![](https://assets.isu.pub/document-structure/230629132858-94e17065c10a2b48a877cee9caac838f/v1/d6304b4c691d465297d7aaeb6cfa924b.jpeg?width=720&quality=85%2C50)
1 minute read
BUILDING ELEVATION & SECTION
BLDG. SECTION -NORTH SOUTH GRID X5 LOOKING WEST1
E-E SECTION NORTH SOUTH GRID X1 LOOKING EAST
Advertisement
SELF -ADHERING FLASHING AT
WALL SECTION @
ON COLD FORMED ANGLE OR BOXED STUD FRAMING
Atrium Steel Mesh Panel
![](https://assets.isu.pub/document-structure/230629132858-94e17065c10a2b48a877cee9caac838f/v1/a42a6625735778ef52ccafaa7b756174.jpeg?width=720&quality=85%2C50)
Different mesh types meet various requirements with regard to transparency and robustness.
The renovations will provide the school with modern classrooms with new technology, more efficient MEP systems, and better accessibility measures. The 130,000 GSF renovated building will house laboratories for STEM departments, classrooms, offices, and study spaces. Additionally, work is being done to renovate several pedestrian bridges that connect Marlboro Hall to two other buildings on campus. Finally, the exterior of the building will be renovated and rebranded.