THE COLLAPSE Urban villages have the most intense breathing in the city. These urban spaces have assumed important functions and are home to low-income m i g r a n t w o r k e r s . Pe o p l e live here and start from this, providing indispensable services for the city center. ——Gangxia “Rashomon”
Decision-Making of Urban Renewal in China Jiarong Yao 200082 The Royal Danish Academy - Architecture Urbanism & Societal Change Characters: 38331
CONTENTS Abstract
01
Introduction
04
Why Study Urban Renewal in China
05
Research
08
Research Field
09
Research Question
10
Research Method
11
Analysis and Cases
12
Stakeholders and the Operation of Urban Renewal
13
Application of Participatory Decision-Making Theory
13
Stakeholders and Urban Renewal Process
13
Urban Renewal Process
17
Urban Renewal Cases
Jiarong Yao The Royal Danish Academy - Architecture Master’s Programme of Urbanism & Societal Change 10 ECTS Written Assignment Title: The Collapse Decision-Making of Urban Renewal in China
19
The Projects in Shenzhen
19
Case 1 Gangxia Village
21
Case 2 Baishizhou Village
26
Discussion
32
The Potential of a Decision-Making System with Balance
33
Government's Goals and Initiatives
37
Developer's Goals and Initiatives
38
Resident's Goals and Initiatives
39
21st, December 2021
Conclusion
42
Supervisor: Christine Bjerke
The Role of the Architect and the Way of Intervention
43
Bibliography
47
Image & Figure List
49
1. Cover Image: "Urban Mountain" in Gangxia Village, Shenzhen, Zhubo Design, 2018 2. Chinese Yuan (CNY) 1.00 = Danish Krone (DKK) 1.00
ABSTRACT
Image #01 Shenzhen Skyline Panorama by Jalvaran
With the explosive growth of the population
can be simplified into a multi-party decision-
of different urban renewal cases. When
in China, urban planners are facing a dilemma
making model. Real cases show that this model
architects put forward strategies that suit
of how to accommodate the growing urban
has an unbalanced relationship, which leads
different interest groups based on their position
population and limited resources such as energy,
to specific problems in the results of urban
and use design as their own tools, they can
space and land. Demolition and reconstruction
renewal. Different attempts are used to find a
improve the decision-making process, and
proved to be a quick way to increase economic
new relationship, but these new relationships
this optimization for participatory decision-
benefits, as one of the ways to intervene in the
are usually established in an ideal environment,
making can allow the government, developers
form of urban renewal, trying to balance the
and some groups in the existing model need to
and residents to obtain a new flow of interests,
resources within the city. However, especially
sacrifice some benefits for it. Although the new
which makes a balanced participatory decision-
in the transformation of urban villages, the
model can bring about the improvement of the
making system possible.
demolition and transformation methods
general environment, compared with the huge
advocated by the government not only threaten
temptation, it has become a question whether
the livelihoods of the low-income groups, but
these long-term benefits can trigger rational
also have an impact on the local culture and the
thinking by different groups.
labor-intensive urban economy. This written thesis could test the possibility Based on the theory of participatory decision-
of establishing a new relationship with the
making, the entire process of urban renewal
intervention of architects through the collation 01
02
INTRODUCTION
一
Urban renewal, a game between the Chinese government and residents. As residents, the price of losing the game is to convert their home into a number into their account. The total construction area approved by the Ministry of Land and Resources of China in 2020 is 976 square kilometers. However, the vacant land currently is only 43 square kilometers, accounting for 2.3% of the total (approximately 1 9 5 2 s q u a r e k i l o m e t e r s ) . 01 A m o n g t h e remaining 97.7% of the land, the game of urban renewal provides large swathes of land for the new construction. Image #02 Shenzhen Cityscape by Alamy Stock Photo 03
04
WHY STUDY URBAN RENEWAL IN
government uses demolition and reconstruction as
CHINA
the primary approach (70.48%) while the other two
According to Shenzhen's official statistics, the
policy instruments are secondary approaches (14.29%
long-term population of Shenzhen in 2021 is 12.59
and 15.23%).03
million, and the actual population is more than 20 In the past, demolition and reconstruction is proved
residents. And in the past 40 years, the population
to be a quick way to increase economic benefits, as
that has increased by more than 500 times has put
one of the ways to intervene in the form of urban
unprecedented pressure on this land, and the entire
renewal, trying to balance the resources within the
urban ecology is on the verge of collapse. Along
city. As of December 31, 2020, there have been a total
with this growth, urban planners are now facing the dilemma of how to accommodate ever increasing
1980-1990
million02. Before 1980, the entire city had only 30,000
of 929 demolition and reconstruction urban renewal Image #03 Handshake Buildings in Shuiwei Village by Juanzong Wallpaper
urban populations versus finite resources available for energy, space, and land. In this process, different ways have been tried to alleviate this pressure, population, and redistributing urban population inward to ease the congestion in the city center.
square meters. Among them, the land use supply for urban renewal will be 1.1 million square meters in 2020, accounting for 30% of the total residential land
1990-2000
including expanding outward to accommodate more
projects in Shenzhen, with a total area of 74 million
supply in Shenzhen that year.04 However, empirical institutional barriers hinder the actual implementation process, especially the transformation of villages in cities. In a lot of practice, the demolition and
urban renewal, which is to optimize the relationship
transformation methods advocated by the government
between space or buildings and the city based on the
not only threaten the livelihoods of the low-income
existing urban structure.
2000-2010
Among them, this inward redistribution is called
groups, but also have an impact on the local culture and the urban labor-intensive economy. This leads us
The urban renewal projects aim at improving
to re-examine the starting point of urban renewal and
the physical, social, economic, and ecological
the decision-making process.
actions, including redevelopment, rehabilitation, and renovation. Due to different conditions, there are three different urban renewal methods at the government level: demolition and transformation, functional transformation and comprehensive renewal. Considering the high demand for land, 05
2010-2020
aspects of abandoned urban areas through various
Figure #01 Shenzhen's Urban Growth Timeline by MVRDV
01. Communiqué on Major Data of the Third National Land Survey, Ministry of Natural Resources of China and National Bureau of Statistics, 2021 02. Seventh National Population Census of Shenzhen, Bureau of Statistics in Shenzhen, 2021 03. An Evaluation of Urban Renewal Policies of Shenzhen, China, Guiwen Liu, 2017 04. "Construction Land Supply Plan 2021", Shenzhen Municipal Bureau of Planning and Natural Resources, 2021 06
RESEARCH
二
Since the central government of China designated Shenzhen as a special economic zone (SEZ) in 1979, the city has been growing at an incredible pace. A "general old village's office", addressing the renewal of Shenzhen's original ten villages, was established as early as 1990. Sequentially, over the years to 2004, renewal plans for the old villages and old factories were published. By 2009, Shenzhen emerged as the first Chinese city to promulgate urban renewal legislation that specifically dealt with urban socioeconomic development problems arising from a lack of available land. Thereafter, in 2012, more land was released by the Shenzhen government to accommodate growth projects, systematically set out in the urban renewal policies adopted. Image #04 Facade of Village in the City Series 07 by Sun Haiting 07
08
Image #05 Facade of Village in the City Series 06 by Sun Haiting
RESEARCH FIELD
Main Research Question:
RESEARCH METHOD
research, establish an evaluation system for the
Compared with other cities in China, the
Based on participatory decision-making
Different groups have participated in the
behavior and impact of different participants in
historical development of Shenzhen determines
theory05, what is the current model of decision
decision-making process of urban renewal
urban renewal, discuss the goals and tools of
that it faces more problems of urban renewal,
making in urban renewal projects and how
at different stages, which is understood as a
different groups in the process, and sort out the
and the Shenzhen government also pays more
can a new model be built to help balance the
fair decision-making process. However, when
impact of different behaviors on the final urban
attention to the problem of urban renewal.
stakeholders with the new self-positioning of
power and resources are tilted towards a certain
renewal result. By thinking about the influence
Therefore, this research also uses Shenzhen's
the architect?
group, the fairness of decision-making results
and resistance of the participatory decision-
becomes a question.
making theory model in the decision-making
urban renewal project as the main case to analyze the behavior of various stakeholders in
Sub Research Questions:
the renewal process.
1. Why study urban renewal?
process, it tests the possibility of architects if they could build a platform with fairness.
Based on urban renewal cases and empirical
2. What are the reasons for urban renewal? RESEARCH QUESTION
3. What is the operation mode of urban
The challenge for the government is to balance
renewal?
the interests of different participants while
4. What are the results and impact of urban
accelerating the development of urban renewal.
renewal?
As architects, how could we assume our social
5. What are the goals and response methods
responsibilities in this situation where the
of different participating roles (government,
policy and the implementation of games are in
developer, and residents)?
a bad balance.
6. What is the role of the architect in it? 09
05. Participatory decison-making theory, Aaron Lowin, 1968 10
ANALYSIS & CASES
三
In the process of urbanization and population movement, a large number of cities in China are facing the problems of obsolete buildings, overcrowding, and poor environmental conditions. And urban renewal is considered to be an effective way to achieve short-term construction goals, expand population capacity and balance population distribution. Image #06 Baishizhou Village by Zhang Chao 11
12
STAKEHOLDERS AND THE OPERATION OF
government, citizens, developers, and architects.
URBAN RENEWAL
Application of Participatory Decision-Making
In China, the rights of land use and land ownership
Theory
are separate. The municipal government leases land
Participatory decision-making (PDM) is one of many
use rights to developers within a certain period
ways that organizations make decisions. Initially,
of time. According to Chinese national land law,
PDM is a way that employers allow or encourage
they obtain competitive prices through auctions or
employees to share or participate in organizational
bidding. However, in the use of non-agricultural
decision-making. The basic concept involves any
land in urban renewal projects, the transfer of land
power-sharing arrangement in which workplace
use rights between collectives or individuals and
influence is shared among individuals who are
developers depends on whether an agreement can be
otherwise hierarchical unequals06.
reached through negotiation.
With the development of theory, PDM has been more widely used in different fields, such as environmental, financial decision-making and even the decisionmaking process of some non-profit organizations. In urban renewal projects in China, since there is no complete national urban renewal system to coordinate urban renewal policies related to planning laws, land laws or urban housing demolition laws, the decision-making process is more inclined to a multiparty discussion and coordination of participatory decision-making model. However, the results of a large number of urban renewal practices in China show that this participatory decision-making model does not always balance the interests of all parties, and the problems in it need to be analyzed through specific case studies. Stakeholders and urban renewal process
Image #07 Reconstruction of Gangxia Village by Juanzong Wallpaper
The basic roles in the urban renewal projects are the 13
06. Locke, E.A.; Schweiger, D.M. "Participation in decision-making". Research in Organisational Behaviour 1: 265–339, 1979 14
TENANT Village Committee
HOUSEHOLDER
RESIDENT DEVELOPER
Real Estate Company
GOVERNMENT
Land Planning Institution
I Determination of Urban Renewal Area Specifically, when the government has a need to improve the urban environment, it will use corresponding incentive measures, such as introducing laws and regulations related to urban renewal in specific areas, adjusting the tax system, increasing public capital investment to enter the plot of urban renewal.
V Clearence of Tenant
VI Tenant Resolution
Tenant clearances are taking place in houses whose land property has been handed over to the developer. Tenants could appeal to the government in this process.
The government establishes Urban Renewal Field Work Group, acting as the interest coordinator, and providing solutions to problems arising in the process.
II Determination of the Implementer
V Contracts for Land Rights Transfer
According to the urban renewal areas provided by the government, the developer needs to contact the village committee to obtain the right to execute the urban renewal project. And the village committee has the right to select the developer through the shareholder meeting.
Next, the developer needs to sign contracts with existing residents to obtain the land use rights granted by the residents. In this process, it is necessary to clarify the compensation method for land transfer, and compulsory demolition can be done after obtaining the consent of 95% of the residents.
III Confirmation of Urban Renewal Project After the agreement is confirmed, the developer needs to pay a deposit (50 million to 200 million yuan) to the village committee to complete the project, and publicize it at the Urban Renewal and Land Development Bureau of the area.
IV Declaration of Constration Plan After that, the developer needs to submit a declaration to the government, which needs to include the total construction area of the future construction and the proportion of residential buildings, etc., to obtain the special plan of the project.
VI Application for Constration Certificate
VII Implement of Urban Renewal Project
Developers need to apply for four certificates within 6-12 months thereafter, including 1. State-owned land use certificate 2. Construction land planning permit 3. Construction project planning permission Certificate 4. Construction Permit.
After completing the above procedures, the old house can be demolished, and the construction of the new building can be carried out. The project is generally completed within 36-48 months of obtaining the construction permit.
Figure #02 General Urban Renewal Process by Author 15
16
Urban Renewal Process
declaration to the government, which needs to
01 Specifically, when the government has a
include the total construction area of the future
need to improve the urban environment, it will
construction and the proportion of residential
use corresponding incentive measures, such
buildings, etc., to obtain the special plan of the
as introducing laws and regulations related to
project.
urban renewal in specific areas, adjusting the tax system, increasing public capital investment,
05 Next, the developer needs to sign contracts
and even using government procurement to
with existing residents to obtain the land use
support market forces to enter the plot of urban
rights granted by the residents. In this process, it
renewal.
is necessary to clarify the compensation method for land transfer, and compulsory demolition
02 Under this series of measures, developers
can be done after obtaining the consent of 95%
can obtain huge benefits in the process of urban
of the residents.
renewal, so they actively choose to participate in the process of urban renewal. Taking the
06 Developers need to apply for four certificates
village in the city as an example, according to
within 6-12 months thereafter, including 1.
the list of urban renewal plots provided by the
State-owned land use certificate (issued by the
government, the developer needs to contact the
Land and Resources Bureau) 2. Construction
corresponding village committee to obtain the
land planning permit (issued by the Planning
right to execute the urban renewal project. In
Bureau) 3. Construction project planning
this process, the village committee has the right
permission Certificate (issued by the Planning
to select the developer through the shareholder
Bureau) 4. Construction Permit (issued by the
meeting.
Construction Bureau).
03 After the agreement is confirmed, the
07 After completing the above procedures,
developer needs to pay a deposit (50 million
the old house can be demolished, and the
to 200 million yuan) to the village committee
construction of the new building can be carried
to complete the project, and publicize it at the
out. The project is generally completed within
Urban Renewal and Land Development Bureau
36-48 months of obtaining the construction
of the area.
permit.
04 After that, the developer needs to submit a
Image #08 The Housing Expropriation Decision by People's Government of Nanshan District, Shenzhen 17
18
URBAN RENEWAL CASES
buildings on the west side were demolished in
The Projects in Shenzhen
several years’ negotiation, the city village on
Shenzhen has a large number of urban renewal
the east side was preserved under the dispute
projects every year. According to Shenzhen's
and became a unique urban texture in the center
urban renewal policy, there are specific
of Shenzhen.
procedures for the promotion of urban renewal projects. However, due to the inconsistency
Therefore, this written thesis hopes to compare
of policies and the uncertainty of the
these two projects to study the impact of
implementation process, different results will
different behaviors of different groups in the
often be brought by the same procedure.
same urban renewal process on the decisionmaking process.
With the progress of reform and opening up, Shenzhen’s rapid economic development has brought about unprecedented urban expansion, resulting in part of the surrounding villages and their arable land being included in the scope of urban land use. The functional types of most cultivated land have been changed due to the conversion of ownership, but the residential functions of the villages have been preserved.
Image #09 Baishizhou Tangtou Old House by Liang Zhou
As two historic urban villages, the Gangxia urban village and the Baishizhou urban village in Shenzhen both faced the problem of urban renewal after 2000, but the results of the two projects were completely different. The urban renewal project of the Baishizhou Urban Village has benefited a lot of its residents, and once caused many residents of other urban villages in Shenzhen to hope to welcome demolition. While the urban renewal project of Gangxia City Village has faced failure. Although the
Image #10 Gangxia Village in Shenzhen by Luo Changwei
19
20
Case 1 Gangxia Village
handed over the reconstruction task to the
the urban village, the developer proposed a
▶ General Information
Futian District Government to do the organize
preliminary conceptual plan in communication
In 2009, the west side of Gangxia Village was
and implement work. However, in the first step
with the planning institution represented by the
demolished and became Futian Business Center.
of transformation, it is difficult to determine
government, in which a possible compensation
The renewal project covers an area of approximately
property rights. Among them, legal, illegal,
method was proposed with reference to the
220,000 square meters and the entire construction
and semi-illegal property rights are difficult to
collective interests of the village. The number
area reaches 1.4 million square meters.
distinguish, and history has left a gray property
of villagers who agreed with the compensation
rights problem in Shenzhen.
standard once reached 85%.
In 1992, after the urbanization of rural areas, relying
At the same time, when Shenzhen was
However, when the demolition of Caiwuwei
on the income from the collection of collective land
undergoing urbanization reform in 2004, apart
village, another urban renewal project in
by the government, local residents began to establish
from the traditional agricultural industries
Shenzhen, came to an end in 2007, one of the
some industries, and some families gradually gained
in a small area, Shenzhen's agriculture had
villagers refused to demolition and demanded
some savings. With the gradual influx of more than
basically disappeared. However, most farmers
a substantial increase in compensation, which
100,000 migrant workers, they began to tear down
have not really received modern industrial and
led to the stagnation of the project. This directly
the tiled houses, and build new buildings to rent
commercial training, so houses have become a
led to the immediate reduction of the number of
out their vacant houses. Gangxia Village gradually
major way for them to gain income.
villagers in Gangxia Village who agreed with
▶ The Formation of the Urban Village
expanded at this time and occupied a piece of land in
the original compensation standard to less than
the current Shenzhen city center.
From the confirmation of the urban renewal
50%.
project in 1998, until July 2006, the Shenzhen Futian District Government, Gangxia Co.,
In December 2008, as the developer could not
Ltd., with villagers as shareholders, and the
bear the huge losses, after coordination by
Shenzhen, the Shenzhen Municipal Government
developer Gemdale Group finally signed a
different parties, the developer made certain
planned to make a comprehensive renovation of
framework agreement to formally promote
concessions to the compensation conditions,
the Gangxia area. The Shenzhen Urban Planning
the overall transformation of Gangxia area.
which lead to a contract rate of 92% in February
Institute submitted a study on the reconstruction plan
By then, the population of Gangxia Village
2009. There are two standards of compensation:
of Gangxia Village through a year of work. After
has reached 68,000, of which there are 486
First, the compensation for houses within 480
that, in 2000, 2005, and 2006, they invited different
permanent villagers, about 67,000 temporary
square meters is 1:1, and for apartments over
domestic and foreign design companies to propose
tenants, land area of 151,600 square meters, and
480 square meters is 1:0.88. Second, the first
plans for the reconstruction of Gangxia Village.
590 houses.07
floor will be compensated at a ratio of 1:0.9 for
▶ The Urban Renewal Project In 1998, in order to build the central area of
In 2002, the Shenzhen Municipal Government 21
Image #11 Street of Gangxia Village in Xiasha by Ping Shen
Image #12 Xiasha Cultural Square at Night by Zhang Chao
commercial properties, and the second floor and In 2007, based on the current situation of
above will be compensated at a ratio of 1:0.9 22
TENANT Village Committee
HOUSEHOLDER
RESIDENT
Real Estate Company Land Planning Institution
GOVERNMENT
DEVELOPER
I Determination of Urban Renewal Area Specifically, when the government has a need to improve the urban environment, it will use corresponding incentive measures, such as introducing laws and regulations related to urban renewal in specific areas, adjusting the tax system, increasing public capital investment to enter the plot of urban renewal. In the early stage of urban development, due to the lack of a complete policy, the project was mainly promoted by the government, and more often determined by the government’s unilateral wishes.
V Clearence of Tenant
VI Tenant Resolution
Tenant clearances are taking place in houses whose land property has been handed over to the developer. Tenants could appeal to the government in this process.
The government establishes Urban Renewal Field Work Group, acting as the interest coordinator, and providing solutions to problems arising in the process.
II Determination of the Implementer
V Contracts for Land Rights Transfer
According to the urban renewal areas provided by the government, the developer needs to contact the village committee to obtain the right to execute the urban renewal project. And the village committee has the right to select the developer through the shareholder meeting.
Next, the developer needs to sign contracts with existing residents to obtain the land use rights granted by the residents. In this process, it is necessary to clarify the compensation method for land transfer, and compulsory demolition can be done after obtaining the consent of 95% of the residents.
III Confirmation of Urban Renewal Project After the agreement is confirmed, the developer needs to pay a deposit (50 million to 200 million yuan) to the village committee to complete the project, and publicize it at the Urban Renewal and Land Development Bureau of the area.
As a government-led project, the architectural design team is also controlled by the government. In contrast, the new urban design takes more account of the urban landscape and the interests of high-income residents.
IV Declaration of Constration Plan After that, the developer needs to submit a declaration to the government, which needs to include the total construction area of the future construction and the proportion of residential buildings, etc., to obtain the special plan of the project.
From the result, part of the demolition work was completed, while some villages in the city were retained. This was caused by the residents' dissatisfaction with the benefits obtained from the transfer of property rights.
In the process of property rights transfer, since both the households and tenants want to keep their houses, the negotiation process between the government and residents about new projects is more complicated.
VI Application for Constration Certificate
VII Implement of Urban Renewal Project
Developers need to apply for four certificates within 6-12 months thereafter, including 1. State-owned land use certificate 2. Construction land planning permit 3. Construction project planning permission Certificate 4. Construction Permit.
After completing the above procedures, the old house can be demolished, and the construction of the new building can be carried out. The project is generally completed within 36-48 months of obtaining the construction permit.
Figure #03 Urban Renewal Process of Gangxia Village by Author 23
24
for houses or apartments.08
▶ The Result of Urban Renewal
of the household, the developer, and the
Case 2 Baishizhou Village
through illegal construction. Over the years,
government, they are forced to leave to find a
▶ General Information
the 0.6 square kilometer of land in Baishizhou,
new residence.
In 2018, the Shenzhen Municipal Planning
with more than 2,500 rental buildings, was once
and Land Commission approved the Urban
home to more than 150,000 people at the same
There are about four or five hundred aborigines in Gangxia Village, among which more than
In March 2011, two years after the start of the
Renewal Unit Planning of Shahe Five Villages,
time09, and home to more than a million migrant
seventy thousand people live in the rental
contract, the developer reached a contract with
Shahe Street, Nanshan District. Urban renewal
workers.
houses. At different stages of the project,
all the villagers and completed the demolition
was carried out in the form of demolition
tenant clearances are taking place in houses
of all the properties, officially starting the
compensation, using houses and cash for
At the end of 2006, to promote the resolution
whose land property has been handed over to
construction project on the west side of
compensation, resulting in 1878 billionaires.
of land-related historical issues, the villagers
the developer, and there are some large-scale
Gangxia Village. Tens of thousands of people
protests from the tenants. Although the protests
who originally lived in Gangxia Village moved
▶ The Formation of the Urban Village
plan. With the support of the Nanshan District
of these tenants affected the demolition process
to the edge of the city as they could not afford
In the 1990s, Baishizhou was an old village in
Committee and District Government, Shenzhen
to a certain extent, under the joint intervention
the land price in the city center.
Shenzhen. Most of the buildings inside were
Baishizhou Investment Development Co., Ltd.
still 3 or 4 stories. Although the income in
was established with the 2075 original villagers
the village was relatively low, everything was
as shareholders to represent the collective
in order. At this stage, Shenzhen promoted
economic interests of the villagers. Afterwards,
rural urbanization and encouraged villages
the company and the government agreed to
to set up joint-stock companies to promote
obtain the management and use rights of part of
land restructuring by taking advantage of the
the land and assets in the village.
tended to implement the old city reconstruction
collective economy. Baishizhou was one of them.
▶ The Urban Renewal Project In July 2014, under the joint promotion of
Image #13 Gangxia Village after demolish by Luo Changwei
07. Looking for Gangxia Village, https://www.szdesigncenter.org/17fMmeR60kyDhP, Accessed 01 Oct, 2021 08. Demolition and Reconstruction of Gangxia Village in Shenzhen, http://www.nbd.com.cn/articles/2009-11-12/252326.html, Accessed 01 Oct, 2021 25
Around 2000, with the improvement of the
the government and the village committee,
surrounding traffic, Baishizhou became the first
Baishizhou was approved to be included in
choice for migrant workers to settle in central
the urban renewal unit plan of Shenzhen that
Shenzhen. The villagers saw the benefits of
year. And in 2017, the Nanshan Administration
renting their houses to migrants, so they began
Institution of the Shenzhen Municipal Planning
to rebuild buildings with more than six or
and Land Committee announced the draft of
seven stories on top of the existing buildings.
the urban renewal project plan, and confirmed
Because of the historical reasons of the land
that a new project with a construction area
reform, the government can only acquiesce in
of 3.4796 million square meters will be built
the behavior of villagers to obtain rent income
after the reconstruction of urban renewal units 26
TENANT Village Committee
HOUSEHOLDER
RESIDENT
Real Estate Company Land Planning Institution
GOVERNMENT
DEVELOPER
I Determination of Urban Renewal Area Specifically, when the government has a need to improve the urban environment, it will use corresponding incentive measures, such as introducing laws and regulations related to urban renewal in specific areas, adjusting the tax system, increasing public capital investment to enter the plot of urban renewal. On the basis of a large number of cases, the household can see the huge benefits that can be obtained by demolition, so the villagers are likely to promote the urban renewal project with the government.
V Clearence of Tenant
VI Tenant Resolution
Tenant clearances are taking place in houses whose land property has been handed over to the developer. Tenants could appeal to the government in this process.
The government establishes Urban Renewal Field Work Group, acting as the interest coordinator, and providing solutions to problems arising in the process.
II Determination of the Implementer
V Contracts for Land Rights Transfer
According to the urban renewal areas provided by the government, the developer needs to contact the village committee to obtain the right to execute the urban renewal project. And the village committee has the right to select the developer through the shareholder meeting.
Next, the developer needs to sign contracts with existing residents to obtain the land use rights granted by the residents. In this process, it is necessary to clarify the compensation method for land transfer, and compulsory demolition can be done after obtaining the consent of 95% of the residents.
III Confirmation of Urban Renewal Project After the agreement is confirmed, the developer needs to pay a deposit (50 million to 200 million yuan) to the village committee to complete the project, and publicize it at the Urban Renewal and Land Development Bureau of the area.
Village committees have the power to choose developers, so the developer will be more dominated by the householders, in which the process of renewal will more likely to be affected by accidents.
IV Declaration of Constration Plan
For the large number of tenants, the urban renewal projects means a substantial increase in the cost of living and time. However, under the impetus of other stakeholders, this cannot affect the progress of urban renewal.
The household has made huge gains in urban renewal. However, as the largest urban village in Shenzhen, a large number of low-income workers have suffered a huge blow in the same process.
After that, the developer needs to submit a declaration to the government, which needs to include the total construction area of the future construction and the proportion of residential buildings, etc., to obtain the special plan of the project.
VI Application for Constration Certificate
VII Implement of Urban Renewal Project
Developers need to apply for four certificates within 6-12 months thereafter, including 1. State-owned land use certificate 2. Construction land planning permit 3. Construction project planning permission Certificate 4. Construction Permit.
After completing the above procedures, the old house can be demolished, and the construction of the new building can be carried out. The project is generally completed within 36-48 months of obtaining the construction permit.
Figure #04 Urban Renewal Process of Baishizhou Village by Author 27
28
in Baishizhou area. There will be 31 residential
Baishizhou, most of the buildings, whether
for the villagers, the connection between
buildings with 49-65 floors, 21 apartments, 3 super
residential or commercial, were emptied, and
Baishizhou and them was cut off, but they
high-rise office buildings with 66-79 floors, 1 office
the land was taken over by developers. Most
received quite generous compensation. Taking
building with 59 floors, and other buildings including
of the owners within the area of the first-
a contract signed by a villager in Baishizhou
new schools.10
phase renewal project have signed contracts,
as an example, his family’s demolition area
the developer has obtained the construction
is about 1,200 square meters. According
On December 28, 2018, the Planning and Land
permit, and the urban renewal project has been
to the compensation standard of 1:1.03, 15
Committee of Shenzhen Municipality officially
implemented.
resettlement houses will be obtained after the
approved the Urban Renewal Unit Planning of Shahe
demolition. At the same time, the price of
Five Villages, Shahe Street, Nanshan District. A
▶ The Result of Urban Renewal
second-hand houses in nearby communities is
number of developers aimed at the huge benefits of
As the ultimate beneficiaries, for the villagers,
between 65,000 and 75,000 CNY per square
this project. And the village collective finally chose
the connection between Baishizhou and them
meter, while the price of newly built houses is
the real estate company LVGEM China and signed an
was cut off, but they received quite generous
about 100,000 CNY.11
agreement which has many years of experience in the
compensation. As the ultimate beneficiaries,
reconstruction of the old city in the Shenzhen market. In June 2019, Baishizhou North District began to clean up the property rights of the leased land, and the landlords who had signed the demolition compensation agreement began to notify the tenants Image #14 Daily Life in Baishizhou Village by Ping Shen
to move out within 3 months. The government established a Baishizhou Urban Renewal Field Work Group, acting as the interest coordinator of all parties, and providing solutions to problems arising in the process of tenant clearance. For example, the impact of house demolition on students' schooling has become a major issue reported by tenants. Although the demolition will not affect the school itself, family relocation means a substantial increase in the cost of
Image #16 Baishizhou Village 2016 before demolish by Juanzong Wallpaper
living and time. Image #15 Self Construction in Baishizhou Village by Zhang Chao
In December 2020, more than 40,000 people left 29
09. Restart Baishizhou, https://finance.sina.cn/china/gncj/2019-09-24/detail-iicezueu7940672.d.html, Accessed 01 Oct, 2021 10. Announcement on the public announcement of the urban renewal unit plan (draft) of Shahe 5th Village, Shahe Street, Nanshan District, Shenzhen Municipal Planning and Land Resources Commission Nanshan Administration, 2017 11. Daily Economic News, http://www.sunmeltd.com/sdcjks/8561.html, accessed 01 Oct, 2021 30
DISCUSSION
四
In urban renewal projects, the decision-making process directly affects the result of the project. Participatory decision-making is not necessarily the only correct answer to the problem of urban renewal in China, but it can help us find the problems in the existing system, so that it can become one of the ways to solve the problem in the future with the help of policy or institutional tools. Image #17 Shibati Rd in 2015-2018 by Dasongge shi ge Daomeidan 31
32
THE POTENTIAL OF A BALANCED
With consensus everyone in the group must
to implementation, there is a lack of a core
DECISION-MAKING SYSTEM
agree to a decision for it to be adopted. To
process which can gather all stakeholders.
Although, the urban renewal is an effective way
ensure the fairness of decision-making, there
Specifically, 1. The process of establishing
to achieve short-term construction goals, expand
are several key points in the process of making
an urban renewal project is only led by the
population capacity and balance population
participatory decision-making. 12 1. Every
government; the village collective can only
distribution, it will destroy community connections
stakeholder must be committed to reaching a
put forward their needs and opinions. 2. In the
and original cultural heritage buildings, while the
consensus view. 2. Awareness of the common
process of determining the implementer of the
interests of low-income residents cannot be protected.
ground within the group is needed. This is
projects, the developer is only selected by the
So, it is important to find a balance way to process
useful for bringing the group back to if there
village committee based on its own interests
the urban renewal projects.
are disagreements. 3. Every stakeholder must
almost without the government. 3&4. The
understand the process 4. Sufficient time must
process of initiating urban renewal projects
be allowed for the process.
includes negotiation between the developer
From the perspective of the profession of architecture, it is able to contribute to the integration of the system,
and the government for future construction,
but this is also why sometimes the complexity
After clarifying the stakeholders and their goals
but the village collective has no participation.
of understanding will be missed when looking at
related to the decision-making results, we can
5. The government is not specifically involved
the political, economic, and social issues that are
find that after simplifying the process of urban
in the transfer of land use rights; the main
integrated in urban renewal. At the same time, due
renewal to a participatory decision-making
compensation methods are determined by
to the homogeneity and lack of perspectives in most
model, the four specific groups involved in
developers and villagers. 6&7. After the
architectural fields, we need a systematic strategy to
urban renewal are the government, developers,
agreement is signed, the villagers will withdraw
guide the groups to put forward their requirements
heads of households, and tenants. There is a
from the decision-making process, and the
huge difference in the distribution of power and
specific planning and construction of the future
the way they participate in the process.
