NAPHASORN PA K K R U K (JEJIE)
E X P ER IE N C E 2 02 2
Architect at Bimagine
2 02 2 2 01 9
BIM Architect at Plan Associates Co., LTD (2 Years 5 months)
2 01 8
Internship at Openspace design Co., LTD (4 Months)
2 01 8 2 01 7
Freelance 3D Modeller and Visualizer at Wittharuck Group Co.,LTD (1 Year)
2 01 9 2 01 4
I AM NAPHASORN, 26 YEARS OLD. I AM GRADUATED FROM SCHOOL OF ARCHITECTURE AND DESIGN, KING MONGKUT’S UNIVERSITY OF TECHNOLOGY THONBURI. I HAD WORKED AS BIM ARCHITECT AT PLAN ASSOCIATES FOR TWO YEARS AND FIVE MONTHS. AS ONE OF THE TEAM, I AM AN ACTIVE PERSON WHO IS ALWAYS LOOKING FOR NEW MOTIVATION, AND NEW EXPERIENCE. BEING PREPARE FOR UNEXPECTED SITUATION AND READY TO FIGURE IT OUT. FLEXIBILITY IS THE KEY FOR WORKING WITH THE ANOTHER TEAMS TO REACH AND SUCCESS THE GOAL ON TIME. I AM READY TO GET THE KNEW KNOWLEDGE FROM OTHER DEPARTMENTS.
@
Donmueang, Bangkok, Thailand
(+66)89-626-9541
p.naphasornp@gmail.com
https://jeechnps.blogspot.com/
L ANGUAGE Thai (Native) English (Proficient)
E D UCAT ION
P ROF ICIENCY
Bachelor of Architecture, School of Architecture and Design, King Mongkut’s University of Technology Thonburi
Revit SketchUp AutoCAD Rhino Grasshopper
Illustrator Photoshop Lightroom Microsoft Office
A R C HIE VE ME NT 2 02 1
Revit LinkedIn Badge
201 9
Second Class Honours of Bachelor degree 1 of 12 Thesis Project of the Year
201 6
Grasshopper project is exhibited at Out of Sight Exibition
I N TEREST 2D and 3D Graphic Sub title making
Photography
ARCH IT E C T PRO JE CT LAB AND L EARN IN G C ENT ER PTTEP Technology Innovation Project Laboratory and learning Center. HIDE - S EEK H OUS E Private for Two families house for Three generations HEAD QUAT ER AN D OFF IC E Mass Rapid Transit Authority of Thailand Headquater (MRTA) MIX E D- US ED PTT EnCo Office and Community Mall (Competition)
CA P ST ONE THESI S BLEND, Depression disorder Day-care relief Center 2D/3 D G RAP H IC
C B A
F
E
PTTEP Technology Innovation Project (PTIC) Building A PTTEP Exhibition and learning center Building B Office and Staff development Building C Chemical laboratory Building D Pilot machanical and laboratory Building E LAB Collaboration Building F HPCC Data Center
The PTTEP Technology Innovation Center (PTIC) is located at Wangchan, Rayong, Thailand. The Wangchan Valley district is going to be a Silicon Valley demonstration in the Future. PTTEP, the petroleum provider in Thailand, had an idea to develop the miniature and laboratory Center, which is winning from competition for whole master plan. PTIC is composed with six buildings in Master plan. Building D-F are my responsibility from Design, develop to Construction. Building D construction is completed on March 2022
LA B AN D LEARN ING CENTER
D
02
1
Building D
Pilot and Laboratory 5,000 SQ.M. Status: Complete on March 2022 Laboratory in miniature of petroleum machine of PTTEP company, including of chemical laboratory, mechanical workshop such as alternative energy technology, and industrial manufacturing collaboration with government. Building D is the first building started the construction on this project. There is the planning for the next phase between Architect, Engineer, and Landscape architect TK studio, to plan for retaining pond to be reused in the project.
Workshop
Office and Test bench
Car Parking
BUILDING D
During Preliminary design, industrial visual is suitable for building appearance from the team brainstorm idea. The triangle stripe facade is applied along the building and applied for Building B and C.
While building D is only one which is industrial visual, adding more ventilation for workshop area, triangle facade is way tend out of the building to add more dimension and to reduce building massive of the building.
4 mm. Aluminium Composite Panel in off-white with Metal stud
Normal Module Building B, C & D
Special Module Building D
06
Developed to Revit
Building Facade
Revit Family is created for Facade arrangement
Special Module
Family is created by Extrusion following plan
Design Development
07
Tender, Permission, and Construction
08
SECTION
ARI COM
GEN
SERVICE TEST BENCH TEST BENCH MDB E&I WORKSHOP
WELDING WORKSHOP MEETING
OFFICE LAB 1
LAB 2
PUMP ROOM
CHEM & PART STO.
ENGINEER STORAGE
ENGINEER STORAGE WORKSHOP AREA
WORKSHOP AREA
SERVICE
SERVICE & LIFT
AI & ROBOTIC STAGEAGE
AI & ROBOTIC STAGEAGE LOBBY LOBBY
PUMP ROOM MEZZANINE
MAIN STARCASE
MAIN STARCASE
MAIN ENT
1ST FLOOR PLAN
09
Permission part and Tender part, both parts did at the same time and starting to develop in Revit. During tender, I took responsibility for material selection for building appearance, such as Crane for the workshop, Aluminium composite for front facade cladding, metal sheet cladding for back facade (Service area), and back of house building materials.
2ND FLOOR PLAN
After meeting with sales, develop drawings and specify on drawings. In the part of Revit as Bim architect, facade design and planning had developed to the requirements. Therefore, according to drawings, it goes toward for tender and construction by time.
Construction part, I took responsibility for Monthly site minute of meeting, and consult with Project architect answering for RFI (request for information) and RFA (request for approval). Giving the best solution that remains design to the contractor via consultant relate to site construction by time.
Sketch for answering RFI
10
Building E
Joint Venture Lab collaboration 2,700 SQ.M. Status: Tender Waiting for construction bidding. Building E is for Joint venture between PTTEP and third party to develop products that related to petroleum products. Including sub-space of workshop for rental. Providing resources for research and development in related field.
LA B AN D LEARN ING CENTER
2
02
MAIN ENT
WORKSHOP AREA
LOBBY W.C
WORKSHOP AREA
WORKSHOP AREA
WORKSHOP AREA
WORKSHOP AREA
W.C TEST BENCH MEP SERVICE
1ST FLOOR PLAN
WORKSHOP
WORKSHOP
WORKSHOP
WORKSHOP
WORKSHOP
MEP & FUME HOOD TEST BENCH
2ND FLOOR PLAN
03
The joint venture is mainly included of space of the workshop where is open-plan for unpredicted workshop, some of them need a wider space for that machine testing for petroleum technology. Meeting and office is located upper the workshop to easily access the workshop.
04
A group of front line buildings (E&F) uniquely from other building. Curve precast concrete facade. They are applied along the building curve to visualize building bold and casual. They created volume together with shade and shadow for buildings.
PRECAST CONCRETE FACADE
Theses four difference semi-circular shape are rationally that made facade create varieties in 1 module.
2nd floor
Original pattern
Mirror pattern ISOMETRIC
To create a variety of facades, the pattern goes with vertical mirrors in difference floor. 1st floor
CDU
SERVICE
05
ELEVATION
PLAN
Precast concrete wall with Texture painted in Light grey
Typical mold is 2.1 m wide which is proper to building width and the precast concrete can pre-fabricated.
LOBBY
SECTION
OFFICE
WORKSHOP
TEST BENCH
06
Building F
Data Center 4,850 SQ.M. Status: Tender Waiting for construction bidding. Building E is also called Data Center. The center of data stacks for overall buildings in Master plan. To support the data and service, data center is prepared rows of data stack where is located on the front line of master plan for easy maintenance.
LA B AN D LEARN ING CENTER
3
02
MEP
GEN
STO. MEETING LOBBY
MEP
CHILLER ROOM
ENG. ROOM
MEP GEN
MEP
MEP
PUMP ROOM
GAS STO.
LOADING SERVICE
1ST FLOOR PLAN
STO. CDU
CDU
UPS ROOM
SERVER AREA
UPS ROOM
OFFICE OFFICE
SERVER AREA
MULTI PURPOSE
2ND FLOOR PLAN
The first floor is not the main function, where is full of MEP, GEN, and the other services support such as gas storage while the basement is in the water tank for running the engine systems. Sometimes, they had a group of visitor for visiting a role model of Data center server racks, meeting room and visitor support are provided at the front of the building which is public zone.
03
04
PIPE ROOM
PRECISION AIR CONDITION
SERVER AREA
PUMP ROOM
CHILLER ROOM
FLOOR FINISHING AND CEMENT FLOOR LEVELING CEBAU CONCRETE FOAM 4 MM. THK.
WATER TANK
5?
CEMENT GROUTING
LIFT SERVICE LOADING
LOADING
ROCKWOOL 2 MM. THK.
VISITOR OFFICE
OFFICE
SECURITY ENGINEERING LOUGE/ EE ROOM ROOM MEETING RM.
The data Center needs higher protection from humidity and any flood from water that can cause from the weather. The protection is beginning from the 1st floor, it lifted 1 m. height from the access road.
SECTION
The second floor, where stack of data center located there. The data stacks are scented of the floor and service circulation covers all of them for easier and faster maintenance. The owner has the image of technology leader in the country. We decided to plan a space for the visitor as a role model in the future. Providing a glass room with 270 degree perception for visitor for seeing. They could not enter in the space of the data stack because they need high protection.
WALL SECTION
Especially at Second floor, the server stacks need to protect from any fire or smoke. The Cebau cement foam is added only where the data server area. Causes it works as insulation, causes that area cooler with a thin layer.
06
PRECASE CONCRETE FACADE
FACADE TYPICAL PLAN Roof As previously Building E, building F applied to the same facade concept in difference mold. There are not only facade, but also use as a parapet wall to cover MEP machine on the RC slab.
2nd floor
HIDDEN HOUSE
Two privacy dwelling for Three generation in one place Ramkamhaeeng 35, Bangkok, Thailand. 2,000 SQ.M. Status: Tender
House in Thai is also called ‘BAAN’ is the space for living and being themselves for residents. Every house has their own space for living following how owner lives. The location of this placed is embed and crowded with people from hotel and community mall. Owner demands to escape crowded area and isolate this house as comfortable and peaceful for the family. From exterior perspective, the other people could not notice this as a house or a house within two seperate inside.
RESI DENTI AL AR CHITEC TURE
4
02
SITE CONTEXT
3 RA
M
KA
M
1
H
EA
N
1 OWNER’S CURRENT HOUSE 2 OWNER’S PROPERTY 3 HOTEL 4 CINEMA 5 UNIVERSITY
G
35
A
LL
EY
2
3 4
5
Apart from that, she has two sons who are going to be the owner of this place in the future, even each son has his own family, their family will be staying at this place as bigger family.
SEP
ERA
TE
LIN
E
ZONING
PARKING
MAIN GATE
RAMKAMHEANG 35 ALLEY
SERVICE
OWNER’S CURRENT HOUSE
SERVICE
MAIN ENTRANCE
COURTYARD MAIN ENTRANCE
OWNER’S PROPERTY
LIVING ZONE
I took the responsibility on design, development, material selection, tender, and permission. Meeting with owner to develop and find the best solution design based on preliminary and current owner’s demands.
So, our team designs this house as two separate houses, garden wing and pool wing with centered-courtyard garden as facility of these two houses.
The hidden concept is need context-isolated, which is the facade of the house is hiding all activity of people inside the house. We planned the service, maid area at the front of the house to hide activity inside. A part of that, the living area and bedroom is at centered of the house, the other support functions are surrounded causes of; privacy brings to the inside of the house, decreasing noise pollution from context.
Then, put all the data and information to Revit to develop drawings for each state. Younger Son Older Son Courtyard
04
+0.10
+1.00
7
7
8
9 5
8
+1.20
4
+0.60
+0.00
6
8
MAIN ENTRANCE GARDEN WING
+0.60
1
7 +0.10
+0.10 MAIN GATE
Parking lots Garden courtyard Swimming pool Public living room Multi-purposed Generation living unit Service Pocket garden Guest/Future expansion Terrace garden Terrace deck
EXTERIOR
INTERIOR
Area for samll garden with natural ventilation
Pocket garden
MAIN ENTRANCE POOL WING
8
MEP
7
10
RC SLAB
7
+0.10
+0.00
1ST FLOOR PLAN
1 2 3 4 5 6 7 8 9 10 11
4
3
2
8
9
6 +1.20
+1.20
5
2ND FLOOR PLAN
The hidden house has three and a half storey, which is centered separate as a garden wing (left) and pool wing (right). Each wing has its own function, but they share common facilities such as garden at the left and the pool at the right all we called courtyard on the first floor and also parking lots. On the second floor, garden wing is double volume of the public living room where is the most crowded are in this house. Pool wing is provided for the bedroom of the first generation(owner and her spouse).
EXTERIOR
INTERIOR
The highlight of this house is terraced garden where is aligned in the front of the house, double volume height with skylight. To bring natural ventilation from triangle facade chamber design.
Exterior appearance is walled with a chamber for an indirect natural ventilation cause they do not want to face with the uncomfortable context surroundings.
This area, known as people assembly, or just visiting. They will precept garden courtyard atmosphere while they are not too close to the living area of the owner area.
Interior appearance, to reduce massive perception as exterior, we designed with curve feature wall that made of brick masonry wall.
7 9
5
8
11
5
9
8 9 6
8 6
8
10
MEP
1F
07
Parking lots Garden courtyard Swimming pool Public living room Multi-purposed Generation living unit Service Pocket garden Guest/Future expansion Terrace garden Terrace deck
RC SLAB
RC SLAB
3RD FLOOR PLAN
11
6
8
1 2 3 4 5 6 7 8 9 10 11
7
8
6
8
3M FLOOR PLAN The third floor of each wing is separate for each son, garden and pool wing. Each living unit including of master bedroom, multi-purposed room, guest or study room (flexible), and pantry.
The important function is multi-purposed and living room. The elevator is provided to this floor, which is a wood deck terrace that connected between the double volume, multi of each wing together, and it has also brought natural ventilation to the courtyard.
The mezzanine of the thrid floor is the future expansion living unit for each son’s kid, and also provided the outdoor deck at pool wing, when they have an outdoor party.
3M
08
WINDOW DESIGN DEVELOPMENT WITH POCKET GARDEN AREA
1F
AD-7 EXTERIOR
AD-6 INTERIOR
At Exterior, aluminium folding window with manual lock to let natural ventilation and sunlight into the house by pocket area (non-AC). At Interior, aluminium awning and fixed window to let natural and sunlight in the house. In this case, owner require for easy to maintenance and easy to cleaning every single window. Awning window is the easiest way and familiar to users. REVIT IN DESIGN DEVELOPMENT PROCESS In the Revit part in Design development, the most concern topic is door and window. Owner requirements are natural ventilation with high security.
AD-1
AD-3 AD-4
To archieve requirenments and design, adding parameters for awining window into a small one for usage. There are easy to use and cleaning and its opening are stable. Cause building front is not faced with the win, we can adjust parameters for awining window in any position.
