1 minute read

AND ADDITION

Brief Description of Project

Size : 130,156 SF

Advertisement

College Maryland. 20774.

Design Start : 2018

Constructions Start : 2020

Setting : Academic

Marlboro Hall, originally built in the 1970’s, is a three-story building that will end up being doubled in size once the project is complete. The project included a full existing conditions study of the whole building, finding deficiencies in the superstructure, roofing, exterior walls, stairs, and windows and doors.

MC459

KPNARCHITECTS, llc 2017 - Present

Department of General Services: ACTING SECRETARY: Atif T. Chaudhry

301 West Preston Street.

The renovations will provide the school with modern classrooms with new technology, more efficient MEP systems, and better accessibility measures. The 130,000 GSF renovated building will house laboratories for STEM departments, classrooms, offices, and study spaces. Additionally, work is being done to renovate several pedestrian bridges that connect Marlboro Hall to two other buildings on campus. Finally, the exterior of the building will be renovated and rebranded.

Responsibility

Understands the project and devises creative strategies to complete the work that meet or exceed the client’s expectations. Conducts research on existing building and campus infrastructure, coordinates field research, investigates and analyzes codes, produces site plans, floor plans, roof plans, demolition and phasing plans, and detailed elevations. Assists the Project Manager in providing overall architectural support throughout all phases of the project.

Baltimore. MD. 21201

DIAGRAMS - LEVELS 1,2,3,4

EXISTING: 40,056 GSF NEW: 33,578 GSF

This article is from: