Architectural Portfolio
JOYI LARASARI
BIOGRAPHY
NAME
Joyi Larasari
MAJOR
Architecture
MINOR
Sustainable Environments
FROM
Indonesia
LOVES
Dancing, photography, travel
CONTENTS 1
BIO
02
2
CSU STOCKTON ACADEMIC BUILDING
04
3
DANCING TUBES
4
INNER SUNSET GARDENS
5
WORK SAMPLES
6
OTHER WORKS
WINTER/SPRING 2020, 3RD YEAR
FALL 2019, 3RD YEAR
07
10
SPRING 2019, 2ND YEAR
WORK AND DOCUMENTS FROM INTERNSHIP
COMPETITIONS, PROJECTS, AND PERSONAL WORK
12
15
ACADEMIC: DATA SCIENCE AND INTERNATIONAL UNDERSTANDING Our studio started by designing an overall campus masterplan for the newest CSU located in Stockton. My partner, Gabrielle Werst and I worked on the Data Science and International Understanding academic building on the CSU campus. We chose programs that would allow for a fusion between environmental law and science, while allowing students to be a part of saving the planet. Our aim was to encourage diverse learning spaces and create many options of spaces for people to collaborate throughout the entire building, inside and outside.
WHOLE STUDIO COLLABORATIVE MASTERPLAN
ACADEMIC DATA SCIENCE
WINTER/SPRING 2020
CSU STOCKTON ACADEMIC BUILDING
AI
WINTER/SPRING 2020 STRUCTURE Glulam Beams: 20” x 3-1/8” Glulam Girdes: 32” x5-1/8” CLT Sheathing: 5 layer
CLADDING North: Terracotta Louvers on top parts of opening South: Mostly covered by Terracotta louvers Roof: PV Panels to reach zero net energy East and West: Egress stairs covered with tinted glass and BIPV panels
SOUTH FACADE Most of the building is covered in white erracotta panels paired with terracotta louvers.
STRUCTURAL AND CLADDING DIAGRAM NORTHWEST SECTION BY GABRIELLE WERST
WINTER/SPRING 2020 RECYCLED CRAFT STORE
SOUTH FACADE
GROUND FLOOR WORKSPACE
NORTH FACADE
STUDY SPACE AND MEETING SPACE
NORTH FACADE
LONGITUDINAL SECTION BY GABRIELLE WERST 1A
2A
3A
4A
5A
PHYSICAL MODEL AND DETAIL (LIGHT/ SPACIAL STUDY)
FORM DEVELOPMENT PROCESS The project is a multipurpose use tower that is located in San Fransisco. It has programs including a theatre, cafe, commercial and microresidential in one building. Inspired by our warm up kinetic model, the towers structures are inspired by Toyo Ito’s Sendai Mediatheque with the tube like structure that goes through the entire lenght of the building. The Dancing Tube mimics the motion of a dancer twirling at its place.
FALL 2019
DANCING TUBES
SHADOW ANALYSIS OF SURROUNDING BUILDINGS
STRUCTURE AND PROGRAM DIAGRAM
UP
UP
FALL 2019
UP UP
UP
UP
0 0
5
15
30
5
15
30
50
50
The section expresses the structure and shows how it creates spaces within the tubes while the plan 0shows how you could occupy 5 15 30 50 0 5 15 30 50 the clumped tubes.
THE SPACES IN 3D MODEL
FALL 2019
OVERALL FORM OF THE BUILDING WITH STRUCTURE
EXPLODED CLADDING AND TUBULAR EXPERIENCE
DETAIL OF SPACES CREATED BY THE STRUCTURE AND THE TUBES
TEXTURE AND STRUCTURE STUDY
GARDEN COMMUNITY The public gardens on the site serves as an anchor to the project. The project is designed to connect the community gardens together and encourage the residents to practice sustainable gardening while being able to enjoy being surrounded by nature. The project includes a multi-family housing, community center, a community garden that has a farm to table cafe, and a playground.
