Final Presentation Boards

Page 1

REVEAL ARCHITECTURE DESIGN STUDIO : AIR | SEMESTER 1 | 2012

TIMELINE : 2012 Elsa CHRISTIAN | 377955 Nadira JEANNOT | 376188 Jinn Jyh LEOW | 376016 Mohd. Izzat MOHD. NAZRI | 376055

“Stains on a building are evidence of its capacity for resistance” – Kolarevic and Malkawi, 2005

2028

2036

N 55

55

o

o

“Reveal” is based on the concept of persistence over change. It is a reflection of Wyndham’s aspiration to break away from its stagnant past –constantly and gradually evolving towards a progressive new future. The sculpture is one which stands proud within the constant changes surrounding it, a form influenced by weather and enhanced through time. From afar, the tower serves as a marker for the city, a sign, a gateway. Up close, it is a sculpture of persistence. The sculpture’s veils will eventually corrode, revealing the true form of the sculpture. Hence a prevailing theme of metamorphosis exists, symbolising the progression of a city which can only happen and be observed with time. The sculpture will therefore mature together with the city, growing together with its changes and making it an essential part of Wyndham – changing as much as the city changes. The stains and patina then become the symbol of the city’s resistance, and its gradual progress towards the future.

TUTORS : LOREN ADAMS | CHRIS GILBERT

The tower fulfils Wyndham’s aspiration of wanting something which inspires and enriches the municipality. It is exciting and eye-catching – a dynamic tower which constantly reinvents itself through time. This is an essential characteristic which the municipality wants - a sculpture with little maintenance and has “longevity in its appeal”. The tower and the city will go hand in hand towards progress– acting as a catalyst for further improvements in the city, inspiring the community at large, and encourages further reflection of the sculpture beyond first glance. There is this sense of meaning, a continuous interest in the sculpture as we observe its transformations through time.

Melbourne

WIND DIRECTION

DESIGN PROCESS

Wyndham

2020

TWIST

WATER PATH TIMELINE

Geelong

ITERATIONS

SITE PLAN

2012

CONSTRUCTION METHOD

steel bolts

steel cover

copper underlay

steel cover

2020

2028

2036

copper underlay

IRON SHEET VEILS

brass nails east bound

+ 0

50

100

150

200

=

250m

west bound

DAY

NIGHT

DETAIL

covered striations

exposed striations

PERSPECTIVES

Towards Geelong // looking back (newly built)

combined surface striations precast concrete panel (cnc milled formwork)

Towards Geelong // driver’s view (20 years later)

precast concrete panel (cnc milled formwork)

2044


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.