Work Samples

Page 1

Jeff MLA Israel 2013

+ CONTACT

RALEIGH TRANSIT HUB

jeffdisrael@gmail.com 919.309.5005 CELL I

MASTER PLAN; CAD, SKETCH UP, PHOTOSHOP 2

3

19

1.

Water HP

2.

Elevators

3.

High Speed Platform

4.

Bio-Wetland Park

5.

Boardwalk Overlook

6.

Pedestrian Bridge Over Tracks

7.

Water LP

8.

Wetland Wye

9.

Light Rail Platform

10.

Gabion Wall Check Dams

11.

Permeable Outdoor Patio

12.

Contemplative Patio Walk with Sculpture

13.

The Station

14.

Awnings with Demonstration Plantings

15.

Commuter Rail Platform

16.

Additional Platform Seating + Openspace

17.

Outwash Basin

18.

Clean Water LP

19.

Parking

4

5 6 7

8

9

2

11 13

10

12 14

16 2 15

17

18


Jeff MLA Israel 2013

BIOPARK WETLAND AND BIOPARK PERSPECTIVE; CAD, SKETCH UP, V-RAY, PHOTOSHOP

+ CONTACT

jeffdisrael@gmail.com 919.309.5005 CELL


Jeff MLA Israel 2013

+ CONTACT

RALEIGH TRANSIT HUB

jeffdisrael@gmail.com 919.309.5005 CELL

SECTIONS; CAD, ADOBE ILLUSTRATOR

Outdoor Patio

Light Rail Platform

Elevator access from pe-

Train buffer with lighting

destrian bridge

Swaying lights Filtration Beds Moveable seating Train buffer with lighting

Elevator access from pedestrian bridge

• • •

Swaying lights

Moveable seating

Glass Atrium

Bridge

Train Entrance

Indoor Wetlands

• Patio Walk • • • •

Wetlands penetrate

Pedestrian circulation on

the station Increase visibility and Wetlands penetrate awareness of site the station sustainablity Increase visibility and Inset lights in awareness of site wetlands sustainablity

via elevators second Patio + Light Rail Entrance and escalators Pedestrian circulation on via elevators

second

and escalators

Inset lights in wetlands

Outlook into

Walkway accessible to outlook

beds

Steps down to

Educational Signage

River Birch

Permeable patio, carries water into

No water collection in pedestrian

beds

beds for a closer,

more intimate interaction

walkways

Respite, Views, Showcase, Education

Rail inspired sculpture

Ticket machines

Using recycled rail lines, up lit

Lighting, Artful designed walls

Front Entrance


Jeff MLA Israel 2013

RALEIGH TRANSIT HUB

AERIAL RENDERING; SKETCH UP, V-RAY, PHOTOSHOP

+ CONTACT

jeffdisrael@gmail.com 919.309.5005 CELL

AXONOMETRIC BREAK OUT OF WETLAND WYE; SKETCH UP, V-RAY, PHOTOSHOP Water is received from Bio-Park

Water is slowed via a series of gabion wall check dams

Held in three Outwash Basins before released

Surface treatment, 1-2% slope to allow plants to naturally filter water Controls the vital ‘First Flush’ from a storm

River stone and engineered soils Flow splitters to control water flow Settling tanks for rough sediments Underground storage tanks pumps water into greywater system

Wetland plants: Irregular to permanent saturation large variety for varied and rich planting palette

Storage Tank Sizing 150’ x 270‘ x 20’ = 810,000 cu ft 150’ x 270‘ x 40’ = 1,620,000 cu ft 150’ x 270‘ x 50’ = 2, 025,000 cu ft 250’ x 300’ x 20’ = 1,500,000 cu ft 250’ x 300’ x 40’ = 3,000,000 cu ft 250’ x 300’ x 50’ = 3,750,000 cu ft 500’ x 600’ x 50’ = 15,000,000 cu ft

Men’s 8 toliets Women’s 16 toilets 6 bathrooms per gender Men’s 76.8/240 gallons Women’s 404.8/640 gallons

Site Area 8 ac 7416.3 ft (355,896.3 sq ft) Raleigh Average Rainfall 43.05 in Total Potential Rainwater 15,321,335.13 cu ft -15% Evaporation and Natural Absorption 2,298,200 85% Retention 13,023,125.13 cu ft

300 times = 144,480/264,000 gallons 500 times = 240,800/440,000 gallons 1000 times = 481600/880,000 gallons

Excess water flows off site


Jeff MLA Israel 2013

+ CONTACT

DESIGN BUILD

Process

jeffdisrael@gmail.com 919.309.5005 CELL

THE GREEN STAIR

Day One of Plant Installation

5 Months of Growth!!


Jeff MLA Israel 2013

CONCEPTUAL DEVELOPMENT PROCESS AND IDEATIONS

• Hand Drawings for Ideations & Rendering • 3D Explorations with Quick Modeling For Fast Idea Generation • Develop Real Understandings of “Flat” Plan-View Drawings • Opens Dialog About Site Allows for Criticism and Collaboration • Valuable Information Gained Through Study Models

+ CONTACT

jeffdisrael@gmail.com 919.309.5005 CELL


Jeff MLA Israel 2013

+ CONTACT

MAPPING AND DIAGRAMS

jeffdisrael@gmail.com 919.309.5005 CELL

DIAGRAMS, ANALYSIS AND MAPS; GIS, ILLUSTRATOR, EXCEL, WORD REGIONAL SYSTEMS FUTURE GROWTH FRAMEWORK: URBANITY IN THE PARK

