2014-2016
P O R T F O L I O W E L C O M E J I R A K I T P H A N O M P H O N G P H A I S A R N
Faculty of Architecture Kasetsart University
INTRODUCTION
Profile Name
Jirakit phanomphongphaisarn (aon)
Date of birth
20 December 1992
Education
Patumwan Demonstration School Faculty of Architecture Kasetsard University
Address
2/106 floor13 the royal place 1 soi. Mahadleklaung 1 radjadumri road, Lumpini, Patumwan, Bangkok 10330
Age Tel. E-mail
24 years old 081-1416416 jirakita19@gmail.com
Design Skill Work Experience Year 1 Greenery cafe / Artist house Year 2 GuestHouse / Convenience mall Year 3 Kaomai lanna Resort / Wonder Fruite / Theatre BMART Year 4 Urban Year 5 Thesis International workshop 2014 with University of Houston Asa volunteer 13 Archfebfest 4
Adobe illustrator Adobe Photoshop Autocad Sketchup Microsoft office
CON TENTS Charoenkrung Start-up workshop and residence "Reconstructing thai tobacco factory
(2016)
Nangloeng Community "Re-configuration Community"
BMART Theatre "Riverfront Theatre"
Wonder Fruite "Riverfront Theatre"
Extra activity ArchfebFest 04 Asavolunteer 13 Graphic coffeeshop Kitchen
(2015)
(2014)
(2014)
1 Charoenkrung Start-up workshop and residence "Reconstructing thai tobacco factory
(2016)
This design thesis aims to create start-up workshops for learning and creative development through reusing Old Tobacco Building One, which has been left from operations, to improve public interests and ever-changing contexts. This program emphasized existing structural reconsideration leading to design process of cooperative spaces of activity nodes
H
S
LAB
STORAGE
LAYOUT
STORAGE
SOUND VENTILATION
SOUND VENTILATION
VENTILATION
3.00
S
H
S
TESTROOM SOUND
SOUND VENTILATION
SOUND VENTILATION
3.00 3.00
.00
2.0
3
0
.00
3.0
0
2.0
3
3.50
2.0
5.0 0 0
H
S
H
FORMING
STORAGE
3.00 3.50
0
3.0
3.0
3.0
0
2.5
0
0
0
0
3.50
3.50
0
0
3.5
SOUND VENTILATION
3.50
4.00
3.0
H
STORAGE
SOUND VENTILATION
VENTILATION
3.0
3.0
3.0 0
0
3.0
3.0
0
S
S
H
PATTERN
STORAGE
SOUND VENTILATION
SEWING
SOUND VENTILATION
SOUND VENTILATION
2.0
0
2.0
0
3.0
0
H
3.0
CUTWOOD SOUND VENTILATION
VENTILATION
3.00
2
H
COATINGWOOD SOUND
VENTILATION
VENTILATION
.00
0
0
3.0
H
SCRUBWOOD SOUND
COMPOSITING SOUND
VENTILATION
2.0
S
H
JOINTWOOD SOUND
3.0 0
0
0
3.5
3.00
3.50
3.50
4.0 0
TESTROOM
SOUND VENTILATION
3.00
3.50
0
3.5
S
S
CUTTING 2-3D
SOUND VENTILATION
0
4.0
0
ENAMEL
DECORATION SOUND
SOUND VENTILATION
3.00
4.0
H
S
FIRING
SOUND VENTILATION
0
4.0
0 3.5
3.0
SOUND VENTILATION
3.00
0
0
3.00
3.00
3.00
3.0
0
3.5
0
.00
3.0
3
.00
0
6.0 0
0
3.0
3
.50
2
H
H
CUTMETAL SOUND
SOUND VENTILATION
VENTILATION
VENTILATION
3.00
3.00
3.00
LAYOUT
COATINGMETAL SOUND
COMPOSITING SOUND
VENTILATION
S
S
H
JOINMETAL SOUND
VENTILATION
3.00
3.00
4.0
0
5.0 0
3.0
0
0
3.0
3.0
0
0
3.0
0
3.0
5.0 0
0
3.0
CO-OPERATION SPACE
LAYOUT
FORMING DECORATION
SEWING LAYOUT
OPENSPACE
OPENSPACE
COATING
STORAGE
SCRUBWOOD
4
SPECIFIC SPACE
SHARING BETWEEN WORKSHOP AREA
PATTERN
LAYOUT
.00
LABTEST TESTROOM JOINT METAL
JOINTWOOD CUTWOOD
TESTROOM CUTTING
FIRING
STORAGE ENAMEL
CUTTING METAL
JOINTWOOD
COMPOSITING
COMPOSITING WOOD
WOOD
STORAGE
STORAGE
STORAGE
TEXTILE
CERAMIC
METAL
Charoenkrung Start-up workshop and residence "Reconstructing thai tobacco factory (2016)
ELECTRIC
SCHOOL
GRAVEYARD
HIGHTRISE
SITE
TEMPLE
CARPARK ASIATIQUE
N
PIER
PIER
PIER
OAD GR
RUN
K EN ARO
CH
ROAD
OEN HAR
NG
KRU
D ROA
SITE
C
28.0 m x 12.0 m 336.0 sqm.
4
46.40 m
STRUCTURE COLUMN 0.40 X 0.40 M BEAM 0.40 X 0.20 M
VOID 3.00 X 1.60 M 3.50 X 1.00 M 15.40 m
BUILDING 1
SITE
COMMERCIAL AREA OFFICE AREA
6.00 m 4.50 m
258.0 m
130.90 m
AREA 10680.0 sqm LANDTYPE DENSITY RESIDENCE (ย8) FAR 1 : 6 [ 64,080 sqm. ] OSR 5% [ 3,204 sqm. ]
GRID MODULAR 6.00 X 4.50 M
4.50 m
9.00 m
1
117.5 m x 16 m 1880 sqm.
15.40 m
121 .00
90.0 m x 15.0 m 1350.0 sqm.
m
3
10,000 sqm. 5,000 sqm.
123.30 m
117. 50
m
10.00 m 10.00 m
40.0 m 28.7 m x 12.4m 355 sqm.
2
12.0m
BUILDING 2
10.0 m
VOID 3.00 X 2.00 M 2.00 X 0.45 M
PIER PUBLIC STRUCTURE COLUMN 0.30 X 0.30 M BEAM 0.40 X 0.20 M
RESIDENC
12.0 m 6.00 m
6.00 m
6.00 m
GRID MODULAR 6.00 X 6.00 M
RESTAURANT&LIBRARY
SETBACK
3.00 m 10.00 m
.0
0
30.50
m
m
10.00 m
12
SETBACK RIVER 12.0 m SETBACK WALL--VOID 3.00 m SETBACK FROM MAINROAD 1.20 m
3.00 m
SOUVENIER
10.00 m 10.00 m
28.
70
m
.40
m
12
1.20 m
BUILDING 3
4.30 m
STRUCTURE COLUMN 0.40 X 0.40 M BEAM 0.40 X 0.30 M
VOID 3.00 X 2.00 M 2.00 X 0.45 M
15.00 m 6.00 m
GRID MODULAR 6.00 X 5.00 m
5.00 m
PIER PUBLIC
6.00 m
15 .0 0
m
4.40 m
OPENSPACE
90.0
RESTAURANT&LIBRARY
m
4.40 m
OPENSPACE 30% [ 3200sqm ]
90.0
4.40 m
15 .0 0
m
now 2400 sqm. +1800 sqm.
m
4.40 m
STRUCTURE [OLD BUILDING]
BUILDING 4
VOID 5.00 X 2.50 m 7.50 m
STRUCTURE - PORTALFRAME COLUMN 0.50 X 0.30 M BEAM 0.60 X 0.30 M
PIER
PLANE FIX [OLD BUILDING]
12.0 m 7.00 m
6.00 m 7.00 m
VOLUMN ALLOWANCE
GRID MODULAR 7.00 X 6.00 M
3.50 m
.
0
m
.0
12
7.50 m 21.0
0 m.
CHAROENKRUNG ROAD
negative and old building 20000 sqm. height < 23.00 m
7.50 m
MAIN ROAD .
