EDUCATION
PROFESSIONAL EXPERIENCE
2010-2013 Illinois Institute of Technology Master of Architecture Chicago IL
Intern Architect - Produced drawings, models, and renderings for Summer 2013 proposals, permits, bids, and construction Dirk Denison Architects - Conducted site visits and communicated with clients, contractors, and vendors - Prepared marketing material for portfolios, presentations, award submissions, etc.
2004-2009 University of British Columbia Bachelor of Fine Arts Vancouver BC 2000-2004 Notre Dame Regional Secondary School High School Graduate Vancouver BC
AWARDS/ACHIEVEMENTS 2013 2011, ‘12 2011, ’12, ‘13 2007, ‘09 2008 2008 2007 2006 2004 2003 2001, ‘02 2001
Finalist for Master’s Thesis Project Award Awarded Student Assistant Scholarship Work selected to be shown at I.I.T. Spring Show Student Aid Bursary for Undergraduate Students Award Art work selected to be displayed in art show (Today’s Special ) Essay (“Artist, Curator, Critic: Who holds the power?”) published in The Promont Alma Mater Society Special Bursary Award David King Award for Academic Excellence Don Modjeski Award for being top math student over 5 years in high school Fermat Math Award Placed in top 11% in FSA Testing American Scholastic Mathematics Association Award
Graphic Designer Spring 2013 I.I.T. Dirk Denison
- Collected, organized, and compiled research f rom I.I.T. seminar on housing -Designed and published a cohesive book
Teacher’s Assistant Aug 2012 - May 2013 I.I.T. Jonathan Miller
- Collected and compiled student work and and produced a unified book - Led class discussions and presentations - Acted as liaison between professor and students
Teacher’s Assistant Aug 2011 – May 2012 I.I.T. Materials Lab
- Learned how to use many different tools and modeling techniques - Supervised and taught other students how to use various tools - Trained for workshop safety protocol (HAZMAT)
Carpenter Seasonal; 2004-2010 Van New Construction
- Contributed to completion of high-end residential condominiums and townhomes - Learned to read and implement construction documents
Sales Audit/ Expense 2004-2010 Costco Wholesale
- Audited sales and expense sheets - Worked with extreme attention to numbers and details at different scales
28 August 2013 RE: Recommendation for Jesse Nguyen
To Whom It May Concern, It is with pleasure that I strongly recommend Jesse Nguyen for employment at your firm. I have had the good fortune of knowing Jesse for over a year, both as a graduate student at the Illinois Institute of Technology, and as an Architect Intern in my office during the summer of 2013. Jesse was a student in my Housing Seminar in the fall of 2012 and in my Masters Project Studio in the spring of 2013 for his last semester of study in the Masters Program at IIT. In both courses, Jesse was one of the strongest students, consistently exhibiting his passion for design and his incredible dedicated work ethic. His work was thorough, well conceived, and of great quality. Jesse has a tremendously talented hand, continuously demonstrated through his dayto-day sketches and more formal presentation material. Jesse also worked at Dirk Denison Architects as an Architect Intern during the summer of 2013. Though he was only in our office for a few months, Jesse was a great addition to our staff. He was very motivated and worked on a variety of projects, offering experience at various stages of design. His personality and collaborative nature also made a positive impact on the office atmosphere. Had it not been for him returning to Vancouver, I would have gladly kept him on our staff as a full-time employee. I highly recommend Jesse for an entry-level architectural position. His strong character and skills make him an exceptional candidate for your consideration. Please do not hesitate to contact me if you require additional information. Most sincerely,
Dirk Denison, FAIA Principal, Dirk Denison Architects Professor, Illinois Institute of Technology, College of Architecture
THESIS MASTER PROJECT
ILLINOINS INSTITUTE OF TECHNOLOGY COLLEGE OF ARCHITECTURE SPRING 2013 JESSE NGUYEN PROFESSOR DIRK DENISON
POLYDWELLINGS
1/128" = 1' SITE MODEL
PERSONS/ACRE 860+
430
0
FAMILY INCOME $200K +
$100K
0
2KM 2MI
.4KM .4MI
VANCOUVER, BC
THIS IS A PROPOSAL FOR THREE MIXED-INCOME, MIXED-USE RESIDENTIAL COMPLEXES IN VANCOUVER, CANADA. VANCOUVER�S CURRENT URBAN GEOGRAPHY IS UNIQUE BECAUSE 50% OF ITS LAND USE IS DEDICATED TO SINGLE FAMILY RESIDENTIALHOMES. THIS IS AN INEFFICIENT MODEL BECAUSE VANCOUVER�S POPULATION GROWTH IS CURRENTLY OUT-PACING CANADA�S NATIONAL AVERAGE BY 9%. INCREASING THE AVAILABLE HOUSING STOCK AND SUBSEQUENTLY, INCREASING THE POPULATION DENSITY, IS REQUIRED TO PROVIDE ADEQUATE HOUSING THAT CAN BEGIN TO MEET THE EXISTING DEMAND.
3
PUBLIC PROGRAM AND AMENITIES
GROUND LEVEL
4
COMMUNITY INTERACTION
The three sites are located immediately adjacaent to each other. The goal is to increase housing stock so it was important to select three empty lots as opposed to tearing down existing buildings. I have also chosen this site because it is located in a buffer zone between the downtown peninsula and Vancouver's poorest neighbourhood. The two distinct areas are within just 2 miles of each other. A large goal of this project was to create a community that is attractive to new residents but one that also does not displace current residents. This was achieved by increasing retail and amenities for the community. This will improve the local economy and expedite the community's development. Secondly, there was ample space allocated to social services to provide support for the lower income residents. Lastly, there are various scales of public outdoor space that are adaptable to numerous programs (from balconies and interior courtyards to an open park) to encourage interaction between all community members. A focus was placed on organizing public program and amenities so that pedestrian traffic and sidewalk activity would increase.
PROGRAM SECTION
5
SITE 1 INCREASED PEDESTRIAN ACTIVITY
PUBLIC COURTYARD
MATERIALITY: PERFORATED COPPER SCREEN
MATERIALITY: HORIZONTAL WOOD FACADE
MATERIALITY: MASONRY BRICK WEAVE
PREFABRICATED BRICK PANEL This project is sited in one of Vancouver's oldest neighbourhoods, VIctory Square. The existing architecture is compressed of mid-rise masonry buildings commonly seen around North America built in the last century. There was an effort to acknowledge the area's history without imitating the area's surrounding architecture. This challenged was tackled by choosing materials that will age gracefully and create their own stories and histories - copper which patinas to a vibrant green, timber which loses its colour and turns into a steel gray, and masonry whose weight speaks of timelessness. Having three buildings cladded in different materials will create individuality, identity, and pride. An attempt was made to use the materials to skin the building in interesting ways that still stayed true to the material's essence. For example, the unit of the brick was translated into the unit of the prefabricated panel that is still stacked the same way a traditional brick would be. The unit of the brick was further emphasized by offsetting the way each was stacked to create an interesting texture. Thirdly, depending on the program of the specific part of the building, bricks were taken out of the wall to create openings.
MATERIALITY
In an ode to the area's strong industrial past, the facades are mechanically operable. This gives the inhabitants the ability to control natural lighting and fenestration.
11
SITE2: OPERABLE FACADE
MIXED-INCOME 12
DIVERSE UNIT MAKE-UP
Circulation is key to all housing projects. In this case, circulation includes organization of unit types - market and subsidized. It was important that various units were dispersed throughout the project, so as to not segregrate. Buildings also shared one residential entrance and lobby. Units are all organized in U-shapes to provide shared outdoor courtyards elevated above the street. Additionally, units were pushed and pulled to to create varied floor plates to accomodate square-footage unit requirements. This created balconies or sunrooms in some units and increased square-footage in other units.
SITE2: TYPICAL RESIDENTIAL UNIT LAYOUT
RESIDENTIAL COURTYARDS
20FT
13
SITE3: OPERABLE WOOD FACADE AS SCREEN
SITE 1: PERFORATED SCREEN
FACADE MODEL
LAYERING
FACADE SECTION
15
CIRCULATION 16
SITE3: TYPICAL RESIDENTIAL UNIT LAYOUT
25FT
SITE1: PRIVATE COURTYARD
SHARED OUTDOOR SPACE 18
SITE2: COURTYARD PERSPECTIVE SECTION
GATHERING SPACES SITE2: 1/16" = 1' SCALE MODEL
19
DYNAMIC SCREENING 20
SITE1: 1/16" = 1' SCALE MODEL
POLYDWELLINGS SITE3: 1/16" = 1' SCALE MODEL
21
JESSE NGUYEN
DIRK DENISON ARCHITECTS
1 A203
A-300.00
18'-0" ARD) (SIDE Y
(R) ' 2 6 . 1 24 EXISITING LIGHT POST TO BE REFURBISHED
EXISITNG CHAINLINK FENCE ALONG PROPERTY LINE WITH GOLF COURSE -NO CHANGE
(R) 0.00' R=44 ) .73'(R A=37
REPLACE ENTIRE EXISITNG ASPHALT DRIVEWAY WITH WATER WASHED CONCRETE NO CHANGE TO GRADE
EXISITING LIGHT POST TO BE REFURBISHED
REPLACE ENTIRE EXISITNG ASPHALT DRIVEWAY WITH WATER WASHED CONCRETE NO CHANGE TO GRADE 60' LONG 8" WIDE CURB TO BE ADDED ALONG EAST SIDE OF DRIVEWAY TO DISCOURAGE VEHICLES FROM SLIPPING OFF EDGE FINISH TO MATCH DRIVEWAY
5" WIDE COBBLE EDGER -TYP.
DW
TOTAL SURFACE AREA OF PROJECTED ROOF: 4,868 SF TOTAL INCREASE OF SURFACE AREA OF EXISITING ROOF SURFACE: 196 SF
EXISITING LIGHT POST TO BE REFURBISHED
'(R) 179.64
REPLACE ENTIRE EXISITNG ASPHALT DRIVEWAY WITH WATER WASHED CONCRETE NO CHANGE TO GRADE
REFER TO SHEET A-003.00 DETAIL 2 FOR LOWER LEVEL COVERED TERRACE DESIGN (NOT SHOWN THIS SHEET)
NEW ~3'' SCULPTURAL ROCK INTEGRATED INTO LANDSCAPE DESIGN THIS AREA.
REUSE EXISITING EQUIPMENT PAD FOR NEW CONDENSER AND GENERATOR
EXISITING LIGHT POST TO BE REPLACED
ARCHITECT: R/
DIRK DENISON ARCHITECTS
F
REFURBISH MAILBOX @ SAME LOCATION
'(R) 141.96
REFER TO SHEET A-003.00 DETAIL 1 FOR MAIN LEVEL TERRACE DESIGN
60'-0" D) R A Y R (REA
1123 West Washington Chicago, Illinois 60607 312.455.1388 (p) 312.455.1264 (f ) www.dirkdenisonarchitects.com
STRUCTURAL ENGINEER:
ENSPECT ENGINEERS 8300 Mississippi Street Merrillville, IN 46410
TOTAL INCREASE OF IMPERMEABLE SURFACE FROM EXISITNG HARDSCAPE: 200 SF REPLACE ENTIRE EXISITNG ASPHALT DRIVEWAY WITH WATER WASHED CONCRETE NO CHANGE TO GRADE
219-736-6002 (p)
MEPFP CONSULTANTS:
Building Engineering Systems 444 N. Wells Street, Suite 501 Chicago IL 60610 USA
E
312.836.0595 (p)
(FR
EXISITING LIGHT POST TO BE REFURBISHED
SITE PLAN 0
2
4
1/4" = 1' - 0" 8
12
20
28
18'-0" ARD) (SIDE Y
NE
OK LA TED BAYBROERETOFORE DEDICA WAY H HT-OF66' RIG
33'-0"
40'-0" D) R A Y T ON ISSUANCE: #:
DATE:
1 2 3 4 5 6 7 8 9
JULY 15, 2013 AUGUST 15, 2013
DESCRIPTION:
LOCATION:
) R ( ' 0 0 . 240
GINGER CREEK PERMIT SET
23 Baybrook Lane Oak Brook, IL 60523
PROJECT:
Renovation and Addition to an Existing Residence
HUANG RESIDENCE CAD FILE: DRAWING TITLE:
SITE PLAN DRAWING NUMBER:
A-002.00
© DIRK DENISON ARCHITECTS 2013
RCP LEGEND SYMBOLS SHOWN FOR REFERENCE AND LOCATION PURPOSES ONLY. PLEASE REFER TO ELECTRICAL DRAWINGS FOR SPECIFICATIONS. COORDINATE EXACT LIGHT FIXTURE LOCATIONS WITH INTERIOR ELEVATIONS AND LIGHTING DETAILS RECESSED CIRCULAR FIXTURE (FOR ADJUSTABLE FIXTURES ALSO - SEE SCHED.) RECESSED OR SURFACE-MTD. WALL FIXTURE RECESSED UNDERCABINET STRIP LIGHT - SEE SCHEDULE FOR EXACT LENGTHS INDIRECT LED COVE LIGHT
EXISTING STEEL & CONCRETE TREAD STAIR TO REMAIN; REPAIR, SAND, PRIME, & PAINT
DECORATIVE SURFACE-MNT, SEMI-RECESSED, OR PENDANT FIXTURE - TYPE TBD. KP 82 KEYPAD (SEE ELECTRICAL DRAWINGS)
DN
Z0-00
ZONE DESIGNATIONS (SEE ELECTRICAL DRAWINGS) - NOT USED
F4
LIGHT FIXTURE TYPE DESIGNATION (SEE ELECTRICAL DRAWINGS) B.O. CLG. + 16' - 3" FINISHED HEIGHT AT CEILING (SEE ALSO INTERIOR ELEVATIONS)
IMPORTANT NOTES: A. - ALL RECEPTACLES SHALL BE SPACED ACCORDING TO NEC 210.50 B - AFCI & GFCI SHALL BE INSTALLED ACCORDING TO NEC 210.12 & 210.8 C. - BATHROOM RECEPTACLES AND LUMINAIRES SHALL COMPLY WITH NEC 406.8 (C) AND 410.10 (D) D. -FOR MORE INFORMATION, REFER TO "E" SHEETS
HD HEAT DETECTOR
S
EXISTING CONCRETE PATIO TO BE RECLAD WITH A BLUE STONE VENEER
APP
GFCI
DW
F1 EXIST.
113-A
EXIST.
UP TO LED TROUGH LIGHTS
S HOMERUN TO FAMILY RM MEDIA
RT
F1
LFT
HOMERUN S TO FAMILY RM MEDIA
F1
F1
APP
F1
S
HOMERUN TO FAMILY RM MEDIA
TV:
DENOTES RECEPTACLE FOR TELEVISION; COORDINATE LOCATION WITH TV SPECS
GFCI: DENOTES RECEPTACLE WITH GROUND FAULT CIRCUIT INTERRUPTOR FOR OUTLETS NEAR SINK OR WET LOCATION.
TO POST LIGHT AT STAIR
HALF-SWITCHED DUPLEX RECEPTACLE OUTLET FLOOR-MOUNTED RECEPACLE BOXES: FOR CONCRETE FLOORS: LEW, #SH-6262-58 W./ 2 #6304-DFB-LR-A, SATIN NICKEL OR SATIN CHROME FOR WOOD FLOORS: LEW, #RCFB-1, W./ RCFB-1-BP, BRASS
TO LANDSCAPE PATH LIGHTS AND KOI POND LIGHTING
APP
CEILING-MOUNTED SUPPLY DIFFUSER (SEE MECH. DRAWINGS FOR SPECIFICATION)
109-A
IW-1A
109 1
1 HR. RATED DUMBWAITER F1 F1 SHAFT AND 1 HR. DOOR
F1
NEW: 35' LENGTH LIGHT
F5 COVE USING EXISTING TRIM
F1
F1
LEWS RCFB-1-A
IW-3
36" GLASS GUARD RAIL AND WD. HAND RAILING, TYP. 10 3/4" WD. TREADS WITH 3/4" NOSING, TYP.
VERIFY CEILING
UP TO CHAND.
HALL 107 F2
EXIST.
107 1
106 2
IN CAB.
IW-1
F1 POWDER 108
F2A
F2
F2
HALL 106
IW-5
105-B
BATHROOM 105 F1A
DIRK DENISON ARCHITECTS
EX EW-5 (SIM. INSTALL EXTERIOR LIMESTONE CLADDING)
BEDROOM 104
STRUCTURAL ENGINEER:
ENSPECT ENGINEERS 8300 Mississippi Street Merrillville, IN 46410 219-736-6002 (p)
EXIST.
MEPFP CONSULTANTS:
F9
BEDROOM 103
Building Engineering Systems 444 N. Wells Street, Suite 501 Chicago IL 60610 USA
EXIST.
312.836.0595 (p)
CE:
F9
6"
EXIST.
69'-
EXIST.
