Architectural Portfolio

Page 1

Jason Hudson

Portfolio 3/08/15



Table of Contents Essay - Reflection “Dream City” Armature Twist & Stretch Folding the Block Green Link to the Future Bicycle Highway Essay - Grad Statement Parametric Pavilion Concord Cultural Hub

-

2 4 6 10 16 20 26 28 - 34

1


Reflection Feb 2015

2Essay - Reflection


I distinctly remember the first Christmas I tried to compile a wish list. I was maybe 7 years old, still believed in Santa, and was convinced that as long as I could conceive of a thing, it could be created in his magical workshop. I won’t pretend to remember the name of any item I requested, but to properly set the scene for you, they were items such as the “Singing Pink Flamingo 3000,” “Island Racing Fire Bear,” or the “Extreme-o Star Warrior Battle Cruiser.” I was a strange kid (but that’s not the point of this story). The point is none of the items on that list were actually real toys. To their credit, my parents readily came up with a plausible explanation for why the things I asked for actually had to exist, and furthermore be readily available for purchase at a nearby store. Thus my innocence was preserved and I continued to believe in Santa for many more years. It’s kind of a stupid memory, one that I’ve held on to for no real good reason. It only recently occurred to me, if not in a moment of clarity, then in a moment of “why the heck not,” that this memory could be relevant to the process of looking back on my work and compiling it in a portfolio. While I am putting this together to show and communicate my skills to others, the portfolio process does me good in that it is a chance for me to reflect on the work that I’ve done and pull the pieces together not as I would have five or so years ago, but as I would today with the kind of critical lens that only comes with hindsight. Similarly, looking back as an adult on that silly Christmas memory, I can see now that 7-year-old me had planted the seed of a set of ideas and questions that I now ask myself as a designer - If I can conceive of something… can I make it? Should I? And how? Do the things I envision and make need to be made of pieces that are readily purchasable at a nearby store? Should the buildings themselves come off a shelf or out of a catalog, so to speak? Or can I invent the pieces myself? The thing I find most appealing about architecture is that there is the potential to create something unique that didn’t exist before and watch it blossom from a sketchy thought to a physical construction. And while like in many creative endeavors there is in architecture the potential for infinite creativity, due to its scale, lifespan, cost, and its prominence in the lives of its users, architecture is limited by the laws of physics, concerns for durability, economic feasibility, and the whims not of its designer –but of its users, in a way unlike any other creative art. One of the major defining forces that shapes a building’s construction is the balance between infinite creativity and what is feasible. In a way, that balance is analogous to the wishful imagination of a seven year old versus the necessary practicality of his parents. Since I first started this catalog of work as a freshman at Clemson University, my architectural knowledge has increased greatly and the way I go about designing a project has changed drastically. Since my first portfolio revision, my idea of which projects to include and what I say about them has evolved. Each project, though, is a critical piece in my development as an architect. So I’ve chosen to include a cross section of the work back to my freshman year and in this process of selection and exposition, highlight the qualities that evolve throughout my body of work that have come to define me as a designer. Through this process I have gained a better understanding of my abilities, and I hope you will understand me better by browsing through. Thanks for reading, and enjoy! -Jason Hudson 3


“Dream City” Armature Semester Class Year Professor School Project Location

-

Fall 2007 Freshman Harry Harritos Clemson N/A

Project Background This project was a simple exercise in model building inspired by source material. The painting below is a Paul Klee painting called “Dream City.” A series of physical study models (left) were built to emulate the characteristics of the painting. A final model was then constructed based on the explorations done in the study models. I did not include this project in the previous iteration of my portfolio, but lately I’ve been concerned with the process of architecture and how the process manifests itself in a completed design, so I felt it was fitting to include it now.

4“Dream City” Armature


Final Model The final model pulls elements from each of the four study models. The paper elements are constructed around an armature of wood dowels that supports and allows those elements to layer on top of one another in the same manner as the elements in Klee’s painting. The model also captures some of the characteristics of Klee’s black voids in the space between the armature voids, and captures Klee’s white areas as cutouts in the center of some of the shapes.

5


Twist & Stretch - Foot Bridge Semester Class Year Professor School Project Location

-

Fall 2008 Sophomore Jori Erdman Clemson Lee Hall, Clemson, SC

Project Background The objective for this project was to design a bridge that would span across the outdoor courtyard located in Lee Hall, Clemson University’s building for the School of Architecture.

Concept I chose a word - “stretch” - that would be used to inform my design. The word fits perfectly with the concept of a bridge - pull the ends of an object apart, the resulting form is a passage between two points. I used a piece of silly putty to demonstrate that action.

6Twist & Stretch


Twist? So why “twist”? To me it became apparent that in the way I was stretching the silly putty there was an apparent rotation component. You can see in the images of the silly putty how my hands are rotated 90 degrees from one another, creating a “static twist,” if you will. The image on the right is a quick study model of the creases created in the putty by this action.

Study Models The purpose of the models to the right was to reconstruct the twisting and stretching motions in a single model that has mass. I was also beginning to consider the interior of the structure, and how the center of the twisting/stretching action would begin to compress.

7


Aerial View The bridge eventually took on the form shown to the left. Two masses taper towards the center of the bridge with roof slats and structural members that are space in a way so as to reinforce the “stretching” motion. The understructure of the bridge and the tilted roofs add the “twisting” element.

Courtyard Below

8Twist & Stretch


View inside the Bridge

Physical Model Looking back on this project now, I can appreciate the way the form of this project was influenced by iteration in each step from the conceptual stretching of silly putty to a physical, architectural model. I think perhaps some of the uniqueness of the silly putty shape got lost along the way, and my final result would almost surely be different if I did this project today, but looking back I was able to find some similarities here to the way I work now in how there was a central concept that could be traced through each successive step towards the final result.

9


Folding the Block - Study Abroad Semester Class Year Professors School Project Location

-

Fall 2009 Junior Toni Montez, Santi Ibarra Clemson Barcelona, Spain

Project Background This project was completed during my semester abroad in Barcelona, Spain. The site for the project spans two city blocks within Barcelona’s city grid. The grid is called the Eixample, and to this day follows the plan laid out in the early nineteenth century. Preserving the character of the grid while being innovative was one of the aims of the project. The site sits in an area of the Eixample called the 22@ District. This district was formerly an industrial area, but is now part of a development plan for the city’s future. The city plans to demolish the industrial remains and transform 22@ into a completely new area for living, business, and technological innovation. The immediate area reflects the former purpose of 22@ as Barcelona’s industrial center. As the city’s industrial operations have moved beyond the old city limits, this district has become abandoned. The site spans two blocks in a portion of the district planned to become a center of knowledge and innovation with a specific focus on interaction with students at local universities.

10Folding the Block


Concept This project explores the relationship of the city street to the center of the block. It looks to create interaction between the two areas by manipulating open spaces at the perimeter of the block. The perimeter is thought of as an object that can be pushed back to reach the center of the block. In doing so, open space is extended from the street to the interior.

By pushing, pulling, and lifting the perimeter at strategic intervals, deviations from the typical Eixample block perimeter are created. The end result takes the form of a folded plane that binds the continuous perimeter of the block together. By manipulating the plane, pedestrian activity from the street can be made to extend to the center of the block through the perimeter.

11


Possible Configurations The plane could be manipulated to create multiple types of spaces that would serve different purposes and have different spatial qualities.

Perimeter Plane/Skin

12Folding the Block


Building Skin The folded plane ties the block’s individual buildings together. It serves a practical application as a building skin that gives sun protection, privacy, and visual appeal.

Skin Variations The folded metal skin takes one of three forms: Deep honeycomb pattern for privacy Dense perforations for sun protection Large canopies as roofs with cut-outs for light where the canopy covers an exterior courtyard

13


Program Distribution The two blocks will include residences, private businesses, retail areas, and warehouses. Local Universities can use these resources to create business and research opportunities for both students and professionals in this new academic research park.

Public Office

Private Office

Academic

Retail

Warehouse

14Folding the Block


Section

Perspective

Perspective - Block Interior

15


Green Link to the Future Semester Class Year Professor School Project Location

-

Spring 2010 Junior Harry Harritos Clemson Anderson, SC

Project Background Anderson University recently purchased a new tract of land that it plans to develop into a dedicated area for the school’s various athletic programs. Located several blocks east from the main campus, the new land roughly doubles the current campus’s size and gives the land-locked campus great potential for growth. Located directly northeast of the new area is a previously purchased but undeveloped area that is ideal for studying ecology and biology, where the university also plans to add research buildings. The first step of the project was a group task of creating a master plan for the new campus. Our plan centered around creating connections that would benefit the university now and in the future with respect for the university’s history. The project focuses first on making connections between its three distinct parts, the campus and community. The vehicle we chose to do this with was using the natural environment as a connector - a major artery of greenscape would connect the three areas of campus and tie the site together. We would also add areas on the athletic campus that the community could take advantage of - the additional beautification by means of the greenscape would further serve to make it a desirable place for the community.

16Green Link to the Future


Athletic Stadium After the brief master planning stage, the individual group members chose one building on the master plan and developed it further. I chose to develop the soccer stadium located in the western half of the site. Echoing our master plan’s theme of transitioning from and unifying separate campuses, my plan for the building was about unifying an angular, vertical, machined facade with the horizontal organic stadium surface.

Study Models This project was developed mostly with physical models. Each iteration further developed a distinct form for the facade and articulated connections between the man disparate elements.

Final Model

17


Floor Plan The stadium would house a combination of athletic facilities, classrooms, and gathering areas. There is also a trophy room and lounge that could be used for events and entertaining guests and sponsors. Stadium seating would be landscaped and would eventually blend with the other horizontal plane as it meets the building.

Locker Room

Soccer/Football Field

Classrooms/ Activity Rooms

Tickets

Cafe

Indoor Seating and Lounge

Trophy Room/ Exhibition Space

18Green Link to the Future


Section

Facade Elevation Although intended to be less organic than the rest of the building in its materiality, the facade is still quite organic in its randomness.

19


Bicycle Highway Semester Class Year Professor School Location

Fall 2010 Senior - Kevin Hyslop Clemson - Greenville, SC

Project Background Bicycle Highway is a project that would be located on the Swamp Rabbit Trail in Greenville, South Carolina. The Swamp Rabbit Trail is a recreational bike and foot path that extends from downtown Greenville to the nearby town of Traveler’s Rest. There are plans to extend branches of the trail to other nearby cities. The intent of this project was to design a hub, located where the trail meets downtown Greenville, that would serve the trails users by providing them with access to food, water, bike supplies, repairs, etc. in a centralized location conveniently located adjacent to the trail.

20Bicycle Highway


Concept My concept for the project was to create three distinct building sections housing different functions categorized by the degree to which they interact with the trail. Inspired by automobile culture and the specialized building types that have grown up around it, the three sections are:

contain bicycle storage and shower facilities so that commuters could park their bikes, change clothes, then walk the last few blocks to their destination. 3) Drive In - here, the bike hub would serve as the destination. Bicycle rentals, repairs, and a small retail shop would be housed here, as well as areas for hub users to 1) Drive Thru - where users would stop for congregate. a second or two to refill water or grab a quick snack from a vending machine. The building form comes together as a 2) Drive Up - where users would stop for series of skewed concentric shells, with the more than a moment, engage the building Drive Thru surrounding the trail, the Drive more fully i.e. to sit down and have a meal Up located directly adjacent, and the Drive or a cup of coffee. This section would also In beyond that.

Lounge Information

Cafe Seating

Maps Water

Conference Room Cafe

Vending

Gathering Area

Tire Refill

Daily Bike Storage Bike Sales

First Aid

Restrooms/ Showers

Bike Rack

DRIVE THRU

Rentals

Retail

DRIVE UP DRIVE IN

21


Intermission - Portable Hub

Drive Thru

22Bicycle Highway

Drive Up

Drive In

As a mini-exercise midway through the semester, our studio was tasked with creating a portable version of our building that could be built on a trailer and moved around. This process was useful for distilling the core concept driving our design. The portable version of “Bicycle Highway� borrowed the food service functions from the main building in order to become a portable food stand. Here, like in the main building, the Drive Thru is an area where trail users would only stop briefly to get food to eat on their journey. The Drive Up is the primary service counter where people could come get food to go. The Drive In area would contain a seating area where people could sit down to eat.


Floor Plan

North Elevation

Building Section

Co x

Site Plan

Str ee

Ac

ad em

yS

tre et

Br id ge

Re

ed y

Riv

er

t

23


Perspective from Southeast

Drive In Shop The arching structure comprising the roof would be a steel frame system clad in translucent panels. In the Drive In area, this structure shapes the space. In the Drive Thru area, where more security and privacy is needed, a secondary, curved concrete shell and additional walls would further enclose the space. In the Drive Thru area, a similar concrete shell encloses the trail, with glass concrete block and open cutaways allowing natural light to pass in.

Drive Up

24Bicycle Highway


Physical Model They juxtaposition of layers in the roof canopy and underlying structure would allow varying levels of light to pass into the building.

Panel Junction Detail

25


Graduate Statement Jan 2015

Introduction I realized that there is a large gap in my portfolio for the three years that I worked at Jacobs Engineering following my graduation from Clemson and prior to enrolling at UNC Charlotte for graduate school. This is due to most of the work I did at Jacobs being done on confidential projects. It was also rather dull to look at, anyway. Yet, I felt that period of time was an important stage in my development, so I felt compelled to acknowledge it somehow. So, in the interests of not boring anyone by putting a bunch of confidential construction drawings in my portfolio, instead, I’ve opted to include this essay I wrote when applying to graduate school which explains my thoughts as I was preparing to leave Jacobs and how that time and experience influenced my understanding of architecture.

26Essay - Grad Statement


“ I graduated from Clemson University three years ago with a pre-professional degree in

Architecture. I was hired by Jacobs Engineering in Greenville, SC, where I have now worked for the past three years. At the time of my graduation I felt that the best decision for me was to take some time off from school and re-focus myself and think about the things I wanted to accomplish – not only eventually returning to school and completing the track to licensure, but developing my skills and craft as a competent architect regardless of my formal qualifications. I’ve spent the last few years at Jacobs drafting and designing industrial buildings - not nearly as glamorous as what students are prepared for in architecture school - however, I think the experiences that I have gained through my work at Jacobs have been valuable in shaping my views on architecture. The buildings I design at Jacobs are typically lacking from an aesthetic standpoint – the primary focus is on the bare bones of what makes the building functional and most economical. Having, through my undergraduate studies, experienced architecture primarily as a visual and spatial medium, I wondered, did these buildings really ‘count’ as architecture? Eventually I came to understand that the fundamentals of architecture were still there – programming, planning, material choice, etc. – but they were present without a focus on how the building looks and feels. My primary reason for returning to finish a professional degree is to fulfill the requirements for licensure. But, despite its being necessary I think there is also an opportunity for me to grow in my understanding of architecture because I will be returning to the academic side of the profession having now both experienced a taste of it architectural practice and having had a prior academic experience through my previous undergraduate program. For me, architecture is finding a creative and efficient way to create a building that meets the client’s needs using all the tools an architect has at his disposal, those tools including: his knowledge of materials/construction products, his understanding of program and spatial arrangements, his understanding of structural systems, and his knowledge of the construction process. This definition helped me reconcile working on nondescript industrial buildings and understanding that they could be just as successful, architecturally, as a high profile civic building or skyscraper. What I want to get out of school this time around is a more thorough knowledge and understanding of these things from a perspective that I would not get in a professional setting. I am very much interested in gaining a more in-depth understanding of materials, structural systems, etc… because I think that understanding those elements of architecture is key to putting together a cohesive building. I am interested in any design-build opportunities there might be and opportunities to engage with practicing architects and the real world practice of architecture. I am looking for opportunities to develop my skills in both an academic and professional setting. This is an opportunity to take what I’ve learned after working in the industry for several years and apply it to projects where there is less pressure from clients, budgets, managers, etc. Very rarely will I have the opportunity to make as many decisions on a real project as I can on one in school – so for me, being able to return to that setting with a fresh perspective is valuable. While I do not necessarily intend to return to industrial architecture in the future, I think it has been a valuable experience for me. My time spent over the past few years working on simple structures has been time well spent. I hope that I can look back on my next few years of study and also see a valuable experience that has helped shape me as an architect.

27


Parametric Pavilion Semester Class Year Professor School

Fall 2014 - 1st Yr Graduate Nick Senske - UNC Charlotte

Project Background This digital model was generated using a Grasshopper script and Rhino as part of a class focused on parametric design. The script process recreates a precedent project - a pavilion located in a city garden in Zug, Switzerland designed by RamserSchmid Architects in collaboration with Planetage Landscape Architects.

About the Precedent The pavilion and accompanying landscaping plan were the winning entry in a competition held by the city of Zug to design a public park that would connect two parts of the local library. The library had recently expanded to a neighboring building, which now needed to be connected with the original library building. In between the two library locations existed a partially buried parking garage, which provided a challenging site condition. The design team’s solution was not to hide the parking structure with their scheme for the park, but to further expose it and dress the edge of the structure with vertical wooden 28Parametric Pavilion


slats. As part of their modifications to the parking structure, the architects designed a pavilion to sit on top of it that would provide a source of shelter for the park’s users. The pavilion sits on top of the garage’s lift and ventilation shaft. It is comprised mainly of laminated brick-like wooden slats which match the wooden slats protruding from the adjacent landscaping.

Source for photos and section: http://www.archdaily.com/531618/citygarden-zug-planetage-landscape-ramserschmid/

29


1

2

TION SEC

TION SEC

3

VIE

VIE

Scripting Process

W

TION SEC

original vertices

VIE

W

2) Each curve is analyzed to identify its vertices.

W

4

TION SEC

VIE

1) Inputs: The script takes two curves (with an equal number of vertices) as inputs.

W

SECTION VIEW

3) The original vertices are duplicated by moving on the z-plane to begin forming a cross section curve for each pair of vertices. 4) An additional copy of each inner curve’s vertex is moved on the z-axis...

original vertices

original vertices

SECTION VIEW SECTION VIEW

5 TION SEC

6

W VIE

5) ...and a final point is created on a line between the two uppermost points. 6) A line is then a created between the first two points...

al vertices

ION VIEW 7

8

7) ...a NURBS curve is interpolated between the middle three points... 8)... and a final line is created between the last two points.

al vertices

ION VIEW

30Parametric Pavilion


This process is done for each set of 9 vertices.

Each individual curve is then connected 10 with the corresponding curve in the next adjacent set of curves to create three separate surfaces on each side of the structure. While a single surface could be created for each side, using this method will eventually give more control over the brick spacing.

Each of the resulting surfaces is then 11 split into a user specified number of subsurfaces.

31


14

12) Since some of the resulting surfaces may be curved, each individual sub-surface is broken down to its component geometry and recreated using its vertices so that all resulting geometry is planar. 13) Every other surface is eliminated to leave only the desired brick pattern.

scale

extrude

scale

13 extrude

12

Each brick is then extruded to give depth and scaled in the horizontal direction to make the bricks overlap.

Resulting Form Using various input values, the user can recreate the Zug Pavilion almost exactly. The script is actually very flexible, and can be used to create many different forms, including the ones on the next page.

32Parametric Pavilion


rotate

Variations Each of the following variations is made with the same two base curves, but different parameters for height, brick density, and brick depth.

coplanar

coplanar

coplanar

The input curves do not need to be rectangular. The following form can be created with coplanar two triangles as inputs. Less regular geometries can be used as well. The script requires only that the two polygons have the same number of vertices.

coplanar

offset

The input curves need not be coplanar. The following geometry was created by rotating each curve and offsetting the top curve vertically.

offset rotate

rotate

offset rotate

coplanar

By using some of the intermediate geometry produced by the script for reference and using the script several times, multiple iterations of the process can be combined and stacked.

offset offset rotate

rotate

coplanar

offset rotate

coplanar coplanar

33


Old Concord Culture Hub Semester Class Year Professor School Project Location

-

Fall 2014 1st Yr Graduate Jose Gamez UNC Charlotte Charlotte, NC

Project Background The City of Charlotte is currently undertaking construction of an extension to its light rail system. Currently the line extends south from the city center. The new line will extend north from center city and connect with the UNC Charlotte campus. As part of this studio, groups selected one of the planned light rail stops and proposed a master plan for that area. Based on the master plan, individual group members then developed one of the buildings from the master plan. For the Old Concord Road light rail station, our group developed two distinct zones, a “Culture” zone focused on retail, arts, and entertainment, and an “Institutional” zone focused on business, research, and education. Each area would have one central building that would be the highlight of that area. The Old Concord Culture Hub is the focal building for the “Culture” zone for retail, art, and entertainment.

