Supporting the Development Sector

Page 1

SUPPORTING THE DEVELOPMENT SECTOR HELPING YOU PLAN DESIGN AND DELIVER HIGH QUALITY AND BEST VALUE DEVELOPMENTS


HELPING YOU PLAN, DESIGN AND DELIVER HIGH QUALITY AND BEST VALUE DEVELOPMENTS

We understand that throughout your development project you need the right specialist service at the right time to ensure any potential adverse effects are addressed early on.

We have extensive experience across both the private and public sectors, offering innovative and pragmatic advice, helping you find practical solutions to complex projects.

This resource has been developed for you bringing together the services we can help you with from project inception to project delivery and implementation.

The projects throughout this guide demonstrate how we can help you and the benefits we can bring to your project. If you would like to discuss how we can help you or any of the projects featured please contact: Steve Maslen on 01274 714 269.

We are engineers, environmental consultants, scientists and designers, managing weather and environmental risks and opportunities for our clients. We are committed to improving the natural and built environment and creating sustainable places to live and work.

2 Supporting the development sector | JBA Consulting

To develop sustainably is to consider and manage the social, economic and environmental impacts of our built environment. When we do this well, we create quality communities which support our natural environment and are built to last.


CONTENTS CONTENTS Introduction

02

Structural Engineering, Buildings and Structures Flood Risk Management and Drainage Design

10

Groundwater and Water Supplies

20

12

Environmental Impact Assessment and Environmental Statements

22

Environmental Performance and Environmental Management

24

04

SuDS

14

Arboriculture

06

Landscape Design and Green Infrastructure Planning

16

Contamination of Soils and Groundwater

08

Ecology

18

Land and Site Surveys

JBA Consulting | Supporting the development sector 3


LAND AND SITE SURVEYS

WHAT YOU NEED You may require a land survey at any stage of your project to help you. HENDRE-DDU SCOUR AND GEOMORPHOLOGY ASSESSMENT

PROJECT 1 | HENDRE-DDU SCOUR AND

WHAT WE DID

GEOMORPHOLOGY ASSESSMENT

• River channel cross section survey

LOCATION: Conwy CLIENT: Conwy County Borough Council

• Production of survey drawings and supply of ISIS model data.

We carried out a channel survey along 3km of the river to inform the design of a replacement 7.2m span bridge. The existing bridge foundations had been subject to several phases of scour as the upstream watercourse meanders and flows against the bridge foundations.

4 Supporting the development sector | JBA Consulting

BENEFITS TO THE CLIENT • Provided a hydraulic model to give a better understanding of scour risk • Allowed them to take into account all of the impacts at the design stage of the project.


NOCTON AND POTTERHANWORTH FEN CATCHMENT

HOW WE CAN SUPPORT YOU Our in depth understanding of the natural environment allows us to provide a Land Survey service with a difference. We understand that every job is unique and therefore requires the skill of our highly trained surveyors and the right equipment. We utilise the most modern Land Survey technology to provide cost effective and safe solutions for all of our client’s needs. Our surveyors can provide support at all stages of a development project including: • Topographical surveys • Setting Out • Level position surveys of assets • Volume surveys and calculations • Bathymetric surveys of inland waters • Post flood event surveys. Our team also have specialist skills in Property Level Protection surveys associated with protecting individual properties from flooding.

PROJECT 2 |

WHAT WE DID

NOCTON AND POTTERHANWORTH FEN CATCHMENT STUDY

• Topographical survey of drains within the catchment

LOCATION: Lincolnshire CLIENT: Witham First District Internal Drainage Board

• HEC–RAS model data.

We carried out a channel survey of the catchment to determine the standard of protection within the catchment to provide appropriate level of flood protection.

BENEFITS TO THE CLIENT

• Production of survey drawings

• Clear communication with relevant stakeholders throughout the entire duration of the works ensured efficient project delivery • Helped the production of the hydraulic model through supply of the model data.

JBA Consulting | Supporting the development sector 5


ARBORICULTURE

WHAT YOU NEED If your project involves a site where trees could affect the development you are likely to require specific tree and construction related skills.

HIGH PARK FOOT SOLAR FARM

PROJECT 1 | HIGH PARK FOOT SOLAR FARM LOCATION: Carlisle, Cumbria CLIENT: Elgin Energy EsCo Ltd As part of a planning application for the construction of a solar farm, it was necessary to understand how this might potentially affect the trees and woodland adjacent to the site.

WHAT WE DID • Undertook an Arboricultural Impact Assessment (AIA) • Undertook a Preliminary Ecological Assessment (PEA), in parallel with the AIA 6 Supporting the development sector | JBA Consulting

• Made recommendations on how trees should be managed and protected.

BENEFITS TO THE CLIENT • • •

Reassurance that any tree related issues had been thoroughly examined and any potential effects would be mitigated Elgin Energy could present to the local planning Authority a clear plan to conserve the trees onsite Ensuring the development would have no adverse effects on surrounding woodland.


BETTESHANGAR COUNTRY PARK

HOW WE CAN SUPPORT YOU With our skills in arboriculture, design and engineering we can help you find the most appropriate solution to enhance your development. We can help you with: • Tree condition and value surveys to BS5337 • Constraints plans • Tree protection plans • Hazard and safety assessments • Tree preservation order advice • Adaptation engineering design • Works specifications •

Contract management.

PROJECT 2 |

BENEFITS TO THE CLIENT

BETTESHANGAR COUNTRY PARK

• •

LOCATION: North Kent CLIENT: Hadlow College

Integrated approach enabled a first phase development to be progressed quickly Providing further support for the planning application for a Green Energy Visitor Centre which was approved in 2015.

WHAT WE DID • Undertook an arboricultural survey to BS5837 • Identified priority protection, management and enhancement operations • Integrated work with other disciplines in the masterplan.

JBA Consulting | Supporting the development sector 7


CONTAMINATION OF SOILS AND GROUNDWATER

PROJECT 1 | CRINDAU PILL FLOOD ALLEVIATION SCHEME LOCATION: Newport, Wales CLIENT: Natural Resources Wales (NRW) NRW were constructing a new flood defence scheme on Crindau Pill (a tributary of the River Usk) comprising approximately 2.5km of new flood defences. The planning application required an understanding of the presence of historical contamination and any potential effects associated with this.

WHAT WE DID • Reviewed existing contamination conditions 8 Supporting the development sector | JBA Consulting

• Developed a Conceptual Site Model identifying potential pollutant linkages • Completed detailed geotechnical and environmental site investigations • Made recommendations as to the mitigation of the potential effects linked to contamination.

BENEFITS TO THE CLIENT • Able to apply for planning permission knowing that the potential effects relating to historic land contamination would be very limited • Advanced their discussions with the Local Planning Authority in relation to discharge of this planning condition.


HOW WE CAN SUPPORT YOU Our environmental specialists can help take projects from initial concept, where desk studies and feasibility are considered, through to design and implementation which might require particular remediation and management strategies and regulatory approvals. Our experienced team of hydrogeologists, environmental consultants and engineers can help you with: • Site investigations • Phase 1 and phase 2 geo environmental and land contamination assessment • Water quality assessment • Impact assessment •

Remediation strategies

• Environmental impact assessment.

PROJECT 2 |

WHAT WE DID

LOCATION: Fontwell, West Sussex CLIENT: Private Housing Developer

• Developed a Conceptual Site Model using background data to aid understanding of the groundwater system beneath the site

Part of the site for a planned residential and light industrial development was located within a sensitive groundwater source protection zone, therefore one of the planning conditions related to the risk of underlying groundwater resources. The Environment Agency required a hydrogeological risk assessment to assess the impact of the development. we particularly highlighted drainage proposals which incorporated SuDS.

• Completed a risk assessment for the underlying groundwater system • Made recommendations in relation to the design and location of SuDS systems to protect groundwater resources.

BENEFITS TO THE CLIENT Peace of mind that their proposals would not have a negative impact upon underlying groundwater. JBA Consulting | Supporting the development sector 9


STRUCTURAL ENGINEERING, BUILDINGS & STRUCTURES

WHAT YOU NEED We can provide early guidance on the practical and cost effective solutions for your particular project, and advise on any additional investigations required to comply with legislation.

SOCIAL AND PRIVATE HOUSING DEVELOPMENT

PROJECT 1 | SOCIAL AND PRIVATE HOUSING DEVELOPMENT LOCATION: Nationwide CLIENT: Numerous Housing Associations The design of foundation solutions, building superstructures, retaining walls, boundary walls, roads, hardstandings and drainage.

• Assessment, checking and coordination of contractor designed elements • Design of drainage and external works • Provision of design drawings and calculations for approval purposes.

BENEFITS TO THE CLIENT

WHAT WE DID

• Full structural design and detailing package coordinated with other disciplines and approvals

• Made recommendations on the most appropriate and cost effective foundation solutions

• Provided the most practical and cost effective solutions.

• Assessed site levels and prepared designs, to avoid using retaining walls and therefore minimise costs 10 Supporting the development sector | JBA Consulting


REFURBISHMENT OF GRADE II LISTED BUILDING

HOW WE CAN SUPPORT YOU We can help you with the full range of structural and civil engineering services including: • Structural design and analysis of buildings and structures • Structural detailing • Geotechnical assessment • Foundation design and detailing • Structural inspections and reports • Appraisal of existing buildings and structures • Structural alterations, refurbishment and repairs, including listed and historic buildings and structures • Design and detailing of bridges, culverts, underground tanks, retaining walls, boundary walls, highways, hardstandings, drainage and other external works elements.

PROJECT 2 |

• Temporary propping was installed to maintain stability

REFURBISHMENT OF GRADE II LISTED BUILDING

• Structural repairs were guided by archaeological research and appraisal which identified timbers and parts of the building fabric of particular value

LOCATION: 41 - 42 Kirkgate, Ripon CLIENT: ATC Properties Ltd The project involved the repair of a Grade II Listed three storey building. Structurally the building was fragile, with failed internal beams and sagging floors.

WHAT WE DID • Provided a structural report for a listed building application for refurbishment • Structural design services for repairs

• Introduced new steelwork to support sagging upper floors and roof.

BENEFITS TO THE CLIENT • •

Derelict building, unoccupied and in an unsafe condition, brought into use Restoration provided two shops at ground floor, a cottage in the rear, and two flats which the owner could rent out. JBA Consulting | Supporting the development sector 11


FLOOD RISK MANAGEMENT AND DRAINAGE DESIGN

WHAT YOU NEED In England the National Planning Policy Framework (NPPF) and Planning Practice Guidance (PPG) are the basis for development management decisions. In Wales, the Planning Policy Wales TAN 15, and in Scotland the Scottish Planning Policy (Sections 196-211) are the relevant party documents.

TESCO BRIXHAM

PROJECT 1 | TESCO BRIXHAM LOCATION: Brixham, Torbay CLIENT: Albourne Developments (RDP) Ltd The site was located in Flood Zone 3b and was on land formerly owned by the council where strong public objections had arisen. Flooding from surface water, fluvial and tidal sources, needed to be addressed.

WHAT WE DID • 1D-2D hydraulic modelling (rainfall runoff, fluvial and tidal simulations) using ICM 12 Supporting the development sector | JBA Consulting

• Option scoping/testing (preparation of flood mitigation option capable of reducing flood risk to the site and to third party land) • Consultation with the Environment Agency and Torbay Council and validation of ‘best’ flood mitigation option • Flood risk assessment to National Planning Policy Framework.

BENEFITS TO THE CLIENT • Flood risk benefit to third party land removed public objection (on flood risk grounds) • Withdrawal of Environment Agency’s Objection • Planning Application approved in March 2013 of the site.


FRA/DETAILED DRAINAGE DESIGN FOR LAND WEST OF PANFIELD LANE

HOW WE CAN SUPPORT YOU We offer a full range of flood risk management and drainage services including: • Flood risk assessments (FRA) • Flood consequence assessments (Wales) • Drainage design and impact assessments • Sustainable urban drainage systems (SuDS) • Site development planning • Flood resilient design • Flood plans and contingency planing • Flood warning services • Expert witness. Our work is underpinned by our Hydraulic Modelling, Breach and Overtopping Modelling and our engineering skills. Our work for clients also benefits from our strong relationship with the Environment Agency, SEPA, NRW and Lead Local Flood Authorities.

PROJECT 2 |

WHAT WE DID

FRA AND DETAILED DRAINAGE DESIGN FOR

• A FRA and surface and foul water drainage strategies were proposed to support the planning application.

LAND WEST OF PANFIELD LANE LOCATION: Braintree CLIENT: Mersea Homes Ltd and Hills Residential Construction Ltd This mixed use development located on a large strategic site (44ha) required all sources of flooding to be considered.

BENEFITS TO THE CLIENT • •

Outline detailed designs for surface and level water drainage Early advice on changes in industry legislation, including SuDS standards and their implications on the development of the site (e.g. land take).

JBA Consulting | Supporting the development sector 13


SUDS

WHAT YOU NEED Sustainable Drainage Systems managing surface water runoff from roofs, roads and other hard surfaces is a requirement for all new developments. Planning applications are expected to include a Surface Water Drainage Strategy.

PERRY COMMON REGENERATION SCHEME – PHASE 5, DOVEDALE ROAD

PROJECT 1 | PERRY COMMON REGENERATION SCHEME – PHASE 5, DOVEDALE ROAD LOCATION: Perry Common, Birmingham CLIENT: Birmingham Metropolitan Housing Trust

• • • • •

Conceptual design Stakeholder liaison Outline design and hydraulic modelling Planning submission Detailed design to construction.

The Housing Trust wanted to develop 100 new homes on previously developed land. A sustainable drainage approach would minimise flood risk and water quality problems, whilst integrating into a wider landscape GI plan.

BENEFITS TO THE CLIENT

WHAT WE DID

• Significant reductions in local flood risk maintenance.

• Appraisal of SuDS options 14 Supporting the development sector | JBA Consulting

• Early establishment of the preferred option • Reduced costs - Birmingham City Council’s parks department adopted the SuDS


MARCHFIELD RESIDENTIAL DEVELOPMENT

HOW WE CAN SUPPORT YOU Our SuDS specialists, with over 10 years’ experience, can help you design high quality cost effective SuDS that are acceptable to Planners, Regulators and other stakeholders. We write much of the Guidance used by many Local Authorities and use our in-depth knowledge of local, regional and national SuDS drainage requirements to efficiently deliver projects. Our team of Engineers, Landscape Architects and Hydrologists can support the development of schemes in any sector and at any scale, from pre-planning advice and appraisals through to the detailed development and design of a scheme. We also support its implementation as part of a comprehensive Green Infrastructure plan. Our range of services include: • Feasibility studies • Green infrastructures and open space planning • Technical design • Construction design and implementation.

PROJECT 2 | MARCHFIELD RESIDENTIAL DEVELOPMENT LOCATION: Dumfries, Scotland CLIENT: Story Homes The site extends to over 1km of greenfield land and is able to accommodate around 1000 new homes and 14ha of commercial development. 2

• Developed an innovative solution that minimised excavation and eliminated the need for hard engineering • Detailed design • Extensive consultation with stakeholders and regulators.

BENEFITS TO THE CLIENT

WHAT WE DID

• Land not suitable for development used for SuDS and amenity use

• Assessed the current hydrological and environmental processes across the site

• Design saved the developer £30,000

• Developed a conceptual SuDS design

Project was chosen by the Environment Agency/DEFRA as an example of best practice. JBA Consulting | Supporting the development sector 15


LANDSCAPE DESIGN AND GREEN INFRASTRUCTURE PLANNING

WHAT YOU NEED We can support your proposals from the initial concept stages through to implementation. Our team can provide advice and guidance in all aspects of landscape planning, design and assessment.

BRADFORD UNIVERSITY PEACE GARDEN

PROJECT 1 | LOCATION: Bradford University Peace Garden CLIENT: Bradford University The project involved the design and construction of a Peace Garden for Bradford University’s city centre campus. The Peace Garden project was to form one of the most visible developments in Phase 1 of the University’s ecoversity proposals. Embedding the principle of sustainable development and place making throughout the campus.

WHAT WE DID • Designed an inspiring, uplifting, innovative, space, sensitive to many different users and stakeholders 16 Supporting the development sector | JBA Consulting

• Construct on ecologically sound area for quiet contemplation.

BENEFITS TO THE CLIENT • • •

The city and the university staff/students now have a new public realm garden. Design allowed for the retention of a number of existing mature trees and the re-use of existing railings and paving materials. Chosen design incorporates 7 water jets & fruit trees representing the 7 continents.


HOW WE CAN SUPPORT YOU We can offer a full range of landscape design and assessment services including: • Landscape design • Landscape planning • Masterplanning • Landscape and visual impact appraisals and assessment • Landscape management plans • Landscape character assessments • Planting plans and specifications • Green infrastructure studies • Photomontages • Graphic design, sketches and other visualisations • Contract management • Stakeholder engagement and public consultation.

LOCATION: Stonehaven CLIENT: Aberdeenshire Council

• •

To ensure that designs for a flood alleviation scheme responded to the historic and amenity value of the town and riverside spaces. Helping Aberdeenshire Council with public engagement and communication of the scheme.

BENEFITS TO THE CLIENT

PROJECT 2 |

WHAT WE DID • Worked closely with other disciplines to ensure that we considered the sensitive and well-used surroundings, through assessment and design development

• •

Provided sketch concepts that allowed the public to easily understand the proposals Undertook detailed design of ‘pocket parks’ overlooking the river.

All constraints raised at the planning stage had been considered Raised aspirations for public space and green infrastructure over and above the requirements for flood protection.

JBA Consulting | Supporting the development sector 17


ECOLOGY

WHAT YOU NEED

The presence of designated sites, protected habitats and species and invasive non-native species require prompt identification of constraints and opportunities to avoid costly delays.

SOLAR PV DEVELOPMENT

PROJECT 1 |

WHAT WE DID

SOLAR PV DEVELOPMENT

• • •

LOCATION: Derbyshire CLIENT: Global Renewables Construction Ltd The proposed site for a large scale solar PV installation was located adjacent to locally designated wildlife sites and contained habitats with the potential to support protected species. Ecological support was required in obtaining planning permission.

18 Supporting the development sector | JBA Consulting

Initial baseline ecological survey and PEA Reptile and amphibian surveys and monitoring Liaison with statutory consultees and advice on detailed mitigation.

BENEFITS TO THE CLIENT • Significantly reduced time, costs and planning complications • Raised awareness of potential ecological constraints early in the project which supported the smooth development of the scheme.


WILLOW BECK CHANNEL DIVERSION

HOW WE CAN SUPPORT YOU Our ecologists provide support from feasibility to construction including: • Preliminary Ecological Appraisal (PEA)/extended Phase I habitat survey • Protected species surveys and mitigation, including licensed work • Invasive non-native species surveys and management plans • Ecological Impact Assessment (EcIA) as part of EIAs • Habitats regulations assessment of plans and projects • Habitat design • Environment, habitat and biodiversity management plans • Ecological clerk of works • Post development monitoring • Ecology input to BREEAM • Training. We have specialists in terrestrial and aquatic habitats who are experienced in undertaking the following surveys and mitigation for protected species: Water Vole, Otter, Bats, White-clawed Crayfish, Great Crested Newt, Reptiles, Dormouse, Badger, breeding and wintering Birds and protected flora.

PROJECT 2 |

WHAT WE DID

WILLOW BECK CHANNEL DIVERSION

• Further detailed protected species surveys for otter and bats • Production of mitigation plan and obtaining of development licence for otter • Design and supervision of an artificial otter holt installation • Post-works monitoring.

LOCATION: North Yorkshire CLIENT: FT Construction Group The diversion of a watercourse to increase the developable land area required a flood risk assessment and ecological impact assessment work. During the early stages of the project our ecologists undertook a baseline survey of the site and watercourse identifying an otter holt and potential bat roosting features.

BENEFITS TO THE CLIENT • Full legal compliance for protected species • Efficient project delivery through clear communication and stakeholder engagement. JBA Consulting | Supporting the development sector 19


GROUNDWATER AND WATER SUPPLIES

WHAT YOU NEED Groundwater is an important natural resource requiring careful management to conserve its value. It can contribute significantly to sustainable communities and the health of aquatic habitats.

GROUNDWATER MODELLING

PROJECT 1 |

WHAT WE DID

GROUNDWATER MODELLING

• • •

LOCATION: A63 Castle Street, Hull CLIENT: Mott MacDonald Grontmij Joint Venture Investigations were required to inform an Environmental Impact Assessment for a major road cutting in southern Hull. Nearby buildings are vulnerable to settlement damage so there was particular interest in the degree and extent of water table drawdown around the scheme.

20 Supporting the development sector | JBA Consulting

Desk-based review of existing information and a hydrogeological conceptual model of the site and area Groundwater flooding studies Impact assessments.

BENEFITS TO THE CLIENT The model demonstrated limited likely impacts and was used to support the highway design.


ABSTRACTION FOR DRINKS MANUFACTURER

HOW WE CAN SUPPORT YOU Our experienced team of hydrogeologists can advise on abstraction, design of protection measures and the management of development proposals. This includes: • Water resources studies •

Groundwater supply assessment and implementation

Dewatering design of construction and mineral extraction.

Development can potentially affect groundwater in numerous ways and our technical teams can help establish what these effects might be.

PROJECT 2 | ABSTRACTION FOR DRINKS MANUFACTURER LOCATION: East Fife CLIENT: Private Developer The design and management of the installation of a new water supply borehole on site.