IW-3
F6
TAN
F1A
EXIST.
104-B
DIS
F2A
OCCUPANCY SENSOR
312.455.1388 (p) 312.455.1264 (f ) www.dirkdenisonarchitects.com
INSTALL STAINED CLR WESTERN RED CEDAR SIDING BELOW EXTERIOR DECK SOFFIT USE ~5 1/2" WIDE W/ 1/4" GAP TO MATCH WIDTH OF ADJACENT T&G SOFFIT SPACING -TYP. , REPLACE WITH REMOVEABLE USE CAMO TYPE FASTENERS TYP. USE NEW ST. STL. REMOVEABLE FASTENERS AT OUTERMOST AND INNERMOST BOARD TO ACCESS FOR PERIODIC MAINTENANCE. -TYP.
ESS
F4
LEWS RCFB-1-A W/ DATA
103-A
103 1
IW-1
NEW 18" x 18" ACCESS PANEL TO ROOF
F1A DEN 102
EXIST.
1123 West Washington Chicago, Illinois 60607
EGR
TO POST LIGHTS AT DRIVE
ARCHITECT:
F2
F2
EXIST.
IW-8
F9
NOTE: REFER TO LANDSCAPE PLAN FOR LIGHTING AT TERRACE
IW-5
SD/ CO
F1A
F2A
EXIST. EX EW-4
F2
O C
F
EXIST.
EX DK-1
REMOVE ALL EXIST'G PNTD CLR EXISTING 36" WOOD GUARD CEDAR LAP SIDING AT EXT SOFFIT RAIL TO REMAIN, REPAIR AS FLIP OVER, PREP & RE-PURPOSE REQUIRED, FOR "LIKE NEW" REFER TO FOR SOFFITS AFTER BEING APPEARANCE & FUNCTION, TYP. FINISHED -USE STOCK TAKEN FROM LANDSCAPE PLAN EXISTING METAL STAIRS TO BASEMENT SOFFIT REMAIN, REPAIR, PRIME & PAINT AS REQUIRED FOR "LIKE NEW" APPEARANCE & FUNCTION, TYP.
EX EW-5
LFT
104-A
F2A
EXIST. EXIST.
DN 4
S
F10 8'
GFCI
DASH LINE OF FIRE SEPARATION
EXIST.
EXIST.
HOMERUN TO FAMILY RM MEDIA
108-A
F1A PNTD WATER RESISTANT WALL BOARD @ SHOWER
F4
F4
F1
F1
F10 8' IW-4
106 3
NEW WOOD SCREEN DASH LINE OF PARTITIONS FIRE SEPARATION
F9
F4
DN
CLERESTORY
104 1
EXIST. IW-8
101-A
EX EW-3
DETAIL A -
105-A
102 1
101 2 S
F1
F2
40" INFINITY DRAIN FXTIF 6540
TUBES EXIST.
RT
ALL CONTROLS TO BE VAREO BY LUTRON ALL RECEPTACLES TO BE VAREO BY LUTRON
F1
IW-2
REMOTE INLINE FAN
SLOPE F3A
EXIST.
REPLACE EXISTING 15' FLOR. TUBES
F4 EXISTING WOOD DECK EXIST. STRUCTURE TO REMAIN, REPLACE FLOORING AS SCHEDULED
F1
REMOVE PAINT OFF BEAM & RESTAIN DARK -COLOR TBD
EXISTING WOOD WINDOW FRAMES TO REMAIN, REPAIR AS HOMERUN GLAZING TO REQUIRED. REPLACE AS EXIST. FAMILY RM MEDIA SCHEDULED. F5
101 1
F5
OR. 12' FL
EXIST.
NOTES: SECURITY SYSTEM NOT IN CONTRACT, G.C. TO COORDINATE W/ OWNER'S INSTALLER
EXIST.
EXISTING J. BOX
UP TO LED TROUGH LIGHTS
HOMERUN TO FAMILY RM RT MEDIA
106 1
F1
LEWS RCFB-1-A
114 2
ISTING C E EX REPLA
LIGHTLY CLEAN EXIST'G WALNUT CLAD BEAMS
EGRESS DISTANCE FROM UPSTAIRS: 26' 8"
FOYER 101
TO MATCH EXISTING
EXIST.
UP 18 @ 6 7/8" R
FLOOR-MOUNTED RETURN GRILL (SEE MECH. DRAWINGS FOR SPECIFICATION)
INSTALL STAINED CLR CEDAR T&G SIDING AT NEW OVERHANG USE CAMO TYPE FASTENERS TYP. COOR. BOARD WIDTH W/ DECK SOFFIT FINAL SURFACES TO ALIGN -TYP
EXIST.
IW-3
DN. 15 @ 7 1/8" R
F4
EX EW-5
ALL TELEPHONE/ DATA/ CABLE TO BE VAREO BY LUTRON CUSTOM MULTIGANG WALLPLATES BY VAREO COLOR TO BE DETERMINED WITH OWNER/ ARCHITECT
F1
IW-2A
F10 3'
107-A
UP TO HALL
NEW WOOD AND DEPTH FOR FIXTURE GLASS SCREEN & REQ. F2A CABINET F2A MILLWORK
LEWS RCFB-1-A
F1
IW-1
F6
F4
S
CEILING-MOUNTED RETURN GRILL (SEE MECH. DRAWINGS FOR SPECIFICATION)
IW-8
F1 PANTRY 110 DOWN TO LOWER LEVEL
S
FAMILY RM. 109
103-B
F11
110-A
DASH LINE OF FIRE SEPARATION IW-2
F1 F11
60" AFF
APP For TV
IW-4
IW-2 SD/ CO
W GFCI
DASH LINE OF FIRE SEPARATION
W IW-7 APP
111-B
110 1
112 2
F1
VERIFY CEILING DEPTH FOR FIXTURE REQ.
SD/ CO
SD/ CO
IW-3
NEW WOOD SCREEN PARTITIONS F2A F2A
EXIST.
F11
IW-7
105 2
F11
RT HOMERUN TO FAMILY RM S MEDIA
108 1
EXISTING MASONRY FIREPLACE & CHIMNEY TO REMAIN
IW-4
113 1
F5 ~42"
LIVING RM. 113
LFT
F2
109 2
LEWS RCFB-1-A
REMOVE PAINT OFF FIR BEAMS AND RESTAIN DARK -COLOR TBD -TYP
S
R/F
EXIST.
EXIST.
EXIST.
F4
S HOMERUN TO FAMILY RM MEDIA
CONTROL FOR ELECTRICAL IN-FLOOR RADIANT HEAT DUPLEX RECEPTACLE OUTLET APP: DENOTES RECEPTACLE FOR APPLIANCE; COORDINATE LOCATION WITH APPLIANCE SPECIFICATIONS
EW-1
LFT
J. BOX
J. BOX
J. BOX
TO MATCH EXISTING
F4
111-A
GFCI
F1
APP
S
PNTD EXT PLASTER OVER DENSGLASS GOLD
F1
F1
HOMERUN TO FAMILY RM MEDIA
MW
GFCI
GFCI
E
FLOOR-MOUNTED SUPPLY DIFFUSER (SEE MECH. DRAWINGS FOR SPECIFICATION)
F4 REMOVE PAINT OFF FIR BEAMS AND RESTAIN DARK -COLOR TBD -TYP
LFT
HOMERUN TO FAMILY RM MEDIA
114 1
. TUB ES
RT
E EXIS TING 8' FLO R
F5 RE PLAC
EXIST.
NEW: 42" ROW LED STRIP LIGHTS
F4
S
GFCI
F1
KITCHEN 111
HOMERUN TO FAMILY RM MEDIA
EXIST.
APP
GFCI
F1
F1
DINING RM. 112
F5 REPLACE EXISTING 15' FLOR. TUBES
APP
INFRASTRUCTURE - DOOR PHONE (SHOWN FOR REFERENCE ONLY, SEE LV DRAWINGS AND ARCH. ELEVATIONS)
NEW STONE CLAD STEEL INSTALL STAINED CLR WESTERN RED CEDAR COLUMN SIDING BELOW EXTERIOR DECK SOFFIT USE ~5 1/2" WIDE W/ 1/4" GAP TO MATCH WIDTH OF ADJACENT T&G SOFFIT SPACING -TYP. , REPLACE WITH REMOVEABLE USE CAMO TYPE FASTENERS TYP. USE NEW ST. STL. REMOVEABLE FASTENERS AT OUTERMOST AND INNERMOST BOARD TO ACCESS FOR PERIODIC MAINTENANCE. -TYP.
TURN UP TERRACE MEMBRANE FLASHING 18" ONTO BUILDING WALL SHEATHING, LAP UNDER WALL MEMBRANE
EW-1
EW-1
F4
INFRASTRUCTURE - PHONE/DATA (SHOWN FOR REFERENCE ONLY, SEE LV DRAWINGS AND ARCH. ELEVATIONS)
NEW SECOND FLOOR ADDITION ABOVE
EX DK-1
EXISTING WOOD WINDOW FRAMES TO REMAIN, REPAIR AS F4 AS REQUIRED. REPLACE GLAZING SCHEDULED. EXIST.
CLG-MTD. SMOKE DETECTOR/ CARBON MONOXIDE DETECTOR(SHOWN FOR REFERENCE ONLY, SEE LV DRAWINGS) INFRASTRUCTURE - PHONE (SHOWN FOR REFERENCE ONLY, SEE LV DRAWINGS AND ARCH. ELEVATIONS)
REMOVE ALL EXIST'G PNTD CLR CEDAR LAP SIDING AT EXT SOFFIT FLIP OVER, PREP & RE-PURPOSE FOR SOFFITS AFTER BEING FINISHED -USE STOCK TAKEN FROM BASEMENT SOFFIT
GENERAL NOTES: ALL SWITCH PLATES, OUTLETS, CATV, ETC TO BE FROM THE LUTRON VAREO SERIES IN STANDARD ARCH. MATTE FINISH TBD INCLUDE RESPECTIVE DRIVERS AND INTERFACE FOR ALL LAMP TYPES CONFIRM LED IS COMPATIBLE WITH VAREO SERIES USING DRIVER COOR. RECEPTACLES AND SPEAKERS WITH CLIENT'S A.V. CONSULTANT OR CONTRACTOR IF ONE IS USED.
SD/ CO
FLUSH MOUNTED CEILING SPEAKER (COOR. W/ CLIENT'S AV CONSULTANT)
EXIST.
EXIST.
EXIST.
EX EW-5 (SIM.)
ISSUANCE: EX EW-4
EXISTING STONE & PATIO, PATIO STEPS TO REMAIN, REFINISH AS REQUIRED, SEE EXTERIOR ELEVATIONS FOR DETAILS
EXIST. EXIST.
EXIST.
EXIST.
NEW MASONRY SPIRAL STAIR ENCLOSURE TO MATCH EXISTING CONSTRUCTION
#:
DATE:
1 2 3 4 5 6 7 8 9
JULY 15, 2013 AUGUST 15, 2013
DESCRIPTION:
LOCATION:
GINGER CREEK PERMIT SET
23 Baybrook Lane Oak Brook, IL 60523
PROJECT:
Renovation and Addition to an Existing Residence
FIRST FLOOR REFLECTED CEILING PLAN 0
2
4
8
12
20
HUANG RESIDENCE 1/4" = 1' - 0" 28
CAD FILE: DRAWING TITLE:
FIRST FLOOR REFLECTED CEILING PLAN DRAWING NUMBER:
A-121.00 © DIRK DENISON ARCHITECTS 2013
1 A2.11
(732.42') EL.= 22' - 8" A.F.F. T.O. Roof Coping (High Point, East)
RR2
RR1
QQ3
QQ2
NEW METAL-CLAD WOOD WINDOW
QQ1
NEW METAL-CLAD WOOD WINDOW
NN2
PP1
PP2
MM2
NEW METAL-CLAD WOOD WINDOW
207-B
POWDER COATED ALUM. GUARDRAIL, 4" O.C. HORIZONTAL
DD2
STAINED CEDAR FASCIA
CC2
CC1
(720.00') EL.= 10' - 3" A.F.F. T.O. Finish Floor - 2nd Floor EL.= 8' - 6" A.F.F. (718.25') B.O. Finish Ceiling - 1st Floor Addition
BB2
DD1
(716.75') EL.= 8' - 0" A.F.F. B.O. Finish Ceiling - 1st Floor Existing
NEW METAL-CLAD WOOD WINDOW
NEW METAL-CLAD WOOD WINDOW
REPAIR/ REFURBISH EXISTING LANNON STONE
EL.= 13' - 9" A.F.F. (723.50') T.O. Guardrail - 2nd Floor
STAINED CEDAR CLAPBOARD SIDING
CC3
DD3
(728.00') EL.= 18' - 3" A.F.F. B.O. Finish Ceiling - 2nd Floor (West)
MM1
NEW CEDAR SHAKE SHINGLE ROOFING TO MATCH EXISTING
DD4
STAINED CEDAR FASCIA
NEW METAL-CLAD WOOD WINDOW
STAINED CEDAR CLAPBOARD SIDING
NEW STAINED CEDAR FASCIA TO MATCH EXISTING
(730.08') EL.= 20' - 4" A.F.F. T.O. Roof Coping (Low Point, West)
EXTEND NEW LANNON STONE TO MATCH EXISTING
NEW LANNON STONE TO MATCH EXISTING
NEW LANNON STONE TO MATCH EXISTING
111-A
BB1
STAINED CEDAR SHIPLAP SIDING
STAINED CEDAR SHIPLAP SIDING
(709.75') EL.= 0' - 0" A.F.F. T.O. Finish Floor - 1st Floor (708.43') EL.= - 1' - 4" A.F.F. T.O. Existing Foundation Wall EL.= Varies (See Grading Plan) Grade at Building
2
DIRK DENISON ARCHITECTS (ABOVE ROOF MEMBRANE)
EXHAUST FAN
CHIMNEY CAP
1123 West Washington Chicago, Illinois 60607
EL.= 22' - 9" A.F.F. (732.50') T.O. Roof Coping (High Point, East)
2'-0"
XX1 ROOF SKYLIGHT
METAL FLASHING
(730.08') EL.= 20' - 4" A.F.F. T.O. Roof Coping (Low Point, West)
STAINED CEDAR FASCIA TO MATCH
VV1
STAINED 1X8 FLUSH JOINT TONGUE AND GROOVE WITH RESAWN FACE ON "A CLEAR" GRADE WESTERN RED CEDAR LAP SIDING MITER AT CORNER -TYP
REPAIR/ REFURBISH EXISTING LANNON STONE CHIMNEY RE-FLASH AND WEATHER PROOF EXISITING FIREPLACE
UU1
STAINED 1X8 REVERSE BOARD AND BATTEN WITH RESAWN FACE ON "A CLEAR" GRADE WESTERN RED CEDAR SIDING
METAL-CLAD WOOD WINDOW, TYP.
METAL-CLAD WOOD WINDOW, TYP.
TT1
SS3
SS2
G2
F2
E2 D1
REPLACE EXISTING ~12" WIDE WOOD BENCH W/ (4) 4" WIDE STAINED WESTERN RED CEDAR BOARDS 1/2" APART TO MAKE 1'-5 1/2" BENCH -MITER AT DECK CORNER IF OCCURS
D2
REPAIR, PATCH AND REPAINT EXISTING WOOD WINDOWS, TYP.
H1
G1
F1
C1
B2
GG4
GG3
GG2
GG1
FF4
DASH LINE OF NEW 6"x4" BOX BRONZE PAINTED BOX DOWNSPOUT -HOOK INTO EXISTING
REPAIR/ REFURBISH EXISTING LANNON STONE -AS REQUIRED
E1
OPTION 1: REPLACE EXISITNG WEAR LAYER AT TOP LANDING AND FIRST RUN OF TREADS AND RISERS USING 1" T. DIMENSIONAL BLUESTONE PAVERS SET WITH EPOXY GROUT OPTION 2: REPLACE EXISITNG WEAR LAYER AT TOP LANDING AND FIRST RUN OF TREADS AND RISERS WITH NEW WATER WASHED CONCRETE FINISH TO EXPOSE PEA-GRAVEL TEXTURE
NEW PRESTAINED 1X4 FLUSH JOINT TONGUE AND GROOVE WITH RESAWN FACE ON "A CLEAR" GRADE WESTERN RED CEDAR LAP SIDING REPAIR/ REFURBISH EXISTING LANNON STONE -AS REQUIRED
FF3
FF2
FLASHING -TYP
REPLACE ALL EXISTING FLOOD LIGHTS -TYP -REFER TO RCP
FF1
EE4
NEW PRESTAINED 1X4 FLUSH JOINT TONGUE AND GROOVE WITH RESAWN FACE ON "A CLEAR" GRADE WESTERN RED CEDAR LAP SIDING
EE3
EE2
8300 Mississippi Street Merrillville, IN 46410 219-736-6002 (p)
444 N. Wells Street, Suite 501 Chicago IL 60610 USA
(720.00') EL.= 10' - 3" A.F.F. T.O. Finish Floor - 2nd Floor
312.836.0595 (p)
EL.= 8' - 6" A.F.F. (718.25') B.O. Finish Ceiling - 1st Floor Addition
EE1
NEW METAL-CLAD WOOD WINDOW REPAIR/ REFURBISH EXISTING LANNON STONE -AS REQUIRED
ENSPECT ENGINEERS
(728.00') EL.= 18' - 3" A.F.F. B.O. Finish Ceiling - 2nd Floor (West)
Building Engineering Systems
STAINED CEDAR CLAPBAORD SIDING
NEW METAL-CLAD WOOD WINDOW
101-A
REPAIR EXISTING WOOD RAILING AS NEC.
REPLACE DECK BOARDS WITH NEW STAINED WESTERN RED CEDAR BOARDS W/ 1/8" MAX SPACING BETWEEN TO PREVENT DEBRIS COLLECTION
B1
STRUCTURAL ENGINEER:
MEPFP CONSULTANTS:
NEW STAINED WESTERN RED CEDAR FASCIA
H2
312.455.1388 (p) 312.455.1264 (f ) www.dirkdenisonarchitects.com
203-B
NEW CEDAR SHAKE SHINGLE ROOFING TO MATCH EXISTING
REPLACE RAIN GUTTER ASSEMBLY AND RESLOPE TO EXISITNG DOWNPOUT LOCATIONS
REPLACE W/ NEW STAINED WESTERN RED CEDAR FASCIA -TYP
STAINED CEDAR FASCIA
STAINED 1X4 FLUSH JOINT TONGUE AND GROOVE WITH RESAWN FACE ON "A CLEAR" GRADE WESTERN RED CEDAR LAP SIDING APPLIED DECORATIVE CEDAR BATTENS TO ALIGN W/ RAILING
INTEGRATED RIDGE VENT
CLEAN EXISTING LANNON STONE CHIMNEY NOTE: THERE IS NOTICEABLE EFFLORESCENCE NEAR SOFFIT AT THIS LOCATION
SS1
STAINED 1X8 FLUSH JOINT TONGUE AND GROOVE WITH RESAWN FACE ON "A CLEAR" GRADE WESTERN RED CEDAR LAP SIDING
NEW CEDAR SHAKE SHINGLE ROOFING TO MATCH EXISTING
NEW STAINED WESTERN RED CEDAR FASCIA
EL.= - 8' - 11 1/4" A.F.F. (699.81') T.O. Existing Concrete Slab - Cellar EL.= - 10' - 3 1/4" A.F.F. (698.48')
ARCHITECT:
2'-0" PVC ROOF REFER TO ROOF PLAN
1/4" = 1' - 0"
1 A2.11
(ABOVE ROOF MEMBRANE)
2 A2.10
SOUTH BUILDING ELEVATION
ISSUANCE: REPAIR/ REFURBISH EXISTING LANNON STONE -AS REQUIRED
NEW PRESTAINED 1X4 FLUSH JOINT TONGUE AND GROOVE WITH RESAWN FACE ON "A CLEAR" GRADE WESTERN RED CEDAR LAP SIDING
(709.75') EL.= 0' - 0" A.F.F. T.O. Finish Floor - 1st Floor (708.43') EL.= - 1' - 4" A.F.F. T.O. Foundation Wall EL.= Varies (See Grading Plan) (708.25') Grade at Building
REPLACE EXISITNG HOSE BIBB WITH FROST PROOF WALL MOUNT
#:
DATE:
DESCRIPTION:
1 2 3 4 5 6 7 8 9
JULY 15, 2013 AUGUST 15, 2013
LOCATION:
GINGER CREEK PERMIT SET
23 Baybrook Lane Oak Brook, IL 60523
PROJECT:
PATCH/REPAIR CURVED MASONRY WALL
Renovation and Addition to an Existing Residence
NOTE: REFER TO LANDSCAPE DRAWINGS FOR REMAINDER OF ENTRY WALKWAY FINISHES
HUANG RESIDENCE
EL.= - 8' - 11 1/4" A.F.F. (699.81') T.O. Concrete Slab - Cellar EL.= - 10' - 3 1/4" A.F.F. (698.48') B.O. Footing (South/West)
1
WEST BUILDING ELEVATION
EL.= - 13' - 3 1/4" A.F.F. (695.48') (FACING T.O. FootingSTREET) (North/East) 1/4" = 1' - 0"
CAD FILE: DRAWING TITLE:
BUILDING ELEVATIONS DRAWING NUMBER:
A-200.00
© DIRK DENISON ARCHITECTS 2013
New Roof Assemblies: RF-1
New Membrane Roof: 1 Hr. Rated (GA FC 5514,UL L528 (SIM.)) Total R Value = R-43.68 min. Total Thickness = 1'-9 3/8" min.
(732.42') EL.= 22' - 8" A.F.F. T.O. Roof Coping (High Point, East)
(732.42') EL.= 22' - 8" A.F.F. T.O. Roof Coping (High Point, East)
SLOPED ROOF COPING BEYOND - SEE BUILDING ELEVATIONS
3 A310 SIM.
RF-1
RF-1
3 SIM. A310 O P. HAND
RF-1
(730.08') EL.= 20' - 4" A.F.F. T.O. Roof Coping (Low Point, West)
(730.08') EL.= 20' - 4" A.F.F. T.O. Roof Coping (Low Point, West)
(730.08') EL.= 20' - 4" A.F.F. T.O. Roof Coping (Low Point, West)
EL.= 18' - 3" A.F.F. (728.00') B.O. Finish Ceiling - 2nd Floor (West)
(728.00') EL.= 18' - 3" A.F.F. B.O. Finish Ceiling - 2nd Floor (West)
(728.00') EL.= 18' - 3" A.F.F. B.O. Finish Ceiling - 2nd Floor (West)
RF-2 RF-1
New Shingled Roof: 1 Hr. Rated (UL L502) Total R-Value = R-38.4 Total Thickness = 10.75 -CCA Treated Cedar Shake with Stainless Steel Nails -Overlap 18" strips of 30lb.Roofing Felt Over the Top Portion of Cedar Shake and Onto the Underlayment -New 1/4" Underlayment - "Benjamin Obdyke Cedar Breather" -New 36" Wide Roofing Felt with 4" Overlap -Ice and Water Shield - "GAF StormGuard Film-Surfaced Leak Barrier" -3/4" Exterior Grade Plywood -6"t. "CertainTeed CertaSpray Closed Cell Foam", R-38.4 -1/2" Metal Resilient Channel -(1) Layer Type "X" Gypsum Board (Level 4 Finish)
New Exterior Wall Assemblies:
ROOF DRAIN DOWNSPOUT, DISCHARGE ONTO EXISTING ROOF SEE PLUMBING DRAWINGS
PAINTED CEMENT STUCCO FINISH OVER 3/4" DENSGLASS GOLD SHEATHING
-60 mil. High Albedo White Roof Membrane - "Firestone UltraPly TPO SA Membrane" -1 Layer 1/2"t. Cover Board -"Firestone ISOGARD HD Coverboard", R-2.5 -Tapperd Rigid Insulation - "GAF Energy Guard Perlite Tapered Roof Insulation", min. 1"t., 1/4":12" Slope, R-2.78-11.11 (varies) -3/4"t. Exterior Grade Plywood -16" Open Web Wood Truss, 16" O.C.(See Structural DWGs) -6"t. "CertainTeed CertaSpray Closed Cell Foam", R-38.4 -1 5/8" Furring Channel -1/2" Metal Resilient Channel -1 Layer 5/8"t. Type X Gypsum Board with Level 4 Finish
EW-1
EW-1
PAINTED CEMENT STUCCO FINISH OVER 3/4" DENSGLASS GOLD SHEATHING
New Bearing Exterior Wall - Cedar Siding: 1 Hr. Rated (U344) Total Thickness = 8 3/4" Total R Value = R-35.2
NEW METAL-CLAD WOOD WINDOW - SEE WINDOW SCHEDULE AND DETAILS
-1" Stained Cedar Siding (See Elevations for Details) -1/2" Cedar Furring Strips -Weather Barrier - "Dupont Tyvek HomeWrap" -5/8"t. Exterior Fire Resistant Gypsum Board - "DensGlass Sheathing" -1/2"t. Exterior Grade Plywood -2x6 Wood Stud 16" O.C. -5 1/2"t. "CertainTeed CertaSpray Closed Cell Foam Insulation", R-35.2 -1 Layer 5/8"t. Type "X" Gypsum Board with Level 5 Finish
EXISTING WOOD ROOF JOISTS OVER DINING ROOM TO REMAIN - SEE STRUCTURAL DRAWINGS
EX-RF2
EW-2
New Bearing Exterior Wall - Stone Veneer: 1 Hr. Rated (U344) Total R Value = Total Thickness = 1'-01/4"
IW-1 MILLWORK CABINET - SEE INTERIOR ELEVATIONS AND DETAILS
-4"t. Lannon Limestone Veneer with Metal Ties as Required -1" Air Space -Weather Barrier - "Dupont Tyvek HomeWrap" -5/8"t. Exterior Fire Resistant Gypsum Board - "DensGlass Sheathing" -1/2"t. Exterior Grade Plywood -2x6 Wood Stud, 16" O.C. -5 1/2"t. "CertainTeed CertaSpray Closed Cell Foam Insulation", R 35.2 -1 Layer 5/8"t. Type "X" Gypsum Board
WOOD AND GLASS GUARDRAIL ASSEMBLY - SEE INTERIOR ELEVATIONS AND DETAILS
IW-2
New Floor Assemblies:
EW-1 SF-1 (720.00')
SF-1
SF-1
SF-1
FF-1
New First Floor at Overhang: 1 Hr. Rated (GA FC 5514, UL L528 (SIM.)) Total Thickness = 1'-7 7/8" t. (w/o Finish Floor) Total R-Value = R-38.4
