1 minute read

The Menu

Food

Scallops & Sludge - scallops rockefeller, brioche crust, fennel sauce 40

Advertisement

Pollution Patties - beef sliders on a brioche bun, side of dijon mustard and housemade sauce 31

Fresh Fungus - mushrooms stuffed and baked with cheese and garlic 25 1/2

Sewer Soup - lentils, kale, carrots and onion in a delicious vegetable broth served with a side of toasted sourdough 29 3/4

Escargot

Away - escargot baked with butter and garlic 39 3/4

Mud Pie - chocolate mousse, raspberry puree, topped with whipped cream 20 1/4

Clay Flambe - vanilla custard topped with a caramelized sugar coating 23 3/4

Drink

River Water - 1.5 oz bourbon, 1 oz half and half, 0.5 oz amaretto and 0.5 oz white creme de cacao 18

Before - 2 oz gin, 0.5 oz dry vermouth, 2 dashes blue curacao, lemon twist 12

Industrialization - 2 oz gin, 0.5 oz maraschino cherry liqueur, 0.5 oz creme de violette, 3/4 oz lemon juice, 1 dash blue curacao 17

Growth - 2 oz Irish whiskey, 1 oz simple syrup, 3/4 oz lime juice, 1 egg white 21

*40% of all proceeds go to the Red River Basin Commission*

Primary User Secondary User

Frequency Psychological Needs

per week, during hours of operation, with the exception of private days per month depending on freof private and public events per week , during hours of operation, can be open during private depending on kitchen needs per week, during hours of operabefore and after opening

Welcoming environment, curiosity

Special Requests

Accessibility

Comfort, curiosity

Coat room

Secretive, interesting, confrontational

Secret access

Safety, organization, support per week, during hours of opera- Organization, support per week, at least one security for slower times

Safety, organization, communication per week, 9AM-5PM Organization, communication

Access to camera feed per month depending on freof private and public events week depending on events

Welcoming environment, organization

Podium

Organization, accessibility

Supply closet

Dependant on need for repairs

Organization, accessibility to monthly depending on prod- Organization

Accessible electric room

Materials

This article is from: