SITE TECTONICS NAME: HO TSZ YING STUDENT NUMBER: 683692
ASSESSMENT 2 AUTOCAD GRADING DRAWING
U
TH PA ER PP
A
E + 10.000
G
R2
+ 10.500 + 5.000
C
R1
I
+ 7.000
+ 9.500
+ 7.500
+ 12.000
+ 6.500
+ 11.000
Path Length
Depth
Grading
Ratio
AB
25m
0.5m
0.02
1:50
BC
20m
0.5m
0.025
1:40
CD
7m
0.5m
0.0714
1:14
DE
21m
1.5m
0.0714
1:14
EF
21m
1.5m
0.0714
1:14
FG
21m
1.5m
0.0714
1:14
GH
14m
1m
0.0714
1:14
HI
14m
1m
0.0714
1:14
IJ
11.7m
0.15m
0.0128
1:78
JK
6m
0.35m
0.058
1:17.143
KL
9m
0.4m
0.0444
1:22.5
LM
5.6m
0.4m
0.0714
1:14
MN
14m
1m
0.0714
1:14
NO
10m
0.5m
0.05
1:20
OP
50.5m
0.5m
0.0909
1:101
+ 5.500 + 12.500
+ 9.000
B
+ 4.250
+ 8.000
+ 11.500 + 6.000
D
H
+ 8.500
13
+ 5.150
J + FFL 5.150
F
.00
+ FTL 4.400
L
M + 4.000
O + 2.500 + 4.800
K + 3.000
Revision 1 landing not to code
N
0
0 4. 0
5.0 0
6. 00
7.0
8. 00
9. 00
10 .0 0
P
AR
N
G
4. 00
3. 00
2. 00
M
YR B I
NO
R VE I R
1. 00
ER LO W
11 .0 0
12
.0 0
PA
TH
Revision 2 annotation too small
SITE PLAN
1:500
ASSESSMENT 2 AUTOCAD GRADING
HO TSZ YING (JEANNIE) 683692
MARIBYRNONG PAVILION
2
06/09/2016
ARCHITECTURE MAJOR YEAR 3
SITE TECTONICS .0 0
NAME
10
EXERCISE NO.
9. 00
SCALE
2.00
DRAWING TITLE
3.00
8. 00
7. 00
6. 00
5. 00
orignal CAD plan
Revision 1 the ramp do not connectproperly to the house Revision2 the design concept for farnsworth house is to float above the ground
R1 R2
Previous
Modified
DRAWING TITLE
SCALE
EXERCISE NO.
NAME
SITE PLAN
1:500
ASSESSMENT 2 AUTOCAD GRADING
HO TSZ YING (JEANNIE) 683692
MARIBYRNONG PAVILION
2
20/10/2016
ARCHITECTURE MAJOR YEAR 3
SITE TECTONICS
tree distribution testing 01
tree distribution testing 02
DRAWING TITLE
SCALE
EXERCISE NO.
NAME
SITE PLAN
1:500
ASSESSMENT 2 AUTOCAD GRADING
HO TSZ YING (JEANNIE) 683692
MARIBYRNONG PAVILION
2
20/10/2016
ARCHITECTURE MAJOR YEAR 3
SITE TECTONICS
Mechanical grading and contor from Assement one
DRAWING TITLE
SCALE
EXERCISE NO.
NAME
SITE PLAN
1:500
ASSESSMENT 2 AUTOCAD GRADING
HO TSZ YING (JEANNIE) 683692
MARIBYRNONG PAVILION
2
20/10/2016
ARCHITECTURE MAJOR YEAR 3
SITE TECTONICS
Mechanical grading and contor export from 3ds Max, slightly different from the hand drawn one
DRAWING TITLE
SCALE
EXERCISE NO.
NAME
SITE PLAN
1:500
ASSESSMENT 3 CONTOUR PLANDRAWING
HO TSZ YING (JEANNIE) 683692
MARIBYRNONG PAVILION
2
06/09/2016
ARCHITECTURE MAJOR YEAR 3
SITE TECTONICS
Mechanical grading and contor Assement one
DRAWING TITLE
SCALE
EXERCISE NO.
NAME
SITE PLAN
1:200
ASSESSMENT 2 AUTOCAD GRADING
HO TSZ YING (JEANNIE) 683692
MARIBYRNONG PAVILION
2
06/09/2016
ARCHITECTURE MAJOR YEAR 3
SITE TECTONICS
Mechanical grading and contor export from 3ds Max, with faster and more accurate result
DRAWING TITLE
SCALE
EXERCISE NO.
NAME
SITE PLAN
1:200
ASSESSMENT 3 CONTOUR PLAN
HO TSZ YING (JEANNIE) 683692
MARIBYRNONG PAVILION
2
06/09/2016
ARCHITECTURE MAJOR YEAR 3
SITE TECTONICS
EYE HEIGHT PERSPECTIVE 01 LOWER RAMP - hand rail designfor middle and lower - with glass - with flat landscape design
EYE HEIGHT PERSPECTIVE 02 TERRANCE (FACING UPPER RAMP)
EYE HEIGHT PERSPECTIVE 03 FROM OPPSITE RIVER
EYE HEIGHT PERSPECTIVE 02 TERRANCE (FACING LOWER RAMP)
OVERVIEW RENDER
11:30am
01:30pm
03:30pm
01:30pm
03:30pm
05:30pm
Date: 06/09/2016
11:30am
05:30pm
Date: 06/09/2016
DRAWING TITLE
SCALE
EXERCISE NO.
NAME
SITE PLAN
1:500
ASSESSMENT 2 SUNLIGHT TESTING
HO TSZ YING (JEANNIE) 683692
MARIBYRNONG PAVILION
2
06/09/2016
ARCHITECTURE MAJOR YEAR 3
SITE TECTONICS
06/09/2016 11:30am
DRAWING TITLE
SCALE
EXERCISE NO.
NAME
SITE PLAN
1:500
ASSESSMENT 3 SUN SHADOW
HO TSZ YING (JEANNIE) 683692
MARIBYRNONG PAVILION
2
06/09/2016
ARCHITECTURE MAJOR YEAR 3
SITE TECTONICS
06/09/2016 01:30pm
DRAWING TITLE
SCALE
EXERCISE NO.
NAME
SITE PLAN
1:500
ASSESSMENT 3 SUN SHADOW
HO TSZ YING (JEANNIE) 683692
MARIBYRNONG PAVILION
2
06/09/2016
ARCHITECTURE MAJOR YEAR 3
SITE TECTONICS
06/09/2016 03:30am
DRAWING TITLE
SCALE
EXERCISE NO.
NAME
SITE PLAN
1:500
ASSESSMENT 2 SUN SHADOW
HO TSZ YING (JEANNIE) 683692
MARIBYRNONG PAVILION
2
06/09/2016
ARCHITECTURE MAJOR YEAR 3
SITE TECTONICS
06/09/2016 05:30am
DRAWING TITLE
SCALE
EXERCISE NO.
NAME
SITE PLAN
1:500
ASSESSMENT 3 SUN SHADOW
HO TSZ YING (JEANNIE) 683692
MARIBYRNONG PAVILION
2
06/09/2016
ARCHITECTURE MAJOR YEAR 3
SITE TECTONICS
ORIGNAL VOLUME: 1848,356.93 DRAWING TITLE
SCALE
EXERCISE NO.
NAME
SITE PLAN
1:500
ASSESSMENT 3 VOLUME CACULATION
HO TSZ YING (JEANNIE) 683692
MARIBYRNONG PAVILION
2
06/09/2016
ARCHITECTURE MAJOR YEAR 3
SITE TECTONICS
After cut and fill, the volume decreased, as the cutting area is larger than the filling area, therefore, the landform should be modified for the reminded fill.
NEW VOLUME: 1847,139.05
DRAWING TITLE
SCALE
EXERCISE NO.
NAME
SITE PLAN
1:500
ASSESSMENT 3 VOLUME CACULATION
HO TSZ YING (JEANNIE) 683692
MARIBYRNONG PAVILION
2
06/09/2016
ARCHITECTURE MAJOR YEAR 3
SITE TECTONICS
A
B
A: Some soil are filled away from the house, as keeping the surrounding area flat and clean.
NEW VOLUME: 1848,349.68
B: Some are filled along the river side.
DRAWING TITLE
SCALE
EXERCISE NO.
NAME
SITE PLAN
1:500
ASSESSMENT 3 VOLUME CACULATION
HO TSZ YING (JEANNIE) 683692
MARIBYRNONG PAVILION
2
06/09/2016
ARCHITECTURE MAJOR YEAR 3
SITE TECTONICS
It refers to Assessment 1.2 new form, basin land form. The landform transformation are generated by using brushes to pull and relax.
DRAWING TITLE
SCALE
EXERCISE NO.
NAME
SITE PLAN
1:500
ASSESSMENT 3 LANDFORM TRANSFORMATION1
HO TSZ YING (JEANNIE) 683692
MARIBYRNONG PAVILION
2
20/10/2016
ARCHITECTURE MAJOR YEAR 3
SITE TECTONICS
EYE HEIGHT PERSPECTIVE LANDFORM TRANSFORMATION
Drawing from Assement1
DRAWING TITLE
SCALE
EXERCISE NO.
NAME
SITE PLAN
1:500
ASSESSMENT 1.2 NEW LANDFORM
HO TSZ YING (JEANNIE) 683692
MARIBYRNONG PAVILION
2
06/09/2016
ARCHITECTURE MAJOR YEAR 3
SITE TECTONICS
Comparing the contour plan generated by 3ds Max and the assessment 1.2 drawing, which is not alike. A more complex contour lines are formed. it may relate to 3ds max brushes draw irregular shape, and flat land is hard to formed.
DRAWING TITLE
SCALE
EXERCISE NO.
NAME
SITE PLAN
1:500
ASSESSMENT 3 NEW LANDFORM CONTOUR PLAN
HO TSZ YING (JEANNIE) 683692
MARIBYRNONG PAVILION
2
20/10/2016
ARCHITECTURE MAJOR YEAR 3
SITE TECTONICS
This landform is generated by using displace, a cell photo is used as reference. Black / dark area will stay remind, and brighter colour will be pulled and extruded.
DRAWING TITLE
SCALE
EXERCISE NO.
NAME
SITE PLAN
1:500
ASSESSMENT 3 LANDFORM TRANSFORMATION2
HO TSZ YING (JEANNIE) 683692
MARIBYRNONG PAVILION
2
20/10/2016
ARCHITECTURE MAJOR YEAR 3
SITE TECTONICS
This landform is generated by using squeeze. DRAWING TITLE
SCALE
EXERCISE NO.
NAME
SITE PLAN
1:500
ASSESSMENT 3 LANDFORM TRANSFORMATION2
HO TSZ YING (JEANNIE) 683692
MARIBYRNONG PAVILION
2
20/10/2016
ARCHITECTURE MAJOR YEAR 3
SITE TECTONICS