Architecture Portfolio 2019

Page 1


PERSONAL INFO

JIE LIU AIBC Intern | M.Arch | LEED Green Associate

CONTENT

2008 - 2013 Bachelor of Architecture Wuhan Polytechnic University 2011 - 2012 News Anchor Hubei News Radio Station 2013 - 2016 Master of Architecture The University of British Columbia 2015 - 2016 Architectural Consultant Frits de Vries Archtiects 2016 - 2019 Junior Architect Revery Architecture (BingThom Architects)

PROJECT INVOLVED

RESIDENTIAL Alberni Street Resi. Tower | Vancouver First Baptist Resi. Tower | Vancouver West Blvd. Resi. Complex | Vancouver Cambie Street Resi. Complex | Vancouver Commercial Broadway Resi. Complex | Vancouver PUBLIC

01

02

03

2016 - 2017 Alberni Street Resi. Tower

2018 West Blvd. Resi. Complex

2017 HongKong Country Club

Tzu Chi Foundation Building | Vancouver HongKong Country Club | HongKong Orpheum Theatre Renovation | Vancouver INTERNATIONAL COMPETITION Qianhai Tower Complex| Shenzhen Singapore NTU | Singapore

2

3


1668 - 1684 ALBERNI STREET In brief, the properties are on the southeast corner of Alberni and Bidwell Streets. The property is relatively level and the site area is 21,607 s.f. The proposed concept development conforms to the West End Community Plan adopted by City Council. The proposal is for a high-rise market residential building. The proposed FSR is 10.7 and a density of approximately 21,402 sm / 238,096 sf. Related Working Content: - Exterior Renderings - Penhouse Layout - Diagrams for Client Package - Rezoning Package Update

4

5


NEIGHBOURHOOD PLAN

1668 - 1684 Alberni

DESIGN RATIONALE

The project is located amongst the most vibrant neighborhoods of the West End Community Plan and joins other future

The form of development is contingent on a continuous architectural spine that runs up the middle of each of the four facades.

notable towers planned for the Georgia Corridor.

STANLEY PARK

This ‘weave’ or ‘exoskeleton’ takes cues from repeated structures found in nature; seemingly simple elements that when assembled together achieve greater strength and beauty.

The challenge was to find a simple and elegant geometry that when repeated and woven together, would become a complex system that is functional and visually attractive.

BAYSHORE DR

COAL HARBOUR

COAL HARBOUR

WEST END GASTOWN

WEST GEORGIA ST

DENMAN VILLAGE

GEORGIA CORRIDOR

ALBERNI ST

NICOLA ST

DENMAN ST

BIDWELL ST

CARDERO ST

DOWNTOWN

TH OR

N

LOWER ROBSON

ROBSON ST

YALETOWN

19

NEIGHBOURHOOD PLAN

2.1 Site Context

HARO ST

The project is located amongst the most vibrant neighborhoods of the West End Community Plan and joins other future notable towers planned for the Georgia Corridor.

WEST END NEIGHBOURHOOD

The proposed height of the building is 385’ (based on established building grades) and the City has already confirmed that it does not intrude into restricted view cones.

The 94 units proposed include a mix of types and sizes ranging from one to three bedrooms. The 39-story tower is set into a six-story podium.

1668 - 1684 Alberni

N

NIC OL

AS

CA R

DE

ST

WE

I

G OR

GE

T AS

I ST

LL

RN

BE

AL

BID WE N

SO

B RO

ST

H

T OS AR

6 20

DE

NM

AN

T

RO S

T

ST

ST

7


TOP VIEW

ELEVATION VIEW

PODIUM VIEW

8

BACK LANE

STREET VIEW

LANEWAY VIEW

9


‘EXOSKELETON’

LEVEL 07- 14

This ‘weave’ or ‘exoskeleton’ takes cues from repeated structures found in nature; seemingly simple elements that when assembled together achieve greater strength and beauty.

3BR UNIT

1BR UNIT

1BR UNIT

3BR UNIT

LEVEL 07 - 14

LEVEL 15 - 35

3BR UNIT

3BR UNIT

LEVEL 15 - 35

10

11


LEVEL 36

LEVEL 38

SPA

DINING / LIVING

PH C ENTRY

MASTER BEDROOM PENTHOUSE A 4610 SF

BR 3

BR 2

PENTHOUSE D LOWER

BR 2 MASTER BEDROOM BR 4

BR 3

LEVEL 36 - A

LEVEL 38

LEVEL 37

LEVEL 39

PENTHOUSE C UPPER 2335 SF

DINING / LIVING

BR 4

BR 2

STUDY / OFFICE

PENTHOUSE B 3930 SF

BR 3

PENTHOUSE D UPPER 5170 SF

MASTER BEDROOM

BR 2 MASTER BEDROOM

LEVEL 37 - A

12

LEVEL 39

13


ROOF LEVEL

PENTHOUSE C TERRACE

PENHOUSE VIEW 01

BMU

PENTHOUSE D TERRACE

ROOF LEVEL

PENHOUSE VIEW 02 PENHOUSE SECTION

PH D

PH C

PH D

PH D

PENHOUSE VIEW 03

PH B

PH A

14

S E C TI O N - S O UTH

15


6103 WEST BOULEVARD The properties are on the southwest corner of West Blvd and 45th Ave. The site area is 35,316 s.f. According to C-2 Zoning bylaw, the proposal is a low-rise market residential building with 52 unit. The proposed FSR is 2.47 and a density of approximately 87,266 sf.

16

Related Working Content: - Project Drafting | Client Communication - Digital Modeling - Conceptual Exterior Renderings - Typical Unit Interior Design & Renderings - Schemaic Design Client Package - Design Development Drawing Package

17


NEIGHBOURHOOD PLAN The properties are on the southwest corner of West Blvd and 45th Ave. The site area is 35,316 s.f.

HERITAGE REVITALIZATION AGREEMENTS A HRA is required for the heritage building around the street corner. In order to maintain C-2 FSR, the building massing extand on both side (front and back) with city allowed relaxation.

The building massing allows a clear setback for the existing heritage building. However, the building circulations are inter-connected between the heritage and the proposed massing

18

19


VIEW FROM SOUTHEAST

VIEW FROM LOBBY

West Blvd & 45th Ave

VIEW FROM NORTHEAST

VIEW FROM LOBBY 02

West Blvd & 45th Ave

VIEW FROM ATRIUM

20

September 13th, 2018 8

September 13th, 2018 9

ATRIUM SECTION

West Blvd & 45th Ave

September 13th, 2018 11

21


LIVING ROOM TYP.

MASTER BR TYP.

BATHROOM TYP.

22

23


GROUND LEVEL PLAN There are 11 CRU units on the ground facing West Blvd. The main lobby entrance is on the north side of the building connecting with the water garden.

TYPICAL LEVEL PLAN There are 14 units per floor (9 2BR and 5 1BR). Two elevators are designed to be in the middle of the corridor with natural lighting coming from three sides.

24

25


EAST ELEVATION

WEST ELEVATION

26

27


HONG KONG COUNTRY CLUB The new sports pavilion is located in the northeast corner of the site. It is set within beautiful mature trees which are to be maintained and celebrated, and has potential views to the surrounding mountains and ocean. It also provides a view connection to the main club and drop-off. Related Working Content: - Project Drafting - Digital Modeling - Conceptual Exterior Renderings - Schemaic Design Client Package

28

29


MULTIPURPOSE SPACES

FUTURE CONNECTION TO WATER

ge reserve eight of proposed The large maintained mmodate aces, the parking d angling view

ge reserve eight of proposed The large maintained mmodate aces, the parking d angling view

FUTURE CONNECTION TO WATER

The multipurpose gym and the multipurpose fitness studio are seen as two major program elements. These volumes are raised up and set within the trees and allow natural light to filter through the façade to the interior, creating beautiful lighting effects. The raising of the main building forms combined with material choice adds a feeling of lightness to the design, allowing it to float within the tree canopy.

SITE RESTRICTIONS The major site restrictions include a drainage reserve leading to the water, a maximum building height of 31m (above principle datum = 14m above proposed site) and a no-build setback from the road. The large existing trees located on the site are to be maintained and used as a design opportunity. To accommodate the requirement of 20 additional NEIGHBOURHOOD PLANparking spaces, the majority of the building is raised to provide parking and drop access beneath. By raising and angling The HKCCoffsite offers beautiful views The existing country club is deSite Restrictions the building, we are able to provide a direct view to the surrounding landscape and signed in a modern style, and opens connection to the existing club entry.

ocean in Deep Water Bay. The area is filled with different types of trees and lush vegetation.

onto a large open lawn facing the SETBACK FROM ocean. The area is an escape from the ROAD business of Hong Kong, and provides a connection with nature.