0
.0
12
28.0 0 m.
CHAROENKRUNG ROAD
Charoenkrung Start-up PIERworkshop and residence "Reconstructing thai tobacco factory (2016)
7.50 m
STRUCTURE [OLD BUILDING]
PLANE FIX [OLD BUILDING]
m
SOUVENIER
PROCESS
PIER SERVICE PIER PUBLIC RESIDENCE RESTAURANT&LIBRARY
MAIN HOIST
CARPARK
EXHIBITION
SOUVENIER
PIER
CHAROENKRUNG ROAD
1
2
MAIN ROAD
STRUCTURE [OLD BUILDING]
CHAROENKRUNG ROAD
PUBLIC SEQUENCE
PIER
STRUCTURE [OLD BUILDING]
PLANE FIX [OLD BUILDING]
CARPARK
VERTICLE CORE WC CO-WORKINGSPACE
MAIN ROAD
CHAROENKRUNG ROAD
3
4 MAKER SPACE HOIST CONNECT TO WOOD&METAL WORKSHOP EXHIBITION
CO-WORKING SPACE PUBLIC SEQUENCE
VERTICLE CORE WC CO-WORKINGSPACE PIER SERVICE CO-WORKING SPACE MAIN HOIST
CARPARK EXHIBITION
R
PUBLIC SEQUENCE
PIER SERVICE
5
6
MAIN HOIST
CARPARK
WORKSHOP CONDITION SPACE HOIST CONNECT TO WOOD&METAL WORKSHOP EXHIBITION VERTICLE CORE WC CO-WORKINGSPACE
PIER SERVICE MAKER SPACE HOIST CONNECT MAIN TO HOIST WOOD&METAL WORKSHOP EXHIBITION
PLANE FIX [OLD BUILDING]
CHAROENKRUNG ROAD
BITION
DENCE
PUBLIC SEQUENCE
Charoenkrung Start-up workshop and residence "Reconstructing thai tobacco factory (2016)
Design problem furthermore resulted in insightfully spatial analyses ; CO-WORKING SPACE particularly workshops that operate heavy machines have an effect on existing structures, to seek for architecture in response for activity changes.Existing structural analyses manipulate design on which creative environments were greatly promoted while search for architecture inserting into existing structures with retaining architectural identity of factories.The applications of hoist systems and rail services were employed to interconnectedly reorganize linear workshops and sequences as well as creative,maker spaces
4.00 m
0.20 m
WORKSHOP CONDITION SPACE
NEW STRUCTURE
WORKSHOP CONDITION SPACE
3.70
4.0
0 0
OLD BUILDING
2.0
Hoist system
Structure
Charoenkrung Start-up workshop and residence "Reconstructing thai tobacco factory (2016)
ELEVATION & SECTION
CO-WORKING SPACE
EXHIBITION
ELECTRIC STORAGE
JOINT METAL
CO-WORKING SPACE
EXHIBITION CAFE
STORAGE
EXHIBITION WOOD&METAL WORKSHOP
ELEV
+15.50m
LIBRARY +9.00m
+4.50m
WC
RESTAURANT
COWORKINGSPACE
WC
WC
PATTERNROOM
SEWINGROOM
TEXTILESTORAGE
+0.00m
Charoenkrung Start-up workshop and residence "Reconstructing thai tobacco factory (2016)
MAKERSPAC
RESIDENCE +15.50m
MAKERSPACE +9.00m
CO-WORKINGSPACE LECTUREROOM FORMING
STORAGE
SERVICE ROOM
FIRING
+4.50m
+0.00m
OFFICE
VATION
CE SOUVENIR CO-WORKINGSPACE ADMINITRATION WOOD&METAL STORAGE ADMINITRATION
Charoenkrung Start-up workshop and residence "Reconstructing thai tobacco factory (2016)
Charoenkrung Start-up workshop and residence "Reconstructing thai tobacco factory (2016)
Charoenkrung Start-up workshop and residence "Reconstructing thai tobacco factory (2016)
FACADE
STRUCTURE
24 HOURS CERAMIC WORKSHOP
TEXTILE WORKSHOP
WOOD METAL WORKSHOP ELECTRIC WORKSHOP
PRIVATE VOLUME
FAST ROUTE
PUBLIC VOLUME
Charoenkrung Start-up workshop and residence "Reconstructing thai tobacco factory (2016)
1F
2 16
15
9
3
4
8
3
1
2 19
18
17
10
11
8 8
7
20
5
6
12 14
2F
A1
A2
A3
A4
A5
A6 A7
A8 A9
13
A10 A11 A12 A13 A14
A15
A16
A17 A18
A19
A20
A21
A22 A23 A24 A25 A26A27
A28 A29 A30 A31A32 A33 A34
B1 B2 21
B3 B4 B5 B6 B7
3F
27
28
3
30 28
26
23
4
8
24
23 25
23
22 5
8 31 28
29
4F
33
8 23 4
32 32
34
8
32
23 32
31
5F
36
35
FIRST FLOOR 1 1.CAFE 2.SERVICEROOM 3.STORAGEROOM 4.EXIBITION 5.ADMINITRATION ROOM 6.MANAGER ROOM 7.OFFICE 8.WC 9.WOOD&METAL WORKSHOP 10.WOOD&METAL STORAGE 11.STAFF ROOM 12.CUSTOMER ROOM 13.TEXTILE STORAGE
15.ENAMELROOM 16.FIRING ROOM 17.CERAMIC STORAGE 18.OFFICE 19.EVENT SPACE 20.RESTAURANT
SECOND FLOOR 2
THIRD FLOOR 3
FOURTH FLOOR 4
FIFTH FLOOR 5
21.LECTURE ROOM
22.SOUVENIR 23.CO-WORKING 24.LAB STORAGE 25.LAB-TEST 26.JOINT METAL 27.COATIN ROOM 28.MEETING SPACE 29.SEWINGROOM 30.FORMING CERAMIC 31.LIBRARY
32.MAKERSPACE 33.RESIDENCE M 34.PATTERNROOM
35.DRYING TEXTILE 36.RESIDENCE W
Charoenkrung Start-up workshop and residence "Reconstructing thai tobacco factory (2016)
N
2
Nangloeng Community "Re-configuration Community"
(2015)
In the past Nangloeng was the most important market and strong community but now a day they can’t survive in many way so how to bring them back ? This proposal want to make a Nangleong market revise / strong community by SUSTAINABILITY STRATEGY
Nangloeng Community
PROBLEM DECREASING PEOPLE / COMMERCIAL
Population 92,251
USER IN COMMUNITY
48,585
Commercial Customer Decreas from pass
INTIMAE SPACE : FAMILY
PERSONAL SPACE GRUOP OF PEOPLE
FASCINATION OF NANGLOENG
NANGLOENG HAVE A LOT OF FASINATION THAT MAKE MARKET UNIQUE SUCH AS ‘’ HOW THEY LIFE , ACTIVITY AND FLEXIBLE OF SPACE “ THAT THEY CREATE BY THEM SELF
Nangloeng Community "Re-configuration Community" (2015)
SOCIAL SPACE : PUBLIC AREA
ANALYSIS Market structure
Commercial Housing
TYPE OF HOUSE
Type A 10 x 3 x6 Sell in house
Site working
Type B 10 x 3 x 5
Nangloeng Community Type 1 sell out Type 2 sell in
Type C 10 x 3 x 5
Landmark theatre & market
Nangloeng Community "Re-configuration Community" (2015)
Unit type 3 UNIT
2 UNIT 1 UNIT
Volumn site
Grid from context
Nangloeng Community "Re-configuration Community" (2015)
Open ground floor
PROCESS Solid
Interaction space
Openspace
System
Unit
Void
Nangloeng Community "Re-configuration Community" (2015)
Verticle area
Groundfloor First floor
1 UNIT
2 UNIT
Second floor
PLAN
TYPE OF HOUSE
3 UNIT
Nangloeng Community "Re-configuration Community" (2015)
ISOMETRIC CIRCULATION
UNIT HOUSING
SECTION Nangloeng Community "Re-configuration Community" (2015)
3 BMART Theatre "Riverfront Theatre"
(2014)
BANGKOK
Metropolitan Administration RIVERFRONT THEATRE
BMART Theatre "Riverfront Theatre" (2014)
