««QST is rapidly moving forward to fullf ill the promise of high quality»»QST Team
02
vision To be the worldÂťs most reliable and innovative manufacturer, service and solution provider in the steel industry.
mission statement To supply high-quality steel products, providing related services and solutions to a worldwide client base while utilizing innovative technologies within an environment of motivated employees focused on continuous improvement, highest business standards, work ethics and corporate citizenship, leading to added value to our customers and sustained return on investment to our shareholders.
03
core values 2 Integrity We remain true to our founding values of quality, honesty and hard work. We have the highest ethical standards in the industry. We “do the right thing.� Qatar Space Technology is a business based on trust.
2 Safety Our commitment to safety is complete and unwavering. We do not let time or money override our obligation to keeping our people safe.
2 Commitment We are proactive in finding solutions for our clients that best achieve their goals. Lasting relationships are the lifeblood of our business. We want the client to feel that our staff is even more committed to the effort than their own staff.
04
about us
THE LEADING STEEL FABRICATOR Known Worldwide as the Middle East leading structural steel fabricator Qatar Space Technology was established in South Korea to offer its expertise in the fabrication of structural steel and plate works for various industrial and commercial applications. For the past two decades QST supplied structural steel and plate works for many large power and desalination, petrochemical, gas and oil, cement plants, steel mills, high-rise buildings as well as other industrial and commercial complexes.
05
history and milestones
MARCH, 1998 ESTABLISHED AS MECHANICAL DIVISION, M/S. YOUSEF AL GHAMDI INDUSTRIES
MAY, 1998 PETROCHEMICAL OLEFIN III JUBAIL, KSA • • • • • •
Mechanical work for 350 units of rotating equipments Pipe rack installation Pre assembly & installation of pin fan cooler (3,500 tons) 2 units of inceronator installation 2 units of package boiler & stack 9 units of gas turbine compressor installation
JULY, 1999 SECO-CER/SPGP PP7 & PP8 Power Plant RIYADH, KSA • • • •
Mechanical work Pipe rack installation Piping work for gas supply pipe line (150,000 dia-inch) Steam & gas turbine installation
JAN, 2000 - MOVING BUSINESS TO QATAR AS NAME OF «YOUSEF AL GHAMDI INDUSTRIES» BASED ON KSA BUSINESS LICENCE.
06
MAR, 2000 MESAEED, QATAR , NGL 4 PLANT, (QATAR PETROLEUM) • • • •
Piping work Off site piping work Tank farm tie-in work Exiting plant piping work
MAY, 2001 ESTABLISHED AS M/S. YOLK ARABIA CONSTRUCTION CO., W.L.L. IN QATAR BASED MAR, 2003 MESAEED, QATAR , LPG TANK PROJECT, (QATAR PETROLEUM) •
Fabrication of pipe rack steel structure (1,200 tons)
SEPTEMBER, 2003 BUSINESS INVESTMENT BY M/S. SPACE TECHNOLOGY CO., LTD (BASED ON SOUTH KOREA) DEC, 2003 JOINT VENTURE WITH M/S. SPACE TECHNOLOGY CO., LTD
JAN, 2004 ESTABLISHED AS M/S. QATAR SPACE TECHNOLOGY W.L.L. (PARTNERSHIP WITH M/S SPACE TECHNOLOGY CO., LTD)
07
JULY, 2004 DOHA, QATAR, KHALIFA SPORT HALL (ASPIRE) • •
Steel Structure Erection Work (11,100 tons) Painting & Scaffolding
OCT, 2004 MESAIEED, QATAR - QASCO HBI/DRI (QATAR STEEL COMPANY) • • •
Building Work Design, Fabrication & Installation of Steel Structure (2,200 tons) Scaffolding, Painting &Fire Proofing
NOV, 2004 DOHA, QATAR 44 WEST BAY RESIDENTIAL TOWER ABDULLAH BIN NASSER BIN ABDULLAH AL MISNAD) • •
Design, Fabrication & Install 44 Floor Building Steel Structure & Metal Deck (3,100 tons) Scaffolding, Painting & Fire proofing
SEP, 2005 DOHA, QATAR NATIONAL COMMAND CENTER (DOHA ASIAN GAMES ORGANIZING COMMITTEE) • •
Design, Fabrication & Installation of Steel Structure (900 tons) Scaffolding, Painting & Fire Proofing
JAN, 2006 PARTNERSHIP WITH MR. KHALID BIN ABDULLAH AL MISNAD (60% SHARE HOLDER) FEB, 2006 DOHA, QATAR - KHALIFA TENNIS & SQUASH COMPLEX (QATAR OLYMPIC COMMITTEE) • •
Design, Fabrication & Installation of Steel Structure & Roofing (400 tons) Scaffolding, Painting & Fire Proofing
JAN, 2007 MESAIEED, QATAR “QATAR CHEMICAL PLANT I & II” • •
Painting Work (282,923.00 m²) Steel Structure Installation (800 tons) with Scaffolding
SEP, 2007 DOHA, QATAR AL HITMI OFFICE BUILDING
08
ALI BIN KHALIFA AL HITMI & CO.) •
Design, Fabrication & Installation of Steel Structure with Scaffolding
JULY, 2008 RAS LAFFAN, QATAR, PEARL GTL PLANT – C4 • • • •
Metal Cladding Installation Work (5,600 m²) A frame Assembly & Erection Work Construction of 80m x 120m x 12m Height Blasting Shop 12 units (300 tons) of heavy equipment supports
OCT, 2008 DOHA, QATAR EMIRI TERMINAL, PARKING STRUCTURE & MOSQUE (CP019) (NDIA - NEW DOHA INTERNATIONAL AIRPORT) • •
Design, Fabrication & Installation of Steel Structure & Roofing (900 tons) Scaffolding, Painting & Fire Proofing
JAN, 2009 RAS LAFFAN, QATAR “RAS LAFFAN C IWPP” (RAS GIRTAS POWER COMPANY) • •
Aluminum Louver for Trnsformer Room Various kind of Steel Fabrication & Supply
JUNE, 2009 MESAIEED, QATAR, QAFCO-5 & 6, QATAR FERTILIZERS COMPANY) •
Various kind of Steel Fabrication & Supply
JAN, 2010 RAS LAFFAN, QATAR, NAKILAT SHIP REPAIR YARD, (QATAR PETROLEUM) • • • •
Painting Work for Piping & Equipments (38,597.44 m²) Civil Painting Work Various kinds of Steel Fabrication & Supply Various kinds of Stainless Steel Fabrication & Supply
APRIL, 2010 DOHA, QATAR, (MALE & FEMALE STUDENT HOUSING QATAR FOUNDATION EDUCATION CITY) •
Various kind of Steel Fabrication & Supply
NOV, 2010 DOHA, QATAR, AL DAREEN TOWER •
Various kind of Steel Fabrication & Supply 09
Sales Performance History
10
Field of Activities Steel Structures •
The “QST” having business of Steel Structure fabrication & Installation, and giving solution of value engineering and the development of erection method for saving cost and time consumption
•
Plant Structure such as pipe rack, Bulk Storages, shelter and Equipment structure for Power Plant, Petrochemical and Cement Plant
•
Super Structural Steel & Facade, sub structure steel Work for Building, Sports Complex. Shopping Mall
•
Light duty steel Work for Car Park System, Warehouse Building, Site Temporary Facilities
11
Production Division • • • • • • • • • • • •
12
Fabrication & Installation of Storage Tank Piping Spool Fabrication Steel Structure & Misc. Steel Fabrication Superstructure for Stadiums and Steel Buildings Pre-Engineered Building System Space Frame Structures Steel Structure for Buildings Industrial Plant Steel Structure Emblem Structures Pipe Support Machining works Embed Steel part & Anchor Bolts
Industrial Plant Division •
Piping work for Gas & Oilfields, Power Plant
•
Industrial Painting
•
Installation of Gas & Oilfield Plant Equipments
•
Incinerator
•
Static & Rotating Equipment with Internal Works
13
Major Projects West Bay 44 Storey and Residential LOCATION
:
WESTBAY, QATAR BLDG, STORIES 44 STOREY STRUCTURE STEEL + CONCRETE USAGE RESIDENTIAL
OWNER
:
ABDULLAH BIN NASSER BIN ABDULLAH AL MISNAD
STEEL CONTRACTOR
:
QATAR SPACE TECHNOLOGY
DESIGNER
:
MZ & PARTNERS
WORK VOLUME
:
STEEL STRUCTURE 3,000 TONS
START OF PROJECT
:
MARCH 30, 2005
COMPLETION DATE
:
MAY 30, 2006 (TOTAL 15 MONTHS)
14
Khalifa Sports Hall Project Erection of Super Structure | Erect Rib Truss onto the Temporary Tower, using by 2 units of erection crane
Install Main Truss ( 1 part of 10 segments) using by 650 Tons of Hyd. Crane with 250 Tons of Crawler Crane
Install Cart Walk Way after complete of Rib Truss
Move Rive Truss (App.30 Tons) inside of Building by SPM Module Transporter and Unloading by 250 Tons of Crawler Crane
View of after complete of Main Truss Erection (240 M Long without Column Stand
15
NGL- 4 Projects Start
:
May 2000
Complete
:
Oct. 2000
Off site Piping Work
:
75,000 DIA-Inch
Piping work for revamping area at NGL 1 & 2: 15,000 DIA-Inch Tie-in Work to Existing Butane Tank T1, T2, T3 & T4 at Tank Farm Area
16
Nakilat Ship Repair Yard, Ras Laffan - Qatar Work Description Painting Works with Scaffolding, Miscellaneous Steel Works with Painting and Hot-Dip Galvanization such as:- Fabrication & Supply: Embedded Angle Embedded Plates Anchor Bolts Steel Gratings Checkered Plate Trench Cover Staircase & Handrails Quantity : 38,597.44 M² for Painting Above 600 Tons of Steel Structure Year : 2010
17
Qatar Fertilizers Company (QAFCO-5), Mesaieed - Qatar Work Description:Miscellaneous Steel Works with Painting and Hot-Dip Galvanization such as:• • • • • • • •
Fabrication & Supply: Embedded Angle Embedded Plates, Anchor Bolts, Steel Gratings, Checkered Plate Trench Cover, Staircase & Handrails, Acoustic Wall Cladding
•
Erection of Steel Structure for Pipe Rack & Equipment Shelter
Quantity :
Above 1,800 Tons
Year :
2009
18
Ras Laffan C IWPP Project, Ras Laffan - Qatar Work Description:Miscellaneous Steel Works with Painting and Hot-Dip Galvanization such as:• • • • • • •
Fabrication & Supply: Embedded Angle Embedded Plates, Anchor Bolts, Steel Gratings, Checkered Plate Trench Cover, Staircase & Handrails,
•
Erection of Steel Structure for Pipe Rack & Equipment Shelter
Quantity
:
Above 1,350 Tons
Year
:
2009
19
SECO-CER/SPGP PP7 & PP8 Power Plant, Riyadh - KSA Work Description •
Piping (Pipe Rack Steel Structure) &
•
Mechanical Works Packages.
Quantity
:
150,000 DIA-Inches
Year
:
2000
20
Petrokemya Olef ins III, Jubail - KSA Work Description Piping & Mechanical Works Quantity • • • Year
3,500 Tons of Pin Fan Cooler, 350 Sets of Rotating EQ, 11 Units of Gas Turbine Compressor etc. :
1998
21
Qatar Petroleum 3 Nos. of LPG Tanks & Conversion of Existing 2Nos. Propane Tanks , Mesaieed - Qatar Work Description Fabrication of Structural Steel for Pipe Rack Quantity
:
1,200 Tons
Year
:
2003
22
Qatar Steel Company (QASCO) HBI/DRI, Mesaieed - Qatar Work Description Structural Steel Works with Painting and Fireproofing. Mechanical works Quantity
:
1,200 Tons
Year
:
2005
Qatar Chemical Plant I & II, Mesaieed - Qatar Work Description • • •
Painting Works with Scaffolding Structural Steel Erection Work with Scaffolding, Field Modification Work for Steel Structure.
Quantity • • Year
282,923.00 M² for Painting 800 Tons of Steel Structure :
2007~2009
23
New Doha Int'l Airport Emiri Terminal, Parking Structure & Mosque (CP019), Doha - Qatar Work Description:Structural Steel Works with Painting & Scaffolding. Quantity
:
900 Tons
Year
:
2009
24
Al Bidda Tower, Doha - Qatar Work Description Structural Steel Erection Work Quantity
:
1,000 Tons
Year
:
2007
25
National Command Center, Duhail - Qatar Work Description:Structural Steel Works with Painting and Fireproofing. Quantity
:
900 Tons
Year
:
2006
26
Khalifa Int'l Tennis & Squash Complex, Doha - Qatar Work Description:Structural Steel Works with Painting and Fireproofing. Quantity
:
400 Tons
Year
:
2006
27