09
AD-2
AD-7
Developed following requirements and wind and sun analysis into Revit family
AD-5
AD-6
AD-8
Adjust sizing and proportion together with overall building in Revit project
10
MRTA HEADQUARTER
METROPOLITAN RAPID TRANSIT AUTHORITY OF THAILAND Rama IX Road, Bangkok, Thailand 100,000 SQ.M. STATUS: FEASIBILITY & PRELIMINARY DESIGN
Metropolitan Transit of Authority Thailand is known as an MRT subway service, need to manage a work area of all stuff in one place. The recent office is located in MRTA’s Masterplan as The new headquarters. There are separate of buildings where are hard to communicate and meet. It’s 26-storey with 3 floors, basement.
C OR PO RATE AND OFFI CE BUc I DLI NG
5
02
LAYOUT PLAN
COMMUNITY MALL AND OFFICE LOBBY HALL
Public circulation Officer circulation
RA
MA
03
IX
RO AD
LINKAGE
MRTA HEALTH PARK
MRT ORANGE LINE SUBWAY
FACADE LINKAGE
MRTA is the corporate organization of subway and railway system in Thailand. They are focused on linkage transportation. It is beginning with the master plan. This location is in the plan of the orange line subway to support people who work at railway system corporation. The site is the area that attached to the main road and connect directly to subway future line.
Meeting& Convention
B2 FLOOR
PARKING LOTS AND BUSSINESS RENTAL
Learning Center Office Common space OSS (one stop service) Retail Lobby Hall Basement/MEP
The overall of the building is divided into two parts, podium and tower. Podium is aimed for public space which is community mall and seminar auditorium, and learning center. The tower is an emphasis at office for MRTA officers. The building itself need a linkage from subway, circulation is separated to office zone with security flap gate.
3RD FLOOR
LEARNING CENTER AND MRT’S MONITOR SHOWCASE AREA
A part of that each mass of the tower has its own staircase linkage space to link each department get more work flow. Every group of department is classified by building mass appearance, green area applies for well-being life.
Meeting& Convention Learning Center Office Common space OSS (one stop service) Retail Lobby Hall
The new headquarters creates well-being of the staff where is including internal meeting, external meeting, and seminar for main idea. Vertical facade design is support for sun shading, especially on the West side. Rotating 30 degrees with 0.6 m. depth is filtered while they let the natural sunlight into the building. Each mass is lift the facade up to let full sunlight directly to the building at the side which is less effect of heat and glare.
Basement/MEP
23RD FLOOR
CENTERED-CORE OFFICE BUILDING
26TH ROOF PLAN
ROOF GARDEN AND MEP
07
08
10
6
ENTER COMPETITION (ENCO) MASTERPLAN AND MIXED-USE Donmueang, Bangkok, Thailand 90,000 SQ.M. State: Competition
BUILDING 3
DRIVE-THRU AMAZON CAFE
BUILDING 4 PARKING AND AUDITORIUM
BUILDING 1
COMMUNITY MALL (EXISITING)
BUILDING 2
RENTAL OFFICE (MAIN BUILDING & EXISTING)
BUILDING 5 HOTEL
BUILDING 6
M IXE D- U SE B UIL D IN G
PTT GAS STATION
02
Building 2 l Rental office
Building 1 l Community mall
Street view
ENTER Project is the recreation value of space where is located nearby DMK Airport, by renovating of the two existing buildings, and increasing value by mixed-used building such as auditoriums and hotel to support airport passengers in the future. The existing is still remain the structure, to re-design. Facade design is important both design and sun shading to the building. Vertical facade is applied and twisted in a rhythm. It helps to reduce heat gain and let the natural ventilation easily flow into the master plan.
