PORFOLIO | JEFFREY HENRIQUEZ ERICES Wilson
ROOF DETAIL SCALE 1:5
5
5
4
4
6 LEGEND METALCRAFT ESPAN ROOFING 2470
1. COVERED WALKWAY: TIMBER POST, BEAMS, PLASTIC COVER 2. STAIRS: RIMU STEPS, STEEL RAILING AND BALUSTRADE TO MATCH BLACK BEAMS
3
3
3. WALL: PLY WOOD INTERIOR FINISHING, STAINED. R2.4 INSULATION
3
4. WALL: RIMU PANELLING FEATURE WALL. R2.4 INSULATION DOULBE HEIGHT SPACE
MASTER BEDROOM 3
5. ROOFING/CLADDING: COLOURSTEEL ENDURA ESPAN® 470 9082
GIRL'S BEDROOM
3000
7
9
3 GUEST BEDROOM
8
10
9
ENTRANCE
MASTER BEDROOM 1
8
8
PRE-FINISHED EAVE FLASHING QUATER ROUND GUTTER
TIMBER PURLIN
QUATER ROUND GUTTER EXTERNAL BRACKET
STST OR GALV. FLAT HEAD NAIL FOR FLASHING ESPAN CLIP SYSTEM W 12G x 35mm SCREWS
PRE-FINISHED 8g WAFER-TEK SCREW
TIMBER PACKER FASCIA BOARD
BUILDING PAPER SHOWN DASHED
SHADOWCLAD TIMBER CLADDING
ROOF FRAMING
7. GRAOUND FLOOR CEILING: RIMU PANELLING OVER EXISTING CEILING JOIST
2 2730
1
6. FIRST FLOOR CEILING: EXPOSED RAFTERS, RIMU PANELLING OVER DUMMY RAFTERS
BUILDING PAPER SHOWN DASHED
8. GROUND FLOOR FLOORING: EXISTING CONCRETE POLISHED
GROUND FLOOR LOUNGE SPACE
HALLWAY SIGHTLINE TO LIVING SPACE AND GARDEN
9. BEDROOM FLOORING: CARPET FINISH OVER EXISITNG PARTICLE BOARD, SELECTED BY PRINCIPLE 10. LANDING FLOORING: HARDWOOD FINISH OVER EXISTING PARTICLE BOARD, SELECTED BY PRINCIPLE
SECTION AA 1:100
ARCHITECTURAL DRAWINGS
BOULCOTT HOSPITAL THEATRE 4 AND 5 NORTH FACADE DETAIL WITH OUTDOOR BBQ AND CORNFIELD Boulcott Hospital 666 High Street, Lower Hutt NORTH BEDROOM The large bay windows at the North end of the house create a relaxing space to watch over the backyard. Facing the undeveloped hill to the North, the windows pull the surrounding nature into the bedroom.
OFFICE SPACE Located in the centre of the house, the office space looks to the West with a floor to ceiling window offering a sightline directly to the church/garage.
TENDER CONSENT FFOR O R TE NDER AN& DC ONSENT 2 17/11/2022 1:34:56 a.m.
16/11/2022 20013 JOB NUMBER
001
INDIVIDUAL - WILL - P2
130 Rangituhi Cres, Porirua, Wellington 5022
WILLIAM DU TOIT_300342087
SELECTED GRADUATE/EXPERIENCE WORK
As indicated Author 04/30/17
Drawn By: Date:
Sheet No:
Project No.
CHURCH HOUSE Scale:
C02
20013 Boulcott S3-BUILDING - WS-R20.rvt
PERSPECTIVE SECTION BB NO SCALE
MASTER OF ARCHITECUTE [MArch]
1
| JEFFREY HENRIQUEZ ERICES
I NFOR M AT ION
ABOUT ME
Age 26 [ 18/05/1997 ]
I am a graduate of architecture from Wellington, New Zealand, and I have over two years of extensive experience in the field. My portfolio demonstrates my involvement in various projects such as residential, commercial, healthcare, and social facilities, which I take immense pride in my work and achievements.
Nationality Chilean, New Zealander
Email Jeffhenriquez18@gmail.com Phone Number 64+ 021 146 9360
I am a highly motivated individual who performs well under pressure and actively seeks new challenges to foster personal and professional development. I have a sharp learning curve, and a strong work ethic and am determined to achieve my goals by consistently performing at the highest level.In addition to my mindset, I possess exceptional technical knowledge and conceptual skills. I am proficient in various architectural software such as Adobe Suite, Sketchup, AutoCAD, Revit, Maya, Unreal Engine, and Lumion, to deliver high quality results and provide innovative solutions to complex challenges. These skills have been honed through both my experiences and formal training. As an accomplished professional in the field of architecture, I am eager to continue expanding my knowledge and skills, making further contributions to the field. I am committed to delivering exceptional results in any role I undertake and am highly enthusiastic about the opportunity to create a meaningful impact wherever I go.
2
E DUC AT ION
SKILLS 3D Modeling Drafting & Scripting
Victoria Univesity of Wellington, School of Architecture
Autodesk: Revit, AutoCad, 3ds Max, Maya Sketchup
2019 - 2021 Master of Architecture [MArch] Thesis: A place of Displacement Supervisor: Daniele e lima Brue
Digital Image & Rendering Adobe CC: Photoshop, Illustrator, Indesign,Lighting room, Premier Pro, V-ray, Lumion and Twinmotion.
Victoria Univesity of Wellington, School of Architecture
Physical Modeling
2016-2019 Graduated: Bachelor of Architecutural Studies [BASArch] Wellington
3D printing and laser cutting file preparation, EPS Foam cutting, handcrafting of foam board and balsa wood, concrete casting.
Languages
Newlands College, Wellington
Spanish (Fluent) English (Fluent)
2011- 1015 NCEA Level One: Merit Endorsement NCEA Level Two: Merit Endorsement NCEA Level Three: Excellent Endorsement
WOR K EX PE RIE NCE CCM Architects | Wellington | January 2022 - Present Architecture Graduate Design Builders Ltd | Hawkes Bay | July 2021- November 2021 Architectural Graduate/Technician Victoria University of Wellington | March 2021 - July 2021 Tutor for SARC161 Russell Properties Ltd | Wellington | 2016 - 2018 | Tiling & Material Assistant Retail Sales Assistant
3
CONTEXT
4
Wilson
I 4
II
ROOF DETAIL SCALE 1:5
III
6 LEGEND METALCRAFT ESPAN ROOFING 2470
1. COVERED WALKWAY: TIMBER POST, BEAMS, PLASTIC COVER 2. STAIRS: RIMU STEPS, STEEL RAILING AND BALUSTRADE TO MATCH BLACK BEAMS
3
3. WALL: PLY WOOD INTERIOR FINISHING, STAINED. R2.4 INSULATION
3
4. WALL: RIMU PANELLING FEATURE WALL. R2.4 INSULATION 5. ROOFING/CLADDING: COLOURSTEEL ENDURA ESPAN® 470
3000
MASTER BEDROOM 3
9082
9
ENTRANCE
MASTER BEDROOM 1
8
8
6. FIRST FLOOR CEILING: EXPOSED RAFTERS, RIMU PANELLING OVER DUMMY RAFTERS
IV
8. GROUND FLOOR FLOORING: EXISTING CONCRETE POLISHED
TIMBER PURLIN
QUATER ROUND GUTTER EXTERNAL BRACKET
STST OR GALV. FLAT HEAD NAIL FOR FLASHING ESPAN CLIP SYSTEM W 12G x 35mm SCREWS
PRE-FINISHED 8g WAFER-TEK SCREW
TIMBER PACKER FASCIA BOARD
BUILDING PAPER SHOWN DASHED
SHADOWCLAD TIMBER CLADDING
7. GRAOUND FLOOR CEILING: RIMU PANELLING OVER EXISTING CEILING JOIST
2730
10
PRE-FINISHED EAVE FLASHING QUATER ROUND GUTTER
GROUND FLOOR LOUNGE SPACE
9. BEDROOM FLOORING: CARPET FINISH OVER EXISITNG PARTICLE BOARD, SELECTED BY PRINCIPLE
ROOF FRAMING
V
VI
HALLWAY SIGHTLINE TO LIVING SPACE AND GARDEN
10. LANDING FLOORING: HARDWOOD FINISH OVER EXISTING PARTICLE BOARD, SELECTED BY PRINCIPLE
ARCHITECTURAL DRAWINGS
BOULCOTT HOSPITAL THEATRE 4 AND 5 NORTH FACADE DETAIL WITH OUTDOOR BBQ AND CORNFIELD Boulcott Hospital 666 High Street, Lower Hutt NORTH BEDROOM The large bay windows at the North end of the house create a relaxing space to watch over the backyard. Facing the undeveloped hill to the North, the windows pull the surrounding nature into the bedroom.
VII
VIII
OFFICE SPACE
Located in the centre of the house, the office space looks to the West with a floor to ceiling window offering a sightline directly to the church/garage.
IX
TENDER CONSENT FFOR O R TE NDER AN& DC ONSENT 2 17/11/2022 1:34:56 a.m.
16/11/2022
Project No.
001
INDIVIDUAL - WILL - P2
CHURCH HOUSE Scale: WILLIAM DU TOIT_300342087
X
XI
5
130 Rangituhi Cres, Porirua, Wellington 5022
As indicated Author 04/30/17
Drawn By: Date:
XII
C02
20013 Boulcott S3-BUILDING - WS-R20.rvt
20013 JOB NUMBER
Sheet No:
ULBE HEIGHT SPACE
BUILDING PAPER SHOWN DASHED
I TH E SIS R E SEARCH:
SY R I A A PL AC E BEYOND DISPL ACEMENT MASTER DESIGN RESEARCH / April 2021
In a state of emergency with multiple transitions and disorientation disasters, wars and political conflicts have resulted in a humanitarian crisis and the displacement of more than 11 million people in the Syrian Arab Republic, transforming their homes, livelihoods, and lives of individuals (UNESCO) This design-led research investigation argues that the fields of architecture and preservation can contribute to a tailored experiential story of war-torn heritage sites by managing, manipulating, and renewing the build conditions, to sustain a place and its cultural identity. As a design-led research thesis, the research focuses on the design exploration of post-conflict preparations. This alternative narrative reconsiders design thinking as a tool for intervention, mutual collaborations, tactics, and policies that can be more actively employed during times of conflict, safeguarding the site’s historical narrative while envisioning a more pragmatic solution for a reality affected by the war.
6
TOOLS: Rhino Sketchup Photoshop Illustrator Indesign Vray Lumion Twinmotion
Fig 1.
Site drawing of Aleppo, Al-Madina
7
PROJECT OBJECTIVE To cover the need for the city, existing plans for those buildings are not kept the same way. The goal was to essentially create a form without a predetermined program that made the design distinctive, demanding the invention of new programs corresponding to the new, post-war conditions. The idea was to restore ‘normalcy’ (Woods 6), where the normal is the new way of living lost due to the war. The design also took into consideration the balance between old and new functions within the structure. Thus, retaining its spatial composition and material (plain concrete). A distinctive geometric form that was drawn from the design was the circular shape. The plan acts as a monumental scale that represents the structure of time between old and new. The initial motive began as a structure that can juxtapose the overall environment while acting as the heart for the urban design. Its meaning is derived from the concept that it has no beginning and no end; it replicates itself, and it ends where it started. The interior of this circular space would become the embodiment of absence (the absence caused by the war). On the other hand, the exterior becomes the breaking point that neglects traditional ways of rebuilding.
8
9
URBAN STRATAGIES
Symbolic sequence of Space
Element of reference
Core and boundary
Urban intregration
10
Fig 2.
Final Site Plan
What was important for this thesis was highlighting the importance of the role architecture has in determining the unpredictable. Social and symbolic connotations characterize a programmatic sequence that is not based on predetermined functions but instead becomes a series of halting points where events occur, more like a family of spatial issues linked by continuous movement. This movement is framed each time by cultural information. Thus, courtyards, public spaces and can characterize their true history. Answering the thesis question, it is essential for future generations not to imitate the structure but instead recreate the spontaneity of events and rituals, which is the substance of any city’s matter.
11
Fig 3.
Final Site Plan
Fig 4.
Final Site Plan
12
Fig 5.
Final Site Plan
Fig 6.
Final Site Plan
13
Fig 7.
Alleyways
Fig 8.
Alleyways
14
Fig 9.
Alleyways
15
16
17
Fig 10.
Render Final
18
19
DE SIGN BUILDERS: RESIDEN T I AL A
Kent Cresent, Waihi/ HAURAKI 2021
For DESIGN BUILDERS LTD I worked on multiple residential projects over this year. The role included measuring existing houses, creating working CAD models, and assembling project drawing sets through the concept, preliminary and detailed design phases.
Chief Architects/ ArchiCAD Lumion A Photoshop A
4 4
4
Abodo Vulcan (WB10) Vertical Weather Board on door 3
4 3
Abodo Vulcan (WB10) Vertical Weather 3 cladding on H3.1 prime LOSP cavity Board 1 system, over selected building wrap. To be W14 installed to manufacturer's specifications.
25.0° W09
W08
W13
A 3
W09
W13
FPL -0.150
FGL -0.225
FPL -0.150
FGL -0.225
W14
A
B
FFL 0.000
B
A
B A
B A
ELEVATION THREE
A4
A
30.0°
A
4
A
B
30.0°
A
A
A
A
4
A
A
ELEVATION THREE
A
FFL 0.000
3
W08
Elevation East
2
Abodo Weather Board cavity system, be installed to
A
3
3
Abodo Weather Board cavity system, be installed to
A Abodo Vulcan (WB10) Vertical Weather Board on door
B A
2
2
A
A
5 250
4
3
5 250
A
Abodo Vulcan (WB10) Vertical Weather Board cladding on H3.1 prime LOSP cavity 1 system, over selected building wrap. To be 4 installed to manufacturer's specifications.
25.0°
2
A
TOOLS:
A4
A
5 250
al Loadbearing Timber Wall Framing: ud - 90x45 H1.2 SG8 Studs @ 400 Crs 1
W19
l Loadbearing Timber Wall Framing: H1.2 SG8 Studs @ 400 Crs MING KEY: l Non - Loadbearing Wall Framing: al Loadbearing Timber Wall Framing: H1.2 600Studs Crs, dwangs 12001Crs ud - SG8 90x45Studs H1.2@ SG8 @ 400 Crs
3
2
30.0° 3
30.0° 3
3
3
1
5 250
W04
FFL 0.000
Wilson
Elevation West
FFL 0.000 ding l NonOne: - Loadbearing Wall Framing: ted Board and batten cladding at 3001200 centers H1.2 SG8 Studs @ 600 Crs, dwangs Crson Cavity system, over selected building wrap. To be ed to manufacturer's specifications
TES: ding Two: o Horizontal WB 125x20 Ship-lap cladding, on ding cavityOne: system. To be installed to manufacturers ted Board andselected batten cladding 300 centers on ications over building at wrap. Cavity system, over selected building wrap. To be ow & manufacturer's Door Joinery: specifications ed to c residential suite 35 series residential window ding Two: to manufacture’s specifications y installed o Horizontal WB 125x20 Ship-lap cladding, on ng: system. To be installed to manufacturers cavity steel Trimform metal roofing, complete ications over selected building wrap. with ing angle capping to hips, ridges and barges. ow & Door Joinery: installed to manufacturer's specifications c residential suite 35 series residential window y installed to manufacture’s specifications
W07
2
3 W04
A
3
3 W05
FPL -0.150
FGL -0.225
A
3 W06
1 W07
A
A
ELEVATION FOUR
ELEVATION FOUR
Scheme Plan for:
TES: ng:
steel Trimform metal roofing, complete with ng ing One: angle capping to hips, ridges and barges. Hardie Linea 180 weatherboard cladding on H3.1 installed to manufacturer's specifications system, over James Hardie 4.5mm HomeRAB. To alled to manufacturer's specifications.
Gutter and Fascia: Lot: 4 Selected Colorsteel 1/4 round section gutters DP: 92068 on Selected 180 Colorsteel fascia
TES: ng Two:
residential ng Two: suite 35 series residential window to manufacture’s specifications linstalled Abodo Vulcan Hector WB10 145x20 Ship-lap ng, on H3.2 castellated CCA cavity system, ng: ames Hardie 4.5metal HomeRAB. be installed teel corrugated roofing,To complete withto acturers ng anglespecifications capping to hips, ridges and barges.
W06
FGL -0.225
A
3
l Loadbearing Timber Wall Framing: TES: H1.2 SG8 Studs @ 400 Crs
l Abodo Vulcan Hector WB10 145x20 Ship-lap ngon One: ng, H3.2 castellated CCA cavity system, Hardie Linea4.5 180HomeRAB. weatherboard cladding ames Hardie To be installedontoH3.1 system, over James Hardie 4.5mm HomeRAB. To acturers specifications alled to manufacturer's specifications. w & Door Joinery:
FPL -0.150 W19
W05
A
MING KEY:
II
M & S Wilson Kent Cresent Waihi
Timber Floor: 20mm Kopine Ultralock on 290x45 SG8 H1.2 joists @ 400 Crs
Version: 15/09/2021 Elevations Title: Scale: 1:100 Job no: 22023 Designer: Design Builders Services Ltd TABLE 7: E2 METAL FLASHING DIMENSIONS - HIGH WIND ZONE
Concrete Floor: All Plan Design, and Associated Documents, the © Copyright Intellectual of Design Builders Ltd and cannot be reproduced in whole or in part without the expressed written permission of the Company. All Rights Reserved. FirthisRibraft 20Mpa and concrete floor,Property see details for more information Hardigroove Soffit: Scheme Plan for: Version: TRANSVERSE FLASHING OVER15/09/2021 ROOF 130mm - FIG 7 & FIG 44 APRONS 7.5mm Hardigroove soffits with 'V' Butt joints, use Trusses: GENERAL Elevations Title: PARALLEL FLASHING OVER ROOF Two crests, finish in next trough full sheets as a preference where possible Nail plate trusses to Carters manufacturer’s specifications Gutter and Fascia: Timber Floor: RIDGES TRANSVERSE FLASHING Lot: 4 Scale:OVER1:100 REFER TO APRONS GENERA Wall and Ceiling Insulation: Purlins: 20mm Kopine Ultralock on 290x45 SG8 H1.2 joists @ 400 Crs Selected Colorsteel 1/4 round section gutters / HIPS ROOF Wall insulation Pink Batts R2.6, ceiling DP: insulation 92068 R3.6 75x45 H1.2 SG8 purlins on the flat @ 900 Crs Max, first Job no: 22023 Designer: Design Builders Services Ltd on Selected 180 Colorsteel fascia OVERLAP CLADDING - FIG 10 CAPPINGS Concrete TABLE 7: E2 METALTO FLASHING DIMENSIONS50mm - HIGH WIND ZONE Purlin spanFloor: @ 600mm. See roof plan for fixing to trusses Ceiling Linings: All Plan Design, and Associated Documents, the © Copyright Intellectual of Design Builders Ltd and cannot be reproduced in whole or Slope in part without theparapet expressed permission of5ºthe Company. Rights Reserved. to top of 5º written Min, balustrade Min - Metal All Capping FirthisRibraft 20Mpa and concrete floor,Property see details for more information Hardigroove Soffit: All ceiling linings to be 13mm standard Gib board, with TRANSVERSE FLASHING OVER ROOF 130mm - FIG 7 & FIG 44 APRONS ROOF/ use 7.5mm Hardigroove soffits with 'V' Butt joints, REFER TO APRONS GENERA OVERLAP TO ROOFING Trusses: 13mm Gib Aqualine to wet areas on 70x35 H1.2 ceiling GENERAL PARALLEL FLASHING OVER ROOF Two crests, finish in next trough DECK full sheets preference where possible Nail plate trusses to Carters manufacturer’s specifications 75mm MIN. battens @ as 450a Crs LAP UNDER CLADDING ABOVE TO WALL RIDGES TRANSVERSE FLASHING OVER REFER TO APRONS GENERA Wall Ceiling Insulation: 35mm MIN. CLEARANCE BELOW CLADDING Purlins: Wall and linings: / HIPS ROOF Wall insulation Pink ceiling insulation R3.6 75x45 H1.2 SG8 purlins on the flat @ 900 Crs Max, first WIN HEAD LAP UNDER CLADDING ABOVE 40mm - FIG 10 All wall linings to be Batts 10mmR2.6, standard Gib board with Gib OVERLAP TO CLADDING 50mm CAPPINGS Purlin span @ 600mm. See roof plan for fixing to trusses AqualineLinings: to wet areas. 9mm Okume ply to garage walls Ceiling Slope to top of parapetTO 5º CLADDING Min, balustrade 5º 50x50mm Min - Metal Capping CORNER CORNER FLASHING All ceiling linings to be 13mm standard Gib board, with ROOF/ REFER TO APRONS GENERA OVERLAP TO ROOFING 13mm Gib Aqualine to wet areas on 70x35 H1.2 ceiling DECK 75mm MIN. battens @ 450 Crs LAP UNDER CLADDING ABOVE TO WALL Floor: Block Wall/ Retaining Wall: Concrete 35mm MIN. CLEARANCE BELOW CLADDING WallHardieflex linings: Soffit: 190mm Block wall. To be installed to manufacturer's and X-Pod 20Mpa concrete floor to engineers specifications, 4.5mm Hardieflex soffitsstandard with PVC joints, use fullGib WIN HEAD LAP UNDER CLADDING ABOVE 40mm All wall linings to be 10mm Gib board with engineer's specifications. 45x45 battens to internal wall to see details for more information sheets as a preference where possible Aqualine to wet areas. 9mm Okume ply to garage walls living areas with DPC behind & masonry Batts insulation CORNER CORNER FLASHING TO CLADDING 50x50mm Concrete Floor: Gutter and Fascia: 100mm 20Mpa concrete floor with concrete block foundation Concrete Block Tanking: Selected Colorsteel 125 box section gutters walls and concrete footings, see details for more information Marshall Protecto wall tanking with Marshall pro-drain 8 over. Backfill on Hardies 180mm Linea Axent fascia Block Wall/ Retaining Wall: with free drainage material wrapped in Geotextile material behind, Concrete Floor: Hardieflex Soffit: Ceiling Linings: Wall Framing: 190mm wall. be installed tostormwater manufacturer's and waste coil drainBlock to base of To footing falling to X-Pod 20Mpa concrete floor to engineers specifications, 4.5mm Hardieflex with PVC joints, All ceiling linings tosoffits be 10mm Ultraline Gibuse full Timber framing as per Lintel and Framing plan Sheet 5.00 45x45 battens to internal wall to engineer's specifications. see details for more information sheets as a 10mm preference where possible board, with Gib Aqualine to wet areas living areas with DPC behind & masonry Batts insulation Concrete Floor: on 70x35 H1.2 ceiling battens @ 450 Crs Gutter and Fascia: 100mm 20Mpa concrete floor with concrete block foundation Concrete Block Tanking: Selected Colorsteel 125 box section gutters walls and concrete footings, see details for more information Marshall Protecto wall tanking with Marshall pro-drain 8 over. Backfill on Hardies 180mm Linea Axent fascia with free drainage material wrapped in Geotextile material behind, Ceiling Linings: Wall Framing: coil drain to base of footing falling to stormwater waste All ceiling linings to be 10mm Ultraline Gib Timber framing as per Lintel and Framing plan Sheet 5.00 board, with 10mm Gib Aqualine to wet areas on 70x35 H1.2 ceiling battens @ 450 Crs
M & S Wilson Kent Cresent Waihi
22023_Wilson_SP_210825 SCALE 1:100 D QUIRE AS RE E T A D 22023_Wilson_SP_210825 SCALE 1:100 UP
w & Door nstalled to Joinery: manufacturer's specifications residential suite 35 series residential window installed to manufacture’s specifications steel Trimline Metal: ng: teel Trim-line profile Vertical cladding, on Cavibat teel corrugated metal roofing, with with system, over selected buildingcomplete wrap complete ng corner angle capping to hips, ridges and barges. ng and window flashings nstalled to manufacturer's specifications al Ship-lap Weather Board: Vertical Ship-lap Weather Board cladding on H3.2 steel Trimline Metal: ated CCA cavity system, over selected building wrap. teel Trim-line profile Vertical cladding, on Cavibat nstalled to manufacturer's specifications system, over selected building wrap complete with steel Trimline Roofing: ng and window flashings eelcorner Endrua Trimline Profile metal roofing,
ete with matching angle capping to hips, ridges and al Ship-lap Weather Board: . To be installed manufacturer's specifications Weather Board cladding on H3.2 Vertical Ship-lap to ated CCA cavity system, over selected building wrap. nstalled to manufacturer's specifications steel Trimline Roofing: eel Endrua Trimline Profile metal roofing, ete with matching angle capping to hips, ridges and . To be installed to manufacturer's specifications
Eleva Eleva
EQ E AS R UPDAT
20
UIRED
D RE UI Q E SR A TE ED IR DA U P Q U E SR A TE DA P U
3
Ground Floor Plan
W09
W08
N
N
Waihi
6 x 2m POOL BY OTHERS
W07
W10
ENSUITE 3 000 X 2 800 8.4 SQ M
TEST SHOR NE 21 DAY JU DAY EST LONG MBER 21 DECE
m 0p 6 5.0 1/0 2
760
am 7.45 6 21/0
8.30pm 21/12
MASTER BDRM
m 0a 2 6.0 1/1 2
Y: Hauraki District ntial
760 760
4 290 X 4 100 18.69 SQ M STUD HEIGHTS @2605mm
WIW 3 000 X 1 800 5.4 SQ M
A
-130
STORAGE 3 000 X 1 500 4.5 SQ M
BEDROOM 2 UNCOVERED COURTYARD
TILES
TILES
3 200 X 3 500 11.97 SQ M
GLASS
2m m m m
TITLE SHEET EXTENT @ SCALE 1:100
W11
710
810
810 closet
2 500 X 3 070 7.72 SQ M
5 720 X 3 379 19.4 SQ M
810
W17
LAUNDRY 3 200 X 1 710 5.47 SQ M
w.oven
hob
2 380 X 2 690 7.21 SQ M 1 700 X 3 289 5.59 SQ M
W16
KITCHEN HALL
W05
BEDRM 4 / STUDY 3 000 X 3 500 10.5 SQ M
W01
W02
W03
fr.
810 W20
ATTIC LADDER ATTIC
W18
810
ATTIC LADDERmedia with built in gallery shelving
SCULLERY
ENTRY
UNLESS OTHERWISE NOTED
1 200 X 2 155 2.59 SQ M
2 850
W04
6 045 X 5 000 29.71 SQ M
SITTING
810
LIVING
W15
27.70m² NOTED R LIVING)
4
closet
1 800
DINING 5 055 X 3 070 15.52 SQ M
810
249.6m²
3 200 X 3 500 11.97 SQ M
810
2
WC 3 000 X 1 400 4.2 SQ M
BEDROOM 3
1 400
SCISSOR TRUSSES
B
810
W13 BULKHEADBULKHEAD
W14 209.3m² 40.3m²
BATH 3 000 X 3 200 9.6 SQ M
W12
B
W06
closet
BULKHEAD
PORTICO
810
1 800 SCISSOR TRUSSES
E: TBC : 80m2 8m Circle
W21
A
LADDER
ATTIC TRUSSES STORAGE ABOVE
STUD HEIGHTS @2605mm
NO
GARAGE 6 000 X 6 400 38.37 SQ M
DO the
W19
ATTIC TRUSSES STORAGE ABOVE
STORAGE TRUSSES ABOVE
All c NZS NZB
Pro and
A
NISHES:
AREA = 31m² =E56m²
1
A
RPET AREA = 96.5m²
Cross Section A-A
A
CKING AREA = 28m²
A
30°
A
NCRETE = 45m²
Scheme Plan for:
PRESENTATION
M & S Wilson Kent Cresent Waihi
Version: 15/09/2021 PRESENTATION TEXT TEXT Floor Plan Title: 4 1:125 Scale: Job no: 22023 Designer: Design Builders Services Ltd
Lot: 4 DP: 92068
30°
4
A
4
TITLE SHEET EXTENT @ SCALE TITLE SHEET EXTENT @ SCALE 1:100 1:100
GD01
MBER OVERLAY AREA = 56m²
B
20°
PRESE All Plan Design, and Associated TRUSSES AS PER Documents, is the © Copyright and Intellectual Property of Design Builders Ltd and cannot be reproduced in whole or in part without the expressed written permission of the Company. All Rights Reserved. TEXT
MANUFACTURERS SPECIFICATIONS M VENTILATION CALCULATION SPREADSHEET: J:\02. Design Team\02. Design Team (VENTILATION SCISSOR TRUSSES AS PER MANUFACTURERS ON CALCULATION SPREADSHEET: J:\02. Design Team\02. Design Team (VENTILATION B SPECIFICATIONS x)
A
1
1
2
B
NOTE
A
A
A
1
1
22023_Wilson_SP_210906 SCALE 1:100 ATION CALCULATION SPREADSHEET: J:\02. Design Team\02. Design Team (VENTILATION SCALE 1:100 BEDROOM 3
A
PATIO
A
A
2 605
HALL
A
2 605
BATHROOM
22023_Wilson_SP_210825 22023_Wilson_SP_210825 SCALE 1:100 A
W02
W14
FFL 0.000
WALL FRAMING KEY:
FPL -0.150
A
External Loadbearing Timber Wall Framing: A 3055 Stud - 90x45 H1.2 SG8 Studs @ 400 Crs
FFL 0.000 FGL -0.225
FPL -0.150
FGL -0.225
Loadbearing Timber Wall Framing: B Internal 90x45 H1.2 SG8 Studs @ 400 Crs
Non - Loadbearing Wall Framing: C Internal 90x45 H1.2 SG8 Studs @ 600 Crs, dwangs 1200 Crs
A
A
A
A A
B
Window & Door Joinery: STORAGE TRUSSES AS PER Pacific residential suite 35 series residential window MANUFACTURERS joinery installed to manufacture’s specifications SPECIFICATIONS Roofing: Colorsteel Trimform metal roofing, complete with 2 matching angle capping to hips, ridges and barges. To be installed to manufacturer's specifications
SCISSOR TRUSSES AS PER MANUFACTURERS SPECIFICATIONS
Window & Door Joinery: Pacific residential suite 35 series residential window joinery installed to manufacture’s specifications
LAUNDRY
M & S Wilson Kent Cresent Waihi
B
LIVING Timber Floor: 20mm Kopine Ultralock on 290x45 SG8 H1.2 joists @ 400 Crs
B Concrete Floor:
Cross Section B-B 1:50
PORTICO
1
Hardieflex Soffit: 4.5mm Hardieflex soffits with PVC joints, use full sheets as a preference where possible GutterA and Fascia: Selected Colorsteel 125 box section gutters on Hardies 180mm Linea Axent fascia Ceiling Linings: All ceiling linings to be 10mm Ultraline Gib board, with 10mm Gib Aqualine to wet areas on 70x35 H1.2 ceiling battens @ 450 Crs
E AS UPDAT
ED REQUIR
Block Wall/ Retaining Wall: 190mm Block wall. To be installed to manufacturer's and engineer's specifications. 45x45 battens to internal wall to living areas with DPC behind & masonry Batts insulation
A
Concrete Block Tanking: Marshall Protecto wall tanking with Marshall pro-drain 8 over. Backfill with free drainage material wrapped in Geotextile material behind, coil drain to base of footing falling to stormwater waste
21
TO WALL
2 605
A
1 COPY CAD Job no:NAME 22023 Designer: Design Builders Services Ltd TABLE 7:BLOCK E2 METAL FLASHING DIMENSIONS - HIGH WIND ZONE 2 UN-GROUP CAD Firth Ribraft 20Mpaand concrete floor, see details for Builders more information Hardigroove Soffit: All Plan Design, and Associated Documents, is the © Copyright Intellectual Property of Design Ltd and cannot be reproduced in whole or in partBLOCK without the expressed written permission Company. All Rights Reserved. TRANSVERSE FLASHING OVER ROOFof the130mm - FIG 7 & FIG 44 A APRONS 7.5mm Hardigroove soffits with 'V' Butt joints, use 3 CHANGE LEVEL AS REQUIRED Trusses: A AGENERALTEXT PARALLEL FLASHING OVER ROOF Two crests, finish in next trough - FIG 47 full sheets as a preference where possible 4 RE-GROUP ITEMS Nail plate trusses to Carters manufacturer’s specifications RIDGES REFER TO APRONS GENERAL Wall and Ceiling Insulation: 5 PASTE SAMETRANSVERSE CAD BLOCKFLASHING NAME. OVER Purlins: / HIPS ROOF Wall insulation Pink Batts R2.6, ceiling insulation R3.6 75x45 H1.2 SG8 purlins on the flat @ 900 Crs Max, first 6 ALL CASES OF SYMBOL IN DRAWING SET OVERLAP TO CLADDING 50mm - FIG 10 CAPPINGS Purlin span @ 600mm. See roof plan for fixing to trusses Ceiling Linings: SHOULD CHANGE TO Slope to topUPDATED of parapet 5ºLEVELS Min, balustrade 5º Min - Metal Capping All ceiling linings to be 13mm standard Gib board, with ONROOF/ SECTIONS, ELEVATIONS, AND DETAILS REFER TO APRONS GENERAL OVERLAP TO ROOFING 13mm Gib Aqualine to wet areas on 70x35 H1.2 ceiling DECK CAD BLOCK TO SUIT USE 7 SCALE 75mm MIN. battens @ 450 Crs LAP UNDER CLADDING ABOVE Wall linings: All wall linings to be 10mm standard Gib board with Gib Aqualine to wet areas. 9mm Okume ply to garage walls
300
Loadbearing Timber Wall Framing: B Internal Colorsteel Trimline Metal: 90x45 H1.2 SG8 Studs @ 400 Crs Colorsteel Trim-line profile Vertical cladding, on Cavibat cavity system, over selected building wrap complete with Internal Non - Loadbearing Wall Framing: C 90x45matching corner and window flashings H1.2 SG8 Studs @ 600 Crs, dwangs 1200 Crs Vertical Ship-lap Weather Board: Cedar Vertical Ship-lap Weather Board cladding on H3.2 castellated KEY NOTES: CCA cavity system, over selected building wrap. To be installed to manufacturer's specifications Cladding One:Trimline Roofing: Colorsteel 1 Selected BoardEndrua and batten cladding 300 centers Colorsteel Trimline Profileatmetal roofing,on H3.1 Cavity system, over selected buildingtowrap. be and complete with matching angle capping hips,To ridges
Scale:
1
22023_Wilson_SP_210825 SCALE 1:100
Roofing: WALL FRAMING KEY: Colorsteel corrugated metal roofing, complete with matching angle capping to Wall hips,Framing: ridges and barges. External Loadbearing Timber A 3055 To be-installed to manufacturer's Stud 90x45 H1.2 SG8 Studs @ specifications 400 Crs
2
Version: 15/09/2021 300 x 63mm HYSPAN BEAM Title: FLOOR LEVELS FOR PLANS:
A
Scheme Plan for: Gutter and Fascia: Lot: 4 Selected Colorsteel 1/4 round section gutters DP: 92068 on Selected 180 Colorsteel fascia
A
Cladding Two: Vertical Abodo Vulcan Hector WB10 145x20 Ship-lap cladding, on H3.2 castellated CCA cavity system, over James Hardie 4.5 HomeRAB. To be installed to manufacturers specifications
SCISSOR TRUSSES AS PER MANUFACTURERS SPECIFICATIONS
2
KEY NOTES: Cladding One: GARAGE James Hardie Linea 180 weatherboard cladding on H3.1 1 cavity system, over James Hardie 4.5mm HomeRAB. To be installed to manufacturer's specifications.