WHAT WE DID • Developed a hydrogeological conceptual model of the surrounding area to allow an assessment of the potential available groundwater resource

• Identified receptors potentially sensitive to an abstraction in the area • Designed and managed the installation of an abstraction borehole • Liaised with SEPA over the pumping tests as part of the abstraction licence application.

BENEFITS TO THE CLIENT • Operational costs were limited using a phased approach and obtaining a sustainable source of water for the drinks manufacturer • A successful application for a groundwater abstraction licence. JBA Consulting | Supporting the development sector 21


ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL STATEMENTS

WHAT YOU NEED Environmental Impact Assessment’s (EIA) play an important role in informing the planning and design of your development project, so that potential adverse effects are addressed early on.

LUGAR RECYCLING FACILITY

PROJECT 1 |

WHAT WE DID

LUGAR RECYCLING FACILITY

• Compiled EIA scoping report in addition to the Environmental Statement (ES) and Non-Technical Summary (NTS)

LOCATION: Lugar, Scotland CLIENT: East Ayrshire Council To provide a household waste recycling centre (HWRC) and a bulking facility, to enable the storage of paper cardboard, glass, plastics, metal cans and compostable food waste prior to recycling. A redundant business park was proposed to be reused for the site.

• Prepared planning application (including design and access statement) • Managed and procured specialist services.

BENEFITS TO THE CLIENT The planning approval process ran smoothly to programme.

22 Supporting the development sector | JBA Consulting


WINDFARM EIA

HOW WE CAN SUPPORT YOU We can undertake: •

Screening submissions

Scoping reports

Environmental statement writing and coordinating

Liaison with regulators

EIA training

Expert witness work

Environmental statement reviews.

Our EIA specialists can help you coordinate the different specialists undertaking the assessments ensuring this fits in with the projects planning and design.

PROJECT 2 |

Coordinated planning application including:

WINDFARM EIA

• Planning statement

LOCATION: Gayton le Marsh CLIENT: Energiekontor UK Ltd

• Design and access statement

The eight turbine wind farm site is now constructed in the district of East Lindsey in Lincolnshire.

WHAT WE DID • Compiled statutory Environmental Statement and co-ordinated the EIA activities in accordance with IEMA /CIEEM and Landscape Institute guidance

• Statement of community involvement • Environmental statement and NTS.

BENEFITS TO THE CLIENT • Reassurance that all the environmental assessments were taken care of with a coordinated approach. • Planning process ran smoothly and to programme.

JBA Consulting | Supporting the development sector 23


ENVIRONMENTAL PERFORMANCE AND ENVIRONMENTAL MANAGEMENT

WHAT YOU NEED Reporting on environmental performance is becoming increasingly important during the construction, life and operation of new assets. Environmental Management Systems (EMS) provide a framework for this.

PROJECT 1 |

WHAT WE DID

BETTESHANGER COUNTRY PARK

Worked closely alongside Marpaul and their landscaping team to make recommendations for enhancing the ecology and biodiversity value of the site.

VISITOR CENTRE LOCATION: Newport, Wales CLIENT: Marpaul (Construction Company) Assessments were required for BREEAM credits as part of the planning submission.

24 Supporting the development sector | JBA Consulting

BENEFITS TO THE CLIENT Results of the BREEAM assessment and recommendations supported the landscape plans and an ecology management plan for the visitor centre.


BETTESHANGER COUNTRY PARK VISITOR CENTRE

HOW WE CAN SUPPORT YOU There are numerous tools available to help design and plan environmental performance improvements. We are familiar with the use of many of these tools such as; BREEAM, CEQUAL, Carbon Calculators, Code for Sustainable Homes. We can: •

Prepare and deliver training in EMS

Support the development of an appropriate EMS

Prepare BREEAM assessments

Prepare Construction Environmental Management Plans CEMP.

PROJECT 2 |

WHAT WE DID

LOCATION: Ibis Hotel, Edinburgh CLIENT: Anglo Holt (Construction Company)

Compared the pre-development and post-development ecological and biodiversity value of the site, informed by the landscape proposals.

A BREEAM assessment was required for a proposed hotel site. This was requested as part of a package of environmental services, including an ecology and flood risk assessment.

BENEFITS TO THE CLIENT Successful assessment providing the maximum credits available for this development.

JBA Consulting | Supporting the development sector 25


Contact us steve.maslen@jbaconsulting.com Tel: 01274 714 269 www.jbaconsulting.com Follow us on: twitter.com/JBAConsulting www.linkedin.com/company/jba-consulting-ltd-jeremy-benn-

26 Supporting the development sector | JBA Consulting