1 minute read

Ted

Baker Showroom, London, UK

Venue & Usage

Advertisement

Visual Merchandising

Retail Display

Technology

Track Systems

Traditional Drapery

Drapery to Adapt a Fashion Space

Technical Components

Over 120m of Triple E’s E Rail Track •600m of custom dyed Coliseum Velour (500gsm IFR)• Installation Services

Challenges & Successes

We were given a lead time of only 5 weeks during Covid 19, and the install needed to take place within a restrictive roof space with other services. Despite this, our customer and the end client were very happy with how the job was delivered. This was achieved by working with our dying partners to provide a range of lab dips for the perfect colour match. We manufactured custom curved corners and custom bracketry to install the track. And our pleated drapery (100% fullness) was tailored to fit the spaces perfectly.

This article is from: