Jialun wu Play-Scapes

Page 1

P L AY -SCAPE S Jialun Wu | Graduate Thesis


S TAT E M E N T QUESTION: How could human PHYSICAL POSTURE inspire a design language and a re-newed approach to underused public spaces ?

THESIS STATEMENT: The thesis aims to transform the under the Manhattan bridge space to an INTERACTIVE PLAYGROUND while it creates a collaborative connection between communities and retrieves the notion of playfulness and the unexpected in the urban context. Based on the study of people’s BODY MOVEMENT, the thesis envisions MULTIPLE ELEMENTS to compose FOUR SPATIAL CONFIGURATIONS in order to facilitate and further amplify the existing space functions.


HISTORY OF PLAYGROUND TIMELINE OF PLAYGROUND

QUOTES OF PLAYGROUND

scale heights on a play structure, or be cooled by a spray shower, but it is also a critical part of a child's emotional education time the challenges of the world outside the home.

they must learn these things through experience and not from books or the bleachers . . . ” – Luther Halsely Gulick, Popular Recreation and Public Morality, 1912 Adequate playgrounds for all the children are a necessity.” – Luther Halsely Gulick, President, Playground Association

The playground, Germany.

1848

First Playground Earliest Playbuilt, ground Form Manchester, England

1859

Reason: Playing on the street is too dangerous. Playground will let children play safely and fairly with one another. Form: Teacher looking children play wooden blocks, toy carts and two rotary swing.

1880

Form: Sand Gardens or sand box, as well as open space for organized games for children.

NYC The Board of Education aimed to open First American at least one Playground built playground at in San Franciseach school co. district.

1887

Form: Swing, slides carousel

1889

Time Frame: These playgrounds were open during the school year, after school hours, and early plans included opening the facilities year–round and with buildings for winter activities.

NYC Seward Park: Became a model for playground programming and design.

1903

First playground association of america was formed.

1906

The facility in the north corner of the park featured cinder surfacing, fences, recreation pavilion, and play and gymnastic equipment.

Charles Stover, set out to increase the number of playgrounds in the NYC Developed NYC Equipped city and focus VARIOUS TYPE plagyrounds. resources in the of playground. area of children’s recreation

1910

Track meets, baseball leagues, folk dancing, childrens‘ farm gardens.

1913

“Indoor Playgrounds,” playgrounds for mothers and children, “Open Air” playgrounds (16 citywide41;, “Evening Playgrounds,” and “Kindergarten Centers.”

1915

70 equipped playgrounds throughout the city with features such as swings, slides, basketball frames, and seesaws.

First equipped play area opened in Central Park,

1926

There were situated in a manner providing proximity to adjoining neighborhoods,

Rise Adventure Playground

1931

Playground modeled on the empty lots that children sought out for play tires & “junk” material with existing play structure.

Begin mass-product playground

1960

Identical play areas in MCDonald’s restaurants.

In USA, All playgrounds should followed proper safety guidelines.

1980

POP-UP PLAYGROUND”

2000

city closes one or more street to serve as forum for games and community.

- Playground provides amount of equipment for children. However, it only supplies the services for play rather than other functions and programs. Sand Box and Open Space

Adventure Park- Raw Materials


SITE ANALYSIS: UNDERUSED ELEVATED SPACE CURRENT SITUATION:

700 miles of elevated infrastructure towering above its streets and weaving throughout its five boroughs. - including: Bridges, highways, subway, rail line - they are Dark & Unsafty - New York City has nearly

SIZE OF UNDERUSED ELEVATED SPACE

http://designtrust.org/publications/life-along-elevated/

CATERGORY OF UNDER ELEVATED SPACE


SPECIFIC SPACE: ARCHWAY- UNDER MANHATTAN BRIDGE CURRENT SITUATION: Size: 7400 Square Feet Reason: simple equipment,

Active, not yet amplified design

EXISTING FIXTURE ICONS

PLYMOUTH STREET

Residential Art Workshop Retails

EL

Cafe

IO AT

ft

OC

233

PLAZA 11,150 sf

Restaurant

PEARL STREET

ft

AG

34

AR

ft

.G

ADAMS STREET

10

PX

AP

PROMENADE 12,000 sf

Plaza

NS

ARCHWAY 7,400 sf CH

AN AG

OR

Clothes Store

CE

LA

EP

Book/ Academy

162

Resting Area ft 49

ft

100 ft

WATER STREET

26’/4”

3 11 ft

ft

146

46

ft

ADAMS STREET

FIXTURE

MATERIAL:

NATURAL CONDITION

- Lighting- Cool Light Color - Seating- Bench under the lighting - Table and Bench- on the archroad

-

- Barely sunlight could be reach - Lighting Fixture turn on all the time - Acoustic: Noisy in most of time, Echo, - Decibel: 90 ft

IO AT OC

233

NS

ARCHWAY 7,400 sf

PEARL STREET

ft

EL AG

34

AR

ft

.G

PLAZA 11,150 sf

10

PX

AP

PROMENADE 12,000 sf ADAMS STREET

CE

LA

EP

AG

OR CH AN

Polished Stone- Arches structure Unpolished Stone - Arch roadway Wood- Bench and Table Steel- Lighting Fixture

PLYMOUTH STREET

162

ft

ICONS Residential Art Workshop Retails Restaurant Cafe Plaza Clothes Store Book/ Academy Resting Area

9 ft

4

100 ft

WATER STREET

/4”

3 11 26’ft

ft

146

46

ft


EXISTING PASSAGE Events/ Activities Lunch Vendors Yoga Catered Meal Music Performance Art installation Film Screening Market Party Theatre performance Dance Performance Fair Event Reception Kids’ Camp

Jan Feb Mar Apr May Jun Jul

Aug Sept Oct

Frequency

Most activities happen during Summer Time Daytime

Movie

Nov Dec

Lunch

Day/Night

Night

Execrise


SPACE & BODY POSTURE MODEL TEST

One body posture in the space

Lighting Catch

Multiple body posture in the space


BODY POSITION ANALYSIS DYNAMIC PHYSICAL POSITION DIAGRAM OF ACTIVITIES & LANDSCAPE & EQUIPMENT DYNAMIC ACTIVITY

ANGLE

SCALE

SURFACE

LANDSCAPE

STRUCTURE

6’

DIMENSION

Slope

Planar

1.5’

30

0

4’ - 7.5’

Hard Rigid & Bump

15

Bump Slope

6’ -60

4.5’

Slope

Planar

3’

Flat Plane

Hard Rigid & Bump & Basin

Wall Ride

STANDARD 6.5’*12’

Flat Slope

SKATING

-30

6’

60

Planar & Elasticity

15

Soft & Basin

6.5’ (L) * 7’ (W)

0

BOUNCE

Flat Plane

6’

60

4.5’

Nest Plane

Basin Plane

-60

Planar

3’

0

Under Ground

On the Ground

In/ Above the Ground

No Change

08- Playground (P)

30

4.5’

Rigid or Soft & Basin

Flat Plane

6’ *6’

Nest Plane

0

JUMP 6’ 4.5’

1.5’

6.5’*8’

Hard Rigid

60

0

SLED

Slope

Planar

3’

Flat Slope

Bend Slope

Parallel

4.5’

Empty Box

4.5’

Planar & Elasticity& Flexible

1.5’

Slope & Elasticity & Flexible

Tunnel

Basin Plane

4.5’

Slope

Planar

Flat Plane

3’*5’ Flat Slope

0

6’

Elasticity& Flexible Horizontal Vertical Planar

45

4.5’ 3’ 1.5’

45

0

Elasticity& Flexible Slope

4.5’

Planar & Elasticity& Flexible

1.5’

Slope & Elasticity & Flexible

On/ Above the Ground

Plane

Nest Plane

Flat Slope

Rigid& Soft & Bump & Basin

WALK

Wall Ride

6’ *6’

Under/ Above the Ground

Linear

Bend Slope

09- Seating

08- Playground (P/ C) N/A

SURFACE

LANDSCAPE

STRUCTURE

DANGEROUS

LANDSCAPE SHAPE

EXAMPLE- BOUNCE 4.5’

1.5’

60

0

SIT

Planar & Elasticity

6’

4.5’

30

3’ 1.5’

Rippled

N/A

Hard Rigid& Soft & Bump

Flat Plane

3’*5’

05- Film Screen (B)

01- Lunch/ Vendors/ Party (B/ I) 08- Playground (P/ B/ I )

Nest Plane

4.5’

1.5’ 0

30

Flat Plane

-30

Planar & Elasticity

Rippled

SURFACE Rigid& Soft & Bump

Wall Ride

N/A

LANDSCAPE

STRUCTURE

60

N/A

Flat Plane

READ

-30

4.5’

4.5’ 3’

1.5’

PlanarSlope & Elasticity

Vertical Planar

Soft & Basin Hard Rigid Flat Plane

Wall Ride

N/A

Flat Plane

Basin Plane

3’*5’

1.5’ 0

BOUNCE

4.5’

1.5’

-30

Rippled

Slope

Flat Plane

Hard Rigid& Soft & Basin

Nest Plane

Nest Plane N/A

4.5’

Planar

Flat Plane

Flat Slope

4.5’

Planar 60

Slow

No Change

Slow

Jumping/ Skating Running

Fast

Rigid

Slow

No Change

0

Flat Plane

Reading Rest

ON

IN

Nest Plane

Above

IN

IN

Circulation/ Jump Running/ Skating

Slow

Bounce/ Drawing

0

Sitting/ Reading

Slow

Above

Plane

Above

IN

Above

Plane

IN

Above

Plane

0

Sitting/ Drawing Looking/ Bounce

0

Slow

0

Soft Surface Running/ Skating Walking

No Change

No Change ON

Element

Sitting/ Drawing

Sitting/ Drawing Looking/ Bounce

No Change

Plane

01- Lunch/ 08- Playground (P/B/I/C) Vendors/ Party (B/I) 06- Market (B)

0

Plane

On/ Above the Ground

3’*5’

6’ *6’

No Change

No Change

ON

N/A

Plane

06- Market (B/P)

Nest Plane

6’

0

Playground

ON

ON N/A

0

1.5’

05- Film Screen (B/I)

Above

RELATIONSHIP WITH GROUND

06- Market (B)

Rigid

1.5’

3’

No Change

Plane

6’ *6’

6’

3’

WONDER

6.5’ 04Art(L) * 7’ (W) Installation (B/P)

IN

ACTIVITIES

Flat Slope

0

RESTING

DIMENSION

07- Workshop (I/P)

08- Playground (P/B)

6’

3’

Fast

No Change 10- Reading (I/ B/P)

3’*5’

Nest Plane

0

LOOKING

IN

Above

6’ *6’

6’ 6’

3’

Rolling

07- Workshop

6’

3’

Legs

No Change ON

ON

SCALE

Fast

DIMENSION

Hard Rigid& Soft & Bump

60

0

DRAW SIT/ STANDING/ ON THE GROUND

Horizontal Vertical Planar

-30

Rippled

Skating/ Running

Linear

6’

3’

No Change

No Change

3’*5’

Bump Slope

ANGLE

Fast

Fast

No Change Linear

Nest Plane

SCALE

Fast

08- Playground (P/ C) Hard Rigid& & Soft Bump & Basin

0

EATING

Plane

On/ Above the Ground

Bend Slope

6’

3’

DYNAMIC ACTIVITY

Under Ground

08- Playground (P/ C)

Hard Rigid& & Bump & Basin

1.5’

STATIC ACTIVITY

Plane

3’*5’

Nest Plane

Parallel

6’

3’

Fast

08- Playground (P/ C) Flat Plane

Top View- Narrow Plane

CLIMB

Under Ground

3’*5’

Nest Plane

Rigid& Soft & Bump & Basin

0

RUN

Linear

Parallel

6’

3’

BALANCE

On/ Above the Ground

08- Playground (P/ C)

Hard Rigid& Soft & Bump & Basin

Planar & Elasticity

1.5’ 0

CROUCH

03- Music Performance (B ) 08- Playground (P/ C) 09- Seating

Bump Slope

6’

3’

SPEED

Plane Point

6’

-30

Sitting/ Resting

Plane

Spin Plane

10’

1.5’

Circulation/ Jump Running

Upper Body Linear No Change

10- Reading (B/ I)

On the Ground

Planar & Elasticity

Sled

No Change

08- Playground (P/ C)

Top View

3’

COMVINE WITH

Plane

6’ *6’

Flat Plane

SPIN

8’

BODY MOVEMENT DIRECTION

08- Playground (P)

Hard Rigid

1.5’

360

3D SPACE PLAN

08- Playground (P)

4.5’

1.5’

02- Yoga/ Excerise class (B / I)

Bump Slope

Bend Slope

3’

RELATIONSHIP WITH GROUND

LIMIT HEIGHT 10’ 4.5’*8‘ (W) *8’(L)

1.5’ 0

ACTIVITIES

08- Playground (P)

Flat Slope

4.5’ 3’

ROLL

DANGEROUS

LANDSCAPE SHAPE

0

Sitting/ Reading Drawing

Slow

0


1.5’ 0

CROUCH

Empty Box

6’ 4.5’

