Entry
DIRTY CORRIDOR
Exit
WARD 8.6M X8.5M
TOILET
GROUND FLOOR
LIBRARY 8.5M X 7.1M
4.7M X 7.1M
SPECIAL ROOM
TOILET 8.5M X 4M SPECIAL ROOM
4.7M X 7.1
CONFERENCE
FIRST FLOOR
THIRD FLOOR
SECTION +23.95
Machine room
MUMTY +19.15
THIRD FLOOR +16 M
SECOND FLOOR +12.4 M
SECOND FLOOR +8.8 M
LIFT SHAFT FIRST FLOOR +5.2 M
GROUND FLOOR +1.6 M
+0 M
BASEMENT -1.55 M
-3.05 M
MUMTY +19.15
THIRD FLOOR +16 M
SECOND FLOOR +12.4 M
SECOND FLOOR +8.8 M
FIRST FLOOR +5.2 M
GROUND FLOOR +1.6 M
02
MULTI STOREY HOUSING
Embarking on the dynamic landscape of modern living, the multi-housing project emerges as a vibrant tapestry of diverse residences within a unified community.
This innovative residential development weaves together the essence of contemporary lifestyles, offering a spectrum of housing options— from sleek apartments to stylish townhouses and condominiums.
PLANS
UTILITY
UTILITY
1.6M X 1.9M
POOJA ROOM 3M X 1.2M DOUBLE HEIGHT BALCONY
1.6M X 1.9M
POOJA ROOM 3M X 1.2M
KITCHEN
KITCHEN
DOUBLE HEIGHT BALCONY
3M X 2.4M
2.5M X 2.9M
3M X 2.4M
2.5M X 2.9M
3.7M X 3M LIVING AREA
DINING AREA 3.2M X 4.4M
3.7M X 3M LIVING AREA
DINING AREA 3.2M X 4.4M
4M X 3.6M 3M X 3.6M BED ROOM
4M X 3.6M
BED ROOM
TOILET 2.5M X 1.5M
3M X 3.6M BED ROOM
TOILET 2.5M X 1.5M
BED ROOM
TOILET 2.5M X 1.5M
TOILET 2.5M X 1.5M
LIFT 1 3M X 1.6M
TOILET 2.5M X 1.5M
LIFT 1 3M X 1.6M
TOILET 2.5M X 1.5M
LIFT 2 3M X 1.6M
UTILITY 1.2M X 2.4M
KITCHEN
4.5M X 5.8M
BED ROOM
4.5M X 5.8M
BED ROOM
4M X 3.7M
4M X 3.7M
POOJA ROOM
DINING AREA 3.2M X 4.8M
DOUBLE HEIGHT BALCONY
LIFT 2 3M X 1.6M
UTILITY 1.2M X 2.4M
KITCHEN
POOJA ROOM
DINING AREA
3M X 1.2M
3.2M X 4.8M
DOUBLE HEIGHT BALCONY
2.5M X 2.5M
3M X 1.2M
2.5M X 2.5M
LIVING AREA
LIVING AREA
4.5M X 5.8M
4.5M X 5.8M
BED ROOM 3M X 3.6M
BED ROOM 3M X 3.6M
4M X 3.6M
4M X 3.6M
BED ROOM
TOILET 2.5M X 1.5M
BED ROOM
TOILET 2.5M X 1.5M
TOILET 2.5M X 1.5M
LIVING AREA 5.3M X 2.8M DOUBLE HEIGHT BALCONY
KITCHEN 2.5M X 3.3M
3.1M X 2.5M
UTILITY 1.2M X 2.5M
TOILET 2.5M X 1.5M
LIVING AREA 5.3M X 2.8M DOUBLE HEIGHT BALCONY
KITCHEN 2.5M X 3.3M
3.1M X 2.5M
DINING AREA 4.8M X 3M
BED ROOM
POOJA ROOM
POOJA ROOM
1.6M X 2.4M
1.6M X 2.4M
BED ROOM
BED ROOM
BED ROOM
UTILITY 1.2M X 2.5M
ELEVATION
LVL -1.5
LVL 0
LVL 0 LVL -1.5
LVL -9.7
LVL -1.5
LVL -1.5
LVL 0
LVL -9.7
LVL -6.5 LVL -6.5
LVL -6.5
LVL -4.8 LVL -4.85
LVL -6.5
LVL -1.5
LVL 0
LVL 0 LVL -1.5
LVL -9.7
LVL -1.5
LVL -1.5
LVL 0
SECTION 16TH FLOOR +51.2 M
16TH FLOOR +51.2 M
15TH FLOOR +48.2 M
14TH FLOOR +43.2 M
13TH FLOOR +40.2 M
12TH FLOOR +37.2 M
11TH FLOOR +34.2 M
1OTH FLOOR +31.2 M
9TH FLOOR +28.2 M
8TH FLOOR +25.2 M
7TH FLOOR +22.2 M
6TH FLOOR +19.2 M
5TH FLOOR +16.2 M
4TH FLOOR +13.2M
3RD +10.2 M
2ND FLOOR +7.2M
1ST FLOOR + 4.2M
GROUND FLOOR +1.2 M LEVEL +-0
BASEMENT -2.4 M
03
03
TOURISM EXPERIENCE CENTER
Digital Museum would be an experience center of glorious history of Jaipur art and architecture. An Experience Center will be the place to introduce (potential) visitors personally to Jaipur journey from history to modern age of art and architecture.
. The experience center integrates green, healthy, intelligent, scientific and technological building concepts, aiming to create an urban interactive center, sharing ecology, modernity, and technology.
5.8M X 6M OPEN ART INSTALLATION
8.2M X 9.8M
377 SQ M
211 SQ M
CULTURAL DISPLAY AY
PL
L
RA
TU
CU L 7M X 9.2M
M
8.2
X
DIS 7M
M
CULTURAL DISPLAY
319 SQ M
CULTURAL DISPLAY TIMELINE 36M X 9.8M
RECEPTION
LVL +16.8 Data Collection / Conference
Cafe/Restaurant LVL +12.75 Admin
Control room
LVL +8.7
Auditorium Back stage
Conservation Area LVL +4.65
Reception / Welcome Lobby
Exhibition
Storage LVL +0.6 LVL +0
SECTION AA'
M
36
X
9.8
04
EDUCATIONAL INSTITUTION
AIM OF THE PROJECT : To design International Baccalaureate (IB) School on site area of 8 acres.
OBJECTIVES: Create an inspiring learning environment. Utilize natural elements for aesthetics. Foster community and connectivity. Integrate sustainability. Ensure compliance with local regulations.
SITE
PLANS
TECHNICAL WASH ROOMS
WASH ROOMS 5'5" x 4'10"
5'5" x 3'9"
5'5" x 3'9"
5'5" x 3'9"
5'5" x 3'9"
5'5" x 3'9"
5'5" x 4'10"
5'5" x 3'9"
5'5" x 3'9"
LVL +0
5'5" x 3'9"
CHANGE ROOMS
5'5" x 3'9"
5'5" x 3'9"
5'5" x 4'10"
5'5" x 3'9"
CHANGE ROOMS
5'5" x 4'10"
5'5" x 3'9"
Kitchen
LVL +0
Counter
LVL +1
CERAMIC TILES (1' X 1')
CERAMIC TILES (1' X 1')
CERAMIC TILES (1' X 1')
CERAMIC TILES (1' X 1')
LVL +0
CERAMIC TILES (1' X 1')
CERAMIC TILES (1' X 1')
CERAMIC TILES (1' X 1')
MARBLE (2' X 2')
CERAMIC TILES (1' X 1')
CERAMIC TILES (1' X 1')
CERAMIC TILES (1' X 1')
1 7'-14"
16'
8'
15'-1"
8'-4"
3'
MOSAIC TILES
LVL +0
WOODEN FLOORING LVL +1
CERAMIC TILES (1' X 1') LVL +0
23'-4"
CERAMIC TILES (1' X 1')
CERAMIC TILES (1' X 1')
LVL -4 MOSAIC TILES
LVL -2
3'
CERAMIC TILES (1' X 1') CERAMIC TILES (1' X 1')
CERAMIC TILES (1' X 1')
18'-4"
CERAMIC TILES (1' X 1')
1 20'-22"
1 3'-14"
9'-8"
11'
1 10'-64"
DRAWINGS
P1
A
A
C
B
E
D
F
C
B
G
E
D
F
G
P12
H
H 15.81
22.45
5.50 0.60
DETAIL C
0.60
0.30
1 DETAIL C
TOILET 1.5 x 1.8
TOILET 1.5 x 1.8
HALL 3.30 x 5.10
0.45 0.34
4.19 0.60
0.30
4.19 0.30 0.60
0.60
1.90 0.35 0.17
0.30
0.34 0.17
C1
0.45 0.11
C4
4.19 0.30 0.60
0.34 0.17
C1
23.74
C2
C2 P3
P11 16.79
16.44
R1
R2
5.50
PANTRY 1.6 X 1.7
0.11
2
0.11
0.45
0.45 0.22
0.60 0.30
0.45
C2
C3
0.11 0.23
0.11 0.23
0.45 0.22
0.60 0.30
C2
0.45 0.22
C3
0.60 0.30
0.45 0.22
C3
0.11 0.23
0.60 0.30
0.45 0.11
0.11 0.23
0.45 0.11
C3
16.60
12.15
C2 P4
C2 11.10
4.19
R3 R14
4.19
PANTRY 1.7 X 1.6
22.71
0.30
0.60
HALL 5.10 x 3.30
TOILET 1.8 x 1.5
16.03
26.12
0.30
0.60
5.50
2
TOILET 1.8 x 1.5
5.50
0.45 0.11
C4
5.50
HALL 3.30 x 5.10
PANTRY 1.6 X 1.7
HALL 5.10 x 3.30
4.19
C2
1.90 0.35 0.17
C2
0.45 0.34
0.30
1 5.50
P2
P13
PANTRY 1.7 X 1.6
3
C4
0.17
0.45
3
0.32
0.32
1.90
PANTRY 1.7 X 1.6
PANTRY 1.7 X 1.6
TOILET 1.8 x 1.5
0.17 C5
0.17
1.90
0.35 0.17
0.35 0.17
TOILET 1.8 x 1.5
0.60 0.30 C4
C4
4
C1
C1
0.45 0.32 0.12 0.23 C3
0.30 0.60
0.45
0.32
0.32
0.17
0.34
0.34 0.60 0.30
C1
0.17 0.35
0.30
0.45 0.32 0.11 0.23 C3
19.44
0.60 0.30 C4
C5
0.60 0.30
4
R15
0.23 0.11
0.23 0.12 0.45 C3
0.60 0.30
0.23 0.34 0.11
0.23 0.12 0.45 C3
0.60 0.30
0.34
0.45 0.32 0.12 0.23 C3
0.60
C1
0.17 0.35
0.45 0.32 0.11 0.23 C3
18.42
HALL 5.10 x 3.30
4.08
HALL 5.10 x 3.30
4.08 0.60 0.30
0.23 ELECTRICAL SHAFT
5
ELECTRICAL SHAFT
0.45
0.60 0.11 C60.23
C2
0.450.01 0.23
5
0.60 0.30
0.60 0.30
0.23
UP
UP
0.60 0.30
0.60 0.11 C6
C6
0.23
C2
0.01
R13
C6
0.23
11.58
4.94
4.94
DN 0.22
DN
ELECTRICAL SHAFT
6
HALL 5.10 X 3.30
PANTRY 1.7 X 1.6
0.00
0.23
0.45
0.22
0.22
0.60
0.45
P10
C2
0.00
0.45
0.60
0.22
C5 0.45
0.59
TOILET 1.8 x 1.5
0.23 0.11
4.08
C5
0.32
0.92
7
0.45
0.45 C5 0.23
0.34
HALL 4.40 X 3.30
0.23
0.32
0.60 0.43
8 C4
0.34 0.17
0.23 0.11
C5
0.60 0.30
C4
0.35
0.23
0.12
C1
0.45
0.60 0.30
0.35 0.60 0.17
0.43 0.59
0.92
0.60
C2
1.32
0.23
0.11
0.23
0.45 0.22
0.45 0.45 C5 0.23
0.45
C5
0.34
0.45 0.11 0.22
4.19
C5
C2
0.11
0.30 0.60
0.60
9
5.50
HALL 3.30 x 5.10
0.34
0.17
0.60 0.30
1.32
C2
0.23 0.11
0.35 0.17
0.60 0.30
C5
C2
16.43
R4
R8
R9
P5 R5
0.11
0.23
0.11
0.23
0.45 0.22
0.45
C5
0.45 0.11 0.22
C5
0.45
C2
0.11
0.30 0.60
PANTRY 1.6 X 1.7
16.79
R6
R7 16.44
P9
0.60
10
TOILET 1.5 x 1.8
R10
C4
14.92
0.45
PANTRY 1.6 X 1.7
0.23
0.32
C4
9
0.23 0.11
C5
0.32
0.60 0.43
8
0.11
0.22
C5 0.45
C2
1.90
4.19
TOILET 1.5 x 1.8
C2
0.23
0.12
C1 0.43
7
PANTRY 1.7 X 1.6