03
04
BUILDING 2
BUILDING 1
COMMUNITY MALL
RENTAL OFFICE
KEY PLAN PLOT
RETAIL MICE GREEN COMMON AREA SUPERMARKET MEP/SERVICE ROOF/PARKING
RETAIL MICE GREEN COMMON AREA SUPERMARKET MEP/SERVICE ROOF/PARKING
ENCO
There are Six buildings in the master planets, The exists are building 1 and building 2 which aimed to renovate for facade design. Especially building 2, the main building aimed to renovate facade design and change program into a rental office for the ENCO in-house company.
PTT ENTER COMPETITION I took responsibility on all drawings for four buildings; Building 1 to Building 5 (building 3 is excluded). Building Building Building Building
Building 3 is to drive-thru cafe serving community mall building 1 and people who passes by, Building 4 and 5 are optional for future expansion when the airport is the full phase open.
1 Community Mall, 2 Rental Office, 4 Auditorium and Parking lots, 5 Hotel,
Building 1
Building 2
Building 4
Building 2
Building 4
Building 4
Building 5
Building 5
Roof +æç
Roof +45.00
F9 +29.00
F8 +26.00
Roof +39.40 F8 +29.00 RENTAL
EVENT SPACE RETAIL
RETAIL
RETAIL
RETAIL
Rooftop +14.00 F3 +10.00 F2 +6.00 F1 +0.00
Section
RENTAL RENTAL RENTAL
F3 +17.00
F5 +12.00 CPAC
OFFICE
RENTAL
PARKING
F1 +0.00
LOBBY
B4 -12.00
F1 +0.00 B3 -9.00
06
BUILDING 4
BUILDING 5 HOTEL
MICE AUDITORIUM AND PARKING LOTS KEY PLAN PLOT
KEY PLAN PLOT
Elevation
07
08
6 BLUEND THESIS Major depressive disorder relief center 2,500 SQ.M.
Major dispressive disorder people, depress people, sad people are sensitive to uncomfortable space because it is going to stimulate their symptom. So, they need a space that help them to get better and warm welcome for them to relief their symptom.
Self healing
Le a r n i n g A re a
Public zo n e
MDD groups needed under hospital responsibility No organization responsibility
MDD groups are already under hospital responsibility Sad people
Depressive people
Mild MDD
Moderate MDD
Severe MDD
Our project responsibility
M a in e n t ra n ce
Access to the Nature
Elimination of environmental stressors
T H ESI S
P ro fe ss i o n a l healing
U S E R DIS T U RB ANC E
U SER
Avoidance of visual disturbance
02
LEVEL AND TRANS PARE N C Y T O BE L A YER S
Level
Tra n s pa ren cy Level Pr i vacy wi t h so l i d e n cl o su re
Indoor space level
Semi-indoor space level
B
Outdoor space level
Semi-outdoor space level
Nature transparency
LAY ERS
Transparency
U se r n e e ds an d h e al t h de m an ds
Comfortable in t h e i r are a
Material transparency Level 4 9000 Level 3 6000 Level 2 3000 Level 1 0
4000
8000
6000
1777
4000
6000
8223
4000
5777
4000
6000
10000
75777
03
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
SEC TION A
04
L AY ER S concep t
Indoor
Semi-outdoor
Outdoor
Level
Transparency
Diffence level in same space Create a space without enclosure by to separate space by step up or down. Space is wider and free to allow to be a multipurpose space.
What does user get? They get the difference usage of space that do not need solid enclosure.
Nature and Environment Transparency by nature is apply to outdoor space where need to talk, fresh, activities where it needs some boundary
Materials and boudary When transparency or opacity of the materials are applied in the space where need sunlight but still need to separate space.
OPEN PLAN Layers o f s p a ce to co nce pt
1
2
Transparency LAYERS N O RT H E L E VATIO N
3
4
Leve l OP E N P L AN
Open plan with Comfortable and welcoming space
1 ST FLO O R P L AN
2 N D F LO O R P LA N
08
2D Graphic 2D graphic is more interest when I need to describe the project to see picture more clearly. When I want to describe something more than writing or take a photo, this is one of the creative way I want to make people see things.
IN TER EST
8
02
03
04