Multipurpose Spaces

20 ADDITIONAL PARKING SPACES

Site Restrictions SITE CIRCULATION Vehicular Drop Off A secondary drop off is provided to allow access to the new sports pavilion.

Parking and Loading 20 additional parking spaces were added on site, with potential for more on other areas of the parking surface. Loading can occur at the existing location for delivery or can be moved to the new area provided for garbage pickup. This scenario would allow for minimal member disturbance.

Pedestrian Circulation A future pedestrian connection was added to connect members and visitors directly to the ocean. The connection begins as a landscaped platform and eventually could be connected down to the basketball court, leading to the water’s edge.

SETBACK FROM ROAD

FUTURE CONNECTION TO WATER

6m DRAINAGE RESERVE

20 ADDITIONAL PARKING SPACES Site Restrictions

SETBACK FROM ROAD

6m DRAINAGE RESERVE MAIN CIRCULATION The form of the circulation acts as 6m DRAINAGE a connective tissue between theMultipurpose Spaces RESERVE gymnasium and fitness studio, and also branches off to encompass the secondary program such as the video library, juice bar, viewing lounge, balcony overlooking the gym and vertical circulation. The main spine of the building consists of the less formal program elements and acts 20 ADDITIONAL PARKING as more of a social/public space for SPACES families and members to interact with one another.

Multipurpose Spaces

Circulation Massing

The facade of the circulation space is shaded by horizontal tubes. The tubes allow views in and out while maintaining privacy and natural light to filter in. The shading elements help protect against unwanted solar heat gain.

Circulation Massing

Circulation Massing

30 10

12

Hong Kong Country Club BTA

Hong Kong Country Club BTA

VIEW FROM NORTHEAST

HKCC

13

31


PRIMARY DROP OFF

CIRCULATION CONCEPT

GARBAGE/ MECH./ STORAGE

LEVEL 0 CIRCULATION

STAIRCASE

ELEVATOR ACCESS

In the final design, the garbage room and pickup is moved away from the main entrance to the building. Garbage can be carried through the tunnel from the existing building and is kept out of public view. The garbage truck can then drive in and out for garbage pick-up without having to travel through the primary drop off.

LEVEL 0 CIRCULATION

This level also provides a large grand stair into the building, which can also be a place to sit and socialize. The high south sun will bring natural light to the stairs, creating a beautiful atmosphere. Elevator access to the building is provided on this level.

LEVEL L0

05

GRAND STAIR ENTRY

This level provides a large grand stair into the building, which can also be a place to sit and socialize. The high south sun will bring natural light to the stairs, creating a beautiful GARBAGE/STORAGE atmosphere. Elevator access BOWLING ALLEYon to the building is provided this level.

SECONDARY DROP OFF

STRUCTURE CONCEPT The building is conceived in two phases as a result of programmatic and construction logistics. The structural design takes into account the phasing operations.

The steel building rests on conventional foundations that enclose the lower BOH program of garbage, mechanical and storage spaces. These would be realized prior to the framing installation.

Generally the fitness centre and changing rooms rest directly on the foundations.

VERTICAL GLASS LOUVRES SOLID METAL SPANDREL PANEL

GARBAGE PICKUP LOCATION 14

HKCC

Hong Kong Country Club BTA

LEVEL 1 CIRCULATION

POTENTIAL NURSERY/ BREAK LOUNGE

CHANGE ROOM

GYMNASIUM

LEVEL 1 CIRCULATION

The grand stair rises up to a landscaped platform and the entry to the building. This platform wraps the existing retaining wall and provides shaded outdoor space. The platform terminates at a stair to the east of the site, through a temporary extension which can be used as a nursery, break lounge, or landscape. This path is also a future pedestrian connection to the water. A welcoming reception desk is situated at the building entry to level 1, with direct access to male and female private change rooms.

JUICE BAR

The circulation corridor on level 1 leads to the video library and gymnasium, as well as exterior ventilated lounge space.

CORRIDOR

BOWLING ALLEY

LEVEL L1

02

VIDEO LIBRARY

16

HORIZONTAL SHADING

The grand stair rises up to a landscaped platform and the entry to the building. This platform wraps the existing retaining wall and provides shaded outdoor space. The platform terminates at a stair to the east of the site, through a temporary extension which can be used as a nursery, break lounge, or landscape.