4
A
4
4
A
3
Cladding Two: Abodo Horizontal WB 125x20 Ship-lap cladding, on H3.2 cavity system. To be installed to manufacturers specifications over selected building wrap.
A
2
Cladding One: Selected Board and batten cladding at 300 centers on H3.1 Cavity system, over selected building wrap. To be installed to manufacturer's specifications
2 605
1
A
300
KEY NOTES: Cross Section B-B
A
T DA
EQ SR EA
D RE UI
35mm MIN. CLEARANCE BELOW FFLCLADDING 0.000 FLOOR LEVELS FOR PLANS: UPCLADDING LAP UNDER ABOVEFPL -0.150 40mmFGL -0.225
WIN HEAD CORNER
CORNER FLASHING TO CLADDING
50x50mm
1 COPY CAD BLOCK NAME 2 UN-GROUP CAD BLOCK Concrete Floor: X-Pod320Mpa concrete TEXT floor to engineers specifications, CHANGE LEVEL AS REQUIRED see details for more information 4 RE-GROUP ITEMS Concrete Floor: FLOOR LEVELS FOR PLANS: 5 PASTE SAME CAD BLOCK NAME. 100mm 20Mpa concrete floor with concrete block foundation walls6 and concrete footings,OF see details for more IN information ALL CASES SYMBOL DRAWING SET Wall Framing: SHOULD CHANGE TO UPDATED LEVELS 1 COPY CAD BLOCK NAME Timber framing as per Lintel and Framing plan Sheet 5.00 ON SECTIONS, ELEVATIONS, AND DETAILS 2 UN-GROUP CAD BLOCK 7 SCALE 3CAD BLOCK TO SUIT USE CHANGE TEXT LEVEL AS REQUIRED
DO NOT the desi
All cons NZS360 NZBC.E
Produce and/or L
B
D
F
B
D
F
III DE SIGN BUILDERS: RESIDEN T I AL 15 Long Street, Raglan/ WAIKATO 2021
My role for this job mainly included the site plan to meet the zoning rules and district plans required. Other jobs also required me to draft the exiting house and prepare renders for client presentations and final construction plans using estimates and specifications provided.
TOOLS: Chief Architects/ ArchiCAD Lumion Photoshop
7.5m Max Rolling Height
4
4
Roof Plane 30.0° 68.52 m²
4
W22
2
1
W23
Roof Plane 30.0° 95.88 m²
1
W10 W11
3
4
W24
1
1
W15
W12
W13
1
3
W14
3
FFL 0.000
FPL -0.150
FGL -0.225
ELEVATION ONE
Elevation South
4 1 3 4
W21 2
RE
4 1 2 ON
3
1
CE S
3
W05
2
W07
I SS E CE AN R E PL
SI
ON
PL AN
E
FFL 0.000
ELEVATION TWO Scheme Plan for: Lot: 3 DP: 36876
Eric and Heather Griffin 15 Long Street Raglan
Version: 16/07/2021 Elevations Title: Scale: 1:100 Job no: 21073 Designer: DW
All Plan Design, and Associated Documents, is the © Copyright and Intellectual Property of Design Builders Ltd and cannot be reproduced in whole or in part without the expressed written permission of the Company. All Rights Reserved.
22
N N
Ground Floor Plan 3
5.00p m 21/0 6
2 999
4 672
A
4 672
B
W01
C
A
DECK 4.47m²
STUDY
s-gate to eck storage
5
GD02
GD01
4
Open Shelves
FFL
5
GD01
FFL
STUDY
1 700 X 2 135 3.63 SQ M
W17
2
GD02
1 700 X 2 135 3.63 SQ M
W01
W17 DECK 4.47m²
Service
810
Open Shelves
W10
C
First Floor Plan
B
W15 PATIO 12.82m²
pm 30 2 8. 1/1 2
W16
3 000
10 105 X 6 600 62.33 SQ M
W14
6.00 am 21/1 2
W16
1 700 X 2 495 4.24 SQ M
LAUNDRY
X 1 305 1650 120 0.85 SQ M
STORA
15m²
5.00p m 21/0 6
2,605mm Stud Height GARAGE
2,605mm Stud Height
W13
O UN DA 21 SH Y J T DA ES BER NG M LO ECE D m a 45 6 7. 1/0 2
10 105 X 6 600 62.33 SQ M
W13
W15 PATIO 12.82m² A
W14
B
1
C
1 700 X 2 495 4.24 SQ M
810 1
W12
LAUNDRY
1
1
W11
W12 STORA
FFL
TV on Wall
Full-Height Privacy Screen
W11
8
FIREPLACE
W10
X 1 305 1650 120 0.85 SQ M
Full-Height Privacy Screen
8
FFL
TV on Wall
4 RTESTECourt 21 Y
N
GARAGE
OTED FIREPLACE
A 3
A
B W19
810
4 315 X 3 415 14.78 SQ M
2,605mm Stud Height
MASTER BDRM
COVE
W18
W20 Window Seat
ENSUITE
W28
3 180 X 2 090 8.85 SQ M
W29
W27
Window Seat
W26
2,605mm Stud Height
2 020
CLOSET
1 530 X 800 1.22 SQ M
1 320
HALL
810
2 090 X 2 925 6.11 SQ M
600 X 2 210 1.33 SQ M
Half-Height Wall
BATH
810
W21
6.95 SQ M
1 720 X 3 500 8.53 SQ M
Version: 16/07/20212.915mm Eric and Heather Griffin BEDROOM 2 2.915mm 4 000 X 3 500 Title: Ground FloorFFL Plan FFL 14.0 SQ M 15 Long Street Lot: 3 Scale: 1:100 Raglan DP: 36876 DN Job no: 21073 16/07/2021 Designer: DW Scheme Plan for: Version: Eric and Heather Griffin All Plan Design, and Associated Documents, is the © Copyright and Intellectual Property of Design Builders Ltd and cannot be reproduced in whole or in part without the expressed written permission of the Company. All Rights Reserved. Ground Floor Plan Title: BEDROOM 3 15 Long Street STORAGE 2 Lot: 3 3 590 X 3 900 OPEN BELOW Scale: 1:100 WIW 14.89 SQ M 4 315 XRaglan 1 600 DP: 36876 810 810 Job no: 21073 Designer: DW Scheme Plan for:
COVE COVE COVE 000 Xwithout 4 015 All Plan Design, and Associated Documents, is the © Copyright and Intellectual Property of Design Builders Ltd and cannot be reproduced in whole or in 1part the expressed written permission of the Company. All Rights Reserved. CLOSET 13.89 SQ M
W22
W23
B
4 30º
A
30º
ON SI
A PL
NE
4
225mm Heel Height
225mm Heel Height
RE
1
Scheme Plan for: 1
Lot: 3 DP: 36876
Eric and Heather Griffin 15 Long Street C) W07 (TB Level Existing Ground Raglan
2 605
S CE
2 020
2 210 X 600 1.33 SQ M
W25
240x45 SG8 Exposed Rafters
3
RE
W24
1
Section B-B
3
Version: 16/07/2021 First Floor Plan Title: Scale: 1:100 Job no: 21073 Designer: DW
CE S
SI
ON
PL AN
E
LIVING All Plan Design, and Associated Documents, is the © Copyright and Intellectual Property of Design Builders Ltd and cannot be reproduced in whole or in part without the expressed written permission of the Company. All Rights Reserved. FFL 0.000 FPL -0.150 FGL -0.225
Existing Ground Level (TBC)
23
Service Court 15m²
3 000
2 999
B
6.00 am 21/1 2
6.00 am 21/1 2
pm 30 2 8. 1/1 2
3
C
T ES 21 5.00p RT m E Y 2O1 JUN DA 21 SH /0 Y6 T DA ES ER G B N M LO ECE D m a 45 6 7. pm /0 30 212 8. 1/1 2
T ES 21 RT E Y O UN DA 21 SH Y J T DA ES ER G B N M LO ECE D m a 45 6 7. 1/0 2
A A
A A
A
A
DE SIGN BUILDERS: RESIDEN T I AL 85 Oak Road Poraiti/ NAPIER 2021
L TA OR LP L EE WAL ST
W22
3
3
Roof Plane 25.0° 37.74 m²
IN
W23
A
A
W24
W25
W27
W26
7 490 O/A height
IV
W28 Roof Plane 25.0° 18.03 m²
In this role I worked on creating working CAD models, and assemblingW13 project drawing sets 1 through the concept, preliminary, detailed design 4 W12 W14 W11 phases, and most importantly assist with council Requests for Further Information
Roof Plane 3.0° 48.15 m²
TOOLS:
1
FLOOR LEVEL: 1 - 21034_Bold_PD_210601 W16
W15
W17
Chief W18 Architects/ ArchiCAD W19 Lumion Photoshop
2
4
1
FFL 0.000
FPL -0.150
FGL -0
ELEVATION ONE
3
TES:
ladding One: elected board and batten cladding on H3.1 cavity ystem, over selected RAB. To be installed to anufacturer's specifications
Block Wall/ Retaining Wall: 190mm Block wall. To be installed to manufacturer's and engineer's specifications. 45x45 battens to internal wall to living areas with DPC behind & masonry Batts insulation
ladding Two: elected 70mm brick cladding with raked joints over elected RAB, with 50mm cavity on 120mm rebate. To be stalled to manufacturer's specifications
Hardieflex Soffit: W35full 4.5mm Hardieflex soffits with PVC joints, use sheets as a preference where possible
oof Cladding: elected Colorsteel metal roofing, complete with matching ngle capping to hips, ridges and barges. To be installed to anufacturer's specifications
indow & Door Joinery: elected residential window joinery installed to manufacture’s pecifications
Wall and Ceiling Insulation: Wall insulation R2.2, ceiling insulation R3.6
3
Ceiling Linings: All ceiling linings to be 10mm standard Gib board, with 10mm Gib Aqualine to 2 wet areas on 70x35 H1.2 ceiling battens @ 450 Crs Wall linings: All wall linings to be 10mm standard Gib board W06 with Gib Aqualine to wet areas. 10mm Strand board to garage walls
Roof Plane 25.0° Timber Floor: 34.24 m² 20mm Kopine Ultralock flooring on 290x45 SG8 H1.2 floor joists @ 400 Crs
Concrete Floor: 1 100mm 20Mpa concrete floor with concrete block foundation 4 W36 and concrete walls footings, see details for more information Concrete Block Tanking: 3 Marshall Protecto wall25º tanking with Marshall pro-drain 8 over. Backfill with free drainage material wrapped in Geotextile material behind, coil drain to base of footing falling to stormwater waste
ED EQUIR RW10 1 4 AS E T A W07UPD
TABLE 7: E2 METAL FLASHING DIMENSIONS - H APRONS GENERAL RIDGES / HIPS CAPPINGS
TRANSVERSE FLASHING OVER ROOF
130mm
WIN HEAD
PARALLEL FLASHING OVER ROOF Two cr TRANSVERSE FLASHING OVER REFER ROOF OVERLAP TO CLADDING 50mm Slope to top of parapet 5º Min, balustrade 5º Min - M REFER OVERLAP TO ROOFING 75mm LAP UNDER CLADDING ABOVE 35mm CLEARANCE BELOW CLADDING LAP UNDER CLADDING ABOVE 40mm
CORNER
CORNER FLASHING TO CLADDING
ROOF/ DECK TO WALL
FFL 0.000
E IR U Q
T DA P U
FPL -0.150
E SR A E
50x50m
FGL -0.225
ass Balastrde: ade A safety glazing. Selected balastrade panel as per ZS 4223.3
Elevation East
ELEVATION TWO
Scheme Plan for:
BOLD 85 Oak Road, Poraiti
Lot: 41 DP: ####
Version: 16/09/2021 Elevations Title: Job no: 21034 Scale:
1:100
All Plan Design, and Associated Documents, is the © Copyright and Intellectual Property of Design Builders Ltd and cannot be reproduced in whole or in part without the expressed written permission of the Company. All Rights
OTE: WHEN ISSUING CLIENT VIEWE ARTNERS ENSURE PLAN IS ON "CL VIEWER" LAYER COMBINATION.