Planar & Elasticity& Flexible

3’ 1.5’

Slope & Elasticity & Flexible

4.5’

Flat Plane

Basin Plane

On/ Above the Ground

Plane

08- Playground (P/ C)

Hard Rigid& & Bump & Basin

Slope

Planar

Flat Plane

1.5’

3’*5’ Flat Slope

0

6’

45

4.5’ 3’ 1.5’

Elasticity& Flexible Horizontal Vertical Planar

45

0

4.5’

Planar & Elasticity& Flexible

1.5’

Hard Rigid& & Soft Bump & Basin

Nest Plane

Slope & Elasticity & Flexible

Flat Slope

Rigid& Soft & Bump & Basin

Linear

Wall Ride

6’ *6’

Under/ Above the Ground

Linear

Bend Slope

09- Seating

08- Playground (P/ C) N/A

WALK

SURFACE

STRUCTURE

LANDSCAPE

DANGEROUS

LANDSCAPE SHAPE

4.5’

1.5’

60

0

SIT

6’ 4.5’

30

-30

3’ 1.5’

Rippled

Horizontal Vertical Planar

Rippled

3’*5’

N/A

Hard Rigid& Soft & Bump Flat Plane

No Change ON

Wall Ride

4.5’

30

Rippled

Planar & Elasticity

Rigid& Soft & Bump Flat Plane

READ 6’

3’*5’

N/A

60

0

Nest Plane

-30

4.5’

Vertical Planar

3’

Slope

Hard Rigid Flat Plane

1.5’

Wall Ride

3’*5’

N/A

0

LOOKING

No Change

6’ 4.5’

-30

1.5’

Rippled

Slope

Flat Plane

Hard Rigid& Soft & Basin

Nest Plane

Above

IN

0

06- Market (B/P)

05- Film Screen (B/I)

ON

4.5’

Above

IN

Plane

3’*5’

N/A Flat Plane

Flat Slope

Nest Plane

ON

6’ 4.5’

Rigid

Planar

3’ 1.5’

Above

IN

Plane

0

06- Market (B)

Rigid

Planar

0

Flat Plane

Nest Plane

6’ *6’

N/A

Bounce/ Drawing

0

Sitting/ Reading

Slow

Sitting/ Drawing

0

Sitting/ Drawing Looking/ Bounce

No Change

No Change ON

1.5’

Slow

Plane

6’ *6’

N/A

6’

3’

WONDER

04- Art Installation (B/P)

ON

Flat Slope

0

RESTING

No Change

07- Workshop (I/P)

08- Playground (P/B)

3’

Circulation/ Jump Running/ Skating

Plane

Above

IN

10- Reading (I/ B/P)

-30

1.5’

Above

IN

0

Plane

6’ *6’

N/A

ON 3’

Fast

Slow

No Change

07- Workshop Flat Plane

6’

Above

IN

Plane

01- Lunch/ 08- Playground (P/B/I/C) Vendors/ Party (B/I) 06- Market (B)

60

0

EATING

05- Film Screen (B)

01- Lunch/ Vendors/ Party (B/ I) 08- Playground (P/ B/ I )

Nest Plane

Hard Rigid& Soft & Bump

60

0

DRAW SIT/ STANDING/ ON THE GROUND

Planar & Elasticity

Jumping/ Skating Running

DIMENSION

6’

3’

Slow

Linear

Bump Slope

ANGLE

No Change

No Change

3’*5’

Nest Plane

0

SCALE

Slow

No Change

On/ Above the Ground

Bend Slope

6’

3’

No Change

08- Playground (P/ C)

Elasticity& Flexible Slope

STATIC PHYSICAL POSITION STATIC ACTIVITY

Plane

3’*5’

Nest Plane

Parallel

6’

3’

CLIMB

Under Ground 08- Playground (P/ C)

Top View- Narrow Plane

RUN

3’*5’

Nest Plane

Rigid& Soft & Bump & Basin

0

BALANCE

Tunnel

Parallel

No Change

No Change ON

Above

IN

Plane

0

Slow

Sitting/ Drawing Looking/ Bounce

0

Running/ Skating Walking

Slow

Sitting/ Reading Drawing

0

Flexible Space (Open Space/ With Equimpent) Is that equimpent shape the circulation, and let visitor experience each part as much as possible? ADULTS