34Old Concord Culture Hub


ADMIN ADMIN ADMIN 1500 sf 1500 sf sf 1500

CL A CCLLASS ASSSRO SRROOM OOOMS MS S

35 0 335500 sf 000 s sff

STORAGE STORAGE STORAGE 1500 sf 1500 sf sf 1500

SHOP SHOP 1000 sf SHOP 1000 sf sf 1000

SHOP SHOP GALLERY SHOP GALLERY GALLERY 1000 sf 1000 sf sf 1000

Program The Culture Hub would house two main exhibition areas for art and culture-driven temporary exhibitions as well as a flexible theater space that could be used for lectures, concerts, and other performances. To support these spaces, rehearsal rooms and administrative office space are also included, along with a shop, art gallery, roof cafe, and a roof plaza.

SMALL SMALL EXHIBITION SMALL EXHIBITION EXHIBITION 4000 sf 4000 sf sf 4000

AUDITORIUM/ AUDITORIUM/ AMPHITHEATER AUDITORIUM/ AMPHITHEATER AMPHITHEATER 700 seats 700 seats seats 700

REHEARSAL REHEARSAL /ACTIVITY REHEARSAL /ACTIVITY 1200 sf /ACTIVITY 1200 sf sf 1200

ROOF ROOF PLAZA ROOF PLAZA PLAZA 3800 sf 3800 sf sf 3800

REHEARSAL REHEARSAL /ACTIVITY REHEARSAL /ACTIVITY 1200 sf /ACTIVITY 1200 sf sf 1200

LARGE LARGE EXHIBITION LARGE EXHIBITION EXHIBITION 8500 sf 8500 sf sf 8500

CAFE AND CAFE AND TERRACE CAFE AND TERRACE 3600 sf TERRACE 3600 sf sf 3600

35


Perspective

Site Plan

OLD CONCORDE

ST

GRADE

ON

RD

DOWN

TRACKS ON

Y TR

The Culture zone would be located south of Tryon Street, while the Institutional zone would be located to the North. An elevated greenway bridge would cross Tryon Street, allowing pedestrian access between the two areas. A greenway follows the light rail tracks through the site, and passes under the track in certain areas to allow unobstructed pedestrian flow through the greenway from one side of the tracks to the other. The Culture Hub would be constructed above the light rail track and adjacent to both the elevated greenway bridge and the lower greenway so that it will help facilitate circulation around the site, as well as to and from the site.

BRIDGE ABO VE

P TO RAM GE BRID

DOW N

SLOPE

GREENWAY (BELOW)

ELEVATED TR

ACKS

PE

RAMP TO BRIDGE

INFILL RAMP

SLOPE

O SL

SITE PLAN @ STREET LVL

36Old Concord Culture Hub

NORTH


Hub Circ

Cultural Center

Concept

Site Circulation Axis

Light Rail

Circulation Hub

Hub Circulation (Downward Force)

Light Rail

Hub Circulation

Vertical Hub Circulation Axis

Hub Circulation (Downward Force)

Light Rail

Horizontal Site Circulation Axis

Cultural Center (Cantilever)

Hub Circulation (Downward Force)

Hub

Hub Circulation

Circulation

Cultural Center

Cultural Center

Light Rail

Elevating the building above the track opens access for foot travel through the building footprint, allowing access to the light rail and the circulation axis. Using this site circulation axis and the light rail axis together provides a means to express the above fulcrum diagram in 3 dimensions.

Light Rail

Light Rail

The main mass of the Hub would be placed directly over the light rail tracks. In order to connect the multiple levels it interacts with (the lower greenway, the tracks, street level, the elevated greenway and the program areas) a circulation axis is run through the entire mass. This gesture begins to articulate the structural system for the building.

Cultural Center (Cantilever)

Light Rail (Fulcrum)

Cultural Center (Cantilever)

Light Rail (Fulcrum)

Cultural Center Site Circulation Axis

Light Rail (Fulcrum)

Vertical Hub Circulation Axis

Light Rail

Horizontal Site Circulation Axis

The (purple) building mass is subdivided into floors - the two building axes are extended upwards (orange) to organize circulation from the hub circulation tower to the edges of the building.

37


Aerial Perspective

Section Through Amphitheater

Structural System The building’s main mass would cantilever off of the circulation tower, using a series of arch structures along the two main circulation axes as fulcrum points. Although not fully developed in this iteration, the idea was that the circulation tower could transfer the loads from the cantilever trusses downward to a subterranean parking structure whose mass would counteract the upward force of the cantilever.

38Old Concord Culture Hub


Lower Greenway Level Plan This level provides access to the cultural hub from the lower greenway and access to subterranean parking.

UP

ELEV

UP

UP

LIGHT RA IL ABOVE

ELEV

UP

ELEV

UP

LIGHT RA LIGHT RA IL ABOVE IL ABOVE

UP

NORTH

GREENWAY LEVEL PLAN

1

Ground Level Plan The ground level provides access to pedestrians from Tryon Street and the retail/ entertainment area of the master plan. This level contains a paved plaza situated beneath the building mass. A curved pathway blends the natural landscape of the greenway with the hardscape beneath the building.

0

1

GREENWAY LEVEL PLAN

1

GREENWAY LEVEL PLAN

5

10

20

0

5

0

10

5

10

20

20

PLAZA

PLAZA

LOBBY PLAZA UP

ELEV LOBBY

PLAZA

UP UP

ELEV LOBBY

UP

ELEV

PLAZA LIGHT RA LIGHT RA IL IL

UP

GROUND LEVEL PLAN @ TRYON

2

0

2

GROUND LEVEL PLAN @ TRYON

2

GROUND LEVEL PLAN @ TRYON

First Floor Plan The primary building mass that contains most of the building’s program starts one level above street level. The elevated greenway bridge has direct access to this level. This level contains the administration area, hub shop/gallery, and lower level auditorium access.

PLAZA

LIGHT RA IL

UP

5

10

20

NORTH 0

5

0

10

5

10

20

20

ADMIN CLASSROOMS

BREAK ROOM STORAGE ADMIN

BREAK FREIGHT ROOM ADMIN

CLASSROOMS AMPHITORIUM

STORAGE CLASSROOMS

BREAK ROOM

FOYER

AMPHITORIUM

FREIGHT STORAGE

ELEVATED GREENWAY PLAZA

UP

ELEV

SHOP FOYER FREIGHT

LOCAL AMPHITORIUM GALLERY

UP

ELEVATED GREENWAY PLAZA

UP

ELEV FOYER

ELEVATED GREENWAY PLAZA

UP

SHOP

LOCAL GALLERY

UP

ELEV

SHOP

LOCAL GALLERY

UP

FIRST FLOOR PLAN

3

0

3

FIRST FLOOR PLAN

3

FIRST FLOOR PLAN

5

10

20

0

5

20

NORTH 0

SMALL EXHIBITION HALL

10

5

10

20

39


UP

3

FIRST FLOOR PLAN

3

FIRST FLOOR PLAN

Second Floor Plan 0

5

10

20

0

5

10

20

0

5

10

20

0

5

10

20

0

5

10

20

The second floor contains upper level access to the amphitheater, as well as rehearsal space and the smaller of the two exhibition halls.

SMALL EXHIBITION HALL

AMPHITORIUM SMALL EXHIBITION HALL

AMPHITORIUM FOYER

UP

REHEARSAL/ ACTIVITY SPACE

ELEV FOYER

REHEARSAL/ ACTIVITY SPACE

UP UP

REHEARSAL/ ACTIVITY SPACE

ELEV

REHEARSAL/ ACTIVITY SPACE

UP

4

SECOND FLOOR PLAN

4

SECOND FLOOR PLAN

NORTH

Third Floor/Roof Plan The third floor contains the larger exhibition space as well as a roof cafe and roof plaza.

ROOF PLAZA

LARGE EXHIBITION HALL ROOF PLAZA

LARGE EXHIBITION HALL FOYER

DN

ELEV CAFE SEATING FOYER CAFE

DN DN

ELEV CAFE SEATING DN

5

THIRD FLOOR/ROOF TERRACE

5

THIRD FLOOR/ROOF TERRACE

CAFE

NORTH

0

5

10

20

Section - Circulation Tower

40Old Concord Culture Hub


North Elevation

South Elevation

East Elevation

West Elevation

41


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.