1 minute read

CONSTRUCTION

Building Under Construction

The auditorium, at the south end of the building, is visible and accessible to both the campus and community. The three-story glass facades of the student entrance, at the north, connects the campus to the building providing visual connection as well as access, on the ground floor, to the centrally located courtyard. Enjoy a welcoming and engaging environment.

Advertisement

The 1500-seat auditorium is iconic anchor at the south end of the building adjacent to the Loop Road and MARC rail station. The facade of the auditorium continues the patterning and movement of the typical facade with adjustments in scale, scope, and openings.

Construction Of The New Cah Building

The new CAH Building will contain multiple departments and programs that are currently accommodated within the existing Martin King Jr. (MLK) Center which will be demolished once construction of the new building is complete. Project objectives include providing state-of-the art flexible and collaborative learning environments; specialized media production facilities, class laboratories, and departmental learning resources; faculty and administrative space to support interdisciplinary activity; and a 1500-seat assembly/auditorium space to serve a wide variety of BSU activities.

This article is from: