Milwaukee bucks Arena design proposal
introduction Milwaukee Arena Design proposal
jca architects
WHO WE ARE
We’ve got what it takes 40 Years of Sports Design Experience and Passion
Jca architects Sports architecture is what we live and breathe.
Meet The team
Callum vierthaler
Jeremy percy
Abbye torgerson
design goals Our design vision for this arena focuses on 3 main goals
Connection
With the community, with the fan.
multifunction
Design for a variety of events to maximize revenue.
iconic
Design that is a cultural symbol for Milwaukee.
connection With the community, With the fan.
art
inviting loyalty
revitalization diverse
urban
riverwalk
hospitality
summerfest home
historic Cream city brick
beer pride
industrial
lively
entertainment
cheese
sports
1
4
3
2 2 1 3 4 5
6
5
8
7
7
6
Connection with the community
8
Connecting with the community Weaving the arena into the community fabric
Connecting with the community Weaving the arena into the community fabric, no matter the season
Connecting with the community Providing urban fabric to the arena
Connecting with the fan A unique experience for every level of ticket
Full range of amenities
From general admission To premium
long section Building features
Level 1 Event level
Event level club Full bar, live screen LED TV wall, glass wall to watch players run by
Full emersion into the game
Level 2 Lobby/club level
Level 2 Iron Horse club
The Iron horse club Views directly into the bowl
Embodying the unique industrial feel of the city of Milwaukee.
Level 3
Main concourse level
Level 4 Suites/Loge level
loge seating Living room suite feel at a lower price point.
MILWAUKEE BREWING CO. Bringing Milwaukee inside the arena with a local brewery and cream city brick
Level 4 Suites/loge level
Suites
Bunker Suite
Loft Suite
Party Suite
Level 6
Upper concourse level
Level 6 Trophy club
trophy Club
trophy Club mechanics Rentable space, surrounded in an LED wall
premium amenities Providing a unique experience for every level of fan Connecting the fan to experiences beyond the event through 8 different levels of price and features.
Multifunction Designed for a variety of events to maximize revenue.
Recipe for revenue Partnering atmosphere with amenities is a chain reaction that leads to a championship.
Premium Players
Retail
General Admission
multifunction Designed for a variety of events to maximize revenue.
teams
Milwaukee Bucks Milwaukee Admirals Marquette Golden Eagles
concerts
Center stage, End stage, Local music festivals, End stage theatre
Restaurants & retail Leon’s Frozen Custard, Milwaukee Brat House, Niketown, Bartolotta’s
entertainment
Monster trucks, Disney on Ice, Circus, March Madness, Summerfest, Comicon, Tradeshows, Cirque du Soleil
iconic Design that is a cultural symbol for Milwaukee.
The real feel of Basketball with a modern twist Allen Fieldhouse University of Kansas
Barclay’s Center
Jenison Fieldhouse Michigan State
Golden 1 Center
I C
O N
I C
Constructability budget $340 Million
OUR TARGET IS YOUR SUCCESS
schedule
On track to finish for the 2018 Season if we start June 2016.
cost estimate Total Project Cost Estimate
$340,933,817
Hard Costs
75%
soft Costs
10%
contingencies
9%
Design fee
6%
hc
Sitework, Demo, Structure, Enclosure, Roofing, Finishes, Mech/Plumbing, Electrical/Av, Elevators.
sc
Scoreboard, Food service, Specialties & Equipment.
$31,878,531
$264,585,658
c
Design Contingency, Construction Contingency, Escalation Contingency.
$26,681,777
df
Design Fee (6%) Architectural and Structural design services
$17,787,851
Game 1
OUR process Opening in time for the 2018 NBA season Key owner decision points
arena State/city reviews Schematic design
Design development
Authorities having jurisdiction; permitting
Construction docs
site Start of construction, Demolition, earthwork, and site utilities
Foundation, structure, skin, interior rough in, finishes.
Liveblock development
Lightrail/infrastructure
Demolition, foundation, structure, skin, interior rough in, finishes.
Demolition, foundation, structure, skin, finishes.
Your new arena
CONNECTED
Your new arena
MULTIFUNCTIONAL
Your new arena
ICONIC
Q+a
Let’S get started Jca architects