TOILET 1.5 x 1.8
0.45 0.22
0.23
R11
0.35
TOILET 1.8 x 1.5
PANTRY 1.7 X 1.6
HALL 4.40 X 3.30
R12
0.60 0.30
0.60 0.11 C6
C2
1.90
TOILET 1.8 x 1.5
10.75
4.08
HALL 5.10 x 3.30
PANTRY 1.7 X 1.6
0.60 0.11 C6
C2
6
HALL 5.10 X 3.30 TOILET 1.8 x 1.5
0.60
0.45
ELECTRICAL SHAFT
HALL 5.10 x 3.30
0.60 0.30
0.45 0.34
0.60
C2
HALL 3.30 x 5.10
TOILET 1.5 x 1.8
0.30
0.30
0.35 0.17
C1
0.34 0.30 0.17 0.60
0.30 0.60 0.11 C2 0.45
5.50 20.72
20.78
22.61
22.68
0.60
10
0.30
0.45 0.34
C2
0.60
0.30
0.35 0.17
C1
0.34 0.30 0.17 0.60
0.30 0.60 20.29
0.11 C2 0.45
20.55
11.72
P6
P8
P7
BEAM 2 7.55 X 0.75 M
112.70
Electrical Room
5.10
Male
H.V Shaft
BEAM 2 7.55 X 0.75 M
SHUTTERING LVL +3.7 M
BEAM 2 7.55 X 0.75 M
SHUTTERING LVL +3.7 M
BEAM 2 7.55 X 0.75 M
5.00
8.15
SHUTTERING LVL +3.7M
5.00
BEAM 2 7.55 X 0.75 M
SHUTTERING LVL +3.7M
5.00
SHUTTERING LVL +3.7M
BEAM 2 7.55 X 0.75 M
5.00
SHUTTERING LVL +3.7 M
BEAM 2 7.55 X 0.75 M
8.15
8.75
SHUTTERING LVL +3.7M
5.00
BEAM 2 7.55 X 0.75 M
5.00
5.00
5.00
5.00
8.79
BEAM 2 7.55 X 0.75 M
8.15
SHUTTERING LVL +3.7M
BEAM 1 5M X 0.6 M
BEAM 1 5M X 0.6 M
BEAM 1 5M X 0.6 M
BEAM 1 5M X 0.6 M
BEAM 1 (5M X 0.6 M)
BEAM 1 5M X 0.6 M
BEAM 2 7.55 X 0.75 M
5.00
BEAM 2 7.55 X 0.75 M
8.15
BEAM 1 5M X 0.6 M
SHUTTERING LVL +3.7M
BEAM 2 7.55 X 0.75 M
BEAM 1 5M X 0.6 M
5.00
5.00
8.75
5.00
BEAM 1 5M X 0.6 M
SHUTTERING LVL +3.7 M
SHUTTERING LVL +3.7 M
BEAM 2 7.55 X 0.75 M
7.55
0.00
8.78
SHUTTERING LVL +3.7 M
BEAM 1 5M X 0.6 M
5.00
BEAM 2 7.55 X 0.75 M
SHUTTERING LVL +3.7 M
BEAM 2 (7.55 X 0.75 M)
8.75
5.00
BEAM 2 7.55 X 0.75 M
BEAM 2 7.55 X 0.75 M
8.15
8.15
SHUTTERING LVL +3.7M
BEAM 1 5M X 0.6 M
5.00
BEAM 2 7.55 X 0.75 M
5.00
5.00
BEAM 1 5M X 0.6 M
5.00
BEAM 2 7.55 X 0.75 M
SHUTTERING LVL +3.7 M
8.15
SHUTTERING LVL +3.7M
BEAM 1 5M X 0.6 M
5.00
8.15
SHUTTERING LVL +3.7M
5.00
BEAM 1 5M X 0.6 M
SHUTTERING LVL +3.7M
BEAM 2 (7.55 X 0.75 M)
8.75
7.55
BEAM 2 7.55 X 0.75 M
BEAM 2 7.55 X 0.75 M
8.15
SHUTTERING LVL +3.7M
BEAM 2 7.55 X 0.75 M
BEAM 2 7.55 X 0.75 M
BEAM 1 5M X 0.6 M
5.00
5.00
BEAM 1 5M X 0.6 M
SHUTTERING LVL +3.7M
BEAM 1 (5M X 0.6 M)
7.55
BEAM 1 (5M X 0.6 M)
BEAM 1 (5M X 0.6 M)
BEAM 1 (5M X 0.6 M)
BEAM 2 7.55 X 0.75 M
8.75
BEAM 1 (5M X 0.6 M)
BEAM 2 7.55 X 0.75 M
8.15
7.55
7.55
7.55
BEAM 2 7.55 X 0.75 M
8.75
SHUTTERING LVL +3.7 M
BEAM 1 5M X 0.6 M
5.00
BEAM 1 (5M X 0.6 M)
BEAM 1 (5M X 0.6 M)
BEAM 2( 7.55 X 0.75 M)
SHUTTERING LVL +3.7M
7.55
BEAM 2 7.55 X 0.75 M
BEAM 1 5M X 0.6 M
SHUTTERING LVL +3.7 M
7.55
SHUTTERING LVL +3.7 M
8.15
8.15
BEAM 2 7.55 X 0.75 M
LVL -2.89 M
5.00
BEAM 1 5M X 0.6 M
5.00
BEAM 2 (7.55 X 0.75 M)
7.55
BEAM 2 (7.55 X 0.75 M)
8.75
SHUTTERING LVL +3.7 M
BEAM 2 (7.55 X 0.75 M)
BEAM 2( 7.55 X 0.75 M)
8.75
5.00
BEAM 1 (5M X 0.6 M)
5.00
BEAM 2 (7.55 X 0.75 M)
8.15
SHUTTERING LVL +3.7M
7.55
BEAM 2 7.55 X 0.75 M
8.15
SHUTTERING LVL +3.7M
SHUTTERING LVL +3.7M
BEAM 1 5M X 0.6 M
SHUTTERING LVL +3.7 M
BEAM 2 (7.55 X 0.75 M)
BEAM 1 5M X 0.6 M
5.00
8.75
5.00
BEAM 1 5M X 0.6 M
5.00
SHUTTERING LVL +3.7M
BEAM 1 (5M X 0.6 M)
BEAM 1 (5M X 0.6 M)
BEAM 2 7.55 X 0.75 M
8.15
7.55
BEAM 2 (7.55 X 0.75 M)
8.15
BEAM 1 5M X 0.6 M
0.00
BEAM 2 (7.55 X 0.75 M)
Video Conference
SHUTTERING LVL +3.7 M
BEAM 2 7.55 X 0.75 M
BEAM 2 7.55 X 0.75 M
LVL -2.89 M
LVL -2.89 M
5.00
5.00
5.00
5.00
5.00
5.00
Medical Room
1.20
Plumbing & Ventilation Shaft
Video Conference
Conference 2
5.00
8.15
SHUTTERING LVL +3.7M
5.00
9.55
Break Out Zone
6.95
SHUTTERING LVL +3.7M
BEAM 2 (7.55 X 0.75 M)
20.60
8.75
SHUTTERING LVL +3.7 M
BEAM 1 5M X 0.6 M
Server Room
5.00
BEAM 2 (7.55 X 0.75 M)
8.15
7.55
BEAM 2 (7.55 X 0.75 M)
BEAM 2 7.55 X 0.75 M
8.15
SHUTTERING LVL +3.7M
BEAM 1 5M X 0.6 M
5.00
Hall
5.00
3.80
BEAM (1 5M X 0.6 M)
BEAM 2 (7.55 X 0.75 M)
Conference 1 Break Out Zone
BEAM 1 (5M X 0.6 M)
Refuge for speciallyabled people
5.00
BEAM 1 5M X 0.6 M
UP
7.55
7.55
BEAM 2 7.55 X 0.75 M
8.15
SHUTTERING LVL +3.7M
BEAM 1 (5M X 0.6 M)
Lift for speciallyabled people
Fire Staircase
5.00
BEAM 1 (5M X 0.6 M)
UP
L.V Shaft
BEAM 1 (5M X 0.6 M)
Fire Staircase
BMS Room
Fire Lift
BEAM 1 (5M X 0.6 M)
Fire Lift
BEAM 1 5M X 0.6 M
7.55
BEAM 2 (7.55 X 0.75 M)
L.V Shaft
UP
UP
0.90
0.90
Male
Plumbing & Ventilation Shaft
13.70
6.77
85.00
3.80
5.00
5.00
5.00
LVL -2.89 M
LVL -2.89 M
UP
UP
UP
5.00
0.60
0.60 1.20
20.60
UP
0.60
Lift for speciallyabled people
