School Library: Construction Process 9

Prefabricated Trusses attach onto existing structure:

8

7

6

5

In November 2013-Feburary 2014 I spent three months on-site overseeing the construction of the libraries final phase. 4

3

.040

.04

2

.04

1

1.40

.93

.89

ExistiertTrackwerk Bewehrungsstahl L-profil 40mmx5mm

3.26

After three months we successfully completed the foundations, 1 2 floor, steel structure and roof. We also6 laid out the steel supports for the facade and developed a new variation that is ready to be constructed before the building opens in July 2014. 17°

3 2°

7

4

8

5

1.64

1.58

5.05

Mixing concrete 1.66

1.58

19°

19°

5.04

A

.04 .04

20°

6

7

17° 71° 17°

.93

.89

3.26

.04 1.43

1.40

156°

3.63 71°

71°

.42

8

9

2° 5.05

1.64

1.58

.83

.04

1.40

.93 3.26

1.43 20°

1.66

19°

.04

19°

.60

5.04

.89

.64

.92

1.48

1.37

A

1.93

Steel structure

3.60 4.97

4.70

.04 156°

1.43

10

3.63 71°

71°

17° 71°

11

.42

.04 .60

.83

.04

1.40

.93

.89

3.26

1.43

.64

.92

1.48

1.37

12

1.93 3.60

4.97

4.70

10

13

11

Prefabricated Trusses

13

12

14supports Sub-Facade

15

14

Lifting the trusses in place

01.1

Steel-work

Library with roof and floor extension

01.1

.54

.60


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.