JJ W W Work
Samples
JJE EN NN NIIF FE ER R WA WAN NG G
E D U C ATI O N
I n te r ior Designer
President’s List and Dean’s List Recipient [6/8 semesters]
(630)-880-9144 jenniferwang.jsw@gmail.com
Pratt Institute
BFA, Interior Design
Brooklyn, NY _ Completed 05. 2016
EXPERI ENCE Megan Grehl Design
Interior Designer
New York, NY _ 05. 2018 - Present
S K I LL S Tools Adobe Creative Suite AutoCAD Sketchp Revit 3dsMax Rhino V-Ray Microsoft Office AGi 32
Design Concept research Concept development FF&E sourcing / styling Space planning Hand sketching / rendering Model building Drafting 3D modeling Rendering
Project lead for two high-end residential renovations in NYC. Role includes project management, design, creating 2D and 3D renders for presentations, conducting materials research for interior schedules and FF&E documentation, and maintaining architectural and vendor coordination.
Built-IN Studio
Freelance Interior Designer
New York, NY _ 02. 2018 - 05. 2018
Conducted site surveys, drafted full construction drawing set, and compiled interior schedules and FF&E documentation for for DOB filing. Created 2D visuals for presentations. Assisted principals with their workloads.
Brian Orter Lighting Design
Jr. Designer
New York, NY _ 08. 2016 - 11. 2017
Drafted full lighting drawing sets, compiled specifications packages and schedules, created 2D renderings for presentations. Assisted project managers, lead designer, and studio leader their workloads and tasks.
Visual Unit Worldwide
Production Intern
Brooklyn, NY _ 10. 2015 - 04. 2016
Languages English Mandarin Chinese
Built architectural and furniture models in 3dsMax to test V-Ray lighting effects and materiality. Organized digital models library.
INDEX
30 PARK PLACE
01
W22ND STREET TOWNHOUSE
02
NEW JERSEY RESIDENCE
03
GREENWICH STREET LOBBY
04
JJ W W
01 30 PAR K PL ACE
Project: Apartment Renovation and Furnishing 2,631 sq ft total Dining Area
Program: Living Room Dining Area Master Closet Master Bedroom Custom Millwork Custom Metalwork
Responsibilities:
Breakfast Nook
Interior Designer Design Development Furniture Selections and Styling Furniture Vendor Coordination Millwork Vendor Coordination Metalwork Vendor Coordination
Team: Fabian Guerra, Jennifer Wang, and Megan Grehl & Studio Frame Architecture
Living Room
6
1 BIDDING SET
DINING ROOM 02
Custom Metal and Millwork
DINING ROOM 01
Refer to page 8-11DESIGN TEAM for renders and drawingsINTERIOR DESIGNER:
10'-15 8"
LIVING ROOM 01
MEGAN GREHL DESIGN
s
68 JAY STREET 11201 BROOKLYN, NY
POWDER ROOM 01
CLOSET 01
MASTER CLOSET 01
3'-0"
ML 002
5'-4"
KEY PLAN MASTER BEDROOM 01
ML 001
5
FOYER 01
A-602
CH
UR
CH
ST
.
4
s
1'-3"
3'-8"
ML 004
2'-0"
KITCHEN 01
9'-3 1 2"
ML 003
11"
5'-2"
2'-0"
7'-17 8"
s
F-01
BA
RC
LA
YS
T.
MASTER BATHROOM 01 F-02
F-02 F-02
F-02
CLOSET 02
PROJECT #:102.00
RENOVATI 30 PARK PLACE, NEW YORK, NY 10007
CLOSET 03
FOR OWNER : SIYUN HUO APARTMENT 65B
s
2'-0"
BEDROOM 01
ML 007
BATHROOM 01
6 A-602
ML 005
CLOSET 04
BEDROOM 02
s
READING AREA 01
ML 007
BATHROOM 02 7 A-602
01 | 1ST FLOOR PL AN
7
LAUNDRY 01
ML 006
F-02
F-02
Furniture and Floor Plan
FLOOR PLAN APARTEMENT 65B
REMOVAL P | 01 & FLOOR P
Custom walk-in Master Closet in the Master Bedroom. Base rendering by K.B., post-production editing by Jennifer Wang.
01 |
Master Bedroom Closet Renderings
8
Custom walk-in Master Closet. Cold-rolled steel with perforated sheet metal partitions and light oak millwork.
9
Master Bedroom Closet Renderings
| 01
FN-01
LT-01
FN-06
FN-02
Breakfast Area
FN-05
LT-03
Dining Area
DINING ROOM 02
DINING ROOM 01
s
10'-15 8"
LIVING ROOM 01
CLOSET 01
MASTER CLOSET 01
ML 002
3'-0"
5'-4" ML 004
MASTER BEDROOM 01 ML 001
5 4
FOYER 01
s
1'-3"
3'-8"
FN-05
9'-3 1 2"
POWDER ROOM 01
2'-0"
KITCHEN 01
5'-2"
ML 003
11"
FN-07
2'-0"
7'-17 8"
s
F-01
A-602
FN-03
FN-07
FN-04
LT-04
Living Room 01 |
Furniture & Lighting
MASTER BATHROOM 01
10 F-02
F-02 F-02
F-02
10
FINISH FLOOR EL. 0'-0"
KITCHEN DOOR DETAILS
5 5
4
SCALE: 1-1/2"=1'-0"
KITCHEN DOOR DETAILS
4
SCALE: 1-1/2"=1'-0"
KITCHEN DOOR ELEVATION SCALE: 3/4"=1'-0"
KITCHEN DOOR ELEVATION SCALE: 3/4"=1'-0"
4"
4"
3'-53 4"
EQ
EQ 13'-71 2"
SLIDING POCKET SLIDING POCKETDOORS DOORS SEE PARTITION PARTITION SEE TYPES TYPES
EQ
EQ
EQ
EQ
13'-71 2"
METAL TRIMTRIM METAL
KITCHEN DOOR DETAILS 02 | DOOR JAMB DETAIL DOOR DETAILS 3 KITCHEN SCALE: 1-1/2"=1'-0"
3
3'-53 4"
2
SCALE: 1-1/2"=1'-0"
KITCHEN DOOR PLAN
2
01KITCHEN | SLIDING DOORDOOR PLAN PL AN
SCALE: 3/4"=1'-0"
SCALE: 3/4"=1'-0"
METAL TRIM
METAL TRIM
SLIDING DOOR RAILS
SLIDING DOOR RAILS
1
KITCHEN DOOR RCP FINISH CEILING SCALE: 3/4"=1'-0"
1
EL. 11'-0"
KITCHEN DOOR RCP SCALE: 3/4"=1'-0"
WD BLOCKING GWB LAYER
METAL TRIM GLASS PANEL
ALIGN
SF 001
GL002
GLASS SLIDING DOORS METAL CHANNEL WOOD BLOCKING AS REQUIRED EXISTING FINISH WOOD FLOOR
C=52 7-SM
ALIGN
STRUCTURAL FLOOR
03 | FLOOR AND HEADER TRACK DETAIL KITCHEN DOOR DETAILS 5 SCALE: 1-1/2"=1'-0" 11
FINISH FLOOR EL. 0'-0"
SLIDING DOOR KITCHEN DOOR ELEVATION 4 SCALE: 3/4"=1'-0" Dining Area Sliding Door Partition
| 01
02 W2 2 N D S T. TOW N H O U S E
Project: Gut renovation and 2 levels addition 7 floors, ~7,000 sq ft total Single family residence 2nd Floor Living Room Lounge and Elevator Shaft
Program: Interior Architectural Structures Custom Stair Design Elevator Design Roof Skylight and Bulkhead Master Suite
Responsibilities:
Stair Design
Interior Designer & Project Manager Concept/Schematic Design Design Development Architectural Team Coordination Metalwork Vendor Coordination Elevator Vendor Coordination
Team: Danielle Connelly, Jennifer Wang, and Megan Grehl & GRO Architects
Master Bathroom
14
3rd Floor Lounge and Elevator Shaft design and Stair design. Fire-rated glass is incorporated into the shaft wall to allow the family to see the interior structures and mechanisms of the elevator cab.
15
Elevator Design
| 02
A
B
D
C
E
F
New Roof 65’- 0”
MUSIC ROOM
GY M
Level 06 54’- 0”
M A S TE R BATH
M A S TE R S U ITE Level 05 44’- 0”
BEDROOM
ELEVATOR
BEDROOM Level 04 34’- 0”
LO U N G E
BEDROOM Level 03 23’- 0”
FA M I LY R O O M
N U R S E RY Level 02 12’- 0”
1 F K ITC H E N
GA R AG E Level 01 0’- 0”
B O I LE R
S TO R AG E
Cellar -7’-11”
BUILDING SECTION
Section drawing by GRO Architects Team, design by Megan Grehl Team
02 |
Elevator Design
16
2nd Floor Family Room view with the Elevator shaft design and Stair design.
17
Elevator Design
| 02
A
B
C
D
E
F
New Roof 65’- 0”
MUSIC ROOM
GY M
Level 06 54’- 0”
M . BATH
M A S TE R S U ITE Level 05 44’- 0”
BEDROOM
BEDROOM Level 04 34’- 0”
2 F K ITC H E N
BEDROOM Level 03 23’- 0”
FA M I LY R M
N U R S E RY Level 02 12’- 0”
1 F K ITC H E N
E NTRY H A LL Level 01 0’- 0”
STAIR
B O I LE R
U TI LIT Y R O O M
Cellar -7’-11”
BUILDING SECTION
Section drawing by GRO Architects Team, design by Megan Grehl Team
02 |
Stair Design
18
Steel staircase with perforated steel sheets and cold-rolled steel plate treads. The integrated guardrail and handrail creates a seamless transition from floor to floor. 19
Stair Design
| 02
03 NEW JERSEY RESIDENCE
Project: New Construction 2 floors, ~7,000 sq ft total Single Family Residence Exterior Rendering, by Architectura Team
Program: Kitchen Master Suite Master Bathroom Private Amenity Spaces Kid’s Amenity Spaces Custom Millwork
Responsibilities:
Master Bathroom
Interior Designer & Project Manager Construction Documents Construction Administration Architectural Team Coordination Millwork Vendor Coordination Consultants & Vendor Coordination
Team: Fabian Guerra, Jennifer Wang, and Megan Grehl & Architectura
Master Bedroom
22
Refer to page 2425 for renders and drawings FOR 11'-8"
4'-6"
8'-9"
13'-11"
2'-5"
3'-1"
5'-11"
W1
REF
5'-11"
5'-11"
FIREPLACE
1'-9"
1'-1" COOLER
7'-11"
"
25'-5"
GYM 018
3'-1"
25'-8"
8'-0"
BULLET PROOF METAL LINING
10'-0 "
PROVIDE ARMORTEX BULLET RESISTANT DOOR AND FRAME IN EXISTING OPENING
23'-8
24'-2"
W2
11'-8"
17'-0 21 "
30'-2"
3'-0 "
9'-1 3 4"
EXISTING FOUNDATION WALL, TYP.
PROVIDE 'ARMORCORE' LEVEL 6 PANELS ON U/S OF CEILING IN PANIC ROOM
FRZ
2'-4"
4"
PANIC ROOM
OVENS
1'-6"
D/W
KITCHEN 05
W2
17'-0 21 "
17'-0"
1ST FLOOR PLAN MILLWORK AREAS
COORDINATE DOOR LOCATION WITH BASEMENT DIMENSIONS
11'-8"
23'-8
"
LIVING ROOM 04
15'-4" 7'-5"
6'-1"
" 24'-6
"
4'-7"
3'-0
13'-6"
3'-0" 3'-0"
MUD RM. 07
2'-6"
3'-0" 7'-1"
3'-0"
21'-2"
GARAGE 017
DINING ROOM 02
3'-11"
5'-0"
3'-7"
5'-1"
EXISTING FOUNDATION WALL, TYP.
9'-6"
9'-5"
W1
14'-2"
3'-0"
5'-10"
RAILING BETWEEN STONE PIERS TO MATCH HOUSE RAILING STYLE
3'-7"
CLOSET 08
PANTRY 06
9'-1"
2'-7"
3'-6"
3'-2"
12'-10"
1'-9"
3'-10"
G.C. TO VERIFY CONC. SLAB CONDITION AND REPAIR AS NECESSARY. TYP.
PROVIDE NEW ARMORTEX BULLET RESISTANT DOOR AND FRAME IN EXISTING OPENING
UTILITY RM 09
7'-4"
EXISTING BASEMENT DN
2R
3'-0"
6'-0"
ACCESS HATCH TO THEATER ABOVE
W1
KEEP STONE PIERS AND WALL
3'-2"
5"
12'-8"
3'-7"
3'-2"
4'-0"
BATH RM 010
3'-3"
10" VIF
6'-5"
7"
Partial Plan basement
KEEP STONE STAIRS
ENTRY FOYER 01 W3 8'-9"
2
15'-9"
2'-2"
3'-0"
8'-9"
2'-10"
3'-3"
6'-0"
9'-5"
3'-10"
1'-2"
14'-3"
KID’S STUDY 011
10'-10"
1'-2"
4'-11"
W1
UP
W1
TONY’S OFFICE 013 2'-8"
3'-5"
W1
13'-3"
8'-7"
2'-9"
4'-9"
W1
16'-8" 8'-9"
2'-1"
8'-1"
3'-3"
1'-8"
2'-6"
22'-3"
7'-2"
21'-5"
2'-10"
W1
W2
7'-11"
PLAY ROOM 012
ACCESS HATCH TO PANIC ROOM BELOW LOCATION VIF
18'-7"
14'-0"
7'-6"
7'-5"
UP 2"
MOVIE ROOM 014 16'-3"
GARAGE 015
8'-1"
12'-4"
STONE WALL
UTILITY RM. 016 17'-0"
21'-9"
3'-2"
6'-9"
2'-10"
17'-8"
2'-6"
1
1ST FLOOR
55'-7"
01 | 1ST FLOOR PL AN
23
Furniture and Floor Plan
| 03
Kitchen design and built-in millwork.
Rendering by F.B., maintaining design intent during construction administration by Jennifer Wang.
03 |
Kitchen Design
24
WD 003
PL 003
ST 002
ST 004
WD 003
ST 002
ST 002
WD 003
WD 003
ST 004
FINISHED FLOOR EL. 0'-0" AFF
WD 003
AP 05
ML 001 FINISHED FLOOR EL. 0'-0" AFF
7
ELEVATION
ELEVATION
6
CEILING CEILING EL. 10'-0" AFF EL. 10'-0" AFF CEILING EL. 10'-0" AFF
CEILING CEILING EL. 10'-0" AFF EL. 10'-0" AFF
CEILING EL. 10'-0" AFF
PT 001 WD 003
WINDOW HEAD EL. 8'-0" AFF
PL 006
PT 001
PT 001
PT 001
PL 006
OVENS
3 ST 004
WD 003
REF
3
ST 004
AP 010
WD 003
PL 007
ML 003
AP 008
ELEVATION
FRZ
02 | KITCHEN ISL AND ELEVATION
PL 003
ST 002
7 A-605
D/W
PL 007
KITCHEN CABINET PLAN 5 3
ISSUE
FINISHED FLOOR EL. 0'-0" AFFFLOOR FINISHED EL. 0'-0" AFF
ELEVATION ELEVATION
AP 01
5
6
12.05.17
12.18.17
ADDITION TO SCOPE
GARAGE DRAWINGS
4
11.20.17
REVISION TO FRAMING PLAN
ADDITION TO SCOPE
REVS. DUE TO EXIST. CONDITIONS
2
3
11.09.17
1
10.30.17
09.25.17
architecture interior design planning C ARCHITECTURA , 2017
08.22.17
08.11.17
DATE
suite LL100 One Executive Drive Fort Lee, New Jersey 07024 201-346-1400 fax 201-346-1418 email@architectura.tv
architecture interior design planning
AP 04
PT 001
ST 004
3
PL 003
AP 03
ST 002
WD 003
PT 001
WD 003
ST 004
AP 02
GL 101
3 GL 101 A-605
PL 003
AP 03
WD 003
DRAWING TITLE
DRAWING TITLE
01 | KITCHEN ELEVATION KITCHEN AND KITCHEN AND
CEILING EL. 10'-0" AFF
PANTRY
ELEVATIONS SHELVING BEHIND CLOSET
SCALE
DRAWN BY
SCALE
DRAWN BY
1/2"=1'-0"
Megan Grehl Design
1/2"=1'-0"
Megan Grehl Design
DATE
SHEET NO
DATE
1
WD 003
AP 05
SHELVING BEHIND CLOSET WD 003
ST 002
PT 001
Kitchen Design Drawings VENS
2 1
KITCHEN PLAN ML 002 KITCHEN CABINET PLAN
PL 002
Architectura
12.18.17
12.05.17
3
AP 09
WINDOW SILL EL. 3'-8" AFF
34
AP 02
KITCHEN CABINET PLAN
PANTRY ELEVATIONS
25
BLDG. DEPT. COMMENTS 09.24.17
ADDITION TO SCOPE
6
GARAGE DRAWINGS
REVISION TO FRAMING PLAN
5
ADDITION TO SCOPE
2
4
BLDG. DEPT. COMMENTS 09.24.17
1
REVS. DUE TO EXIST. CONDITIONS 11.20.17
08.22.17
PT 001
1
ML 004
WD 003
ST 004
FINISHED FLOOR EL. 0'-0" AFF
ELEVATION ELEVATION
PL 003
4PL 003
WINDOW HEAD EL. 8'-0" AFF
AP 01
AP 03
WD 003 WD 003
470 ANDERSON AVENUE CLOSTER, NEW JERSEY
PL 007
PL 006
ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND PUBLISHED OR UNPUBLISHED WORK OF THE ARCHITECT, ARCHITECTURA INC. THEY MAY NOT BE DUPLICATED, USED, TRANSFORMED, OR DISTRIBUTED FOR ANY REASON WITHOUT THE EXPRESSED WRITTEN PERMISSION OF THE ARCHITECT.
A-605
PL 001
ML 001
ELEVATION ELEVATION 3 4 ELEVATION
WD 003 PT 001
SINGLE FAMILY RESIDENCE
6
SHELVING BEHIND CLOSET
Architectura
FRZ
FINISHED FLOOR 0'-0" AFF FINISHEDEL. FLOOR FINISHED FLOOR EL. 0'-0" AFF EL. 0'-0" AFF
SHELVING BEHIND CLOSET
REF
6
ML 004
COOLER
D/W
PT 001 SHELVING BEHIND CLOSET
ML 002
ST 002
FINISHED FLOOR FINISHED FLOOR EL. 0'-0" AFFEL. 0'-0" AFF
7 A-605
PL 002
SHELVING BEHIND CLOSET
COOLER
001 PTPT 001
5
ML 004
WD 003
CEILING EL. 10'-0" AFF CEILING EL. 10'-0" AFF
FRZ
OVENS
KITCHEN PLAN
WD 003
08.11.17
DATE
ML 004
AP 04
ML 001
CEILING EL. 10'-0" AFF
2
suite LL100 One Executive Drive Fort Lee, New Jersey 07024 201-346-1400 fax 201-346-1418 email@architectura.tv
WINDOW SILL EL. 3'-8" AFF ST 002
C ARCHITECTURA , 2017
ML 003
ELEVATION
4
ST 002
5 3
WD 003
AP 008
SHELVING BEHIND CLOSET
ML 003
AP 03
PL 007
FINISHED FLOOR EL. 0'-0" AFF
CEILING CEILING EL. 10'-0" AFF EL. 10'-0" AFF
ML 002
AP 010AP 02
APAP 0103
ST 004
ML 001
ELEVATION
AP 09
470 ANDERSON AVENUE CLOSTER, NEW JERSEY
FINISHED FLOOR FINISHED FLOOR EL. 0'-0" AFF EL. 0'-0" AFF FINISHED FLOOR EL. 0'-0" AFF
3
ST 004
WD 003
GL 101
A-605 4 PL 003
ST 004 AP 04
PLAP 00102
APWINDOW 01 SILL
WD 003
GL 101
PT 001
Architectura
ST 002
WD 003
57 4
6
PL 003
EL. 3'-8" AFF
ML 002
WINDOW HEAD EL. 8'-0" AFF
PL 007
OVENS
AP 09 WD 003 5
AP 09
AP 04
D/W
Architectura
ST 002
WD 003
PT 001
ML 002
WD 003
WINDOW SILL EL. 3'-8" AFF
PL 002
REF
PT 001 WD 003
ST 002
WD 003
WINDOW HEAD EL. 8'-0" AFF
PL 006
COOLER
WINDOW HEAD EL. 8'-0" AFF
11.09.17
PT 001
10.30.17
03 | KITCHEN ELEVATION
CEILING CEILING EL. 10'-0" AFF CEILING EL. 10'-0" AFF EL. 10'-0" AFF
CEILING EL. 10'-0" AFF
DATE
DATE
ELEVATION 4 ELEVATION
09.25.17
CEILING CEILING EL. 10'-0" AFF EL. 10'-0" AFF CEILING EL. 10'-0" AFF
6
ELEVATION ELEVATION 6
SINGLE FAMILY RESIDENCE
ELEVATION ELEVATION 5 7 ELEVATION | KITCHEN 6 04
WD 003
AP 05
ISSUE
FINISHED FINISHED FLOOR FLOOR EL. 0'-0" AFF EL. 0'-0" AFF
FINISHED FLOOR EL. 0'-0" AFF
AP 02
ISSUE FOR PERMIT
ML 001
AP 01
FOR OWNER REVIEW
WD 003
WD 003
WD 003
AP 05
ISSUE
ML 001 FINISHED FINISHED FLOOR FLOOR EL. 0'-0" AFF EL. 0'-0" AFF FINISHED FLOOR EL. 0'-0" AFF
PL 007
WD 003 ST 004 WD 003WD 003
AP 05 ML 001
ISSUE FOR PERMIT
WD 003
ST 002
ST 002
ST 002
ST 002
ST 002
AP 04
WINDOW SILL EL. 3'-8" AFF
ST 004
FOR OWNER REVIEW
ST 002
ISSUE
PL 003
ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND PUBLISHED OR UNPUBLISHED WORK OF THE ARCHITECT, ARCHITECTURA INC. THEY MAY NOT BE DUPLICATED, USED, TRANSFORMED, OR DISTRIBUTED FOR ANY REASON WITHOUT THE EXPRESSED WRITTEN PERMISSION OF THE ARCHITECT.
PL 003
ST 002
GL 101
WD 003
WD 003
WD 003
WD 003
WD 003 WD 003
WD 003
AP 09
WD 003
ML 002
PL 006
PT 001
PL 006
03/15/18
1
SHEET NO
KITCHEN CABINET PLAN A-605
| 03
03/15/18
PROJECT NUMBER
PROJECT NUMBER
2017031
2017031
A-605
3 A-605
PL 003
04 G R E E N W I C H S T. LO B BY
Project: Renovation ~3,000 sq ft total Lobby/Amenity Spaces for a Residential Building
Program: Lobby Reception Desk Seating Area Residential Corridor Gym
Responsibilities: Designer Site Survey Drawing Set and Details Rendering Consultant Coordination
Team: Gary Eisner, Terence Kinnee, Jennifer Wang at Built-IN Studio
Full Drawing Set Sample Available Upon Request
CONSTRUCTION PL AN
28
LOBBY RECEPTION DESK ELEVATION
03 | LOBBY WALL SECTION DETAIL
29
02 | ENL ARGED WOOD SL AT DETAIL (PL AN)
02 | STEEL SHEET CONNECTION DETAIL (PL AN) Lobby Drawings
| 04