1 A310 SIM.
SF-2
EL.= 10' - 3" A.F.F. T.O. Finish Floor - 2nd Floor
EL.= 10' - 3" A.F.F. (720.00') T.O. Finish Floor - 2nd Floor
EXISTING WOOD PANEL AND TRIM
6" T. CLOSED CELL SPRAY FOAM INSULATION @ PERIMETER RIM JOIST/ BEAM, TYP. EL.= 8' - 6" A.F.F. (718.25') B.O. Finish Ceiling - 1st Floor Addition
EL.= 8' - 6" A.F.F. (718.25') B.O. Finish Ceiling - 1st Floor Addition
-Finish Floor (See Finish Plan for New Finish Floor Where Scheduled) -1 Layer 3/4"t. Plywood Subfloor -2x6 Framing (See Structural DWGs) -6" "CertainTeed CertaSpray Closed Cell Spray Foam Insulation, R-35.2 -1/2" Metal Resilient Channel -1/2" Exterior Grade Plywood Sheathing -5/8"t. Exterior Fire Resistant Gypsum Board - "DensGlass Sheathing" -Weather Barrier - "Dupont Tyvek HomeWrap" -Existing 2x12 Exterior Deck Joists (V.I.F.) - No Work. -Existing 1x6 Cedar Planks - Remove and Reinstall Upside Down, Refinish Exposed Face SF-1
New Second Floor: 1 Hr. Rated (GA FC 5514, UL L528) Total Thickness = 1'-7 7/8" t. (w/o Finish Floor)
NEW WOOD HEADER - SEE STRUCTURAL DRAWINGS
NEW WOOD BEAM - SEE STRUCTURAL DRAWINGS, TYP.
3
WALL SECTION @ NORTH ELEVATION - 2ND FLOOR
NEW METAL-CLAD WOOD WINDOW - SEE WINDOW SCHEDULE AND DETAILS
IW-1
3/4" = 1' - 0"
EW-5
-Finish Floor (See Finish Plan) -1 Layer 3/4"t. Plywood Subfloor -5 1/2" Acoustic Batt Insulation - Bonded Logic Cotton Batt Insulation, R-21 -16" Open Web Wood Truss,16" O.C.(See Structural DWGs) -1 5/8" Furring Channel -1/2" Metal Resilient Channel -1 Layer 5/8"t. Type X Gypsum Board with Level 4 Finish SF-2
New Second Floor at Overhang: 1 Hr. Rated (GA FC 5514, UL L528 (SIM.)) Total Thickness = 1'-7 7/8" t. (w/o Finish Floor) Total R-Value = R-38.4 -Finish Floor (See finish plan) -1 Layer 3/4"t. Plywood Subfloor -16" Open Web Wood Truss, 16"O.C. (See Structural DWGs) -6" "CertainTeed CertaSpray Closed Cell Foam", R-38.4 -1/2" Furring Channels -1/2" Exterior Grade Plywood -Weather Barrier - "Dupont Tyvek HomeWrap" -1/2" Pressure Treated Wood Furring Strips -5/8" t. Exterior-Grade Moisture Resistant Gypsum Board "DensGlass Sheathing" or Equal Painted With Setting Type Joint Compound and Galvanized Metal J-Stop Trim - See RCP For Control Joint Locations
NEW WOOD STRINGER - SEE INTERIOR STAIR DETAILS
New Interior Wall Assemblies:
WOOD AND GLASS STAIR RAILING ASSEMBLY - SEE INTERIOR ELEVATIONS AND DETAILS
RF-1 IW-1
1 Hr. Rated Wall, UL U-305 Total Thickness: 5"
6" T. CLOSED CELL SPRAY FOAM INSULATION @ PERIMETER RIM JOIST/ BEAM, TYP.
EX-FF3
EX-FF2
EXISTING STONE SILL TO REMAIN
EX-FF3
RF-1 IW-1A
EL.= 0' - 0" A.F.F. (709.75') T.O. Finish Floor - 1st Floor
EXSISTING WOOD FLOOR JOISTS - SEE STRUCTURAL DRAWINGS, TYP
-(2) Layers of 5/8"t. Type "X" Gypsum Bd. with Skim Coat (Level 5 Finish) at Each Side, From Floor to Underside of Floor/Roof Decking Above -2X4 Wood Stud (3.5"t.), From Floor to Underside of Floor/Roof Decking Above -3.5" Cotton Batt Insulation-"Bonded Logic, Ultra Touch R-13" -Acoustical Seals at Top and Bottom of All Gyp. Bd. at Layers
EL.= 0' - 0" A.F.F. (709.75') T.O. Finish Floor - 1st Floor
IW-1 Wall Assembly WITHOUT Cotton Batt Insulation and Acoustic Seals RF-1 IW-2
1 Hr. Rated Wall, UL U-305 Total Thickness: 7"
EL.= - 1' - 4" A.F.F. (708.43') T.O. Existing Foundation Wall EL.= VARIES (SEE GRADING PLAN) Grade at Building
EL.= - 2' - 1 1/4" A.F.F. (707.65') T.O. Existing Foundation Wall
-(2) Layers of 5/8"t. Type "X" Gypsum Bd. with Skim Coat (Level 5 Finish) at each side, From Floor to Underside of Floor/Roof Decking Above -2X6 Wood Stud (5.5"t.), From Floor to Underside of Floor/Roof Decking Above -5.5" Cotton Batt Insulation - "Bonded Logic, Ultra Touch R-19" -Acoustical Seal at Top and Bottom of all Gyp. Bd. Layers RF-1 IW-2A IW-2 Wall Assembly WITH OUT Cotton Batt Insulation and Acoustic Seals RF-1 IW-3
Non-Rated Wall Total Thickness: 5" -(2) Layers of 5/8"t. Type "X" Gypsum Bd. with Skim Coat (Level 5 Finish) at Each Side, From Floor to Underside of Floor/Roof Trusses -2X4 Wood Stud (3.5"t.), From Floor to Underside of Floor/Roof Trusses Above
EX-FW2
RF-1 IW-4
STORAGE CLOSET DOOR - SEE INTERIOR DOOR SCHEDULE
Non-Rated Wall Furring Total Thickness: 4.25" -(1) Layers of 5/8"t. Type "X" Gypsum Bd. with Skim Coat (Level 5 Finish) at Each Side, From Floor to Underside of Floor/Roof Trusses -2X4 Wood Stud (3.5"t.), From Floor to Underside of Floor/Roof Trusses Above RF-1 IW-5
EXISTING WOOD STAIR AND STRUCTURE TO REMAIN - SEE FLOOR PLANS AND INTERIOR ELEVATIONS FOR NEW FINISHES
Non-Rated Wall Furring Total Thickness: 4.25"
EXISTING CONCRETE FOUNDATION WALL AND FOOTING TO REMAIN NO CHANGE
EXISTING 4" T. CONCRETE SLAB, THICKENED TO 8" AT BEARING WALLS - NO CHANGE, TYP.
EX-BF1
EL.= - 8' - 11 1/4" A.F.F. (699.81') T.O. Existing Concrete Slab - Cellar
RF-1 IW-9
Existing Wall - New Lamination Total Thickness: Varies -Existing Wall Assembly to Remain -Remove Existing Layer of Gypsum Board as indicated on Drawings -(1) New Layer of 5/8" Gypsum Board, Level 4 Finish IW-10 RF-1
Load Bearing Acoustic Wall, UL U-313 Total Thickness: 8.5" -(1) Layer 5/8" Gypsum Board and Skim Coat (Level 4 Finish), From Floor to Underside of Ceiling/Roof Decking Above. -(1) Layer 5/8" Gypsum Board, From Sub-Floor to Underside of Ceiling/Roof Decking Above. -2"x6" Wood Studs, 16" O.C., From Sub-Floor to Underside of Ceiling/Roof Decking Above. -5.5" Cotton Batt Insulation - "Bonded Logic, Ultra Touch R-19" -Acoustical Seal at Top and Bottom of all Gyp. Bd. Layers -1/2" Metal Resilient Channels, 24" O.C. -(1) Layer 5/8" Gypsum Board, From Sub-Floor to Underside of Ceiling/Roof Decking Above. -(1) Layer 3/8" Gypsum Board Wall Panel, with Skim Coat (Level 4 Finish), Sub-Floor to Underside of Ceiling/Roof Decking Above
Existing Roof Assemblies: EX-RF2 Existing Insulated 3:12 Slope Cavity Roof: Existing Roof/Ceiling Assembly to Remain - Remove Existing Cedar Shingles and Felt Paper. Prep Existing Plywood Decking as Required for New Roof Cladding -Existing Roof / Ceiling Assembly with Exposed Decking -New 36" Wide Roofing Felt with 4" Overlap -New 1/4" Underlayment - "Benjamin Obdyke Cedar Breather" -Overlap 18" strips of 30lb.Roofing Felt Over the Top Portion of Cedar Shake and Onto the Underlayment -CCA Treated Cedar Shake with Stainless Steel Nails -Ice and Water Shield - "GAF StormGuard Film-Surfaced Leak Barrier" at All Eves, Valleys, Rakes and Chimneys. Ice and Water Sheild to Overlap Location of Interior Walls Below 6'-0" Minimum.
WALL ASSEMBLIES NOTES: GENERAL NOTES: 1. WALL ASSEMBLIES: EW-1
EW-1
THIS SYMBOL DENOTES WALL ASSEMBLY TYPE - SEE ALSO WALL SECTIONS AND DETAILS FOR FURTHER INFORMATION ON ALL EXTERIOR AND LOAD- BEARING WALL ASSEMBLIES. 2. ALL WALL ASSEMBLIES ARE NOTED TO THE INTERIOR FACE OF THE GYP./ PLASTER 3. SEE INTERIOR ELEVATIONS AND MATERIAL SCHEDULES FOR WALL FINISH SPECIFICATIONS, TYP. 4. SEE ALSO STRUCTURAL DRAWINGS FOR ADDITIONAL NOTES 5. PROVIDE WATER RESISTANT FIBERGLASS MESH REINFORCED CEMENT BACKER BOARD"WONDERBOARD BACKERBOARD" AT ALL SHOWERS AND FIXTURE SIDE OF ALL WET WALL LOCATIONS 6. PROVIDE 1/2"t. PLYWOOD BLOCKING AT ALL WALL-HUNG CABINET, SHELF, AND ACCESSORY LOCATIONS. 7. REPAIR OR REPLACE ALL DAMAGED EXISTING GYPSUM BOARD ON WALLS TO REMAIN, PREPARE EXISTING WALLS FOR NEW FINISHES AS SCHEDULED. 8. REPAIR OR REPLACE ALL DAMAGED EXISTING PLYWOOD SHEATHING AT EXISTING EXTERIOR WALLS TO REMAIN. PREPARE EXISTING EXTERIOR WALLS FOR NEW HOUSE WRAP AND STAINED CEDAR CLADDING AS SCHEDULED. 9. SOLID HATCHED WALLS INDICATE EXISTING WALLS TO REMAIN. REPAIR EXISTING WALLS AS REQUIRED FOR NEW SCHEDULED WALL FINISHES.
EX-RF3 Existing Insulated 3:12 Slope Exposed Structure Roof: Existing Roof/Ceiling Assembly to Remain - Remove Existing Cedar Shingles and Felt Paper. Prep Existing Plywood Decking as Required for New Roof Cladding -Existing Roof / Ceiling Assembly with Exposed Decking -New 36" Wide Roofing Felt with 4" Overlap -New 1/4" Underlayment - "Benjamin Obdyke Cedar Breather" -Overlap 18" strips of 30lb.Roofing Felt Over the Top Portion of Cedar Shake and Onto the Underlayment -CCA Treated Cedar Shake with Stainless Steel Nails -Ice and Water Shield - "GAF StormGuard Film-Surfaced Leak Barrier" at All Eves, Valleys, Rakes and Chimneys. Ice and Water Sheild to Overlap Location of Interior Walls Below 6'-0" Minimum.
Existing Exterior Wall Assemblies: EX-EW3 Existing Reclad Insulated Wood Frame Wall: Existing Exterior Wall Assembly to Remain. Remove Existing Cedar Cladding, Prepare Exterior Substrate as Required for New Weather Barrier and Cladding. -Existing Insulated Frame Wall Assembly to Remain -New Weather Barrier - "Dupont Tyvek HomeWrap" -1/2" Cedar Furring Strips -1" Stained Cedar Siding (See Elevations for Details) EX-EW4 Existing Insulated Wood Frame Wall with Stone Veneer: Existing Limestone Veneer Clad Exterior Wall Assembly to Remain. No Work. EX-EW5 Thickened Existing Exterior Wall: Existing Exterior Wall Framing and Exterior Sheathing to Remain, Remove Existing Interior Layer of Gypsum Board Existing Insulation, and Existing Cedar Cladding. Patch and Repair Damaged Sheathing and Wall Membrane as Required for New Cladding. -New 2" Wood Furring Strips Laminated to Inside Face of Existing 2"x4" Wood Studs -5 1/2"t. "CertainTeed CertaSpray Closed Cell Foam Insulation", R-35.2 -(1) Layer 5/8"t. Type "X" Gypsum Board with Skim Coat (Level 4 Finish) -New Exterior Cedar Cladding, See Exterior Elevations for Details EX-FW1 Existing Insulated Wood Frame Foundation Wall: Existing Insulated Wood Frame Foundation Wall Assembly to Remain. No Work. EX-FW2 Existing Insulated Concrete Foundation Wall: Existing Insulated Concreate Foundation Wall Assembly to Remain. No Work.
Existing Floor Assemblies: EX-FF1 Existing First Floor Assembly at Bridged Living Room: 1 Hr. Rated (GA FC 5514, UL L528 (SIM.)) Total Thickness = 1'-7 7/8" t. (w/o Finish Floor) Total R-Value = R-38.4 -Finish Floor (See Finish Plan for New Finish Floor Where Scheduled) -Existing 1 Layer 3/4"t. Plywood Subfloor - No Work -Existing Insulated Wood Frame Floor - No Work -Existing 2x12 Floor Framing - No Work
ARCHITECT:
DIRK DENISON ARCHITECTS 1123 West Washington Chicago, Illinois 60607
-6" "CertainTeed CertaSpray Closed Cell Foam", R-38.4 -1/2" Pressure Treated Furring Strips -Existing 1x6 Cedar Planks - Remove and Reinstall Upside Down, Refinish Exposed Face EX-FF2 Existing First Floor Assembly with Suspended Basement Ceiling Assembly Existing Wood Frame Floor / Ceiling Assembly to Remain - No Work (See Finish Plan for New Finish Floor Where Scheduled)
312.455.1388 (p) 312.455.1264 (f ) www.dirkdenisonarchitects.com
STRUCTURAL ENGINEER:
ENSPECT ENGINEERS 8300 Mississippi Street Merrillville, IN 46410
EX-FF3 Existing First Floor Assembly with Basement Ceiling Assembly Existing Wood Frame Floor / Ceiling Assembly to Remain - No Work (See Finish Plan for New Finish Floor Where Scheduled)
219-736-6002 (p)
MEPFP CONSULTANTS:
EX-FF4
Building Engineering Systems
Existing First Floor Assembly with Exterior Wood Slat Underside Existing Wood Frame Floor and Exterior Wood Slat Underside Assembly to Remain - No Work (See Finish Plan for New Finish Floor Where Scheduled)
444 N. Wells Street, Suite 501 Chicago IL 60610 USA 312.836.0595 (p)
EX-BF1 Existing Basement Floor Assembly Existing Concrete Basement Floor Assembly to Remain -No Work (See Finish Plan for New Finish Floor Where Scheduled) EX-DK1 Existing Wood Deck Assembly Existing Wood and Steel Deck Structure to Remain, Remove Existing Floor Planking and Replace with New Cedar Planks -Existing Wood and Steel Structure to Remain -New Cedar Floor Planks use Camo Type Fasteners
ISSUANCE: #:
DATE:
1 2 3 4 5 6 7 8 9
JULY 15, 2013 AUGUST 15, 2013
-(1) Layer of 5/8"t. Type "X" Gypsum Bd. with Skim Coat (Level 5 Finish) at Each Side, From Floor to Underside of Floor/Roof Deck -2X4 Wood Stud (3.5"t.), From Floor to Underside of Floor/Roof Deck -3.5" Cotton Batt Insulation - "Bonded Logic, Ultra Touch R-13" -Acoustical Seals at Top and Bottom of Gyp. Bd. at Layer
LOCATION:
RF-1 IW-5A
PROJECT:
IW-5 Wall Assembly WITH OUT Cotton Batt Insulation and Acoustic Seals
EL.= - 8' - 11 1/4" A.F.F. (699.81') T.O. Existing Concrete Slab - Cellar
New Interior Wall Assemblies cont'd:
DESCRIPTION: GINGER CREEK PERMIT SET
23 Baybrook Lane Oak Brook, IL 60523
Renovation and Addition to an Existing Residence
HUANG RESIDENCE
RF-1 IW-6
1 Hr. Rated Wall Lamination Total Thickness: 2.125" -(1) Layer 3/4" Plywood Blocking for Dumbwaiter Track -(2) Layers Type X Gypsum Board, Fire Seal at all Joints
EL.= - 10' - 3 1/4" A.F.F. (698.48') B.O. Footing (South/West)
RF-1 IW-7
2 Hr. Rated Shaft Wall: UL U-415 Total Thickness: 5" -(1) Layer 3/4" Ultracode Gyp. Bd. Panel -4" C-H Metal Channel -3" Thermafiber SAFB Insulation -(1) Layer 1" Gyp. Bd. Liner Panel RF-1 IW-8
Wall Furring Total Thickness: 2.25"
2
WALL SECTION @ STAIR SHAFT
3/4" = 1' - 0"
1
WALL SECTION @ SOUTH ELEVATION
3/4" = 1' - 0"
-(1) Layer 5/8" Type "X" Gypsum Board, with Skim Coat (Level 5 Finish), From Floor to Underside of Ceiling/Roof Trusses Above -1.5" Wood Stud, From Floor to Underside of Ceiling/Roof Trusses Above
CAD FILE: DRAWING TITLE:
WALL SECTIONS DRAWING NUMBER:
A-300.00
© DIRK DENISON ARCHITECTS 2013
B.O. Finish Ceiling B.O. Finish Ceiling
B.O. Finish Ceiling
EL. = 8' - 0" A.F.F.
EL. = 8' - 0" A.F.F.
EL. = 8' - 6" A.F.F.
FINISHES LEGEND GENERAL NOTE: REFER TO FINISH, FINISH MATERIALS, STONE AND MILLWORK SCHEDULES ON SHEET A-602.00.
10" OPEN TO BEYOND
T.O. Finish Floor
T.O. Finish Floor
EL. = 0' - 0" A.F.F.
EL. = 0' - 0" A.F.F.
EL. = 0' - 0" A.F.F.
HALL (107) - SOUTH ELEVATION
13
1/2" = 1' - 0"
HALL (107) - NORTH ELEVATION
HALL (107) - E. ELEV.
12
1/2" = 1' - 0"
HALL (106) - WEST ELEVATION
11
1/2" = 1' - 0"
1/2" = 1' - 0"
B.O. Finish Ceiling B.O. Finish Ceiling
B.O. Finish Ceiling
EL. = 8' - 0" A.F.F.
EL. = 8' - 0" A.F.F.
T.O. Finish Floor
T.O. Finish Floor
T.O. Finish Floor
EL. = 0' - 0" A.F.F.
EL. = 0' - 0" A.F.F.
EL. = 0' - 0" A.F.F.
EL. = 8' - 6" A.F.F.
10" OPEN TO BEYOND
HALL (106) - EAST ELEVATION
10
9
1/2" = 1' - 0"
BATHROOM SHWR (105) - N. ELEV.
8
1/2" = 1' - 0"
BATHROOM (105) - S. ELEV. 1/2" = 1' - 0"
B.O. Finish Ceiling
B.O. Finish Ceiling
B.O. Finish Ceiling
B.O. Finish Ceiling
EL. = 8' - 0" A.F.F.
EL. = 8' - 0" A.F.F.
EL. = 8' - 0" A.F.F.
EL. = 8' - 0" A.F.F.
ARCHITECT:
DIRK DENISON ARCHITECTS 1123 West Washington Chicago, Illinois 60607
NEW TRIM @ REPLACEMENT WINDOW. PAINT TO MATCH - TYP.
NOTE: COORD. LOCATION OF NEW TOWEL BARS & BATH. ACCESSORIES W/ CLIENT. ADD BLOCKING AS REQ'D. - TYP.
REPLACE ALL WD. DOOR TRIM & BASE TRIM. PATCH DRYWALL @ WALLS & CEILING. PAINT T.B.D. - TYP.
312.455.1388 (p) 312.455.1264 (f ) www.dirkdenisonarchitects.com
STRUCTURAL ENGINEER:
ENSPECT ENGINEERS 8300 Mississippi Street Merrillville, IN 46410 219-736-6002 (p)
ALIGN
14
T.O. Finish Floor
T.O. Finish Floor
T.O. Finish Floor
T.O. Finish Floor
T.O. Finish Floor
EL. = 0' - 0" A.F.F.
EL. = 0' - 0" A.F.F.
EL. = 0' - 0" A.F.F.
EL. = 0' - 0" A.F.F.
MEPFP CONSULTANTS:
Building Engineering Systems 444 N. Wells Street, Suite 501 Chicago IL 60610 USA 312.836.0595 (p)
7
BATHROOM (105) - WEST ELEVATION
6
1/2" = 1' - 0"
BATHROOM (105) - EAST ELEVATION 1/2" = 1' - 0"
5
BATHROOM (105) - N. ELEV. 1/2" = 1' - 0"
BEDROOM (104) - WEST ELEVATION
4
1/2" = 1' - 0"
ISSUANCE:
B.O. Finish Ceiling
B.O. Finish Ceiling
B.O. Finish Ceiling
EL. = 8' - 0" A.F.F.
EL. = 8' - 0" A.F.F.
EL. = 8' - 0" A.F.F.
#:
DATE:
DESCRIPTION:
1 2 3 4 5 6 7 8 9
JULY 15, 2013 AUGUST 15, 2013
LOCATION: REUSE EXISTING CLOSET SYSTEM
PATCH AND REFINISH EXISTING CLOSET DOORS. INSTALL NEW CLOSET PULLS.
REUSE EXISTING CLOSET SYSTEM
GINGER CREEK PERMIT SET
23 Baybrook Lane Oak Brook, IL 60523
PROJECT:
Renovation and Addition to an Existing Residence
HUANG RESIDENCE
NEW TRIM @ REPLACEMENT WINDOW. PAINT TO MATCH - TYP. REPLACE ALL WD. DOOR TRIM & BASE TRIM. PATCH DRYWALL @ WALLS & CEILING. PAINT T.B.D. - TYP.
REPLACE ALL WD. DOOR TRIM & BASE TRIM. PATCH DRYWALL @ WALLS & CEILING. PAINT T.B.D. - TYP.
REPLACE ALL WD. DOOR TRIM & BASE TRIM. PATCH DRYWALL @ WALLS & CEILING. PAINT T.B.D. - TYP.
CAD FILE: DRAWING TITLE:
T.O. Finish Floor
T.O. Finish Floor
T.O. Finish Floor
EL. = 0' - 0" A.F.F.
EL. = 0' - 0" A.F.F.
EL. = 0' - 0" A.F.F.
FIRST FLOOR INTERIOR ELEVATIONS DRAWING NUMBER:
A-401.00 3
BEDROOM (104) - SOUTH ELEVATION 1/2" = 1' - 0"
2
BEDROOM (104) - EAST ELEVATION 1/2" = 1' - 0"
1
BEDROOM (104) - NORTH ELEVATION 1/2" = 1' - 0"
© DIRK DENISON ARCHITECTS 2013
JESSE NGUYEN A comprehensive design portfolio can be accessed at www.jessenguyen.com