Joyi Larasari 2022 Portfolio

Page 1

Architectural Portfolio

JOYI LARASARI


BIOGRAPHY

NAME

Joyi Larasari

MAJOR

Architecture

MINOR

Sustainable Environments

FROM

Indonesia

LOVES

Dancing, photography, travel


CONTENTS 1

BIO

02

2

CSU STOCKTON ACADEMIC BUILDING

04

3

DANCING TUBES

4

INNER SUNSET GARDENS

5

WORK SAMPLES

6

OTHER WORKS

WINTER/SPRING 2020, 3RD YEAR

FALL 2019, 3RD YEAR

07

10

SPRING 2019, 2ND YEAR

WORK AND DOCUMENTS FROM INTERNSHIP

COMPETITIONS, PROJECTS, AND PERSONAL WORK

12

15


ACADEMIC: DATA SCIENCE AND INTERNATIONAL UNDERSTANDING Our studio started by designing an overall campus masterplan for the newest CSU located in Stockton. My partner, Gabrielle Werst and I worked on the Data Science and International Understanding academic building on the CSU campus. We chose programs that would allow for a fusion between environmental law and science, while allowing students to be a part of saving the planet. Our aim was to encourage diverse learning spaces and create many options of spaces for people to collaborate throughout the entire building, inside and outside.

WHOLE STUDIO COLLABORATIVE MASTERPLAN

ACADEMIC DATA SCIENCE

WINTER/SPRING 2020

CSU STOCKTON ACADEMIC BUILDING

AI


WINTER/SPRING 2020 STRUCTURE Glulam Beams: 20” x 3-1/8” Glulam Girdes: 32” x5-1/8” CLT Sheathing: 5 layer

CLADDING North: Terracotta Louvers on top parts of opening South: Mostly covered by Terracotta louvers Roof: PV Panels to reach zero net energy East and West: Egress stairs covered with tinted glass and BIPV panels

SOUTH FACADE Most of the building is covered in white erracotta panels paired with terracotta louvers.

STRUCTURAL AND CLADDING DIAGRAM NORTHWEST SECTION BY GABRIELLE WERST


WINTER/SPRING 2020 RECYCLED CRAFT STORE

SOUTH FACADE

GROUND FLOOR WORKSPACE

NORTH FACADE

STUDY SPACE AND MEETING SPACE

NORTH FACADE

LONGITUDINAL SECTION BY GABRIELLE WERST 1A

2A

3A

4A

5A


PHYSICAL MODEL AND DETAIL (LIGHT/ SPACIAL STUDY)

FORM DEVELOPMENT PROCESS The project is a multipurpose use tower that is located in San Fransisco. It has programs including a theatre, cafe, commercial and microresidential in one building. Inspired by our warm up kinetic model, the towers structures are inspired by Toyo Ito’s Sendai Mediatheque with the tube like structure that goes through the entire lenght of the building. The Dancing Tube mimics the motion of a dancer twirling at its place.



 











FALL 2019

DANCING TUBES



SHADOW ANALYSIS OF SURROUNDING BUILDINGS

STRUCTURE AND PROGRAM DIAGRAM


UP

UP

FALL 2019

UP UP

UP

UP

0 0

5

15

30

5

15

30

50

50

The section expresses the structure and shows how it creates spaces within the tubes while the plan 0shows how you could occupy 5 15 30 50 0 5 15 30 50 the clumped tubes.

THE SPACES IN 3D MODEL


FALL 2019





 

 

OVERALL FORM OF THE BUILDING WITH STRUCTURE 







EXPLODED CLADDING AND TUBULAR EXPERIENCE

DETAIL OF SPACES CREATED BY THE STRUCTURE AND THE TUBES

TEXTURE AND STRUCTURE STUDY

 


GARDEN COMMUNITY The public gardens on the site serves as an anchor to the project. The project is designed to connect the community gardens together and encourage the residents to practice sustainable gardening while being able to enjoy being surrounded by nature. The project includes a multi-family housing, community center, a community garden that has a farm to table cafe, and a playground.