24
21/0
6 6.00 a 21/1 m 2
pm 30 2 8. 1/1 2
Ground Floor Plan B
3 W03
W04
BUILT-IN CABINET & SHELVING
810
W06
-0.150mm FFL
GD01
0.000mm FFL GARAGE STORAGE
810
1 400
CLOSET
3 100 X 3 515 12.13 SQ M
BATH
2 000 X 3 700 7.7 SQ M
BEDROOM
SHELVES
LIVING 5 000 X 4 215 21.08 SQ M
BEDROOM 3 300 X 3 700 13.0 SQ M
WINDOW SEAT
W15
0.000mm FFL
W17
6 000 X 6 110 37.45 SQ M
N N
W19
W18 5.00 p 21/0 m 6
W16
A
T ES 21 STORAGE RT NE Y 1 800 X 700 HO JU DA 21 T 1.26 SQ MS AY D ES BER NG EM O L EC D m a 45 6 7. 1/0 2
LAUNDRY
Line of Bank
3 DECK TO HAVE DRIVEN PILES INTO BANK. BY ENGINEER
4
2,605mm Stud Height
3 020 X 700 2.11 SQ M
WINDOW SEAT
W14
W13
m²
750
600 X 1 200 0.72 SQ M
W07
1 400
FIREPLACE TO BE AWAY FROM COMBUSTIBLE MATERIALS (CURTAINS)
W12
W01
810
2 100
600 X 1 820 1.09 SQ M
810
9 670 X 1 000 9.67 SQ M
2 245 X 1 000 2.25 SQ M
2 245 X 1 000 2.24 SQ M
CLOSET
810 BATH
WIW
HALL
810
1 800 X 3 000 5.4 SQ M
W10
810
810 2,755mm Stud Height
STORAGE
WC
2 000 X 600 1.2 SQ M
0.000mm FFL
W11
UP
810
3 500 X 4 090 18.1 SQ M
W21 High level window
STAIRS 3 955 X 1 000 3.95 SQ M
2,700mm Ceiling Height
1 800 X 3 000 5.4 SQ M
810
5 045 X 1 600 9.23 SQ M
DINING 5 000 X 3 905 19.6 SQ M
W08 2,605mm Stud Height
2,550mm Ceiling Height BEDROOM
ENTRY
2,605mm Stud Height
W20
POOL FENCING TO NZBC
W09
A
MEDIA 4 500 X 3 600 16.2 SQ M
1 520 0.000mm FFL
0.000mm FFL
2
2,755mm Stud Height
1 701 X 3 600 6.05 SQ M
KITCHEN 4 999 X 3 645 18.29 SQ M
SCULLERY
4.4m x 8.0m Pool
2,605mm Stud Height W02
W05 OUTDOOR FIRE
6.00 a 21/1 m 2
pm 30 2 8. 1/1 2
1 B DECK TO HAVE DRIVEN PILES INTO BANK. BY ENGINEER
First Floor Plan
Scheme Plan for: OUTDOOR FIRE
N
Version: 16/09/2021 Ground Floor Plan Title:
BOLD W31 85 Oak Road, 2,410mm Poraiti
FLOOR LEVEL: 1 - 21034_Bold_PD_210601 W34
W33
W32
Lot: 41 DP: ####
4.4m x 8.0m Pool
Job no: 21034 Scale:
1:100
5.00p m 21/0 6
T ES 21 RT E Y O UN DA 21 SH Y J T DA ES ER G B N EM O L EC D m a 45 6 7. 1/0 2
W35
Ceiling Height 6 0 am All Plan Design, and Associated Documents, is the © Copyright and Intellectual Property of Design Builders Ltd and cannot be reproduced in whole or in part without the expressed written permission of the Company. All Rights2.0Reserved. 1/12 STUDIO m p 30 2 8. 1/1 2
3
5 000 X 3 040 20.88 SQ M
2,455mm Stud Height
TILATION CALCULATION SPREADSHEET: J:\02. Design Team\02. Design Team (VENTILATION AREAS.xlsx
DN
1 420
4 580 X 1 800 8.24 SQ M
FIREPLACE TO BE AWAY FROM COMBUSTIBLE MATERIALS (CURTAINS)
W24
W25
W26
WC
6 490 X 3 200 20.61 SQ M
W29
W17
3.065mm GD02 FFL
810
MASTER BDRM
FFL
W23
Bath mounted on plinth 150-200mm high
DECK 4.47m² 1 000 X 2 000 2.0 SQ M
WC
2 000 X 3 000 6.0 SQ M5
A
2,455mm Stud Height
STUDY
1 000
W01
OPEN TO BELOW
W22
WIW
1M HIGH WALL
1 700 X 2 135 3.63 SQ M
C
W30
4 672
B GLASS BALUSTRADE
W36
2 999
RAKING CEILING
GD01
W28 BALCONY 4 390 X 1 890 8.39 SQ M
W27
4
Open Shelves Line of Bank
Service Court 15m²
W10
Scheme Plan for:
W11
W12
GARAGE
W16
1 700 X 2 495 4.24 SQ M
W13
BOLD 851 Oak Road, Poraiti
10 105 X 6 600 62.33 SQ M
LAUNDRY
STORA
X 1 305 1650 120 0.85 SQ M
FFL
TV on Wall
1
FIREPLACE Full-Height Privacy Screen
8
DECK TO HAVE DRIVEN PILES INTO BANK. BY ENGINEER
3 000
810
DECK TO HAVE DRIVEN PILES INTO BANK. BY ENGINEER
2,605mm Stud Height
W14
FFL(T) - 7
FLOOR LEVELS16/09/2021 FOR PLANS: W15 Version: PATIO 12.82m²
Title:
First Floor Plan
LOOR LEVEL: 1 2 - 21034_Bold_PD_210601
FFL(S) - 6 FFL 3.025 FFL 2.765
1 COPY CAD BLOCK NAME FFL 0.000 2 UN-GROUP CAD BLOCK FPL -0.150 3 CHANGE TEXT LEVEL AS REQUIRED 1:100 Scale: Job no: 21034 FGL -0.225 4 RE-GROUP ITEMS All Plan Design, expressed written permission of NAME. the Company. All Rights Reserved. A the Cand Associated Documents, is the © Copyright and Intellectual Property ofBDesign Builders Ltd and cannot be reproduced in whole or in part without 5 PASTE SAME CAD BLOCK 6 ALL CASES OF SYMBOL IN DRAWING SET SHOULD CHANGE TO UPDATED LEVELS ON SECTIONS, ELEVATIONS, AND DETAILS 7 SCALE CAD BLOCK TO SUIT USE
Lot: 41 DP: ####
FFL(F) - 6
FFL(G) - 6
LATION CALCULATION SPREADSHEET: J:\02. Design Team\02. Design Team (VENTILATION AREAS.xlsx
25
V W E ST COA ST M EN TAL HE ALT H C EN T R E 71 WATER WALK ROAD, GREYMOUTH
As an architecture graduate, I actively contributed to the documentation and imagery for the ongoing development of the GreyBase Mental Health Facility in Greymouth, West Coast, New Zealand. Focused on creating a supportive and modern environment for mental health services, my role included coordinating services, specifying each space and material.
Elevation West
Elevation East
26
TOOLS: REVIT ENSCAPE
Elevation North
Elevation South
Ground Floor Plan
27
VI W E LLINGTON HOSPITAL: R ADIOLO GY 49 RIDDIFORD STREET, NEWTOWN, WELLINGTON 6021
11
COMP EQUIP 02.487
SET OUT ORIGIN OF ROOM
3560 FROM GRIDLINE H PHILIPS CENTRE POINT
SET OUT ORIGIN OF ROOM
3000 MONITORS ON PENDANT
705
2095
PHILIPS: MCS Spring Arm Boom Ceiling & Fixing Plate
H
1
11
SET OUT ORIGIN OF ROOM
2000
210 PENETRATION
750 FROM GRIDLINE 13 - PENETRATION
PHILIPS: Radiation Shield & Surgical Light Pendant Mounting Plate
1500
740 FROM GRIDLINE 11 - PENETRATION
ENTRY 1 02.515
CONTROL ROOM 2 02.512
ENTRY 2 02.513
CONTROL ROOM 1 02.514
H 3885 FROM GRIDLINE 12 - C/L PENETRATION
10
2114 ANAES. PENDANT
625 FROM GRIDLINE 11 - PHILIPS CENTRE POINT
F
PHILIPS: Radiation Shield Pendant Mounting Plate
ANGIOGRAPHY 02.493
1500
560 FROM GRIDLINE 12 PHILIPS CENTRE POINT
CATH LAB 2 02.521
2800
400
EPS PACING LAB 02.489
SKYTRON: Equipment Pendant
405 PENETRATION
1500
CATH LAB 2 COMP 02.526 SKYTRON: Anaesthesia Pendant
2400
2983 PHILIPS CENTRE POINT - ANAES. PENDANT
3077 ANAES. PENDANT
220 SET OUT ORIGIN OF ROOM
3359 FROM GRIDLINE F - PHILIPS CENTRE POINT
1839 EQUIP. PENDANT
210 PENETRATION
SKYTRON: Anaesthesia Pendant
G
SKYTRON: Anaesthesia Pendant
400 GRIDLINE F PENETRATION
PHILIPS PATIENT TABLE ADAPTION PLATE
2333 ANAES. PENDANT
CATH LAB 1 02.518
3188 FROM GRIDLINE F - PHILIPS CENTRE POINT
3481 ANAES. PENDANT
2560 FROM GRIDLINE 11 PHILIPS CENTRE POINT 3228 FROM GRIDLINE 11 - PHILIPS CENTRE POINT
650
SCRUB 02.522 CLEAN UP DIRTY STORE 02.475
PHILIPS: Radiation Shield Pendant Mounting Plate
3220 FROM GRIDLINE G - PHILIPS CENTRE POINT
2056 ANAES. PENDANT
220 PENETRATION
PHILIPS: 2x 27" Monitors Mounted on Pendant
13
12
1855 FROM GRIDLINE 11 - PENETRATION
E
1801 ANAES. PENDANT
400 GRIDLINE PENETRATION
SKYTRON: Anaesthesia Pendant
1757 MONITORS ON PENDANT
2650 FROM GRIDLINE 11 PENETRATION
REVIT ENSCAPE
CONTROL 02.496
1760
4550 FROM GRIDLINE 10 - PENETRATION
G
2545 FROM GRIDLINE 11 C/L PENETRATION
ENTRY 02.489A
TOOLS:
11
600 PENETRATION - PENETRATION
CATH LAB 1 COMP 02.477
400 FROM GRIDLINE G C/L PENETRATION
950 FROM GRIDLINE 10 - PENETRATION
CONTROL & EPS WORKROOM 02.488
1850 FROM GRIDLINE G - PENETRATION
12
1330 FROM GRIDLINE E - PENETRATION
600 PENETRATION - PENETRATION
10
150
ORIGINAL SIZE: CM
I played a crucial role in upgrading the operating theater and overall interior fitout at Wellington Hospital. I assisted in integrating advanced operation theater equipment and supported fit-outs and joinery. This experience significantly enhanced my skills and knowledge in healthcare facility design and collaborative project execution.
11
12
13
12
EPS PACING LAB & A NGIOGRAPHY - SET OUT O F O RI G I N
Setout Plan - EPS Pacing Lab & Angiography
2
CATH LAB 1 & 2 - SET OUT OF OR IGIN
Setout Plan - Cath Lab 1&2 1 : 50 @ A1
17/11/2023 5:47:09 p.m .
1 : 50 @ A1
WC _W0 1 _AR C H_ L EV EL 2 _ RA DI OL OGY S3
MAIN CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK. DO NOT SCALE OFF DRAWINGS. IF IN DOUBT ASK.
THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT DOCUMENTS.
REVISIONS
A B C D
90% DETAIL DESIGN FOR CONSENT 95% DETAIL DESIGN FOR TENDER
LEGEND
18/08/2023 15/09/2023 24/10/2023 17/11/2023
DRAWING STATUS
JOB NAME
FOR TENDER
Radiology Stage 3 WC _W01 W ELL ING TO N HO SPITA L Rid d ifo rd St re et Ne wt own , WE LL ING TO N 6 021
REPRODUCTION OF THE WHOLE OR PART OF THIS DOCUMENT CONSTITUTES AN INFRINGEMENT OF COPYRIGHT WITHOUT APPROPRIATE PERMISSION.
28
DRAWING TITLE
LEVEL 02 SETOUT OF ORIGIN (CRI TICAL)
SCALE AT A1 DATE
1 : 50 17/11/2023
JOB No.
DRAWN
A ut h or
3511- 56
CHECKED
Ch e cke r
PARTNER
AF
DRAWING No.
2-A 205
ORIGINAL SIZE: SIZE: CM CM ORIGINAL
MAIN MAINCO CO SITE SITEBEF BE
DRAWING DRAWIN THIS THISDRA DR ALL ALLRELE REL
1122 BB
D D
22-A-A991188
150 150CABLE CABLE ACCESS ACCESS
915 915
REPROD REPROD DOCUME DOCUM COPYRIG COPYRI
22-A-A991188
150 150CABLE CABLE ACCESS ACCESS
150 150CABLE CABLE ACCESS ACCESS
2095 2095
FF 80mm 80mmØ ØHAFELE HAFELECABLE CABLE PORTS PORTSTO TOAVOID AVOID BRAKETS BRAKETS//ANGLES ANGLES
80mm 80mmØ ØHAFELE HAFELECABLE CABLE PORTS PORTSTO TOAVOID AVOID BRAKETS BRAKETS//ANGLES ANGLES
30 30xx30mm 30mmSHS SHS CONCEALED CONCEALEDDESK DESK SUPPORT SUPPORT
30 30xx30mm 30mmSHS SHS CONCEALED CONCEALEDDESK DESK SUPPORT SUPPORT
80mm 80mmØØHAFELE HAFELECABLE CABLE PORTS PORTSTO TOAVOID AVOID BRAKETS BRAKETS//ANGLES ANGLES
149 (C.O.S.) (C.O.S.) 149 BENCHTOP BENCHTOP
750 BENCHTOP BENCHTOP 750
80mm 80mmØ ØHAFELE HAFELECABLE CABLE PORTS PORTSTO TOAVOID AVOID BRAKETS BRAKETS//ANGLES ANGLES
750 BENCHTOP BENCHTOP 750
FF
RREEVVIS IS AA D DE BB 5500 C C 8855 D D 9900 EE FFO O FF 9955 G G FFO O
CABLE CABLE ACCESS ACCESS
150 CABLE CABLE 150 ACCESS ACCESS
150 CABLE CABLE 150 ACCESS ACCESS
1368 1368
C C
22-A-A991188 150 150CABLE CABLE ACCESS ACCESS
80mm 80mmØØHAFELE HAFELECABLE CABLE PORTS PORTSTO TOAVOID AVOID BRAKETS BRAKETS//ANGLES ANGLES
CABLE CABLETRAY TRAY--REFER REFER ELECTRICAL ELECTRICAL DOCUMENTATION DOCUMENTATION
EQUAL EQUALSPACING SPACING SHS SHSCONCEALED CONCEALEDDESK DESKSUPPORT SUPPORT
eq eq
EQUAL EQUALSPACING SPACING SHS SHSCONCEALED CONCEALEDDESK DESKSUPPORT SUPPORT
2585 2585BENCHTOP BENCHTOP(C.O.S) (C.O.S)
720 720BENCHTOP BENCHTOP(C.O.S) (C.O.S)
adj. adj. Fixed. Fixed. dwr. dwr. fr. fr. mw. mw. s/s s/s bwu. bwu.
A F D F M S B
JJOOIN INEERRYYFFIN IN
30 30xx30mm 30mmSHS SHS CONCEALED CONCEALEDDESK DESK SUPPORT SUPPORT
HPL-01 HPL-01 H C
ALIGN ALIGN eq eq
LLEEGGEENNDDJJO OI
HPL-02 HPL-02 H C
EQUAL EQUALSPACING SPACING SHS SHSCONCEALED CONCEALEDDESK DESKSUPPORT SUPPORT
22
22-A-A880099
2395 2395BENCHTOP BENCHTOP(C.O.S) (C.O.S)
5700 5700OVERALL OVERALLBENCHTOP BENCHTOP(C.O.S) (C.O.S)
LPL-01 LPL-01 L C
LPL-02 LPL-02 L C
11 22-A-A991177
LPL-03 LPL-03 L C SPBK SPBK
JJO OIIN NEERRYY PPLLAAN N ((JJ1166)) -- C CAATTH H LLAABB 22 JJ1166 C CO ON NTTRRO OLL RRO OO OM M
AWP-01 AWP-01
Joinery Plan - Cath Lab 2 & Control Room 2-A251 2-A251 11::10 10@ @A1 A1
1122
AWP-02 AWP-02
TTYYPPIC ICAALLJJO OIN I
1. 1. CHECK CHECKAL A SITE SITEPRIO PRIO CARCASE CARCASE 2. 2. CHECK CHECKAL A DIMENSIO DIMENSIO REQUIREM REQUIRE OF OFCARCA CARC 3. 3. CONFIRM CONFIRM SUPPLIED SUPPLIED OF OFCARCA CARC SCHEDUL SCHEDUL 4. 4. 150mm 150mmTO TO REFER REFERFIN FI JOINERY JOINERYL 5. 5. REFER REFERTO TO FINISHES FINISHES COLOUR COLOUR& 6. 6. COMFIRM COMFIRM ARCHITEC ARCHITEC MANUFAC MANUFAC
1122 BB
C C
D D
22-A-A991188
22-A-A991188
22-A-A991188
2145 2145
FFO OR eq eq
EQUAL EQUALSPACING SPACING SHS SHSCONCEALED CONCEALEDDESK DESKSUPPORT SUPPORT
eq eq
EQUAL EQUALSPACING SPACING SHS SHSCONCEALED CONCEALEDDESK DESKSUPPORT SUPPORT
EQUAL EQUALSPACING SPACING SHS SHSCONCEALED CONCEALEDDESK DESKSUPPORT SUPPORT
EQ. EQ.11 300 300
150 150
150 150
300 300
EQ. EQ.11
300 300
150 150
150 150
DGPO DGPO DDATA DDATA
DGPO DGPO DDATA DDATA
378 378
1100 1100
JOB JOBNo. No.
DGPO DGPO
DDATA DDATA
DGPO DGPO DDATA DDATA
DGPO DGPO DDATA DDATA
900 900
17/11/2023 5:41:53 5:41:53 p.m. p.m. 17/11/2023
DOCUMENTATION DOCUMENTATION
HPL-01 HPL-01
HPL-01 HPL-01
HPL-01 HPL-01
HPL-01 HPL-01
CABLE CABLETRAY TRAY--REFER REFER ELECTRICAL ELECTRICAL
CABLE CABLETRAY TRAY--REFER REFER ELECTRICAL ELECTRICAL DOCUMENTATION DOCUMENTATION
DGPO DGPO DDATA DDATA
DGPO DGPO DDATA DDATA
CUPBOARD CUPBOARDUNDER UNDER BENCH: BENCH:CABLE CABLE MANAGEMENT MANAGEMENT
DGPO DGPO-PH DGPO DDATA DDATA DGPO-PH
HPL-01 HPL-01
DGPO-PH DGPO DGPO DDATA DDATADGPO-PH DDATA-PH DDATA-PH
CABLE CABLETRAY TRAY--REFER REFER ELECTRICAL ELECTRICAL DOCUMENTATION DOCUMENTATION
150 150 30 30xx30mm 30mmSHS SHSCONCEALED CONCEALED DESK DESKSUPPORT SUPPORT
eq eq
30 30xx30mm 30mmSHS SHSCONCEALED CONCEALED DESK DESKSUPPORT SUPPORT
eq eq
eq eq
LPL LPLON ON18mm 18mm SUBSTRATE SUBSTRATEEND ENDPANEL PANEL
eq eq
2585 2585BENCHTOP BENCHTOP(C.O.S) (C.O.S)
eq eq
30 30xx30mm 30mmSHS SHSCONCEALED CONCEALED DESK DESKSUPPORT SUPPORT
LPL LPLON ON18mm 18mm SUBSTRATE SUBSTRATEEND ENDPANEL PANEL
60 60
60 60
1200 1200
720 720BENCHTOP BENCHTOP(C.O.S) (C.O.S)
JJO OIIN NEERRYY EELLEEVVAATTIIO ON N ((JJ1166)) -- C CAATTH H LLAABB 22 C CO ON NTTRRO OLL RRO OO OM M
Joinery Elevation - Cath Lab 2 & Control Room 2-A917 2-A917 11::10 10@ @A1 A1
29
1135 1135CLEAR CLEARWIDTH WIDTH 2395 2395BENCHTOP BENCHTOP(C.O.S) (C.O.S)
CABLE CABLETRAY TRAY--REFER REFER ELECTRICAL ELECTRICALDOCUMENTATION DOCUMENTATION
11
3355
R Raadd
RRid idddifio f NNeewwt too 66002211
DRAWING DRAWIN
DGPO-PH DGPO-PH DGPO-PH DGPO-PH
00 WC_W01_ARCH_LEVEL 2_RADIOLOGY 2_RADIOLOGY S3.rvt S3.rvt WC_W01_ARCH_LEVEL
HPL HPLON ON50mm 50mmSUBSTRATE: SUBSTRATE: BENCHTOP BENCHTOP&&SUPPORTS SUPPORTS EITHER EITHERSIDE SIDE
JJO OI C CA AT C CO O
SCALE SCALEAA DATE DATE
DRAWN DRAWN
CHECKE CHECKE
NNO REFERDETAILS DETAILSON ON OTTEE::REFER SHEET SHEET2-A809 2-A809FOR FOR PENETRATION PENETRATIONBOXING BOXINGOUT OUT
PARTNER PARTNE
DRAWIN DRAWI
22--A
VII BOULCOT T HOSPITAL
ORIGINAL SIZE: CM
666 HIGH STREET, BOULCOTT, LOWER HUTT 5011
As an architecture graduate at CCM Architects, one of my early projects centered on the renovation of the Boulcott Hospital Specialist Centre in Lower Hutt. The primary goal was to enhance the facility, elevating both healthcare standards and overall spatial design. In my role, I played a pivotal part in the documentation process, with a specific focus on optimizing spaces for medical services. A
B
C
1
E
1
2 A-8 01
G
H
I
2 A-3 23 REMOVE CA SLIDER AND REINSTATE WALL TO SUIT NEW SURFACE MOUNTED SLIDER
2 A-3 54
F
REVIT ENSCAPE
2
2 A-3 23
5
D
TOOLS:
WALL RETAINED IN PART REFERS TO DIMENSIONED PLAN FOR EXTENT
1
5
2A-241
2 A-8 01
W-01A
1
SP
WASHER
ELECTRICAL AND GASES PANELS RETAINED
D137.A Dumb Waiter
LOAN STORE 29
2
2 A-8 06
CORRIDOR 1
D122.A
D44.A
2 A-8 03
D30.B
2 A-3 22
D30.A
1
4
2 A-8 03
2
2 A-8 03
D37.B
W-17
1585
W-28b
2 A-8 03
W-61
6
9
5
1
2 A-8 05
3
D24.A
2 A-8 04
STORE 24
2 A-8 05
2 A-8 09
BED
D26.A UTILISE HISTORIC CAPPED SERVICES FOR NEW BUCKET TUB
BED 19 27
ENS 14
D27.A
REFER TO DOOR SCHEDULE FOR NEW OR REUSED/RELOCATED DOOR SET
CORRIDOR 6 D5.A
W-54
ENS BED 8 2 A-8 09
UPS 373
2 A-8 09
6B BED 18 26
7
2 A-8 09
2
4
3
2 A-3 51
1
2 A-3 52 2-BED 20-21
W-33
7B
EQUIP. 129
BED
BED
1
2 A-8 08
ENS
ENS 6 D6.A
5
CREATE UPS ROOM AND FIRE RATING WITHOUT IMPACT ON ADJACENT BEDROOM ON ENSUITE WALLS
2 A-8 09
2 A-8 04
11
2 A-8 07
W-06
ENS
ENS 4 2 AW-33 -3 51
WC
4
1:12
BED
3
2 A-8 04 W-34 W-10 W-34
2 A-8 09
W-19a
W-32
W-55
2 A-8 03
7
6
2 A-8 07
ENS
6
CLNR 130 W-19a
2 A-8 09
5
1
3
W-04b
X-RAY
CORRIDOR 2
W-26
1:12
W-19b
W-13
W-55
W-34 2 A-8 04 W-34
17/11/2022 1:40:13 a.m.
EQUIP 90 2 A-8 04 W-19b W-19b
7
7A
7A
2
2 A-8 08
2 A-8 04
Ground Floor Existing/Proposed 1
A
B
C
D
E
F
G ROU ND FLOOR GA - PART 1
G
H
I
EXISTING/UNCHANGED ELEVATION SHADED
1 : 100 @ A1 3 . EXISTING NU-WALL ALUMINIUM RIPPLE PROFILE ON EXISTING 25mm H3.1 CAVITY BATTENS ON RAB ON H1.2 TIMBER FRAMING 5 . EXISTING 200x25 TIMBER WEATHERBOARDS ON EXISTING 25mm H3.1 CAVITY BATTEN ON RAB ON H1.2 TIMBER FRAMING
4 . EXISTING PROFILED METAL ROOFING 3 . EXISTING NU-WALL ALUMINIUM RIPPLE PROFILE ON EXISTING 25mm H3.1 CAVITY BATTENS ON RAB ON H1.2 TIMBER FRAMING
9 . PROPOSED LOUVERED SCREEN AND PANEL TO WALKWAY
9 . LOUVRE
1 2. EXISTING MEMBRANE ROOF
1 0. MONKEYTOE WALKWAY STAIR ACCESS TO PLANT
9 . PROPOSED LOUVER
6 . EXISTING WELDED ZINC CLADDING
HEIGHT RECESSION PLANE
BOUNDARY LINE
EXISTING CONSULTING BUILDING STAIRWELL
1 1. NEW PROFILED METAL ROOFING DP DP
3460
ORIGINAL SIZE: CM
6
W-55
OT4 37
2 A-8 03
20013 Boulcott S3-BUILDING - WS-R20.rvt
2 A-8 04
W-61
W-55
W-04b
2 A-8 04
1
2 A-8 09 ENS
CIRCULATION
9
2
D37.A
1
2 A-8 04
2 A-8 03
2 A-8 03 W-13
OR 5 30
7B
2 A-3 21
W-58
8
SCRUB 44
5
D14.A
W-52
W-58
ENS 136
6A
D143.A EQUIP W-19a
W-19b
THEATRE CIRCULATION 135 W-52
8
1
ENSUITE AND ASH/WC EACH HAVE LEVEL THRESHOLD FLOORS
2 A-8 02 W-55
2 A-8 02
NEW DOOR LEAF IN EXISTING FRAMEREFER TO SCHEDULE
DISCHARGE LOUNGE 38 5 2 A-8 07 W-19a
CU/MED 39
COURTYARD
W-04b
STAIR
NO TE : SCAN FLOOR FOR UNDERFLOOR HEATING PIPES. BOLT DOWN LOCATION FOR NEW WALL TO AVOID PIPES
6A
3 ENSUITE ASH/WC REDUCED/MODIFIED TO BECOME AWC ONLY
CORRIDOR 4
KITCHEN 40
D367.A AWC 367
7
7
2 A-8 02
6B
DU 112
2 A-8 06
6
2 A-3 53
5
2 A-8 02 W-04
W-54
W-27c
4
2 A-8 02
D142.A
1:14
W-01B
6
3
W-11
ORTHO EQUIP 22
3
2 A-8 02 OXYGEN CYLINDER STORE
D373.A
5 2
W-54 ST. WC 122 OFFICE 369
OR 2
2A-243
D112.A
D147.C D147.B
W-13
W-02S
1
OR 3
INTERVIEW
4 1
2 A-8 06
REFER TO ROOM ELEVATIONS FOR JOINERY REQUIREMENTS
11
W-53
W-54
SUCTION PUMP
AWC 119
D112.B
2
STAFF BASE 23
7
12
D119.A
D39.A
D21.B
DECONTAMINATION
2 A-8 02
7
W-51
D21.A
LOBBY 21
2 A-3 53
2 A-3 22
10 NEW SERVICES DUCT
6
2 A-8 05 RELOCATED SERVICES PANEL
W-13
2 A-3 53
4
2
1 W-13
RECOVERY 138
W-12
NEW WASHER
2
STAFF BASE / DAY STAY 51
2 A-3 55
12
2 A-8 05
1
2 A-8 02
8
1
6
OR 1
OFFICE
BED BAYS 9-10 RETAINED EXISTING (EXCEPT FINISHES)
9
2 W-23
2 A-3 55
UPGRADED REPLACEMENT AND FUTURE INSTALL
NEW STERILISER
W-11 W-19a
W-27b
1
2 A-8 45
8
W-27a
W-02
2 A-8 05
3
W-14
7
D136.A
D134.B
6
W-23 3
4
2
2 A-8 01 5
AUTOCLAVES 150
D131.A
3
2 A-3 55 BAYS 1-5 RETAINED EXISTING (COMPLETE)
6
5
4
W-06
2 A-8 01
STERILISER UPDATED
STERILISER
2 A-8 01
W-19a
5
D147.A
W-02
RO PLANT 131
7
3
4
D23.A
2 A-8 01
W-14 THEATRE STORE W-14 134
SHELVING BAY 4
W-24
3
W-01A
2
STERILE TROLLEY STORE 372
D372.A
STERILE STORE/SUPPORT 92
SEISMIC JOINT COVER
W-23
6
D54.A
2 A-8 01
D92.A
W-01A
3
2 A-3 22
W-24
2
SEISMIC JOINT COVER
D134.A
1
6390
PROPOSED STORE EXTENSION 5288
PROPOSED LOAN STORE EXTENSION
NEW DOOR TO MED GAS
MANPAC
TRASH COMPACTOR ENCLOSURE
PROPOSED CANOPY EXTENSION 1 . EXISTING / TO MATCH EXISTING EX T5 x 25 H3.1 PINE TIMBER SLATS FIXED TO 75 x 50 H3.1 PINE VERTICAL BATTENS AT 600 CRS. 25mm GAP BETWEEN SLATS. PREPRIMED + 1st COAT PREPAINTED. ON EXO TECH O N EXISTING 25mm CAVITY BATTENS ON RAB ON H1.2 TIMBER FRAMING TO MATCH EXISTING ADJACENT WHEN CONNECTING
1693 RO PLANT EXTENSION
1 . EXISTING / TO MATCH EXISTING EX T5 x 25 H3.1 PINE TIMBER SLATS FIXED TO 75 x 50 H3.1 PINE VERTICAL BATTENS AT 600 CRS. 25mm GAP BETWEEN SLATS. PREPRIMED + 1st COAT PREPAINTED. ON EXO TECH O N EXISTING 25mm CAVITY BATTENS ON RAB ON H1.2 TIMBER FRAMING TO MATCH EXISTING ADJACENT WHEN CONNECTING 2 . EXISTING COMPRESSED SHEET EXOTEC ON EXISTING 25mm H3.1 CAVITY BATTENS ON RAB ON H1.2 TIMBER FRAMING TO MATCH EXISTING ADJACENT WHEN CONNECTING
1
SOUTH ELEV AT ION
1 . EXISTING / TO MATCH EXISTING EX T5 x 25 H3.1 PINE TIMBER SLATS FIXED TO 75 x 50 H3.1 PINE VERTICAL BATTENS AT 600 CRS. 25mm GAP BETWEEN SLATS. PREPRIMED + 1st COAT PREPAINTED. ON EXO TECH O N EXISTING 25mm CAVITY BATTENS ON RAB ON H1.2 TIMBER FRAMING TO MATCH EXISTING ADJACENT WHEN CONNECTING
1 1. NEW PROFILED METAL ROOFING CANOPY 8 . EXISTING MASONRY RENDER 190 SERIES BLOCKWORK 50mm INSULATION GAP OVER H1.2 TIMBER FRAMING
LOUVRES/ROOF + MANPAC IN CONSENT 2 SHOWN WHITE
7 . NEW MASONRY ENDER ON 140 SERIES BLOCKWORK 50mm INSULATION GAP OVER H1.2 TIMBER FRAMING
1 : 100 @ A1
ADDITION CONSENT 2 SHOWN WHITE
1 1. NEW PROFILED METAL ROOFING 8 . MASONRY RENDER NEW 190 SERIES BLOCKWORK 50mm INSULATION GAP OVER H1.2 TIMBER FRAMING
9 . LOUVRE
9 . LOUVRE
5 . EXISTING 200x25 TIMBER WEATHERBOARDS ON EXISTING 25mm H3.1 CAVITY BATTEN ON RAB ON H1.2 TIMBER FRAMING
30
1 2. MEMBRANE ROOF
8 . MASONRY RENDER NEW 190 SERIES BLOCKWORK 50mm INSULATION GAP OVER H1.2 TIMBER FRAMING
Elevation North
ON EXISTING 25mm H3.1 CAVITY BATTENS ON RAB ON H1.2 TIMBER FRAMING TO MATCH EXISTING ADJACENT WHEN CONNECTING
SOUTH ELEV AT ION
1
TIMBER FRAMING
LOUVRES/ROOF + MANPAC IN CONSENT 2 SHOWN WHITE
7 . NEW MASONRY ENDER ON 140 SERIES BLOCKWORK 50mm INSULATION GAP OVER H1.2 TIMBER FRAMING
1 : 100 @ A1
ADDITION CONSENT 2 SHOWN WHITE
1 1. NEW PROFILED METAL ROOFING 8 . MASONRY RENDER NEW 190 SERIES BLOCKWORK 50mm INSULATION GAP OVER H1.2 TIMBER FRAMING
9 . LOUVRE
BOUNDARY LINE
BOUNDARY LINE
1 2. MEMBRANE ROOF
LOUVRERED SCREEN TO PLANT
1 3. FIBRE CEMENT SHEET 4 . EXISTING PROFILED METAL ROOFING
R.L.: 14.101 m
8000
5 . EXISTING 200x25 TIMBER WEATHERBOARDS ON EXISTING 25mm H3.1 CAVITY BATTEN ON RAB ON H1.2 TIMBER FRAMING
9 . LOUVRE
HEIGHT RECESSION PLANE (INNER BOUNDARY - APPLICABLE TO SPECAILIST CENTRE ONLY)
HEIGHT RECESSION PLANE
R.L.: 13.799 m DP
DP
DP
2500
DP
ILLUMINATED HOSPITAL SIGNAGE (HOURS TBC)
STORE + MANPAC IN CONSENT 2 SHOWN WHITE
EXISTING/UNCHANGED ELEVATION SHADED 8 . MASONRY RENDER NEW 190 SERIES BLOCKWORK 50mm INSULATION GAP OVER H1.2 TIMBER FRAMING 1 1. NEW PROFILED METAL ROOFING
EAST ELEVATION
1 7/ 11/ 2022 1 : 48: 00 a.m .