Fire Staircase
UP
Lift for speciallyabled people
Fire Lift
0.60
1.20
Fire Lift
Fire Staircase
UP UP
0.60 0.75 UP
UP
0.45
0.45
0.45
SHUTTERING LVL +3.7M
5.00
SHUTTERING LVL +3.7M
SHUTTERING LVL +3.7M
5.00
8.15
5.02
SHUTTERING LVL +3.7M
BEAM 2 7.55 X 0.75 M
BEAM 2 7.55 X 0.75 M
7.55
7.55
SHUTTERING LVL +3.7 M
5.00
BEAM 2 7.55 X 0.75 M
BEAM 2 7.55 X 0.75 M
8.15
8.15
SHUTTERING LVL +3.7 M
BEAM 2 7.55 X 0.75 M 7.55
5.00
5.00
7.55
SHUTTERING LVL +3.7M
BEAM 1 5M X 0.6 M
BEAM 2 7.55 X 0.75 M
BEAM 2 7.55 X 0.75 M
BEAM 2 7.55 X 0.75 M
BEAM 2 7.55 X 0.75 M
BEAM 1 5M X 0.6 M
5.00
5.00
BEAM 2 7.55 X 0.75 M
8.15
5.00
BEAM 2 7.55 X 0.75 M
SHUTTERING LVL +3.7M 5.00
BEAM 2 7.55 X 0.75 M
SHUTTERING LVL +3.7M
BEAM 2 7.55 X 0.75 M
BEAM 2 7.55 X 0.75 M
8.75
5.00
SHUTTERING LVL +3.7M
5.00
BEAM 1 5M X 0.6 M
8.15
BEAM 2 7.55 X 0.75 M
BEAM 1 5M X 0.6 M
SHUTTERING LVL +3.7M
BEAM 2 7.55 X 0.75 M
BEAM 1 5M X 0.6 M
5.00
8.75
BEAM 2 7.55 X 0.75 M
EXCAVATION LVL - 3.00 M
SHUTTERING LVL +3.7 M
BEAM 2 7.55 X 0.75 M
BEAM 2 7.55 X 0.75 M
5.00
BEAM 2 7.55 X 0.75 M
8.15
SHUTTERING LVL +3.7M
BEAM 2 7.55 X 0.75 M 7.55
5.00
BEAM 1 5M X 0.6 M
5.00
5.00
8.15
8.15
BEAM 1 5M X 0.6 M
Service Lift
0.75
SHUTTERING LVL +3.7M
BEAM 2 7.55 X 0.75 M
8.15
BEAM 2 7.55 X 0.75 M
BEAM 2 7.55 X 0.75 M
8.15
BEAM 1 5M X 0.6 M
1.20
5.00
BEAM 2 7.55 X 0.75 M
BEAM 1 5M X 0.6 M
0.90
SHUTTERING LVL +3.7M
8.75
BEAM 2 7.55 X 0.75 M
BEAM 1 5M X 0.6 M
Female
BEAM 1 5M X 0.6 M
HVAC Room
BEAM 1 5M X 0.6 M
HVAC Shaft
Locker Room
BEAM 2 7.55 X 0.75 M
8.15
BEAM 1 5M X 0.6 M
5.00
UP Plumbing & Ventilation Shaft
BEAM 2 7.55 X 0.75 M
BEAM 1 5M X 0.6 M
8.15
BEAM 1 5M X 0.6 M
BEAM 2 7.55 X 0.75 M 9.55
BEAM 1 5M X 0.6 M
55.10
BEAM 1 5M X 0.6 M
13.90
BEAM 1 5M X 0.6 M
13.90
BEAM 1 5M X 0.6 M
13.90
BEAM 1 5M X 0.6 M
13.90
BEAM 1 5M X 0.6 M
Double Height Entrance Lobby
Plumbing & Ventilation Shaft
UP
Janitor's Room
20.60
5.00
BEAM 2 7.55 X 0.75 M 7.55
BEAM 2 7.55 X 0.75 M 7.55
BEAM 2 7.55 X 0.75 M 7.55
BEAM 2 7.55 X 0.75 M 7.55
BEAM 2 7.55 X 0.75 M 7.55
BEAM 2 7.55 X 0.75 M 7.55
BEAM 2 7.55 X 0.75 M 7.55
sharmajayant730@gmail.com 8894861891
JAYANT SHARMA