12
1.58
1.40
.93
.93
.93
.93
.93
.93
.93
.93
.93
.93
.93
.93
11 3.26
10
7.45
3.00
13.71
School Library: Construction Process 9
Prefabricated Trusses attach onto existing structure:
8
7
6
5
In November 2013-Feburary 2014 I spent three months on-site overseeing the construction of the libraries final phase. 4
3
.040
.04
2
.04
1
1.40
.93
.89
ExistiertTrackwerk Bewehrungsstahl L-profil 40mmx5mm
3.26
After three months we successfully completed the foundations, 1 2 floor, steel structure and roof. We also6 laid out the steel supports for the facade and developed a new variation that is ready to be constructed before the building opens in July 2014. 17°
3 2°
7
4
8
5
2°
1.64
1.58
5.05
Mixing concrete 1.66
1.58
19°
19°
5.04
A
.04 .04
20°
6
7
17° 71° 17°
.93
.89
3.26
.04 1.43
1.40
156°
3.63 71°
71°
7°
.42
8
9
2° 5.05
1.64
1.58
.83
.04
1.40
.93 3.26
1.43 20°
1.66
19°
.04
19°
.60
5.04
.89
.64
.92
1.48
1.37
A
1.93
Steel structure
3.60 4.97
4.70
.04 156°
1.43
10
3.63 71°
71°
17° 71°
7°
11
.42
.04 .60
.83
.04
1.40
.93
.89
3.26
1.43
.64
.92
1.48
1.37
12
1.93 3.60
4.97
4.70
10
13
11
Prefabricated Trusses
13
12
14supports Sub-Facade
15
14
Lifting the trusses in place
01.1
Steel-work
Library with roof and floor extension
01.1
.54
.60