2
1 : 100 @ A1
Elevation East REVISIONS
2 0 01 3 B o u lc o tt S3 -B U I LDI N G - WS -R 2 0
MAIN CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK. DO NOT SCALE OFF DRAWINGS. IF IN DOUBT ASK.
A B C D E F G
THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT DOCUMENTS. REPRODUCTION OF THE WHOLE OR PART OF THIS DOCUMENT CONSTITUTES AN INFRINGEMENT OF COPYRIGHT WITHOUT APPROPRIATE PERMISSION.
LEGEND
10% DETAIL DESIGN 50% DETAILED DESIGN 90% DETAIL DESIGN 92% WIP SET 40% DETAIL DESIGN 90% DETAIL DESIGN FOR TENDER & CONSENT
24/11/2021 22/12/2021 07/03/2022 28/03/2022 28/09/2022 02/11/2022 16/11/2022
DRAWING STATUS
JOB NAME
FOR TENDER & CONSEN T
BOULCO TT HO SPITAL TH EAT RE 4 AND 5
6 . EXISTING WELDED ZINC CLADDING
DRAWING No.
Bou lcott Hosp ital 66 6 Hi gh Stree t, Lowe r Hutt
SCALE AT A1
JOB No.
DRAWN
20 013
CHECKED PARTNER
1 2. MEMBRANE ROOF
+64 4 472 9354 admin@ccm.co.nz ww w.ccm.co.nz
3 . EXISTING NU-WALL ALUMINIUM RIPPLE PROFILE ON EXISTING 25mm H3.1 CAVITY BATTENS ON RAB ON H1.2 TIMBER FRAMING
1 3. EXISTING FIBRE CEMENT SHEET 4 . EXISTING PROFILED METAL ROOFING
1 2. MEMBRANE ROOF
G
15 MURPHY ST, THORNDON PO BOX 2182 WELLINGTON 6140 NEW ZEALAND
1 : 10 0 16 /11 /202 2 B N, TP AF
DATE
REVISION
2A-302
SOUTH & EAST REF. ELEVATION
C ONSE NT 2
EXISTING/UNCHANGED ELEVATION SHOWN SHADED
6 . EXISTING WELDED ZINC CLADDING
DRAWING TITLE
L. 1 58
L .26
WN 56. A WN 57. A
D 34 4
NEW FIRE INLET WINDOW/PANEL IN F/C SHEET CLADDING
NEW WINDOWS TO BEDROOMS IN F/C SHEET CLADDING
NEW EXTRACTS TO EXTERIOR WALL IN W/BOARD CLADDING
Elevation North
NORT H E LE VATION
IN USE X-RAY
D37.B
LLE CG1
TROLLEY INSTRUMENT NIC
CLINICAL WASTE BIN NIC
D
ALL OC TE :n Gr o up 3 - I tems Sup p lied & I ns talled b y tN he l ie t PENDANT ARM LENGTHS AREloose INDICATIVE AND plinths, AS ADVISED BY All loose furniture including desks and chairs, examination OPRITECH computers, TV's including wall brackets, rubbish bins, telephones, clocks, printers, bed screens and shower curtains.
LLE
CL
C
IV STAND
B
PANEL
DGPO DGPO
IV STAND LINE OF FLOOR CHANGE (INDICATIVE)
UB DCBD Data Devices DATA QDATA Electrical Fixtures
Allow for additional framing / nogging as required for support to wall mounted hardware and fixtures (indicative only).
DGPO DGPO
IV STAND
NOTE: All light & mechanical fittings to be read in conjunction with Services Design Documentation. Fitting codes for in-ceiling services are as per the Services Design Documentation.
TA CONTROL
1083
ORIGINAL SIZE: CM
WBB07 STZ STZ
1450 QDATA
DGPO
DGPO
DGPO
DGPO
DGPO
FOR TENDER & CONSEN T CG1
PENDANT LC
DGPO
STZ DGPO
DGPO
CLOCK CONTROL
APPROX. 7650
DGPO
DATA
WR
CLK
D
20 013
FLO O R P LAN - O T 4 1 : 25 @ A1
RCP - OT4
THEATR E 4 AND 5 R EQU IR EMENTS
P END ANT R EQUIR EMENT S
• Theatre control panel to have ability to display and adjust temperature, air changes, fan speed and humidity in room • Theatre control panel to indicate if the room is running on generator or UPS • HVAC to have manual overide of setback mode • Fire alarm actication indication to be sounders and lights within theatre • Room lights to be controlled at the nurse workstation with main on/off switch at main door, blue lights not required • Nurse station light control to control "X-ray" indicator light above entry door to theatre • Nurse station light control to control "In Use" indicator light above entry door to theatre • Theatre to have provision for flat screen monitor recessed into wall, refer FFE schedue for monitor and recess cover • Theatre to have ceiling speakers with connection into computer at nurse station, refer to FFE schedule for speakers WV • Both Essential and UPS power required to be evenly spaced throughout the theatre on all walls DATA CLKK • Data / Comms outlets are reuired at the location of power as noted aboove • Wall clocks are to be POE and require data outlet • Doors are automatic opening activated on kick plates • Whiteboard to be magnetic D•3 7Drug .B safe required posts in wall to secure the safe to • Tool air is required
• Pendant requirements to be confirmed by client • Pendants require anaesthetic gas scavenging • Tool air required • Imaging cameras required on pendant refer FFE schedule
LS
IV STAND
TROLLEY INSTRUMENT 3D V I E W - O T4 NIC @ A1
3D
LINEN SKIP NIC CL DR
LLE
CLINICAL WASTE BIN NIC
250 0
LLE
DR VSC
VSC
17/11/2022 1:56:08 a.m.
D 37. A
DATA : VOICE OR DATA OUTLET DD : DISINFECTANT SOAP DISPENSER LIQUID DD(X) : DANGEROUS DRUG SAFE S,M,L
20013 Boulcott S3-BUILDING - WS-R20.rvt
2.700 m AFL
CG1
CG1
1300 1200
BULKHEAD
QDATA DGPO DGPO
CLOCK CONTROL
1400
D
CG1
ORIGINAL SIZE: CM
1600
EC
1400 1200 1000
DGPO TROLLEY INSTRUMENT NIC
800
DGPO EPT
DGPO
(R
TR ES
IC
X
7B
ES TR IC T)
T)
(R
T) IC TR ES
7A BULKHEAD
2.700 m AFL DRAWING TITLE
NORTH & WEST REF. ELEVATION IV STAND
1 : 10 0
SCALE AT A1
FOR TENDER &16 /11 /202 2 B N, TP CONSEN T
DATE
DRAWN
AF
CHECKED PARTNER
LLE
JOB No.
20013
BOULCO TT HO SPITAL TH EAT RE 4 AND 5
MAIN CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK. DO NOT SCALE OFF DRAWINGS. IF IN DOUBT ASK. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT DOCUMENTS.
C ONSENT 2
REPRODUCTION OF THE WHOLE OR PART OF THIS DOCUMENT CONSTITUTES B oul co tt H os pi tal AN INFRINGEMENT OF COPYRIGHT WITHOUT APPROPRIATE PERMISSION.
666 H ig h Str eet, Lo wer Hu tt
R EVI SI OTITLE NS DRAWING
A 10% DETAIL DESIGN R OOM (OR4) B 50% DETAILED ESIGN LCAD9Y O UT 0% DETAIL DESIGN D 92% WIP SET E DEVELOPED DESIGN F DAT EV ELOPED DESIGN SCALE A1 G DEVELOPED DESIGN DATE H 40% DETAIL DESIGN DRAWN J CLIENT REVIEW CHECKED K 90% DETAIL DESIGN PARTNER L FOR TENDER & CONSENT
DRAWING No.
2A-701
24/11/2021 22/12/2021 07/03/2022 28/03/2022 14/04/2022 /2a0te2d 2 A2 s 6in/0d4i c 29/04/2022 2021-06-21 28/09/2022 05/1B 0/N 2,0T2P 2 02/11/202216/11/20A 2F 2 REVISION
L
FW : FLOOR WASTE 15 MURPHY ST, THORNDON PO BOX 2182 WELLINGTON 6140 NEW ZEALAND
+64 4 472 9354 admin@ccm.co.nz w ww.ccm.co.nz
LS : LIGHT SWITCH
LLE
MA : MEDICAL AIR MGAP : MEDICAL GAS ALARM PANEL VSC M(X) : MIRROR
150
ELEVAT ION A - OT4 1 : 25 @ A1
E : ELECTRICAL POWER OUTLET EC : EMERGENCY CALL
X
G : GAS GD : GLOVE DISPENSER WBB07 GPO : GENERAL POWER OUTLET GR(X) : GRAB RAIL (TYPE) GS : GAS SCAVENGE
DGPO
0
A
B
N : NITROGEN NA : NURSE ASSIST CALL BUTTON NC : NURSE CALL BUTTON NO : NITROS OXIDE
ELEVATI ON B - OT 4 1 : 25 @ A1
O : OXYGEN PTD : PAPER TOWEL DISPENSER
Elevation B - OTA
7A
3000
WV
HLE
1805 1600
AVR
DGPO
OB DCBD
Z Z
EC
2100 1:56:22 a.m.
31
768 3000 WV
CLK
2.700 m AFL
DATA
DATA
WBB06
TA : TOOL AIR CLKK TA GAUGE : TOOL AIR CONTROL PANEL TCP : THEATRE CONTROL PANEL TE : TIME ELAPSE CLOCK TPH : TOILET PAPER HOLDER TRS : TROUGH SCRUB WR WC : WATER CLOSET STZ
2700 2650 2650
2.700 m AFL
WV
PANEL
BULKHEAD
LS LS CLOCK CONTROL SSD NA EC
WV
125125125125125
S : SUCTION / VACUUM SD : SOAP DISPENSER - LIQUID ST : STEAM
3000
BULKHEAD
1600
RCD : RCD PROTECTED
D
SCREEN
ATA GPO GPO ATA GPO GPO
7B
PENDANT LC
Elevation A - OTA
DS
17/11/2022 1:55:53 a.m.
2650
EC KEYBOARD NIC WBB06
APPROX. 6900
Floor Plan - OT4
3000
NA
LEGEND
SCREEN
C
1
20013 Boulcott S3-BUILDING - WS-R20.rvt
CLKK
QDATA
24/11/2021 22/12/2021 07/03/2022 28/03/2022 28/09/2022 02/11/2022 16/11/2022
DATA
DGPO
DGPO
DGPO QDATA
DGPO
10% DETAIL DESIGN 50% DETAILED DESIGN 90% DETAIL DESIGN 92% WIP SET 40% DETAIL DESIGN 90% DETAIL DESIGN FOR TENDER & CONSENT
DGPO DGPO DATA
REPRODUCTION OF THE WHOLE OR PART OF THIS DOCUMENT CONSTITUTES AN INFRINGEMENT OF COPYRIGHT WITHOUT APPROPRIATE PERMISSION.
A B C D E F G
QDATA DGPO
STZ
THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT DOCUMENTS.
LLE
REVISIONS
CG1
MGAP TCP
MAIN CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK. DO NOT SCALE OFF DRAWINGS. IF IN DOUBT ASK.
7A
LLE
3320
HEAD
APPROX. 6600
STOOL NIC SSD
(R
T)
GD
100 2B RM -A
7A
r1
DDS
X IC TR ES
TROLLEY INSTRUMENT NIC
EPJ
A AN
QDATA
50 1B r8 RM -A
DGPO DGPO
5 1A 02 r 1 ARM -
ANAESTHETIC CHAIR NIC
PSURG
MONITOR CARRIER
(R
EC
PANTH
PSERV
1 MONITOR AGSS CONTROL PANEL AGSS 2 1 CARRIER CL GPO: Cleaner 1 1 CLOCK CONTROL CLOCK CONTROL 2 1 ANAESTHESIA CARRIER DGPO General Power Outlet: Double 25 1 DR Door Release Button 2 1 LS Light Switch 3 1 MGAP CONTROL PANEL GAS ALARM AN r 1200 1 1 PSERV SERVICES AARM SURGICAL PENDANT PENDANT LC Pendant Lighting Control Panel 1 ANAESTHESIA 2 1A PENDANT PENDANT DATA : VOICE OR DATA OUTLET STZ Storz Conduit Termination 4 2r DD : DISINFECTANT SOAP DISPENSER r 1450 925 25 ANPANTH LIQUID SURGTOOL AIR TA CONTROLr 17 CONTROLPSURG PANEL SU r 1101 A11A 0 RG ARM - ARM 0 - ARM 1B 2A 20 -A DD(X) : DANGEROUS DRUG SAFE S,M,L 2A Furniture SURG RM r 1 ARM 2 G ANAESTHETIC CHAIR Chair - anaesthetist 1 B 3 R E : ELECTRICAL POWER OUTLET SU NIC EC : EMERGENCY CALL STOOL NIC Stool - high 1 NIC SERVICES CARRIER FW : FLOOR WASTE WBB06 WHITEBOARD 1 1 WBB07 WHITEBOARD 1 1 G : GAS Furniture Systems GD : GLOVE DISPENSER GPO : GENERAL POWER OUTLET BKT BRACKET - Refer Joinery Drawings & 1 GR(X) : GRAB RAIL (TYPE) Details GS : GAS SCAVENGE Generic Models MONITOR CARRIER AH-1 ACCESS HATCH 5 1 LS : LIGHT SWITCH T-PANEL Theatre Nurse Station 1 1 D Wall Panel MA : MEDICAL AIR TROLLEY ANAESTHETIC TROLLEY NIC 1 NIC 7A 3000 MGAP : MEDICAL GAS ALARM PANEL WR WALL RECESS FOR MONITOR 1 1 M(X) : MIRROR Lighting Fixtures WV 2650 N : NITROGEN <LUMINAIRE SCHEDULE> 8 DATA CLKK NA : NURSE ASSIST CALL BUTTON R3 <LUMINAIRE SCHEDULE> 8 NC : NURSE CALL BUTTON Nurse Call Devices NO : NITROS OXIDE DRAWING STATUS JOB NAME EC Emergency Call Button 2 1 BOU LCOJunction TT HO SPITAL 1 O : OXYGEN EPJ Equipment Potential 1 D3 7 .B D 37. A EPT Equipment 1 1 TH EPotential AT RETest4 Point AND 5 PTD : PAPER TOWEL DISPENSER NA Nurse Assist Call Button 1 1 C O N S E N T 2 SSD Call bell to SSD 1 1 RCD : RCD PROTECTED CLOCK 1580 Specialty 2100 Equipment CONTROL 1400286 Bou lcott Hosp i2100 tal S : SUCTION / VACUUM AVR AV RECEIVER 1 1300 66 6 Hi gh Stree t, Lowe r Hutt 1 SD : SOAP DISPENSER - LIQUID LS TROLLEY 1200 CG1 Corner Guard 3 1 ST : STEAM JOB No. INSTRUMENT C D BIN CLINICAL WASTE BIN CLINICAL WASTE 3 NIC1 LINEN SKIP NIC TA : TOOL AIR NIC TA GAUGE : TOOL AIR CONTROL PANEL CLK Clock - POE Digital 1 1 CL TCP : THEATRE CONTROL PANEL R CP - O T 4 CLKK CLINICAL CLOCK - Analogue 2 1 2 1 : 25 @ A1 TE : TIME ELAPSE CLOCK WASTE BIN NIC DR LLE TPH : TOILET PAPER HOLDER CPU NIC BOULCOTT HOSPITAL COMPUTERDR NIC 1 3 TRS : TROUGH SCRUB 250 DDS DRUG SAFE (SMALL) 1 1 GD Glove Dispenser 1 3 VSC VSC WC : WATER CLOSET 0 IV STAND IV STAND 3 3 KEYBOARD NIC KEYBOARD AND MOUSE 1 NIC ELEVAT ION A - OT4 LINEN SKIP NIC Linen skip 1 3 A 1 : 25 @ A1 MTR_BCT NIC MONITOR BOULCOTT 27" WALL RE FER TO SH1EETNIC MOUNTED A-7MOUNTED 01 FOR F1FE 2 MTR_STZ NIC MONITOR STORZ 21" W2ALL PANTH ANAESTHESIA PENDANT 3 SCHEDULE 1 PSERV SERVICES PENDANT 1 3 B(X) : BASIN (TYPE) PSURG SURGICAL PENDANT 1 3 CA : COMPRESSED AIR 1 STRZ STORZ EQUIPMENT 3 CD : CARBON DIOXIDE 7B 7A 1 TCP THEATRE CONTROL PANEL 1 CG(X) : CORNER GUARD 3000 TROLLEY GOWN NIC Trolley - gowns 1 3 CL : CLEANSER GPO CM : CEILING MOUNTED 3 TROLLEY Trolley - instrument 3 BULKHEAD WV CTB : CURTAIN TRACK BED INSTRUMENT NIC CTS : CURTAIN TRACK SHOWER Grand total: 137 WV 2.700 m AFL A AN
EPT TROLLEY INSTRUMENT NIC
07/03/2022 28/03/2022 14/04/2022 26/04/2022 29/04/2022 28/09/2022 05/10/2022 02/11/2022 16/11/2022
1 1
7B
CA : COMPRESSED AIR CD : CARBON DIOXIDE CG(X) : CORNER GUARD CL : CLEANSER GPO CM : CEILING MOUNTED CTB : CURTAIN TRACK BED CTS : CURTAIN TRACK SHOWER
QDATA
TROLLEY
3 8
24/11/2021 22/12/2021
PB-NS 2700 AFL
3000 AFL
VOICE OR DATA OUTLET DATA OUTLET: QUADRUPLE
RV SE
DGPO
A 10% DETAIL DESIGN B 50% DETAILED DESIGN C 90% DETAIL DESIGN D 92% WIP SET E DEVELOPED DESIGN F DEVELOPED DESIGN G DEVELOPED DESIGN H 40% DETAIL DESIGN J CLIENT REVIEW K 90% DETAIL DESIGN L FOR TENDER & CONSENT
X
DGPO
TROLLEY GOWN NIC
1 1
B(X) : BASIN (TYPE)
7B 5390
7B
REPRODUCTION OF THE WHOLE OR PART OF THIS DOCUMENT CONSTITUTES AN INFRINGEMENT OF COPYRIGHT WITHOUT APPROPRIATE PERMISSION.
R EVI SI ON S
10 1 4
BENCHTOP - Refer Joinery Drawings & 1 1 Details END / FILLER PANEL 2 1 CUPBOARD: On Bench Cupboard - Refer 1 1 N OTE: LOWERED BULKHEAD Joinery Drawings & Details BULKHEAD: Pre-finished laminate, 30mm 1 1 MDF CUPBOARD: Underbench, Double Doors. 1 PB -NU 1
END OB DCBD
No te: All dimensions shown are rounded up / down to 5mm. Refer to General Arrangement plans for all dimensioned setouts of walls for construction.
A 2 A-7 03
<REFER SERVICES> HIGH LEVEL EXHAUST AIR LOW LEVEL EXTRACT GRILLE
HLE LLE Casework BCH
THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT DOCUMENTS.
QDATA DGPO DGPO
DR
CLKK
Air Terminals
Count Group
CG1
CG1
OT4 37
LINEN SKIP NIC
Gr o up 1 - I tems Sup p lied & F ix ed b y the C on tr ac to r Casework/Joinery items, proprietary fixed seats, sanitary and tapware, wall protection, mirrors, splashbacks, pinboards, noticeboards, whiteboards, window blinds, curtain tracks, power / data cabling and outlets.
Description
DDS
LS DATA
CLOCK CONTROL
MAIN CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK. DO NOT SCALE OFF DRAWINGS. IF IN DOUBT ASK.
D
FFE SCHEDULE OR4 2 Keynote
Gr o up 2 - I tems Sup p lied b y th e Cli ent & F ix ed b y the C on trac to r All dispensers including wall mounted sharps bin and bracket, Opritech examination lights, medical procedure chairs.
D37.A CG1 DR
C NOTE: Items listed below are all generic items and should be considered and grouped accordingly
BULKHEAD TO ALIGN WITH WALL
D
DGPO DGPO QDATA
C
ORIGINAL SIZE: CM
1 : 100 @ A1
ORIGINAL SIZE: CM
1
BOUNDARY
HEIGHT RECESSION PLANE
1950 1700
VIII ROOF DETAIL
SCALE 1:5 DESIGN MANAGEM ENT PROJ EC T
BACHELOR DESIGN RESEARCH/ July 2018 METALCRAFT ESPAN ROOFING
BUILDING PAPER SHOWN DASHED
5
In this University project, I create a house with the client brief wanting an extension for a restaurant. QUATER ROUND GUTTER interior, landscape and Here architect graduates, building science were assigned to divide the role QUATER ROUND GUTTER EXTERNAL BRACKET depending on the specialities in which they study. MyPRE-FINISHED role was to8gdraft the house floor plan, and along WAFER-TEK with the building,SCREW science students calculate the FASCIA BOARD cost of the construction. SHADOWCLAD TIMBER CLADDING
5
4
4
6
TOOLS:
LEGEND
1. COVERE BEAMS, PL
2470
PRE-FINISHED EAVE FLASHING
2. STAIRS: AND BALU BEAMS
ArchiCAD TIMBER PURLIN Photoshop STST OR GALV. FLAT HEAD NAIL FOR FLASHING Illustrator 7
DOULBE HEIGHT SPACE
GIRL'S BEDROOM
MASTER BEDROOM 3
ESPAN CLIP SYSTEM W 12G x 35mm SCREWS
1
TIMBER PACKER 9
3. WALL: P FINISHING
3
10
4. WALL: R WALL. R2.
5. ROOFIN ENDURA E
3000
3
9082
3
6. FIRST F RAFTERS, DUMMY R
9
3 BUILDING PAPER SHOWN DASHED
7. GRAOU PANELLIN JOIST
2
ROOF FRAMING 8
ENTRANCE
MASTER BEDROOM 1
8
8
8. GROUN EXISTING
2730
GUEST BEDROOM
9. BEDROO FINISH OV BOARD, S
10. LANDIN FINISH OV BOARD, S
SECTION AA 1:100
ROOF DETAIL
GROUND FLOOR LOUNGE SPACE 5
5
SCALE 1:5 HALLWAY SIGHTLINE TO LIVING SPACE AND GARDEN
4
4
6 LEGEND METALCRAFT ESPAN ROOFING 2470
1. COVERED WALKWAY: TIMBER POST, BEAMS, PLASTIC COVER 2. STAIRS: RIMU STEPS, STEEL RAILING AND BALUSTRADE TO MATCH BLACK BEAMS
3
3
3. WALL: PLY WOOD INTERIOR FINISHING, STAINED. R2.4 INSULATION
3
4. WALL: RIMU PANELLING FEATURE WALL. R2.4 INSULATION DOULBE HEIGHT SPACE
MASTER BEDROOM 3
5. ROOFING/CLADDING: COLOURSTEEL ENDURA ESPAN® 470 9082
GIRL'S BEDROOM
3000
7
9
3 GUEST BEDROOM
8
10
9
ENTRANCE
MASTER BEDROOM 1
8
8
The large b the house c over the ba hill to the N surroundin
QUATER ROUND GUTTER
QUATER ROUND GUTTER EXTERNAL BRACKET PRE-FINISHED 8g WAFER-TEK SCREW
STST
ESPA
TIMB
OFFICE SP
FASCIA BOARD
BUIL
SHADOWCLAD TIMBER CLADDING
Located in ROO office spac to ceiling w to the chur
7. GRAOUND FLOOR CEILING: RIMU PANELLING OVER EXISTING CEILING JOIST
2
8. GROUND FLOOR FLOORING: EXISTING CONCRETE POLISHED
2730
1
6. FIRST FLOOR CEILING: EXPOSED RAFTERS, RIMU PANELLING OVER DUMMY RAFTERS
NORTH BE
BUILDING PAPER SHOWN DASHED
GROUND FLOOR LOUNGE SPACE
HALLWAY SIGHTLINE TO LIV
9. BEDROOM FLOORING: CARPET FINISH OVER EXISITNG PARTICLE BOARD, SELECTED BY PRINCIPLE 10. LANDING FLOORING: HARDWOOD FINISH OVER EXISTING PARTICLE BOARD, SELECTED BY PRINCIPLE PERSPECTIVE SECTION BB NO SCALE
SECTION AA
NORTH1:100 FACADE DETAIL WITH OUTDOOR BBQ AND CORNFIELD
NORTH FACADE DETAIL WITH OUTDOOR BBQ AND CORNFIELD
NORTH BEDROOM The large bay windows at the North end of the house create a relaxing space to watch over the backyard. Facing the undeveloped hill to the North, the windows pull the surrounding nature into the bedroom.
OFFICE SPACE Located in the centre of the house, the office space looks to the West with a floor to ceiling window offering a sightline directly to the church/garage.
PERSPECTIVE SECTION BB NO SCALE
Project No.
001
CHURCH HOUSE WILLIAM DU TOIT_300342087
32
130 Rangituhi Cres, Porirua, Wellington 5022
17
13 18
17
7
16
D11
6
13
14
16
D10
6
D10
D11
15
15
5
WINDOW LEGEN
14
1. 2400H X 900W 2. 750H X 1800W 3. 862H X 750W S 4. 862H X 750W S 5. 862H X 750W S
5
4
4
3
3
2
2
12
1 D01
6. 2400H X 2000W 7. 2400H X 2250W 8. 750H X 1800W. 9. 750H W 1800W 10. 2000H X 500W
12
1 D01
NORTH ELEVATION 1:200
WEST ELEVATION 1:200
SOUTH ELEVATION 1:200
WEST ELEVATION 1:200
SOUTH ELEVATION 1:200 BB
4623
15030
s
2729
185
VSC/CAV/BP
BUILT IN WARDROBE
D13 DP 2000
185
114 800 114
2661 3221 114 800 114
SHOW ER
D19
FLAT RIMU
D14 760
AA
2ND BATHROOM MAST D21 CARPET ER 2 RIMU FLAT FLAT RIMU 810
760
D20 BUILT IN W ARDROBE 1475
W 14
W W2120
DP
4045
900
4045
185
Project No.
AA
AA
3838
WATER PROOFED TO MEET BATHROOM
130 Rangituhi Cres, Porirua, Wellington 5022
Scale:
Drawn Date:
STST OR GALV. FLAT HEAD NAIL FOR FLASHING ESPAN470
EXTERNAL BRACKET
ESPAN CLIP SYSTEM W 12G x 35mm SCREWS TIMBER PACKER 185
PRE-FINISHED 8g WAFER-TEK SCREW
TIMBER PURLIN
WILLIAM DU TOIT_300342087
FLAT RIMU
FASCIA BOARD
VSC/CAV/BP
SHADOWCLAD TIMBER CLADDING 1000
L
MAST CARPET ER 2 FLAT RIMU
DAUGHTER CARPET FLAT RIMU
W 15
4460
QUATER ROUND GUTTER
IN
001
PRE-FINISHED EAVE FLASHING CHURCH HOUSE W 21
BB
CLOSURE TO BE LINED W ITH VILLABOARD. ROUND GUTTER ER ENCLOSURES 2400MM QUATER ABOVE F.L
SOUTH FACADE ENTRANCE WITH COVERED WA
3221
D18 760
FLAT RIMU
OFFICE/LIBRARY RIMU FLOOR
1000
BUILDING PAPER SHOWN DASHED
D20 BUILT IN W ARDROBE 1475
D22
SOUTH FACADE ENTRANCE WITH COVERED WALKWAY
760 D17 DAUGHTER 760 CARPET
s ESPAN470
METALCRAFT ESPAN ROOFING
760
FLAT RIMU
W 16
114 800 114
CHIMNEY PATH THROUGH WALL
2000
D14
D23 BUILT IN 1475 W ARDROBE
W 20
4460
114
D15 W 15810
1. ALL W ALLS TO SHOW ER ENCLOSURE TO BE LINED W ITH VILLABOARD. 2. ALL TILED W ALLS TO SHOW ER ENCLOSURES 2400MM ABOVE F.L UNLESS NOTED OTHERWISE SPECIFICS
D13
760
AA
114
BATHROOM W ET AREAS. AREA WATER PROOFED TO MEET BATHROOM
D19
FLAT RIMU
BUILT IN MAIN BATHROOM WARDROBE
RIMU FLOORING
LL, RUNNING VERTICALLY DOUBLE HEIGHT W ALLS
FIRE
ESPAN470
15030
W 17
2ND BATHROOM D21 FLAT RIMU 810
s
s OFFICE/LIBRARY RIMU FLOOR
3838
N® 470 RIMU FLOOR
810
FLAT RIMU
SCALE 1:5
760
D16
BATH + SHOW ER
R 2.4 PINK® BATTS®, 90MM
OW CLAD® ULTRA GROOVE - VERTICAL FLOORTYVEK FINISHES"HIGH LEGEND 0MM CAVITY SYSTEM OVER ROOF DETAIL BER FRAMING CARPET CARPET FINISH
D22
SON CARPET D17 D18 760 FLAT RIMU 760
SHOW ER
INSULATION NOTES
MAIN BATHROOM
RIMU FEATURE
1753
PLYING W ITH ANY OF THE FOLLOW ING FLAT RIMU PANELLING 5446 - PART 1 RIMU
FLAT RIMU
FIRE
MAST CARPET ER 1 D15 FLAT RIMU810
2729
114
CEILING FINISHES
SON
W19CARPET V TIMBER
W 16
IN ENTRANCE W AY
M DIAMETER. PRE-FINISHED STEEL 0.55MM
W 17
185
D23 BUILT IN 1475 W ARDROBE
114 800 114
RIMU FEATURE
1632
114 800 114
450 114 1753
2819
ESPAN470 COLOURSTEEL ESPAN® 470 L INTERNAL DOORS HOLLO CORE -ENDURA HEIGHT S NOTED OTHERW ISE RIMU PANELLING FEATURE W ALL, RUNNING VERTICALLY DOUBLE HEIGHT
V TIMBER
2241
BATH + SHOW ER
FLAT RIMU
CARTER HOLT HARVEY: SHADOW CLAD® ULTRA GROOVE - VERTICAL NATURAL FINISH 12MM OVER 20MM CAVITY SYSTEM OVER TYVEK "HIGH R - REFER ELEVATIONSWFOR SIZES IND ZONE" PAPER OVER TIMBER FRAMING
VSC/CAV/BP
810
VIEWING THE HOUSE AND CHURCH FROM THE
2661
MAST
FLAT RIMU
450
WALL FINISHES LEGEND
REFER ELEVATIONS FOR SIZES
FIRE
CARPET ER 1 VSC/CAV/BP D16
COLOURSTEEL DOW NPIPE 63MM DIAMETER. PRE-FINISHED STEEL 0.55MM DIMENSIONS ON SITE PIOR TO . MAIN MEMBERS SHOW N FOR SMOKE CLARITY, DOMESTIC ALARM COMPLYING W ITH ANY OF THE FOLLOW ING S STANDARDS - ULC-S531 ERS W HERE REQUIRED FOR ROOF AND OR BS5446 - PART 1
W19
VSC/CAV/BP
1237
W 18
185
4623
W 18
V TIMBER
1632
ESPAN470
V TIMBER
114
2589
VIEWING THE HOUSE AND CHURCH FROM THE STREET
BB
2241
RIMU FEATURE
W INDOW REFERENCE MARKER - REFER ELEVATIONS FOR SIZES
OCAL AUTHORITY REQUIREMENTS AND DOOR LEAF W IDTH - *NOTE ALL INTERNAL DOORS HOLLO CORE - HEIGHT BUILDING CODE 760 NZS 3604 2011 1980MM R/O UNLESS NOTED OTHERW ISE STANDARD
1237
RIMU FEATURE
DOOR REFERENCE MARKER - REFER ELEVATIONS FOR SIZES
1000
D01 W01
1290
185
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE PIOR TO COMMENCING CONSTRUCTION. MAIN MEMBERS SHOW N FOR CLARITY, ALLOW FOR ADDITIONAL MEMBERS W HERE REQUIRED FOR ROOF AND W ALL FRAMING
2819
ALL WORK TO COMPLY W ITH LOCAL AUTHORITY REQUIREMENTS AND RELEVANT SECTIONS OF THE BUILDING CODE NZS 3604 2011
2589
4623
1000
LEGEND
9360
1290
185
4623
ESPAN470 ESPAN470
N
114
114 800 114
N
1:100
RIMU FEATURE
FLOORFloor PLAN Plan Ground
9360
BUILDING PAPER SHOWN DASHED
W 14
ROOF FRAMING
DP
DP
185
4045
900
4045
185
BB
GROUND FLOOR LOUNGE SPACE
NORTH FACADE DETAIL WITH OUTDOOR BBQ AND CORNFIELD
HALLWAY SIGHTLINE TO LIVING SPACE AND GARDEN WILLIAM DU TOIT_300342087
33
Project No.
CHURCH
130 Rang Porirua, Wellingto
IX N ZMS ( NEW ZE ALAND M USIC SC HO OL) MASTER DESIGN RESEARCH / August 2019
The New Zealand School of Music re-imagines Marion and Swan street as a creative hub for musicians alike. The interior form is softened by the space-frame façade which envelopes the four faces of the design. By regressing the ground floor inward, the threshold between the exterior and interior is obscured to emulate the malleable characteristics of the façade. Each interior space follows a modular archetype that corresponds to the layout of the structural grid. These spaces include teaching/practice areas, a library and two auditoriums. The main auditorium is designed to show diverse angles of the stage which exposes three sides to the audience. This layout centralises the performer within the space where a three-dimensional performance can be exhibited.
34
TOILETS
AUDIOTORIUM
ROOM
Chush space that co auditoriums. A secon small and large aud connected by the bac access as well conne main auditorium is c the main stair at the c
6 9
KEYS 1. Large Audiotorium 2. Small auditiorium 3. Stage 4. Audience restrooms 5. Crush Space 6. Backstage 7. Rehearsal rooms 8. Dressing room 9. VIP dressing rooms 10. Chanching rooms 11. Control room 12. Crew Room 13. Toilets
3
11
3
9
2
10
Core circulation rou down to provide disa the small audito
5
1
13
13
4
12
Entry into auditorium crush spaces. Splits the parts between entering and continuing. High 6m stud high continued through all of bottom floor.
35
7
7
AUDIOTORIUM
BACKSTAGE
TOILETS
KEYS 1. Large Audiotorium 2. Small auditiorium 3. Stage 4. Audience restrooms 5. Atrium 6. Backstage 7. Storage 8. Cafe 9. Meeting room 10. Social area 11. Office 12. Performance 13. Toilets
LIBRARY
OFFICE
CAFE
7
11
Space at the east focus in social environment. Ac both main stre
3 6
10
11
Atrium extends full he building at 16m high. M and spaces just as the lib cafe are circulated aroun
12
5
5
SECOND LEVEL
1
8
AUDIOTORIUM
TUTORIAL
TOILETS
OFFICE
LIBRARY
TEACHING
4
The entrance is designed to be quite closed and private, given the nature of the building and the audience that the auditorium will bring, it is necessary that the building is also cope 6 at the Marion 6 6 with high passenger traffic coming and 6Swan Ln. Doors are able6 to be pushed completely open, 6 opening up the atrium space to allow a clear route into the auditorium, past 10 the reception
KEYS 1. Library 2. Computer room 3. Study room 4. Social Space 5. Atrium 6. Exclusive Office 7 Kitchenette 8. Storage 9. Tutorial 10. Small teaching room 11. Large teaching room 12. 13.Toilets
11
6
6
6
A large space open pl northern light and down onto the stude 10
10
All Offices have an ex that they receive na Wide Corridor for la crush spa
6
6
3 10
2
Library with outlo street view to optom across Marion St to o entering through inte
1
A quite student spac the library that w computers for the dig and production that Include two tutorials total)
5
4
9
11
7
10
SECOND LEVEL 9
9
9
Wide corridors for la Crush Spa
10 10
10 AUDIOTORIUM
9
9 TOILETS
OFFICE
6
6
6
6
6
TEACHING
LIBRARY
6
6
6
6
6
KEYS 1. Library 2. Computer room 3. Study room 4. Social Space 5. Atrium 6. Exclusive Office 7. Social Space 8. Post Grad Offices 9. Post Grad Common Room 10. Storage 11. Tutorial 12. Small teaching room 13. Toilets 14. Kitchenette
TUTORIAL
2
3 6
2
8 3
5 8 4 8
11
8
11
11 1
9
8
8
8
8
36
11
Student Hub Space cr buzz at the rear of th This large 12m high light into the other le at the rear of the s
Post Grad O A large space open pl northern light and down onto the stude
14
11
A quite student spac the library that inclu for the digital and
11
The facade slit is stil point so a socialing z created. Here studen brack and look
1 : 250
Reuben Lauridsen 300335165 This design and drawing is the copyright of Reuben Lauridsen and is not to be reproduced without written permission.
Project Status Status:
Address: Project:
This design and drawing is the copyright of Reuben Lauridsen and is not to be reproduced without written permission.
Enter address here Project Name
Checker
Drawn Scale:
Checked By:
Project Status Status:
A103 Sheet No:
Drawing:
Author
Ground Floor
Drawn By:
1 : 250
Reuben Lauridsen 300335165
Throughout the design integration the structure composition of the building is composed into 3 different areas; social, educational, Throughout the design integration publical. With the atrium being the the structure composition of of circulation around main source the building is composed intothe 3 structure different areas; social, educational, publical. With the atrium being the main source of circulation around the structure
Address: Project:
Enter address here Project Name
SECTION A-A SECTION A-A
4 4 4
KEYS 1. Large auditorium 2. Atrium K E Y S 3. Academic/staff block 4. Library 1. Large auditorium 5. Small auditorium 2. Atrium 6. Reception/cafe area 3. Academic/staff block 4. Library 5. Small auditorium 6. Reception/cafe area
4
3
5 3 3 5 3
SECTION B-B
SECTION C-C
SECTION B-B
SECTION C-C
3 3 3 3
2 5 2
1
6
5 5
1 5
37
6
Drawn Scale:
10/27/18
Date:
Checker
Checked By:
A103 Sheet No:
Drawing:
Ground Floor
Author
Drawn By:
10/27/18
Date:
X COMMUNIT Y CEN T ER WELLI NGTON MASTER DESIGN RESEARCH / November 2019
The community centre proposal for Boulcott Street, Wellington, operates around the connection between design and people. The ideology is that human interaction can determine how people feel about the space against nature and architecture. The design would create a space for people to socialize by maintaining the communal social approach to the plan. The spatial arrangement of the invention would remain simple by focusing on three different areas the main social space, the core and the auditorium. Splitting the plan would allow a recurring transaction across the room and enhance a sense of privacy and connectivity for each purpose of the space.
TOOLS: Revit Photoshop Illustrator
Communal space
MULTIPORPUSE
Autrium
MULTIPORPUSE
HALL
38
39
XI FAC ADE MASTER DESIGN RESEARCH / August 2018
This university project required the construction of a façade for an existing building in Wellington. The project required to meet all the consent development into new products and new building techniques.
TOOLS: Revit Photoshop Illustrator
Thermosash Pw1000 4 side flux glazed unitized curtain wall unit, 12mm laminated glass + air cavity + 12mm laminated glass with low e coating
Spider fitting bolted to timber seconday RF concrete beam. Sizes indicative to SE detail
40
00
1200
TOP VIEW EXPOSED STRUCTURE Flashing, paker and sealant to window column junction
600x600mm Conrete Column. Refer to Engineer for Specifactions
345
Fabrication Aluminum hanger supporting the outer façade
Louvretec Outdoor Aluminum Louvers held by proprietary horizontal frame at 1500 centers
55
Fletcher Flush Glaze curtain wall glazing system with custom profile, thermally broken mullions suspending two 20mm thick panels of toughened glass
600 GIB Standard over R2.6 Pink Batts
2 layers of 13mm Gib Fyreline to be applied to interior faces of RC beam. Title: Drawing: Also to be coated in Phonix 370 Concrete SARCbeam. 321Sizes - Office Tower EX Level 1 Close up Plan Assignment 3: Facade design indicative to SE detail 9mm James Hardie Exotec Drawn By: Address: Façade Panel. Factory sealed in Spider fitting bolted to Jeffrey Henriquez Erices compliance with NZBC B1,B2 Victoria St, Wellington, 6011 Project:Spider fitting bolted to
JNJ ARCHITECT
er
Title:
Assignment 3: Facade design
Drawing:
timber seconday glulam beam. Sizes indicative to SE detail
Bolt through column. Size indicative to SE specification. Blocking for Window head to attach to. Sealant applied for waterproofing where necessary Fletcher Flush Glaze curtain wall glazing system with custom profile, thermally broken mullions suspending two 20mm thick panels of toughened glass Fixed Glazing
10/19/18 Drawn Scale:
Jeffrey Henriquez EricesThermosash Mullions
1 : 10
Sheet No:
A103
Bracket Fixed 1400mm Thermosash Pw1000 4 side Louvretec Outdoor Aluminum flux glazed unitized curtain Louvers held by proprietary unit, 12mm laminated horizontal frame at 1500 wall centers glass + air cavity + 12mm laminated glass with low e coating cantilever's supporting primary facade skin
C 321 - Office Tower St, Wellington, 6011
Bolt through column. Size indicative to SE specification.
Manufacture Metal Hanger to support to column. Size indicative to SE specification.
Rondo Perimeter angle plate installed as per manufactures guilines
Title:
Assignment 3: Facade design
Drawing:
Date:
EW Section
Drawn By:
Author
1:5
A
GIB Rondo Suspe Ceiling System W Teetanium Tee @ Suport Ceiling Pa
Date:
Drawn By:
rs
10/19/18 Drawn Scale:
Rondo 28mm Steel ce
CW Level 1 Close-up Plan
2 layers of 13mm GIB Fyreline Plasterboard on Steel Bracket fixed with 51mm GIB High Thread Screws (Level 4 stop, paint finish) Providing –60/60 FRR for structural support
Date:
Project:
10/19/18
Sheet No:321 - Office Tower SARC
1 : 25
Victoria St, Wellington, 6011
Drawn Scale: Address: A109 JNJ ARCHITECT
h
41curtain wall glazing system Fletcher Flush Glaze with custom profile, thermally broken mullions
Title:
Assignment 3: Facade design
Drawing:
CW Section
Drawn By:
Jeffrey Henriquez Erices
XII J E RVIOUS OFFICE COM PLEX BACHELORS CONSTRUCTION RESEARCH / September 2018
This project included working drawings for a 12-storey commercial office building. The design included the structure, core, services, and façade of the buildings. The drawings below show the technical details for the lobby ceiling design.
TOOLS: Revit
42
43