MODEL
BMART Theatre "Riverfront Theatre" (2014)
ELEVATION
BMART Theatre "Riverfront Theatre" (2014)
MASTERPLAN Sathon Nuea Rd
Sathon Nuea Rd
Chaophraya river
1 8
2
7
6
3
Main entrance 4
5
9
N Buddhist Temple
Ground floor [+1.00m]
1 2 3 4 5 6 7 8 9
Main hall Light room Stage Back stage Amphitheatre Riverfront Wc Carpark Landscape BMART Theatre "Riverfront Theatre" (2014)
PLAN
BTS Saphan taksin St 1
1 3
2
4
4
5 2
6
8
3
7
9
N
First floor
Underground
[+4.50m]
[-3.00m]
1 2 3 4 5 6 7 8 9
Pump room Air-wind room Electric room Generator room Mechanical room Security room Car park Room amphitheatre back stage BMART Theatre "Riverfront Theatre" (2014)
Bts Saphan taksin s Souvenir Store Coffee shop Lobby Recreation room Budha room Common space Wc
tation
station
4
8
3
7 1 5
6 5
5
2
5
Secondfloor [+8.00m] 1 2 3 4 5 6 7 8
Office room Rehersal room Wc Roof top garden
BMART Theatre "Riverfront Theatre" (2014)
1 2 3 4
4 Wonder fruite
"Eco-Liftstyle Festival : Welcome center"
(2014)
WELCOME CENTER WELCOME CENTER
Wonder fruite "Eco-Liftstyle Festival : Welcome center"(2014)
ISOMETRIC Main Entrance
F.3 Access to site
F.2
Connect 2 side
Circulation
6
14
5 3
9 9
15 13
7
10
1
8 4
11 12
2
carpark shuttle carpark crew camp prod compoun arena wc center camp swim area beach kitchen kid lotus pond void area boutique camping boutique carpark
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Function volumn
Existing building
F.1
Wood Column 5x5 cm. Metal Mesh 50x60 cm.
Site
Wonder fruite "Eco-Liftstyle Festival : Welcome center"(2014)
Modular 3x3
ISOMETRIC
Green facade
Structure3x3
Connect to another zone
Welcome center
Connect to another zone
Wonder fruite "Eco-Liftstyle Festival : Welcome center"(2014)
SECTION
Section A-A
Section B-B
Wonder fruite "Eco-Liftstyle Festival : Welcome center"(2014)
PLAN B-B
4
3
3
A-A
A-A
1
A-A
2
1
N B-B
First Floor
Second fl
[0.00m]
Bike park Storage Wc Activity area
[+3.00m] 1 2 3 4
Wonder fruite "Eco-Liftstyle Festival : Welcome center"(2014)
Information Coffee shop First Aid
B-B
B-B
1
2
2
A-A
A-A
A-A
2
B-B
B-B
floor
0m
1
2
3
4
Third floor [+6.00m] 1 2 3
Roof bar Wc
Wonder fruite "Eco-Liftstyle Festival : Welcome center"(2014)
1 2
5 Extra activity Archfeb 04
archfebfest 04
HIERARCHY HIERARCHY archfebfest 04
POSTER POSTER archfebfest 04
PLANING PLANING archfebfest 04
6 Extra activity Asa Volunteer 13 Architecture volunteer camp try to be the assignment at the point above, that would be the education case study for design,and build up the volunteer spirit into students mind by working with the local people
ASA13
Existing section
0
archfebfest 04
0.5
1.5
3.5
7.5
Ground floor 1. Balcony 2. Infirmary 3. Library 4. Toilet
0
2
4
archfebfest 04
10
20
7 Extra activity Graphic Coffeeshop
PERSPECTIVE archfebfest 04
Extra activity Kitchen design
8 PERSPECTIVE
archfebfest 04
THANK YOU