* WATERSHED * OPEN SPACE * GRAIN AND IMPERVIOUS *LANDFORM

WELLNESS

* LAND USE * VEHICULAR CIRCULATION

*NON-VEHICULAR CIRCULATION * EXISTING WELLNESS CENTERS * EXISTING HEALTH CARE FACILITIES

BLUE RIDGE CORRIDOR:

* VEGETATION * CLIMATE

DEVELOPING THE WELLNESS IN THE PARK

SITE

O

S TH NG RE

ST

ES

* NEW COMPREHENSIVE PLAN - DESIGN OPPORTUNITIES

TI

* ENVIRONMENTAL ANALYSIS/FUNDS * DEVELOP QUIET USES IN QUIET AREAS (OUTPATIENT)

* EXISTING UTILITY CONNECTIONS

* PROXIMITY TO ASSISTED LIVING FACILITY

NI

TU

OR

PP

* LOCATION * DEVELOPMENT OF SYSTEM CONNECTIONS

* VARIETY OF USES ADJACENT

* PLACEMENT OF FUTURE PARKS AND GREENWAYS

* CONNECTIONS TO ESTABLISHED USES/COMMUNITIES/ PLACES * DIFFERENT ZONES - ACCESS, TOPOGRAPHY, ADJACENCY, WATER * EXPAND STORMWATER SYSTEM * QUIET PLACES ON SITE SLOW IT DOWN DIDACTIC LANDSCAPING * LOTS OF FILL/LANDSCAPING

* EXISTING VEGETATION - CREATE/ENHANCE A PARK

* MACON POND ROAD - MAKING A PLACE/STREETSCAPE

* EDWARDS MILL: ACCESS TO ORTHOPEDIC CENTER * VEGETATION - BUFFERS, TRAILS, DIDACTIC LANDSCAPES * REX - CREATE A UNIQUE EXPERIENCE (HOSPITAL IN THE PARK)

* UNCERTAINTY OF FUTURE DEVELOPMENT * WATER FLOW: THROUGH AND AROUND SITE * FLOOD PRONE SOIL - DEVELOPMENT CNNECTIVITY * RESIDENTIAL REACTION TO DEVELOPMENT * INTENSITY OF PROGRAM

T

HR

* PHYSICAL LIMITATIONS FOR SITING PROGRAM * SITING PARKING IN “THE PARK”

E

TS EA

* ZONING COMPLICATIONS/ INCONSISTENCIES * SITE ACCESS - CREATING A PLACE OR STREETSCAPE

W

* RESULTS OF ENVIRONMENTAL IMPACT ASSESSMENT

* PEDESTRIAN UNFRIENDLINESS EDWARDS MILL, BLUE RIDGE

SS ES

HOSPITAL IN THE PARK

DESIGN DEBRIS/BROWNFIELDS (SOILS)

* TOPOGRAPHY - CREATE BUFFERS/VIEWS

AK NE

SITE ANALYSIS: S.W.O.T., PLANNING, AND DESIGN

* REX CAMPUS - VARIETY OF USERS

ENVIRONMENTALLY CRITICAL

DESIGN ISSUES

PARKWAY CORRIDORS

COMPLETE STREETS LARGE SIDEWALKS HIGH TRAFFIC VOLUMES MULTI-MODAL TRANSPORATION PEDESTRIAN ACCESS

SOURCE: City of Raleigh 2030 Comprehensive Plan

MIXED USE COMMUNITY CENTER

MULTI-MODAL CORRIDOR


Jeff MLA Israel 2013

GRAPHIC SYSTEMS GRAPHICALLY DISPLAY COMPLEX INFORMATION

+ CONTACT

jeffdisrael@gmail.com 919.309.5005 CELL


Jeff MLA Israel 2013

+ CONTACT

MISSION VALLEY

jeffdisrael@gmail.com 919.309.5005 CELL

SECTION AND MAPS; CAD, ILLUSTRATOR, PHOTOSHOP

0’ 0’

use of sun for passive solar

planting new trees no trees on site previously

Entertainment Residential First floor retail Underground parking

massive underground parking high cost lots of site work energy in put will not last forever

public plaza human interaction music performances art shows cell phone tour lighting vegetation variety of seating moveable seating educational signage small to medium group space tables for gamesz

structured shade from buildings

permeable pavement bicycle lane

vegetative swale 2 way drive lane ROW vehicular + pedestrian

Context Map

ROW pedestrian only

interactive innovated stormwater plaza space for human interaction sidewalks encourage 30 min. of exercise 3+ story buildings permeable pavement multiple forms of seating moveable seating lighting elements sight lines hierarchy of spaces options for access fruit trees shade

Walkability Map

permeable pavement vegetative swale bicycle lane

parking lane 2 way drive lane

vegetative swale shade 3+ story buildings permeable pavement bicycle lanes street trees 40’

1”= 40’-0” 0

North 80’


Jeff MLA Israel 2013

ARTWORK

+ CONTACT

jeffdisrael@gmail.com 919.309.5005 CELL

Orange Virtue, Oil 2005 Turn on the Bright Lights, Mixed Media 2009

World Book no.34, Collage Mixed Media, 2000


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.