Milwaukee Bucks

Page 1

Milwaukee bucks Arena design proposal


introduction Milwaukee Arena Design proposal


jca architects


WHO WE ARE


We’ve got what it takes 40 Years of Sports Design Experience and Passion

Jca architects Sports architecture is what we live and breathe.


Meet The team

Callum vierthaler

Jeremy percy

Abbye torgerson


design goals Our design vision for this arena focuses on 3 main goals

Connection

With the community, with the fan.

multifunction

Design for a variety of events to maximize revenue.

iconic

Design that is a cultural symbol for Milwaukee.


connection With the community, With the fan.


art

inviting loyalty

revitalization diverse

urban

riverwalk

hospitality

summerfest home

historic Cream city brick

beer pride

industrial

lively

entertainment

cheese

sports


1

4

3

2 2 1 3 4 5

6

5

8

7

7

6

Connection with the community

8





Connecting with the community Weaving the arena into the community fabric


Connecting with the community Weaving the arena into the community fabric, no matter the season


Connecting with the community Providing urban fabric to the arena


Connecting with the fan A unique experience for every level of ticket

Full range of amenities

From general admission To premium


long section Building features


Level 1 Event level


Event level club Full bar, live screen LED TV wall, glass wall to watch players run by

Full emersion into the game


Level 2 Lobby/club level



Level 2 Iron Horse club


The Iron horse club Views directly into the bowl

Embodying the unique industrial feel of the city of Milwaukee.


Level 3

Main concourse level



Level 4 Suites/Loge level


loge seating Living room suite feel at a lower price point.


MILWAUKEE BREWING CO. Bringing Milwaukee inside the arena with a local brewery and cream city brick


Level 4 Suites/loge level


Suites

Bunker Suite

Loft Suite

Party Suite


Level 6

Upper concourse level



Level 6 Trophy club


trophy Club


trophy Club mechanics Rentable space, surrounded in an LED wall


premium amenities Providing a unique experience for every level of fan Connecting the fan to experiences beyond the event through 8 different levels of price and features.


Multifunction Designed for a variety of events to maximize revenue.


Recipe for revenue Partnering atmosphere with amenities is a chain reaction that leads to a championship.

Premium Players

Retail

General Admission


multifunction Designed for a variety of events to maximize revenue.

teams

Milwaukee Bucks Milwaukee Admirals Marquette Golden Eagles

concerts

Center stage, End stage, Local music festivals, End stage theatre

Restaurants & retail Leon’s Frozen Custard, Milwaukee Brat House, Niketown, Bartolotta’s

entertainment

Monster trucks, Disney on Ice, Circus, March Madness, Summerfest, Comicon, Tradeshows, Cirque du Soleil








iconic Design that is a cultural symbol for Milwaukee.


The real feel of Basketball with a modern twist Allen Fieldhouse University of Kansas

Barclay’s Center

Jenison Fieldhouse Michigan State

Golden 1 Center



I C

O N

I C




Constructability budget $340 Million

OUR TARGET IS YOUR SUCCESS

schedule

On track to finish for the 2018 Season if we start June 2016.


cost estimate Total Project Cost Estimate

$340,933,817

Hard Costs

75%

soft Costs

10%

contingencies

9%

Design fee

6%

hc

Sitework, Demo, Structure, Enclosure, Roofing, Finishes, Mech/Plumbing, Electrical/Av, Elevators.

sc

Scoreboard, Food service, Specialties & Equipment.

$31,878,531

$264,585,658

c

Design Contingency, Construction Contingency, Escalation Contingency.

$26,681,777

df

Design Fee (6%) Architectural and Structural design services

$17,787,851


Game 1

OUR process Opening in time for the 2018 NBA season Key owner decision points

arena State/city reviews Schematic design

Design development

Authorities having jurisdiction; permitting

Construction docs

site Start of construction, Demolition, earthwork, and site utilities

Foundation, structure, skin, interior rough in, finishes.

Liveblock development

Lightrail/infrastructure

Demolition, foundation, structure, skin, interior rough in, finishes.

Demolition, foundation, structure, skin, finishes.




Your new arena

CONNECTED


Your new arena

MULTIFUNCTIONAL


Your new arena

ICONIC


Q+a


Let’S get started Jca architects


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.