will only be determined through consultation
which are ignored in many cases because of the blind spots and prejudices. Only in this way can we expand
Image #18 Merchants under Demolition by Yu Xuefei
the potential of the space under the framework of
between the government and the developer.
the overall strategy and become the starting point for
This corresponds to the first point of
reconciling contradictions.
participatory decision-making. In the decision-
For the second point, the government,
making process of urban renewal projects,
developers and households have reached a
The participatory decision-making is the systemic
tenants do not have any policy tools or
consensus on the project. The government can
strategy we are looking for. It is a process that
legal protection. And the process of their
develop a better urban environment, and both
works to find common ground and solutions that are
opinions is entirely based on the government's
the developer and the households could have
acceptable to all and best for the group. It tries to
consciousness.
economic benefits here. Therefore, the three
avoid the alienation of minorities that majority rule can create and values everyone’s opinion equally. 33
Image #19 Housing Ownership Certificate by Li Yu
parties can discuss the benefit distribution, During the process from project establishment
and jointly promote the progress of urban 34
TENANT Village Committee
HOUSEHOLDER
RESIDENT DEVELOPER
Real Estate Company Land Planning Institution
ARCHITECTS GOVERNMENT
I Determination of Urban Renewal Area The government's urban planning department could discuss new ideas for reconstruction based on the original space while increase the population capacity of the area through the reconstruction and consolidation of residential units, and retain specific low-cost commercial as well as infrastructure facilities.
V Clearence of Tenant
VI Tenant Resolution
Tenant clearances are taking place in houses whose land property has been handed over to the developer. Tenants could appeal to the government in this process.
The government establishes Urban Renewal Field Work Group, acting as the interest coordinator, and providing solutions to problems arising in the process.
II Determination of the Implementer
V Contracts for Land Rights Transfer
According to the urban renewal areas provided by the government, the developer needs to contact the village committee to obtain the right to execute the urban renewal project. And the village committee has the right to select the developer through the shareholder meeting.
Next, the developer needs to sign contracts with existing residents to obtain the land use rights granted by the residents. In this process, it is necessary to clarify the compensation method for land transfer, and compulsory demolition can be done after obtaining the consent of 95% of the residents.
III Confirmation of Urban Renewal Project Architects can also discover opportunities in the site more broadly, and change the traditional urban renewal project for commercial, entertainment, and residence to integrate more functions and be multi-stage development area.
IV Declaration of Constration Plan After that, the developer needs to submit a declaration to the government, which needs to include the total construction area of the future construction and the proportion of residential buildings, etc., to obtain the special plan of the project.
VI Application for Constration Certificate
VII Implement of Urban Renewal Project
Developers need to apply for four certificates within 6-12 months thereafter, including 1. State-owned land use certificate 2. Construction land planning permit 3. Construction project planning permission Certificate 4. Construction Permit.
Architects can redistribute the interests of different groups with specific design schemes according to the results of participatory decision-making, which could in turn affect the decision-making process.
Figure #05 A Potential Urban Renewal Process with Balance by Author 35
36
renewal. However, tenants are placed outside
steps, but as a result, different stakeholders
the common ground in this process as they can
have great differences in the allocation of
get a cheap living condition from the urban
time for decision making. For example, in
Government's Goals and Initiatives
villages. Reflected in the cases, the decision of
the process of the compensation negotiation
▶ Improve the appearance of the city and complete
the urban renewal project tends to be divided
between the developer and the villagers,
the phased urban development goals.
into two processes, that is, the government,
to reduce the decision-making time within
developer and households make the allocation
the village collective, the developer, as the
There is not a complete national urban renewal
of benefits for urban renewal, and the tenant
dominant player in this process, usually uses
system in China to coordinate urban renewal policies
discuss the compensation method for the
policy pressure to compress the time period
related to planning laws, land laws or urban house
affected living condition with the government.
for signing the agreement, so as to quickly
demolition laws. And since 1970 when most cities in
enter into the project implementation process.
system.
Image #20 Demolition Announcement of Baishizhou Village by Jiemodui
China faced urban decline, until 2008 in which the
For the third point, Shenzhen’s urban renewal
However, reflected in the results, although
State Council issued the "State Council's Notice on
decision-making has certain steps, and for
this way can make a reach of some contract
different project backgrounds and conditions,
with part of the residents in short term, it also
renewal has been facing a gap in national practice
these steps will have some changes. Due to
leads to some residents deliberately prolonging
guidance. Complications of urban renewal polices,
objective reasons such as long project cycle
for a longer period to force developers to
such as complex land usage claims, the protection
and unpredictability, it is difficult to completely
compromise, in order to obtain higher benefits.
of the public interest and endemic social equality,
determine the process of decision-making at
On the one hand, this has caused the loss of
along with limited understanding of policy itself, has
the beginning. At the same time, due to the
public interests. At the same time, for the group
slowed the development of the urban renewal process
differences in the educational level of different
of villagers, the unbalanced distribution of their
across the country. Therefore, most of China's
groups, it is difficult to ensure that the decision-
interests will also lead to the overthrow of the
urban and regional planning actions and policy
making is fully understood by everyone,
previously agreed decisions.
interventions are still local initiatives.
of time, the relatively fair strategy formulated
For the whole urban renewal projects, there
The government also updates its strategy in this
in the early stage has lost its balance due to
must be many objective restrictions that make
process, realizing the transfer of land use rights
changes in external factors.
the entire decision-making process unable to
through agreements, establishing strict compliance
simply follow a set of participatory decision-
requirements for the urban planning system,
Time, the last factor affecting participatory
making models. Therefore, we need to focus
and issuing corresponding incentive measures.
decision making, has an inseparable relationship
more on the goals and abilities of different
with the determination of decision-making
groups to find the possibility of a balanced
Promoting Efficient and Intensive Land Use", urban
especially the residents. From the perspective
Image #21 Life in Baishizhou Village by Dong Li
Including environmental aspects, the promotion of urban renewal through taxation systems, laws and regulations and other similar tools. On the supply side, improve relevant supply factors and
12. Participatory Decision-Making, People & Planet, 2018 37
38
formulate active and effective measures,
projects. conduct.
including public capital investment, technical
and some will rent out a part of their houses to
Shenzhen's economy has achieved tremendous
obtain stable economic benefits.
development in recent years, and the huge
information support, and education to promote
In some cases of forced demolition in the
demand for labor has attracted a large number
the development of urban renewal. And on the
past, at the stage of house expropriation, that
▶ Tenants who want to keep the low-cost
of migrants. Since such migrant workers cannot
demand side, through government procurement,
is, the stage when developers purchase land
shelters in big cities
afford the higher land prices in Shenzhen,
trade control and other measures to eliminate
use rights from residents, developers need
barriers to market power entry and create
to price the houses in the project. Similarly,
Due to Shenzhen's status as a special economic
villages with poor living conditions but low
demand for urban renewal.
since this process can be adjudicated by the
zone in China's reform and opening policy,
rents.
a large part of them can only choose urban
house demolition management department, the Developer's Goals and Initiatives
developer can use the interest link with the local
▶ Get more economic benefits.
government to influence the price evaluation, so that the price determination process will be
Due to China's special land property rights,
more biased towards the developers.
developers need to purchase land use rights from the government through auctions and need
Resident's Goals and Initiatives
to pay land acquisition fees to residents. For
There are different types of residents in the
developers, the government and the demolished
urban villages, which are mainly divided
people stand at both ends of the scale. Article
into households and tenants. Although they
16 of the "Regulations on the Administration of
live in the same environment, they have
Urban House Demolition and Reconstruction"
different expectations for urban renewal due to
stipulates: If the different groups fail to reach
differences in housing property rights.
a demolition compensation and resettlement agreement, the housing demolition management
▶ Households who regard the house as the
department shall make a ruling upon the
memory of the family while measure its value
application of the group concerned. Since the
as a commodity.
government has the dominant power in urban renewal projects, developers can strategically
Most of the households are the aboriginals of
allocate funds to the government and residents,
Shenzhen, or who came here before or at the
for example, by lowering the compensation
early stage of urban development in Shenzhen
price for residents to allow local governments
to obtain housing property rights. Therefore,
to obtain more benefits from the land, thereby
most of these households are 50 years old and
promoting the smoothness of urban renewal
above, have a stable economic foundation, 39
Image #22 Community Bulletin Board of Urban Village in Shenzhen by Ping Shen
40
CONCLUSION
五
In the existing system, the intervention of strong policies and the new bargaining chips of different groups have become a means to break the existing distribution of benefits from urban renewal. Since the government is both a policy maker and a stakeholder of urban renewal, architects in the external environment need to use some active tools to intervene when facing this decision-making model, and use macro strategies to help disadvantaged groups obtain ways to resist, thereby coordinating the reorganization of the entire decision-making model. Image #23 Electricity Network in the Urban Village by Shenzhen Huajian Power 41
42
THE ROLE OF THE ARCHITECT AND THE
it. Similarly, after the completion of the land
possibility of preserving villages in the city,
projects. Compared with the former two, which
WAY OF INTERVENTION
property transfer, the architect will make the
helping to limit the initiative of the head of the
promote the power balance of different groups
The traditional role of the architect in urban
final architectural and urban design under the
household and the developer after the project
in specific steps, architects in Process 7 can
renewal projects is the space designer, driven
guidance of the government and the developer.
is determined, increasing the bargaining chip
redistribute the interests of different groups
for the tenants in the entire decision-making
with specific design schemes according to
by capital to complete the design for the client, in which loses all initiative, and serves only
Therefore, architects can be divided into three
process, and bringing the tenants into Process
the results of participatory decision-making,
as a tool for the goals of different groups.
types: those serve for government in Process 1,
2 and 5 in the decision-making system and find
which could in turn affect the decision-making
From the multi-level discussion of urban
those serve for developer in Process 3 and those
the common ground between the tenant and the
process. When the final design plan is not
planning projects to the implementation of
serve for city and public in Process 7.
other three groups.
limited to commercial and residential functions,
urban plan and even the architectural design,
the various possibilities will lead to uncertainty
architects have many opportunities to do the
For architects serving government in Process
For architects serving developers in Process
in the ultimate flow of benefits, which
change. However, only collecting data at the
1, compared to the traditional complete
3, the core interest of developers is to create
could increase the communication between
request of the government or increasing the
preservation and complete demolition plan,
economic benefits. In addition to gaining
stakeholders and architects in the decision-
plot ratio for developers could not reflect
the government's urban planning department
income through traditional sales and leasing by
making process, and increase the influence of
the social responsibility of them. Therefore,
could discuss new ideas for reconstruction
increasing the building area, architects can also
public architects in the process of balancing the
architects need to be more proactive in finding
based on the original space while increase the
discover opportunities in the site more broadly,
dominant interests
breakthrough points in the existing participation
population capacity of the area through the
and change the traditional urban renewal project
process. Only by using internal changes can
reconstruction and consolidation of residential
for commercial, entertainment, and residence.
In conclusion, architects can use the design
influence the behavior of other decision-makers
units, and retain specific low-cost commercial
This reduces the entry capital of the developer
plan as their own tool based on their position
and seek new ways of benefit distribution and
as well as infrastructure facilities. The goal
to a certain extent, can promote more smaller
to propose strategies that suit different
participatory decision-making.
of the government is to redistribute the urban
but creative developers to participate in the
interest groups and improve the decision-
population while enhancing the image of the
competition for urban renewal projects. This
making process. The optimization of the
In the urban renewal projects, architects can
city. Therefore, although this new method
also reversely promotes larger-scale developers
first three points of participatory decision-
participate in Processes 1, 3 & 7. In the process
of partial demolition and reconstruction will
to improve the rationality of planning and
making (Consensus view, common ground and
of determining the urban renewal area, the
cause a certain loss of economic benefits for
architectural design, making the interests of the
understanding of different stakeholders) can
government will seek advice from the urban
the government in urban renewal projects, as
overall residents more discussed in Process 3
allow the government, developers and residents
planning department to propose conceptual
a public functional department, this method
and 4.
to obtain a new flow of interests, which makes a
proposals for specific projects. In the process
can help control the population composition
of determining the urban renewal project,
and cost of living in specific area. In
Compared with architects who represent the
the developer will invite the architecture
regards of the long-term goals, it could be a
interests of the government and developers,
company to propose a plan and then apply to
reasonable exchange for the government. More
architects who serve the city and the public are
the government for project approval based on
importantly, this renewal method provides the
subject to fewer restrictions in urban renewal
43
balanced participatory decision-making system possible.
44
Income with high quality projects & creative strategies
Urban Environment
Capital
Infrastructure
Policy
Architect for Government
Profit
GOVERNMENT
Urban Environment
Capital
Infrastructure
Policy
DEVELOPER
Profit
GOVERNMENT
DEVELOPER
Urban Renewal Urban Landscape
Urban Renewal Compensation
Urban Landscape
RESIDENT
Compensation
RESIDENT City with a better care for the low-income residents
Living Condition
Architect for Developer
Land Property
Projects with the potential of preserving part of the village Land Property
Living Condition
Architect for Public
Figure #06 The Existing Relationship of the Stakeholders by Author
45
Figure #07 The Potential Relationship of the Stakeholders by Author
46
BOOKS 01. Zhuang, Taozhi. 2020. Urban Renewal
03. Han, Zhiyuan, Ying Long, Xuan Wang, and
Decision- Making in China: Stakeholders,
Jingxuan Hou. “Urban Redevelopment at the
Process, and System Improvement 1st ed.
Block Level: Methodology and Its Application to
03. The Reconstruction of the Village in the City
Rotterdam: TU Delft BK. 978-94-6366-312-0
All Chinese Cities.” Environment and Planning
Radiates New Vitality and New Style in the New
B: Urban Analytics and City Science 47, no. 9
Era of Futian. [accessed 05.10.2021] http://www.
(November 2020): 1725–44.
sz.gov.cn/szcsgxtdz/gkmlpt/content/8/8333/
02. Xiang, Biao. 2018. The Community Across Border, Life history of "Zhejiang Village" in
BIBLIOGRAPHY
[accessed 18.09.2021] http://www.urbanus.com. cn/uprd/main-research-topics/urban-villages/
post_8333305.html?jump=false#19175
Beijing. 2rd ed. Beijing: Sanlian Bookstore. BK.
04. Yi, Zhiyong, Guiwen Liu, Wei Lang, Asheem
978-78-0768-188-5
Shrestha, and Igor Martek. 2017. "Strategic
04. Wikipedia Participative decision-making
Approaches to Sustainable Urban Renewal in
in organizations. [accessed 12.09.2021] https://
03. Sima, Xiao, Jun Yue, Yan Du, and Weidong
Developing Countries: A Case Study of Shenzhen,
en.wikipedia.org/wiki/Participative_decision-
Huang. 2019. Exploration And Practice Of
China" Sustainability 9, no. 8: 1460. https://doi.
making_in_organizations
Shenzhen Urban Renewal. 2nd ed. Shenzhen:
org/10.3390/su9081460 05. The curtain call of Baishizhou, Shenzhen’s
Shenzhen Urban Planning and Design Institute. BK. 978-71-1223-576-6
05. Aaron Lowin, Participative decision making:
largest urban village. [accessed 26.09.2021]
A model, literature critique, and prescriptions
https://www.jiemian.com/article/5340356.html
04. Tang, Yan, Dong Yang, and He Zhu. 2019.
for research, Organizational Behavior and
Construction of Urban Renewal System . Beijing:
Human Performance, Volume 3, Issue 1, 1968,
06. Aerial photography of Gangxia Village in
Tsinghua University Publish BK. 978-73-0252-
Pages 68-106, ISSN 0030-5073, https://doi.
Shenzhen: Ten billionaires popped up overnight.
618-6
org/10.1016/0030-5073(68)90028-7.
[accessed 12.10.2021] https://news.qq.com/ a/20160509/046535.htm#p=9
ARTICLES
06. Locke, E.A.; Schweiger, D.M. (1979).
01. Zhuang, T., Qian, Q.K., Visscher, H.J. et al.
"Participation in decision-making: One more
07. Demolition and reconstruction of Shenzhen's
An analysis of urban renewal decision-making in
look". Research in Organisational Behaviour. 1:
famous urban village. [accessed 27.09.2021]
China from the perspective of transaction costs
265–339.
https://finance.sina.cn/china/gncj/2019-09-24/
theory: the case of Chongqing. J Hous and the
detail-iicezueu7940672.d.html
Built Environ 35, 1177–1199 (2020). https://doi.
WEBSITES
org/10.1007/s10901-020-09733-9
01. Urban Redevelopment, Urban Redevelopment
08. Follow the Trace of Gangxia Village. [accessed
at the Block Level: Methodology and Its
03.10.2021] https://www.szdesigncenter.
02. Liu, Guiwen & Yi, Zhi Yong & Zhang,
Application to all Chinese Cities. [accessed
org/17fMmeR60kyDhP
Xiaoling & Shrestha, Asheem & Martek, Igor
12.10.2021] https://www.beijingcitylab.com/
& Wei, Lizhen. (2017). An Evaluation of
projects-1/39-urban-redevelopment/
Urban Renewal Policies of Shenzhen, China. 02. Urban Village Research, URBANUS.
Sustainability. 9. 1001. 10.3390/su9061001. 47
48
Zhang Chao
(2021) by Urbanus Studio
13. Gangxia Village after demolish (2011) by Luo
FIGURES
Changwei
01. Shenzhen's Urban Growth Timeline Image by
IMAGE & FIGURE LIST
IMAGES 01. Skyline Panorama of Shenzhen (2019) by Jalvaran 02. Shenzhen Cityscape (2019) by Alamy Stock
MVRDV 14. Daily Life in Baishizhou Village (2021) by
Photo
Ping Shen 03. Handshake Buildings in Shuiwei Village
02. General Urban Renewal Process Image by Author
15. Self Construction in Baishizhou Village (2020)
(2019) by Juanzong Wallpaper
by Zhang Chao 04. Facade of Village in the City Series 07 (2018)
03. Urban Renewal Process of Gangxia Village Image by Author
16. Baishizhou Village 2016 before demolish
by Sun Haiting
(2019) by Juanzong Wallpaper 05. Facade of Village in the City Series 06 (2018)
04. Urban Renewal Process of Baishizhou Village Image by Author
17. Shibati Rd in 2015-2018 (2015) by Dasongge
by Sun Haiting
shi ge Daomeidan 06. Baishizhou Village (2020) by Zhang Chao
05. A Potential Urban Renewal Process with Balance Image by Author
18. Merchants under Demolition (2021) by Yu 07. The Reconstruction of Gangxia Village (2021)
Xuefei
by Juanzong Wallpaper
06. The Existing Relationship of the Stakeholders Image by Author
19. Housing Ownership Certificate (2020) by Li 08. The Housing Expropriation Decision (2021)
Yu
by People's Government of Nanshan District,
07. The Potential Relationship of the Stakeholders Image by Author
20. Demolition Announcement (2009) of
Shenzhen
Baishizhou Village by Jiemodui 09. Baishizhou Tangtou Old House (2020) by Liang Zhou
21. Life in Baishizhou Village (2021) by Dong Li
10. Gangxia Village in Shenzhen by (2011) Luo
22. Community Bulletin Board of Urban Village
Changwei
in Shenzhen (2021) by Ping Shen
11. Street of Gangxia Village in Xiasha (2007) by
23. Electricity Network in the Urban Village
Ping Shen
(2021) by Shenzhen Huajian Power
12. Xiasha Cultural Square at Night (2020) by
24. Longgang Six Villages Practice Exhibition 49
50