FLOOR 3
FLOOR 2
CLASSROOM
ART ROOM
CLASSROOM
0’
10’
30’
70’
0 20 60 140 2 BR
2 BR
BR 22BR TH
CLASSROOM
CLASSROOM
ART ROOM
ART ROOM
2 BR 2 BR
TH
TH
2 BR
TH
TH
TH
2 BR
2 BR
TH
TH
2 BR 2 2BR BR
JR 1 BR JR 1JR BR1 BR
2 BR 2 BR
JR 1 BR
STUDIO
STUDIO
1BR 1 BR
TH
TH TH
THTH 1BR 1BR 1 BR
TH
2BR
TH TH TH
JR 1 BR JR TH TH
STUDIO STUDIO TH
TH
2 BR
2BR
TH TH
STUDIO STUDIO
11BR BR
2 BR
2 BR TH TH TH TH
TH
TH
2 BR
2 BR
TH
TH
WINTER-SPRING 2021
INNER SUNSET GARDEN
WINTER-SPRING 2021 NORTH ELEVATION FACADE DESIGN
ROOF OUTDOOR SPACE
GARDEN PLANTERS
NORTH ELEVATION FACADE DESIGN
OUTDOOR SPACES
BBQ SPACE
GARDEN AND CIRCULATION SECTION
INTERNSHIP SGPA ARCHITECTURE AND PLANNING
INTERNSHIP WORK This was the Vestar Pacific Commons in Fremont. I was first tasked to model the site and the existing buildings. Since our scope of work is to do some “planning” (which was a lot of landscaping) and renovation of a building. Here are the before and after views of the work we did on the Vestar Pacific Commons. I modelled the updated landscaping and I designed the facade of the retail stores.
BEFORE
AFTER
I was tasked to create a programmatic model for this project on SketchUp for the before and after masterplan of this project. It was part of an RFI that my firm wanted to submit. Through this I learned to get a little more familiar with SketchUp since I had no prior knowledge on this.
BEFORE
AFTER
INTERNSHIP WORK I started off the project by doing plan check comments for the building deparment. I was then added into the project on Revit to assist my co-worker on revisions and updating the drawings for the permit set. I continued to work on plan checks for different department and filled in Calgreen Measure Checklist. I also learned about the condition’s of approval and gathering consultant’s documents and responses.Aside from updating keynotes, I also organize the notes, tables and making sure that they fulfill the plan checks but is also following the code. I also updatead some of the drawings in the construction drawing in accordance to corrections from my co-worker.
STOP
STOP STOP © SGPA 2021
FEDERAL REALITY INVESTMENT TRUST
STOP
8'-0
PA NO RK ING
EQ
HY
D
WV D
± 62 '-11"
550 SHOWERS DR. (UNDER SEPARATE PERMIT)
HY
1 AD-101
VS-1 VS-3
2
8'-6 "
76'-1 0"
EV CHARGING ONLY
(NO TRA T I DER NC J ON OE'S TR AC T)
SAN FRANCISCO, CA 94108
1 A-102
NO PARKING
VS-3
150 POST ST.
STOP
1 A-101
VS-1
CL
EV CHARGING ONLY
" EN TR YD OO R
9'-0 "
STOP
H
VS-1
) ENTR Y DOOR
H
PARKNO ING
STOP
2
VS-3
STOP
(NO TRAD T IN ER CO JOE NT 'S RA CT
VS-1
STOP
EX IT
VS-3
V.I.F .
STOP
DO OR
SDS-9
VS-1
4'-0 "M IN
TEL
9'-0 "
1
SDS-2
CL
STOP
5'-0 "
NO PARKING
EQ
VS-3
STOP
EXIT
DOOR
3 A-100
STOP STOP STOP
TEL
STOP
STOP
STOP HYD
SAN ANTONIO CENTER
STOP
HY
D
NOTE: 1. CONTRACTOR TO RESTRIPE PER PLAN AND CUT EXISTING HARDSCAPE TO PREPARE FOR NEW TWO (2) NEW CURB CUTS AT THIS LOCATION. 2. REFER TO DETAILS ON SHEET A-801 FOR ADDITIONAL DIMENSIONS AND INFORMATION. 3. FOR DIMENSIONS WITH V.I.F. (VERIFY IN FIELD), CONTRACTOR TO NOTIFY ARCHITECT OF ANY DISCREPANCIES.
