![](https://assets.isu.pub/document-structure/220923174303-d155e684e2f4ce91b409699751ed0878/v1/fe56c1fdb7d368a1cc94a744ced26202.jpeg?width=720&quality=85%2C50)
2 minute read
RETAIL & DINING OPPORTUNITIES
Presently, event greenspace on Jekyll Island is primarily limited to the beach and historic areas. The restructuring of the Jekyll Island golf courses presents an opportunity for a new event space which complements the current inventory. The addition of a garden retail center and restaurant on 5 acres would be a beneficial utilization of the available greenspace. The 2021 Master Plan Update highlighted the desire for diversified dining options by residents and visitors alike. The addition of a garden restaurant would offer a unique experience for those on Jekyll Island. The goal of this addition would be to integrate a restaurant into a greenhouse/plant nursery, to combine delicious food, conservation, retail, and education. This location would provide visitors with a new way to experience the beautiful nature that Jekyll offers.
Several key elements of this venue may include:
• Obvious connection with the conservation area via trails • An extensive healthy menu with sustainably sourced produce and meat from local family farms and purveyors • Outdoor seating and dining areas • Offering of horticulture classes for visitors to learn about native plants • Plants and custom floral arrangements available for purchase • The ability to host private events such as weddings and dinners • Floral workshops for building terrariums, succulent arrangements, and floral designs • Branded merchandise could include planters, garden utility items, and a variety of outdoor living products
![](https://assets.isu.pub/document-structure/220923174303-d155e684e2f4ce91b409699751ed0878/v1/30a8e250ff878b8c07ff3c0f83ab90bf.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/220923174303-d155e684e2f4ce91b409699751ed0878/v1/78e7905409849b16be7d72216ea5af99.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/220923174303-d155e684e2f4ce91b409699751ed0878/v1/05529a6dc83d144f6f780bcc0453b904.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/220923174303-d155e684e2f4ce91b409699751ed0878/v1/dd313215a608fa4e0a011aa2a5210e47.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/220923174303-d155e684e2f4ce91b409699751ed0878/v1/1147c6343382c2585ceb58674b216885.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/220923174303-d155e684e2f4ce91b409699751ed0878/v1/b75c8a63bc7bd28cf0bd2ec81ee38548.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/220923174303-d155e684e2f4ce91b409699751ed0878/v1/d00018f466461381a4433c864702d0a7.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/220923174303-d155e684e2f4ce91b409699751ed0878/v1/c13c1f686edcda01d1f290f9e72dadda.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/220923174303-d155e684e2f4ce91b409699751ed0878/v1/6b8318e506029456a8579a1d909feecc.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/220923174303-d155e684e2f4ce91b409699751ed0878/v1/b05b348bca141e5bdc73bda8f4f3446e.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/220923174303-d155e684e2f4ce91b409699751ed0878/v1/b46c1c3e62d26ff203b8618181672367.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/220923174303-d155e684e2f4ce91b409699751ed0878/v1/3a0a8f14e348497040ad34f7591b5be2.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/220923174303-d155e684e2f4ce91b409699751ed0878/v1/d99c82162e44cdde6e52c77a0be3df34.jpeg?width=720&quality=85%2C50)
STRATEGIC ACTIONS
• Further investigate probability of designating greenspace into active recreational use (such as pickleball or croquet courts). • Consult with the State Historic Preservation Office in advance of building modifications. • The downstairs restaurant space is currently leased. A decision would be required to offer the operator other options or to mutually cancel this lease.
• Issue RFP for Golf Lodge Development Proposals in May 2025. • Issue RFP for Senior Living Community Development Proposals in January of 2024. • Issue RFP for Garden Retail Center & Restaurant Development Proposals in April 2024.