PREFABRICATED STEEL ELEMENTS -ASSEMBLED ON-SITE

HKCC

Hong Kong Country Club BTA

FITNESS STUDIO LEVEL 2 CIRCULATION

JUICE BAR VIEW LOUNGE

Level 2 provides access to the multipurpose fitness studio which is able to open directly on to a roof terrace within the tree canopies. The fitness studio allows controlled natural light to filter through the pixelated facade, and can be naturally ventilated through operable windows if required.

15

17

STRUCTURE CONCEPT The building is conceived in two phases as a result of programmatic and construction logistics. The structural design takes into account the phasing GYMNASIUM operations.

BUILDING BASE JUICE BAR

LEVEL 2rapidity, CIRCULATION For reasons of construction steel framing is proposed to maximize off-site fabrication with clean Level 2 provides access to the and quick on site erection.

The circulation space on level 2 opens to a balcony overlooking the gymnasium, the juice bar, and the view lounge at the end of the corridor providing views to the ocean. The circulation on this level is able to connect to the main clubhouse if required in a later phase.

multipurpose fitness studio

LEVEL L2

ROOF TERRACE

BALCONY

The steel building rests on conventional foundations which is able to open directly that enclose the lower BOH program of garbage, on to a roof terrace within the mechanical and storage spaces. These would be tree canopies. realized prior to the framing installation. Generally the fitness centre and changing rooms rest directly on the foundations.

GARBAGE/ STORAGE

BOWLING ALLEY

06

BELOW GRADE BOWLING ALLEY STRUCTURE

All the steel framing can be realized in conventional sections readily available in the Hong Kong market.

18

32

Hong Kong Country Club BTA

26

Hong Kong Country Club BTA

HKCC

19

33


CONCEPT The new sports pavilion is located in the northeast corner of the site. It is set within beautiful mature trees which are to be maintained and celebrated, and has potential views to the surrounding mountains and ocean. It also provides a view connection to the main club and drop-off. When arriving at the club, the new sports pavilion will welcome members and visitors.

PAVILION FACADE VIEW

The carefully designed building form and facade allow the building to become part of the trees, almost disappearing into the vegetation and sky, and to reflect the immediate surroundings of the club and its existing architecture. The proposed design fully integrates the new sports pavilion with the beautiful Hong Kong Country Club and its core values of maintaining cultural diversity, providing a safe, healthy, and private environment for members and visitors, and respecting the community and the environment.

FITNESS STUDIO

The new building within the trees will add to the creation of an oasis at the HKCC, providing a rejuvenating and social experience for members.

VIEW FROM SITE ENTRY

8

HKCC

Hong Kong Country Club BTA

VIEW OF FITNESS STUDIO

9

20

GRAND STAIR|DROP-OFF

VIEW FROM NORTHWEST - DAY 30

LINEAR CORRIDOR

VIEW FROM NORTHWEST - EVENING VIEW OF FITNESS STUDIO

Hong Kong Country Club BTA

20

VIEW OF JUICE BAR

Hong Kong Country Club BTA

HKCC

Hong Kong Country Club BTA

31

VIEW OF JUICE BAR

HKCC

21

HKCC

23

MOVEABLE WALL

NIGHT VIEW

SQUASH COURT

GYMNASIUM

BADMINTON COURT

BASKETBALL COURT

FLEXIBILITY A moveable wall situated in the main gymnasium allows for flexibility in program. The gym can be sectioned off to provide space for different activities. It is imagined that other events or receptions could take place in this beautiful space. The moveable wall system is based on a product by ASB Squash Courts and is certified by the World Squash Federation.

VIEW FROM NORTHWEST - EVENING

34

HKCC

31

22

Hong Kong Country Club BTA

VIEW OF MAIN GYMNASIUM

35


LEVEL -1 PLAN

LEVEL 1 PLAN

150 m2

50 m2

200 m2 20 m2

35 m2 10 m2

70 m2 25 m2

40 m2

8 m2

180 m2 80 m2

10 m2

45 m2

ADDITIONAL DRAWINGS 34

36

Hong Kong Country Club BTA

LEVEL 0 PLAN

HKCC

Hong Kong Country Club BTA

35

LEVEL 1 PLAN

150 m2

50 m2 20 m2

30 m2

20 m2

35 m2 30 m2 10 m2

15 m2

40 m2

35 m2 100 m2

180 m

2

10 m2

45 m2

36

36

Hong Kong Country Club BTA

HKCC

35

HKCC

37

37


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.