WV
ONL Y
1
ENLARGED PLAN - ACCESSIBLE PARKING - TRADER JOES
SITE IMPROVEMENTS
3
SCALE: 1/8" = 1'-0"
OVERALL SITE PLAN
1
SCALE: 1" = 40'-0"
1
550 SHOWERS DR. MOUNTAIN VIEW, CA 94040 DRAWING SUBMITTAL SCHEDULE
SIGNAGE SCHEDULE TYPE
DESCRIPTION
VS-1
ACCESIBLE PARKING SPACE
VS-2
VAN ACCESSIBLE PARKING SPACE
VS-3
ACCESIBLE PARKING ONLY
ACCESSIBILTY NOTES
LEGEND ACCESSIBLE PATH OF TRAVEL 4'-0" WIDE MIN. CONCRETE OR A.C. PAVED. SEE CIVIL DRAWINGS FOR ADDITIONAL INFORMATION ON MATERIAL, SLOPES AND ELEVATIONS.
SITE DIRECTIONAL ACCESIBLE ROUTE SIGNAGE
SDS-9
ACCESSIBLE PARKING SITE ENTRANCE
BIM 360://San Antonio Center/20837 San Antonio Center - Sitework.rvt
SDS-2
1
PERMIT RESUBMITALL
08/09/2021
1. PATH OF TRAVEL (P.O.T.) AS INDICATED IS A BARRIER FREE ACCESS WITHOUT ANY ABRUPT VERTICAL CHANGES EXCEEDING 1/2" BEVELED AT 1:2 MAXIMUM SLOPE, EXCEPT THAT LEVEL CHANGES DO NOT EXCEED 1/4" VERTICAL AND IS AT LEAST 48" WIDE. SURFACE IS SLIP RESISTANT, STABLE, FIRM, AND SMOOTH. CROSSSLOPE DOES NOT EXCEED 2% AND SLOPE IN THE DIRECTION OF TRAVEL IS LESS THAN 5% UNLESS OTHERWISE INDICATED. (P.O.T.) SHALL MAINTAIN FREE OF OVERHANGING OBSTRUCTIONS TO 80" MINIMUM (11B-307.4) AND PROTRUDING OBJECTS GREATER THAN 4" PROJECTION FROM THE WALL AND ABOVE 27" AND LESS THAN 80" (11B-307.2). CONTRACTOR TO VERIFY THAT ALL BARRIERS IN THE PATH OF TRAVEL HAVE BEEN REMOVED OR WILL BE REMOVED UNDER THIS PROJECT, AND PATH OF TRAVEL COMPLIES WITH CBC 11B-DIVISION 4 2. PROVIDE SITE DIRECTIONAL ACCESSIBLE ROUTE SIGNAGE (SDS-1) AT ALL MAJOR JUNCTIONS PER CBC SEC. 11B-216.6.
1
3. ALL ACCESSABILTY SIGNAGE EXISITNG VERIFY COMPLIANCE IN FIELD.
1
STOP
200 PINE STREET, STUDIO 500 SAN FRANCISCO, CA 94104 415.983.0131 WWW.SGPA.COM
WV
STOP
PROJECT NO: 20837-A60
E
SE
D A RC U A RT
L
W.
ST
HI
Y
LIC
N
CT TE E L
HYD
OVERALL SITE PLAN AND PATH OF TRAVEL RE A ST
17'-0"
© SGPA 2020
1
5
'2 1
A
A-100
FEDERAL REALITY INVESTMENT TRUST 1
4
3
C
N. A U G 3 1, OR OF CAL I F
NI
8/3/2021 10:52:05 AM
No. C-24741
TE
150 POST ST.
3
C
SAN FRANCISCO, CA 94108
0015 0014
STOP
40'-0"
0014
43'-4"
17'-0"
203'-5 1/4"
17'-0"
7'-0" TY P. 1
2
1
3
4
C
5
C
1
16'-7 1/2" 1
0022
21 A-801
1
2
3 A-101
0017
N2O NG RKIH PA
0017
21 A-801
1
8'-0" 2 H
2 A-101 H
0010
TYP.
1'-0"
VS-3
5
20'-11 1/2"
VS-3
26 A-801
EV ING RG CHAONLY
VS-1
NO NG RKI PA
VS-1
EV ING RG CHAONLY
1 A-201
0010
1 A-302
1
VS-3
TYP.
VS-1
VS-2
VS-3
VS-1
VS-1
0023
0017 VS-1
VS-3
0024
0025
1
(E) BUILDING - N.I.C.
0037
SAN ANTONIO CENTER
1
SITE IMPROVEMENTS 550 SHOWERS DR. MOUNTAIN VIEW, CA 94040
DRAWING SUBMITTAL SCHEDULE
1
23 / A-801 24 / A-801
SDS-2
SITE DIRECTIONAL ACCESSIBLE ROUTE SIGNAGE
25 / A-801
PEDESTRIAN CROSSWALK
PRE-CAST CONC WHEEL STOP
0010 0014
0027 0028 0037 VS-1 VS-2 VS-3
1
PARKING COUNT - COMPACT 4" HIGH WHITE TEXT "COMPACT"
1
C H
PARKING COUNT - ACCESSIBLE SPACE NO PARKING ZONE PAVERS, SEE LANDSCAPE
1 1
FUTURE EV
PARKING SUMMARY % TOTAL
ACCESSIBLE PROVIDED
77.5%
0
4
9%
0
2
4.5%
2
2
4.5%
2
4.5%
2 1
1
PARKING SUMMARY 1
TYPE
# SPACES
% TOTAL
NEW ACCESIBLE
4
80%
0
NEW COMPACT
1
20%
0
0016
0016
0027
0027
0015 90°
ACCESSIBLE PROVIDED
1" 10'-1
GENERAL NOTES 2 REQUIRED ACCESSIBLE PARKING WITH ONE BEING VAN ACCESSIBLE SPACES.
1
5'-0"
13'-0"
0028
5'
16'-0"
LANDSCAPE LIMIT OF WORK
12
135°
6°
PROJECT NO: 20837-A60
-0 " 45°
0022 0023 0024 0025
PARKING COUNT - STANDARD
34
12'-9"
0015 0016 0017
WHEELSTOP, PER DETAILS 27/A-801 LIGHT POLE, PER DETAIL 18/A-801, STRUCTURAL AND ELECTRICAL DRAWINGS PLANTING AREA PER LANDSCAPE DRAWINGS SITE FURNISHINGS PER LANDSCAPE DRAWINGS DETECTABLE WARNING PAD SEE DETAIL, 29/A-801 CROSS WALK, S.C.D EXISTING BIKE RACKS TO BE PAINTED EXISTING RAILING TO BE PAINTED EXISTING BENCHES TO BE PAINTED, THIS LOCATION, TYP. REFER TO LANDSCAPE FOR SITE FURNISHING PAVERS SEE LANDSCAPE NEW BIKE RACK ACCESSIBLE PARKING SPACE SIGNAGE VAN ACCESSIBLE PARKING SPACE SIGNAGE ACCESSIBLE PARKING ONLY SIGNAGE
1
# SPACES
04/19/2021 05/24/2021 08/09/2021
1
29'-7"
WHITE PAINTED TRAFFIC DIRECTION ARROWS TYPICAL
KEYNOTES
TYPE NEW STANDARD NEW COMPACT NEW ACCESSIBLE 1 RELOCATED ACCESIBLE
3'-6"
23 / A-801
ACCESSIBLE PARKING ONLY
1" = 10'-0"
" 15'-6
BIM 360://San Antonio Center/20837 San Antonio Center - Sitework.rvt
DETAIL
ACCESSIBLE PARKING SPACE VAN ACCESSIBLE PARKING SPACE
VS-3
ENLARGED SITE PLAN - PARKING AREA
2'-6"
8/3/2021 10:52:09 AM
DESCRIPTION
VS-2
VS-1
PARKING PIPE GUARD / BOLLARD LIGHT POLE FIRE HYDRANT
5'-9"
TYPE
ACCESSIBLE SIGN PER KEYNOTE STOP SIGN ACCESSIBLE ACCESS SYMBOL
12 '-9"
LEGEND
SIGNAGE SCHEDULE
DD SUBMITTAL PERMIT SUBMITTAL PERMIT RESUBMITALL
19'-1" 22'-6"
ENLARGED SITE PLAN AT SEATING AREA B 1
SCALE: 1/8" = 1'-0"
3
ENLARGED SITE PLAN AT SEATING AREA A
NORTH
SCALE: 1/8" = 1'-0"
2
ENLARGED SITE PLAN PARKING AREA
A-101
OTHER WORKS Competitions, projects and personal works.
BOEING COMPETITION
COLLAGE
PHOTOGRAPHY