FLOOR 3

FLOOR 2

CLASSROOM

ART ROOM

CLASSROOM

0’

10’

30’

70’

0 20 60 140 2 BR

2 BR

BR 22BR TH

CLASSROOM

CLASSROOM

ART ROOM

ART ROOM

2 BR 2 BR

TH

TH

2 BR

TH

TH

TH

2 BR

2 BR

TH

TH

2 BR 2 2BR BR

JR 1 BR JR 1JR BR1 BR

2 BR 2 BR

JR 1 BR

STUDIO

STUDIO

1BR 1 BR

TH

TH TH

THTH 1BR 1BR 1 BR

TH

2BR

TH TH TH

JR 1 BR JR TH TH

STUDIO STUDIO TH

TH

2 BR

2BR

TH TH

STUDIO STUDIO

11BR BR

2 BR

2 BR TH TH TH TH

TH

TH

2 BR

2 BR

TH

TH

WINTER-SPRING 2021

INNER SUNSET GARDEN


WINTER-SPRING 2021 NORTH ELEVATION FACADE DESIGN

ROOF OUTDOOR SPACE

GARDEN PLANTERS

NORTH ELEVATION FACADE DESIGN

OUTDOOR SPACES

BBQ SPACE

GARDEN AND CIRCULATION SECTION


INTERNSHIP SGPA ARCHITECTURE AND PLANNING


INTERNSHIP WORK This was the Vestar Pacific Commons in Fremont. I was first tasked to model the site and the existing buildings. Since our scope of work is to do some “planning” (which was a lot of landscaping) and renovation of a building. Here are the before and after views of the work we did on the Vestar Pacific Commons. I modelled the updated landscaping and I designed the facade of the retail stores.

BEFORE

AFTER

I was tasked to create a programmatic model for this project on SketchUp for the before and after masterplan of this project. It was part of an RFI that my firm wanted to submit. Through this I learned to get a little more familiar with SketchUp since I had no prior knowledge on this.

BEFORE

AFTER


INTERNSHIP WORK I started off the project by doing plan check comments for the building deparment. I was then added into the project on Revit to assist my co-worker on revisions and updating the drawings for the permit set. I continued to work on plan checks for different department and filled in Calgreen Measure Checklist. I also learned about the condition’s of approval and gathering consultant’s documents and responses.Aside from updating keynotes, I also organize the notes, tables and making sure that they fulfill the plan checks but is also following the code. I also updatead some of the drawings in the construction drawing in accordance to corrections from my co-worker.

STOP

STOP STOP © SGPA 2021

FEDERAL REALITY INVESTMENT TRUST

STOP

8'-0

PA NO RK ING

EQ

HY

D

WV D

± 62 '-11"

550 SHOWERS DR. (UNDER SEPARATE PERMIT)

HY

1 AD-101

VS-1 VS-3

2

8'-6 "

76'-1 0"

EV CHARGING ONLY

(NO TRA T I DER NC J ON OE'S TR AC T)

SAN FRANCISCO, CA 94108

1 A-102

NO PARKING

VS-3

150 POST ST.

STOP

1 A-101

VS-1

CL

EV CHARGING ONLY

" EN TR YD OO R

9'-0 "

STOP

H

VS-1

) ENTR Y DOOR

H

PARKNO ING

STOP

2

VS-3

STOP

(NO TRAD T IN ER CO JOE NT 'S RA CT

VS-1

STOP

EX IT

VS-3

V.I.F .

STOP

DO OR

SDS-9

VS-1

4'-0 "M IN

TEL

9'-0 "

1

SDS-2

CL

STOP

5'-0 "

NO PARKING

EQ

VS-3

STOP

EXIT

DOOR

3 A-100

STOP STOP STOP

TEL

STOP

STOP

STOP HYD

SAN ANTONIO CENTER

STOP

HY

D

NOTE: 1. CONTRACTOR TO RESTRIPE PER PLAN AND CUT EXISTING HARDSCAPE TO PREPARE FOR NEW TWO (2) NEW CURB CUTS AT THIS LOCATION. 2. REFER TO DETAILS ON SHEET A-801 FOR ADDITIONAL DIMENSIONS AND INFORMATION. 3. FOR DIMENSIONS WITH V.I.F. (VERIFY IN FIELD), CONTRACTOR TO NOTIFY ARCHITECT OF ANY DISCREPANCIES.

WV

ONL Y

1

ENLARGED PLAN - ACCESSIBLE PARKING - TRADER JOES

SITE IMPROVEMENTS

3

SCALE: 1/8" = 1'-0"

OVERALL SITE PLAN

1

SCALE: 1" = 40'-0"

1

550 SHOWERS DR. MOUNTAIN VIEW, CA 94040 DRAWING SUBMITTAL SCHEDULE

SIGNAGE SCHEDULE TYPE

DESCRIPTION

VS-1

ACCESIBLE PARKING SPACE

VS-2

VAN ACCESSIBLE PARKING SPACE

VS-3

ACCESIBLE PARKING ONLY

ACCESSIBILTY NOTES

LEGEND ACCESSIBLE PATH OF TRAVEL 4'-0" WIDE MIN. CONCRETE OR A.C. PAVED. SEE CIVIL DRAWINGS FOR ADDITIONAL INFORMATION ON MATERIAL, SLOPES AND ELEVATIONS.

SITE DIRECTIONAL ACCESIBLE ROUTE SIGNAGE

SDS-9

ACCESSIBLE PARKING SITE ENTRANCE

BIM 360://San Antonio Center/20837 San Antonio Center - Sitework.rvt

SDS-2

1

PERMIT RESUBMITALL

08/09/2021

1. PATH OF TRAVEL (P.O.T.) AS INDICATED IS A BARRIER FREE ACCESS WITHOUT ANY ABRUPT VERTICAL CHANGES EXCEEDING 1/2" BEVELED AT 1:2 MAXIMUM SLOPE, EXCEPT THAT LEVEL CHANGES DO NOT EXCEED 1/4" VERTICAL AND IS AT LEAST 48" WIDE. SURFACE IS SLIP RESISTANT, STABLE, FIRM, AND SMOOTH. CROSSSLOPE DOES NOT EXCEED 2% AND SLOPE IN THE DIRECTION OF TRAVEL IS LESS THAN 5% UNLESS OTHERWISE INDICATED. (P.O.T.) SHALL MAINTAIN FREE OF OVERHANGING OBSTRUCTIONS TO 80" MINIMUM (11B-307.4) AND PROTRUDING OBJECTS GREATER THAN 4" PROJECTION FROM THE WALL AND ABOVE 27" AND LESS THAN 80" (11B-307.2). CONTRACTOR TO VERIFY THAT ALL BARRIERS IN THE PATH OF TRAVEL HAVE BEEN REMOVED OR WILL BE REMOVED UNDER THIS PROJECT, AND PATH OF TRAVEL COMPLIES WITH CBC 11B-DIVISION 4 2. PROVIDE SITE DIRECTIONAL ACCESSIBLE ROUTE SIGNAGE (SDS-1) AT ALL MAJOR JUNCTIONS PER CBC SEC. 11B-216.6.

1

3. ALL ACCESSABILTY SIGNAGE EXISITNG VERIFY COMPLIANCE IN FIELD.

1

STOP

200 PINE STREET, STUDIO 500 SAN FRANCISCO, CA 94104 415.983.0131 WWW.SGPA.COM

WV

STOP

PROJECT NO: 20837-A60

E

SE

D A RC U A RT

L

W.

ST

HI

Y

LIC

N

CT TE E L

HYD

OVERALL SITE PLAN AND PATH OF TRAVEL RE A ST

17'-0"

© SGPA 2020

1

5

'2 1

A

A-100

FEDERAL REALITY INVESTMENT TRUST 1

4

3

C

N. A U G 3 1, OR OF CAL I F

NI

8/3/2021 10:52:05 AM

No. C-24741

TE

150 POST ST.

3

C

SAN FRANCISCO, CA 94108

0015 0014

STOP

40'-0"

0014

43'-4"

17'-0"

203'-5 1/4"

17'-0"

7'-0" TY P. 1

2

1

3

4

C

5

C

1

16'-7 1/2" 1

0022

21 A-801

1

2

3 A-101

0017

N2O NG RKIH PA

0017

21 A-801

1

8'-0" 2 H

2 A-101 H

0010

TYP.

1'-0"

VS-3

5

20'-11 1/2"

VS-3

26 A-801

EV ING RG CHAONLY

VS-1

NO NG RKI PA

VS-1

EV ING RG CHAONLY

1 A-201

0010

1 A-302

1

VS-3

TYP.

VS-1

VS-2

VS-3

VS-1

VS-1

0023

0017 VS-1

VS-3

0024

0025

1

(E) BUILDING - N.I.C.

0037

SAN ANTONIO CENTER

1

SITE IMPROVEMENTS 550 SHOWERS DR. MOUNTAIN VIEW, CA 94040

DRAWING SUBMITTAL SCHEDULE

1

23 / A-801 24 / A-801

SDS-2

SITE DIRECTIONAL ACCESSIBLE ROUTE SIGNAGE

25 / A-801

PEDESTRIAN CROSSWALK

PRE-CAST CONC WHEEL STOP

0010 0014

0027 0028 0037 VS-1 VS-2 VS-3

1

PARKING COUNT - COMPACT 4" HIGH WHITE TEXT "COMPACT"

1

C H

PARKING COUNT - ACCESSIBLE SPACE NO PARKING ZONE PAVERS, SEE LANDSCAPE

1 1

FUTURE EV

PARKING SUMMARY % TOTAL

ACCESSIBLE PROVIDED

77.5%

0

4

9%

0

2

4.5%

2

2

4.5%

2

4.5%

2 1

1

PARKING SUMMARY 1

TYPE

# SPACES

% TOTAL

NEW ACCESIBLE

4

80%

0

NEW COMPACT

1

20%

0

0016

0016

0027

0027

0015 90°

ACCESSIBLE PROVIDED

1" 10'-1

GENERAL NOTES 2 REQUIRED ACCESSIBLE PARKING WITH ONE BEING VAN ACCESSIBLE SPACES.

1

5'-0"

13'-0"

0028

5'

16'-0"

LANDSCAPE LIMIT OF WORK

12

135°

PROJECT NO: 20837-A60

-0 " 45°

0022 0023 0024 0025

PARKING COUNT - STANDARD

34

12'-9"

0015 0016 0017

WHEELSTOP, PER DETAILS 27/A-801 LIGHT POLE, PER DETAIL 18/A-801, STRUCTURAL AND ELECTRICAL DRAWINGS PLANTING AREA PER LANDSCAPE DRAWINGS SITE FURNISHINGS PER LANDSCAPE DRAWINGS DETECTABLE WARNING PAD SEE DETAIL, 29/A-801 CROSS WALK, S.C.D EXISTING BIKE RACKS TO BE PAINTED EXISTING RAILING TO BE PAINTED EXISTING BENCHES TO BE PAINTED, THIS LOCATION, TYP. REFER TO LANDSCAPE FOR SITE FURNISHING PAVERS SEE LANDSCAPE NEW BIKE RACK ACCESSIBLE PARKING SPACE SIGNAGE VAN ACCESSIBLE PARKING SPACE SIGNAGE ACCESSIBLE PARKING ONLY SIGNAGE

1

# SPACES

04/19/2021 05/24/2021 08/09/2021

1

29'-7"

WHITE PAINTED TRAFFIC DIRECTION ARROWS TYPICAL

KEYNOTES

TYPE NEW STANDARD NEW COMPACT NEW ACCESSIBLE 1 RELOCATED ACCESIBLE

3'-6"

23 / A-801

ACCESSIBLE PARKING ONLY

1" = 10'-0"

" 15'-6

BIM 360://San Antonio Center/20837 San Antonio Center - Sitework.rvt

DETAIL

ACCESSIBLE PARKING SPACE VAN ACCESSIBLE PARKING SPACE

VS-3

ENLARGED SITE PLAN - PARKING AREA

2'-6"

8/3/2021 10:52:09 AM

DESCRIPTION

VS-2

VS-1

PARKING PIPE GUARD / BOLLARD LIGHT POLE FIRE HYDRANT

5'-9"

TYPE

ACCESSIBLE SIGN PER KEYNOTE STOP SIGN ACCESSIBLE ACCESS SYMBOL

12 '-9"

LEGEND

SIGNAGE SCHEDULE

DD SUBMITTAL PERMIT SUBMITTAL PERMIT RESUBMITALL

19'-1" 22'-6"

ENLARGED SITE PLAN AT SEATING AREA B 1

SCALE: 1/8" = 1'-0"

3

ENLARGED SITE PLAN AT SEATING AREA A

NORTH

SCALE: 1/8" = 1'-0"

2

ENLARGED SITE PLAN PARKING AREA

A-101


OTHER WORKS Competitions, projects and personal works.


BOEING COMPETITION

COLLAGE

PHOTOGRAPHY