EXAMPLE- SITTING PLAYGROUND

CHILDREN

COMMUNITY SPACE FOR EVENTS

Elements

PARENT & CHILD

PROGRAM

CIRCULATION (CONNECT EXTERIOR/ INTERIOR / EACH PART)

STATIC ACTIVITY

SURFACE

SCALE

STRUCTURE

LANDSCAPE

DIMENSION

ACTIVITIES

RELATIONSHIP WITH GROUND

Lunch Planar & Elasticity Flat Plane 6’

1.5’

Reading

2*4

Resting

Rippled

On

Playground

0

Hardsurface Cube plane

Nest Plane

SITTING Hard Rigid& Soft & Bump

Surface

Talking

4.5’ 3’

2’ *2

Elements

In

Above

Soft Plane

Typo

Lands


PRELIMINARY DESIGN- STRATEGY ONE Elements

Typology

Surface

Landscape Typology

Structure

Cubical Typology


FIELD CONDITION- STRATEGY TWO Original Field Grid

Original Wall Stone 60” x 30” 60” 30”

24”

24”

Designed Field Grid

Original Field Stone 3”x 6” 3” 6”

Designed Field Grid System

24” 24”

24”

48”

Designed Field Grid 24”x 24”


PROGRAM IN EXISTING SITE

Market

Pathway

Market

Under Archway Square

Movie

Execrise

Market

Museum Performance


PROGRAM IN DESIGN SITE

04. Integrated System 04. Integrated System

Upper Level Dynamic Playground

03. Curved System

02. Folded System

03. Curved System

01.Flat System

02. Folded System

PLAYGROUND

VENDOR 01.Flat System RESTING READING

RESTING Lunch Vendors & Market

EATING FAIR

Cubical Sculpture & Seating & Resting

Performace Stage

Resting Nooks Lower Level Dynamic Playground Exercise & Yoga

04. Integrated System 03. Curved System PLAYGROUND WORKSHOP PLANTING

02. Folded Workshop

System

03. Curved System 01.Flat System

02. Folded System EXERCISE PERFORMANCE RESTING


AXONOMETRIC DESIGN FOLDED & INTEGRATED SYSTEM

Hanging Ropes

Extended Lines From Ground & Walls Dynamic Playground Upper Level

Performace Stage

CURVED SYSTEM (WITH SCAFFOLD STRUCTURE)

Resting Nooks

Exercise & Yoga Dynamic PlaygroundGround Level with Nets

Grids on Ground

FLAT SYSTEM (WITH WOOD PILLARS)

Climbing Wall

Dynamic PlaygroundAccess to Upper Level & Ground Level

Lunch Vendors & Market

Cubical Sculpture & Seating & Resting


SYSTEM ONE- FLAT SYSTEM (WITH WOOD PILLARS) Eating

Vendors

Lunch Vendors & Market

Playing on Levels

SCAPE MODULE D STRUCTURE Hanging Ropes

Group Conversation

Talking

Dynamic Playground & Execrise

mic Playground r Level

Hiding & Resting

Module: Curved Landscape with Scaffolding Material: Wood Structure- Permanent

Reading Nooks

ce Stage

Nooks

Cubical Sculpture & Seating & Resting

Peak Time: Weekdays 11a.m -2pm, 5pm-7pm All Weekend Most users: Working People, Neighbor Execrise & Yoga

Material: Wood Pillars/ Wood Panel/ Glass/ Paper Mache Module: Folded Landscape Material: Paper Corrugated Board

Playground Lower Level Module: Folded Landscape Material: Paper Corrugated Board


CUBICAL DETAIL DRAWING

Solid Cube Wood Panel

Transparent Glass Panel with Wood Pillars

Pivot Door for Cabinet Wood Panel



und

ace

& Execrise

SYSTEM TWO/THREE - FOLDED & INTEGRATED SYSTEM Dynamic Playground Module: Soft Surface Wood Panel Material: Wood StructurePermanent

Reading Nooks Dynamic Playground & Execrise Curved Landscape Resting Nooks Module:Dynamic Playground Upper Level Dynamic Playground with Scaffolding Upper Material: Wood Level Structure- Permanent FLAT- WOOD PANEL Dynamic Playground

With FINGER JOINT

Module: Folded Landscape Module: Curved Material: PaperLandscape Corrugated Board with Scaffolding Material: Wood Structure- Permanent

Module: SoftSurface Surface Module: Flat Surface / Soft Wood Panel Material: Soft Fabric/ Wood Frame Material: Wood StructurePermanent

Playground Lower Level

Performace Stage

Performace PlaygroundStage

Module: Soft Surface Wood Panel Material: Wood StructureTENON CONNECTION - 96” WOOD FRAME Permanent With soft Panel & Cover

Resting Nooks

Lower Level Reading Nooks Reading Nooks Module: Folded Landscape Module: Wood Panel Dynamic Playground Resting Nooks Module: Folded Landscape Material: Paper Corrugated Board Material: Wood Frame Hanging Ropes Material: Paper Corrugated Board Wood Panel Upper Level Resting Nooks FLAT- WOOD PANEL- 48” With FINGER JOINT

Dynamic Playground Module: Folded & Execrise

Execrise & Yoga

Landscape Material: Paper Corrugated Board

Module: Flat Surface / Soft Surface Material: Soft Fabric/ Wood Frame

Module: Folded Landscape TRIANGULE PANEL Playground Module: Curved Landscape Material: Paper Corrugated BoardFLAT- WOOD

Playground Lower Level Lower Level

Resting Nooks

With FINGER JOINT with Scaffolding Material: Wood Structure- Permanent

Playground Lower Level

Reading Nooks EXISTING STONE GROUND

Playground

Module: Wood Panel Lower Material: Wood FrameLevel Wood Panel Module: Wood Panel Material: Wood Frame Wood Panel

Module: Folded Landscape Material: SteelMaterial: Pillars/ Panel/ Soft Surface/ Board Rubber Surface Paper Corrugated Artful Wood Magenta Module: Folded Landscape Material: Paper Corrugated Board

Playground Lower Level Module: Folded Landscape Material: Paper Corrugated Board

That’s My Lime

View from West - Landscape Module- Folded Structure


DETAIL DRAWING- FOLDED SYSTEM


DETAIL DRAWING- INTEGRATED SYSTEM Detail A

Detail B

Exposed Column

Wood Beam w/Joist Hangers

Solid Wood Beam

WEAVING NETS & SOFT MATERIAL 6 -12 INCHES Stretching Fabric Weaving Nets Wood Panels

Steel U-Plate Side Plate for connection to wood post

STEEL CABLE

Rope Skin

Wood Frame

WOOD STRUCTURAL FRAME 4 INCHES With Steel Frame

Wood Structural Frame

LED Strips

Wood Columns

LED STRIP UNDER STRUCTURAL FRAME 1 INCHES With Translucent Member sheet

FOLDED UPPER LEVEL SECTION CONSTRUCTION DETAILS

Metal Joist Hangers



SYSTEM FOUR- CURVED SYSTEM Dynamic Playground

Dynamic PlaygroundGround Level with Nets

Module: Curved Surface Material: Paper Mache

CAPE MODULE D STRUCTURE

Dynamic Playground

Hanging Ropes

Module: Curved Landscape with Scaffolding Material: Wood StructurePlayground Permanent

Dynamic & Execrise

ic Playground Level

Climbing Nets

Dynamic Module: Curved Landscape with Scaffolding Material: Wood Structure- Permanent

Workshop

Module: Curved Surface Reading Nooks Material: Wood Waffel Foam

Stage

ooks

Playground

Module: Folded Landscape Material: Paper Corrugated Board

Playground Lower Level Color Execrise &Code Yoga Material: Fabric/ Wood Panel/ Orange Rubber/ Paper Mache Module:

Folded Landscape Material: Paper Corrugated Board


LIFE CYELE PAPER MACHE

Paper Mache Making

1) Newspaper

Get a Strong Structure

2 Mix with Water and blending

3 Customizing Shape

4 Covered by layers and layers


PAPER MACHE - HUMIDITY & WEIGHT TESTING Paper Mache Making

1) Newspaper

Get a Strong Structure

2 Mix with Water and blending

Paper Mache Mixed by Water.- Solid Piece

1) Added Water for one Mins.

3 Customizing Shape

4 Covered by layers and layers

It could be a part could be loaded heavy weight.

2) Press it.- Soft, but not change shape.

3) Weight On that (50g:700g)

4) Shape not change.


DETAILS DRAWING - CURVED SYSTEM

Weaving Net of Ropes

Elasticity Fabric Workshop

Weaving Net of Ropes

Paper Mache

Plants

Paper Mache

Wood Waffel Structure



PLAN

Plan and Section

D

C

B

A

A

Plan Upper Level

A

Plan Lower Level

A

D

C

B


SECTION Plan Lower Level

D

C

B

Section A

Section B

Section C

Section D


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.